Error 206 David Low Way 20230023 Madeleine Swete Kelly Stormwater Management Plan October 2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of sections 2 to 18 (of 42)
Section 2
Document control record
Document prepared by:
RECOR Pty Ltd
ABN 89 647 469 707
75 Noosa Drive
Noosa Heads, QLD 4567
Australia
T +61 7 5211 1003
E [email protected]
W recorconsulting.com
A person using RECOR documents or data accepts the risk of:
a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard
copy version.
b) Using the documents or data for any purpose not agreed to in writing by RECOR.
Document control
Report title Stormwater Management Plan
Document code 20230023-SWMP01 Project number 20230023
File path C:\12dS\data\RecorSYN\20230023 206 David Low Way, Peregian Beach_808\03
Engineering\02 CIV\02 Reports\20230023 206 David Low Way SWMP.docx
Client Madeleine Swete Kelly
Client contact - Client reference -
Rev Date Revision details/status Author Reviewer Verifier Approver
(if required)
0 31/03/2023 Initial Version BP BP
1 17/10/2023 RFI Update BP BP
Current revision 1
Approval
Author signature Approver signature
Name B. Parry Name B. Parry
RPEQ: 28084
Title Civil Engineer Title Civil Engineer
recorconsulting.com
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567
E [email protected]
Section 3
Contents
Introduction..........................................................................................................................................4
Site Details ...........................................................................................................................................5
2.1. Existing Site Description ...................................................................................................................... 5
2.2. Existing Drainage Patterns .................................................................................................................. 5
2.3. Proposed Development Drainage Pattern ......................................................................................... 6
Stormwater Quantity ............................................................................................................................7
3.1. Pre-Post Comparison .......................................................................................................................... 7
Stormwater Quality ..............................................................................................................................9
4.1. Construction Phase .............................................................................................................................. 9
4.2. Operational Phase ............................................................................................................................ 10
Conclusion ........................................................................................................................................ 11
Appendices
Appendix A
Proposed Development Plans
Appendix B
DRAINS Modelling Parameters and Results
Project number 20230023
File 20230023 206 David Low Way SWMP.docx, 2023-10-17 Revision 1
recorconsulting.com
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads,Qld 4567 E [email protected]
Section 4
INTRODUCTION RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application for a residential duplex development located at 206 David Low Way, Peregian Beach. This report investigates the stormwater management considerations for the existing and proposed development site and assesses how the run-off from the site is to be managed in accordance with Noosa Shire Council requirements for stormwater drainage. The report has been updated to reflect the items raised in the Noosa Council information request dated 25 May 2023 for the application in relation to the stormwater matters raised. Project number 20230023 Page 4 of 14 File 20230023 206 David Low Way SWMP.docx, 2023-10-17 Revision 1 P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected] recorconsulting.com
Section 5
SITE DETAILS
2.1. Existing Site Description
The existing site, known in real property terms as Lot 54 P 9319, is located at 206 David Low Way-Plover Strip in
Peregian Beach. The existing site contains an residential dwelling and has a total area of 517.1m². The site adjoins
residential allotments to the east, north and south, with the street frontage to the east of the site.
2.2. Existing Drainage Patterns
The subject land is generally moderately sloping having typical grades of approximately 16% falling south to north.
The portion of the site housing the existing dwelling has been level and the upstream portion of the site south of the
dwelling retained to achieve a suitable house pad.
The run-off from the existing developed site typically drains as overland surface flows towards north draining towards
the adjacent property with the driveway area draining west to the road reserve. Due to the sandy soils present in the
locality the run-off is likely to infiltrate rapidly without causing nuisance to downstream properties.
No stormwater infrastructure is within the vicinity of the site and no kerb and gutter is present in the David Low Way-
Plover Strip.
Although contours indicate that upstream run-off from the adjacent site may enter across the property boundary,
the run-off is likely to infiltrate into the site soils and result in minimal flows arriving into the site from the south.
Figure 2.1 - Site Locality Plan (Noosa Council Intramaps, 2023)
Project number 20230023 Page 5 of 14
File 20230023 206 David Low Way SWMP.docx, 2023-10-17 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected] recorconsulting.com
Section 6
2.3. Proposed Development Drainage Pattern
2.3.1 Stormwater Concept
A rainwater tank is to be provided for each unit, nominally being an 18kL concrete in ground rainwater tank. 2kL of
the tank will be dedicated to attenuation of the run-off to reduce developed flow rates to below existing levels, with
the remaining allocated for reuse for each dwelling in accordance with Council’s Sustainable Building Code. Excess
rainwater will be discharged via stormwater outlets discharging to a new 600mm wide concrete dish drain within the
service road. Each tank will be provided a separate outlet spaced along the frontage to ensure peak discharge is
less than 25L/s at any location.
Remaining stormwater run-off from ground areas will discharge as overland sheet flows at a reduced rate compared
to existing levels, with paved areas being graded towards pervious areas where possible to encourage infiltration
into the sandy soils typical of the site.
The roof and allotment drainage system for the proposed site shall be designed to comply with:
1. Noosa Shire Council Planning Scheme Policy (PSP) - Engineering Design Standards – Roads, drainage and
earthworks;
2. The Queensland Urban Drainage Manual (QUDM); and
3. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage.
Refer to Appendix A Proposed Development Plan for the proposed stormwater drainage layout illustrating the
concept described above.
Project number 20230023 Page 6 of 14
File 20230023 206 David Low Way SWMP.docx, 2023-10-17 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected] recorconsulting.com
Section 7
STORMWATER QUANTITY
3.1. Pre-Post Comparison
The site has been modelled using the DRAINS software to assess the impact on peak flows, comparing the existing
site conditions to the proposed development.
In accordance with ARR2019, an Initial Loss-Continuing Loss (IL-CL) model has been used to assess the site against
the ensemble of storm temporal patterns for the East Coast North region. The loss parameters and temporal patterns
have been imported from the ARR Datahub, and rainfall intensities have been imported from the Bureau of
Meteorology IFD rainfall data allowing for a 20% increase to rainfall rates to account for future climate change
patterns.
The parameters obtained from the Australian Rainfall and Runoff (ARR) Data Hub for the location and the rainfall
IFD data obtained from the Bureau of Meteorology have been imported into DRAINS to generate the storm events.
The models have been run using the ensemble of storm events for 1EY, 50%, 0.2EY, 10%, 5%, 2% and 1% Annual
Exceedance Probability (AEP) for durations from 1 minutes to 12 hours to determine the critical storm duration and
the mean peak flowrate from the storms. Refer to Appendix B DRAINS Modelling Parameters and Results for details
of the parameters used and summary of the results from the modelling.
The configuration of the catchment areas for pre-development and post-development scenarios are shown in Figure
3.1 – DRAINS Pre-development catchment and Figure 3.2 – DRAINS Post-development catchments respectively.
Figure 3.1 – DRAINS Pre-development catchment
Figure 3.2 – DRAINS Post-development catchments
The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
Project number 20230023 Page 7 of 14
File 20230023 206 David Low Way SWMP.docx, 2023-10-17 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected] recorconsulting.com
Section 8
Table 3.1 Existing and proposed unmitigated site peak discharge rates
206 David Low Way
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.014 0.015 0.001 7%
50% 0.016 0.018 0.002 13%
0.2 EY 0.024 0.026 0.002 8%
10% 0.031 0.031 0.000 0%
5% 0.035 0.036 0.001 3%
2% 0.041 0.041 0.000 0%
1% 0.046 0.045 -0.001 -2%
The site has resulted in some small increases to peak run-off for a number of the modelled storm events. Attenuation
will therefore be provided to each unit to ensure that peak flow rates from the site are not increased as a result of
the development.
The site was remodelled splitting the developed site into it’s roof catchment, and the remaining catchment. An
attenuation node was connected to the roof catchment, with an iterative sizing used to determine the required
attenuation volume and low flow orifice outlet the achieve no net increase. Based on this process, providing 2kL of
attenuation storage per dwelling, with a low flow orifice outlet with 35mm diameter at the base of the attenuation
volume, resulting peak flows have been calculated and presented below in Table 3.2.
Table 3.2 Existing and proposed attenuated site peak discharge rates
206 David Low Way
Qchange
A.E.P Qexisting QOSD Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.014 0.013 -0.001 -7%
50% 0.016 0.014 -0.002 -13%
0.2 EY 0.024 0.021 -0.003 -13%
10% 0.031 0.027 -0.004 -13%
5% 0.035 0.033 -0.002 -6%
2% 0.041 0.040 -0.001 -2%
1% 0.046 0.044 -0.002 -4%
As peak flow has been reduced for all modelled storm events, the development does not worsen drainage
conditions as a result of the increased impervious area and it’s discharge to the north is able to constitute a Lawful
Point of Discharge for the development.
The required attenuation is able to be provided within the capacity of the proposed 18kL in ground concrete tanks
that are to be provided within the driveways for each unit.
3.1. Sustainable Building Code
Rainwater reuse for the development will be provided with 2 x 18kL in ground concrete rainwater tanks capturing
roof run-off from each unit. The tanks will be plumbed for reuse to greywater demands including external
irrigation, and internal toilets and laundry areas in compliance with the Noosa Council Sustainable Building Code.
Project number 20230023 Page 8 of 14
File 20230023 206 David Low Way SWMP.docx, 2023-10-17 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected] recorconsulting.com
Section 9
STORMWATER QUALITY
The following sections discuss the stormwater quality considerations for the construction and operational phase of
the development.
4.1. Construction Phase
4.1.1 Erosion and Sediment Control Measures
During construction, it is necessary to manage stormwater run-off to avoid potential contamination and impacts to
the downstream environment from sediments and other pollutants from the site during construction. A range of best
practice sediment and erosion controls should be implemented on the development to ensure negative impacts to
the downstream receiving environment are mitigated.
As the area being developed is below 2,500m², the development’s construction will be managed using best practice
erosion and sediment control principles in line with the desired outcomes of Appendix 2 of the SPP (DERM, July
2017), which are shown below in Figure 4.1.
Figure 4.1 SPP 2017 Construction Phase Stormwater Management Design Objectives
A site-specific erosion and sediment control plan has been prepared demonstrating suitable erosion and sediment
controls suitable for the nature and scale of the development, including:
1. Sediment fencing along downstream of the work areas within the site to prevent sediment from leaving the
construction area.
Project number 20230023 Page 9 of 14
File 20230023 206 David Low Way SWMP.docx, 2023-10-17 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected] recorconsulting.com
Section 10
2. A shakedown area is to be installed at the construction entry/exit to the proposed development area to
minimise sediment being transported to and from the site.
3. Diversion of upstream catchments around any exposed areas using diversion drains around the site.
4.2. Operational Phase
The development consists of a duplex situated within a small allotment in a residential area. Rainwater from the
roof catchments will be captured and used for reuse on site, removing pollutants that would otherwise be
discharged. As the proposed development is not considered to significantly alter the pollutant generation
potential of the site, no additional stormwater treatment is considered necessary for the development.
Project number 20230023 Page 10 of 14
File 20230023 206 David Low Way SWMP.docx, 2023-10-17 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected] recorconsulting.com
Section 11
CONCLUSION
This Stormwater Management Report has outlined how the stormwater run-off from the site is to be managed to
comply with the relevant requirements and minimise any adverse impacts to the downstream catchments.
• The proposed roof area will be captured and drained to large in ground tanks provided under the driveway
providing for both reuse and attenuation for the site. The excess run-off from the overflows will discharged
via concrete bedded outlets into a new 600mm wide dish drain. The discharge of the dish drain will be
provided with scour protection to prevent erosion to the downstream verge.
• The existing and proposed development site have been modelled for the critical design storm events for the
site, which found that minor peak flow increases would arise for the modelled storm events. The small
increase is mitigated by a 2,000L attenuation volume per dwelling, through which roof run-off will drain.
• A minimum of 3,000L of rainwater reuse storage will be provided for each dwelling with reuse plumbed into
non-potable uses on site in accordance with the Noosa Council Sustainable Building Code. This will be
provided in the form of 2 18kL in ground rainwater tanks within the driveway, which will also serve to provide
the attenuation volume for the site.
• During construction, erosion and sediment control measures are to be implemented to minimise potential
contaminants impacting the downstream receiving environment in line with the objectives of Appendix 2 of
the SPP.
• As the development is a small residential site that does not significantly alter the pollutant generating
characteristics of the site, stormwater quality treatment is not proposed for the development. Pollutants will
nevertheless be eliminated from the discharge through the capture and reuse of roofwater.
• The proposed stormwater solution is considered to minimise any adverse impacts to the downstream
environment arising from the stormwater run-off while also meeting the stormwater objectives for the
development.
Project number 20230023 Page 11 of 14
File 20230023 206 David Low Way SWMP.docx, 2023-10-17 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected] recorconsulting.com
Section 12
Appendix A Proposed Development Plans Project number 20230023 Page 12 of 14 File 20230023 206 David Low Way SWMP.docx, 2023-10-17 Revision 1 P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected] recorconsulting.com
Section 13
PROPOSED UNIT DEVELOPMENT
206 DAVID LOW WAY PEREGIAN BEACH QLD 4573
LOT 54 P9319
CIVIL WORKS
SCHEDULE OF DRAWINGS
DWG No. TITLE
WAY
001 COVER SHEET & LOCALITY PLAN
LOW
002 GENERAL NOTES
003 EXISTING LAYOUT PLAN
ID
010 OVERALL LAYOUT PLAN
DAV
020 BULK EARTHWORKS LAYOUT PLAN
021 BULK EARTHWORKS SECTIONS
030 EROSION AND SEDIMENT CONTROL LAYOUT PLAN SAND
PIPER
031 EROSION AND SEDIMENT CONTROL DETAILS CCT
040 SITEWORKS AND DRAINAGE LAYOUT PLAN
041 STORMWATER CATCHMENT LAYOUT PLAN
042 STORMWATER LONGITUDINAL SECTION LOT 54
060 VEHICLE SWEPT PATHS PLAN - SHEET 1 OF 8
ON P9319
061 VEHICLE SWEPT PATHS PLAN - SHEET 2 OF 8
T
AER S
062 VEHICLE SWEPT PATHS PLAN - SHEET 3 OF 8
063 VEHICLE SWEPT PATHS PLAN - SHEET 4 OF 8
064 VEHICLE SWEPT PATHS PLAN - SHEET 5 OF 8
PLOV
065 VEHICLE SWEPT PATHS PLAN - SHEET 6 OF 8
066 VEHICLE SWEPT PATHS PLAN - SHEET 7 OF 8
Y
WA
067 VEHICLE SWEPT PATHS PLAN - SHEET 8 OF 8
068 VEHICLE SWEPT PATHS VERTICAL PLAN - SHEET 1 OF 2
OW
069 VEHICLE SWEPT PATHS VERTICAL PLAN - SHEET 2 OF 2
ID L
DAV
LOCALITY PLAN
SCALE 1:1000
North Point Approved Project Address Title
B. PARRY 206 DAVID LOW WAY COVER SHEET & LOCALITY PLAN
N RPEQ 28084 PEREGIAN BEACH QLD 4573
For and on behalf of RECOR Pty Ltd.
Scale ENGINEERING + PROJECT MANAGEMENT Client Details PROJECT NAME: Project Number Sheet Size
SUNSHINE COAST | BRISBANE | SYDNEY
B 17.10.23 RFI UPDATE HL BP www.recorconsulting.com | ABN 89 647 469 707 MADELEINE SWETE KELLY PROPOSED UNIT 20230023 A1
A 31.03.23 OPW ISSUE QT BP
AS SHOWN COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's client. This DEVELOPMENT Drawing Number Revision
001 B
drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as 'Issued For Construction' in
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK the revision description.
Section 14
GENERAL NOTES ANDSTOCKPILE ON SITE OR REMOVE FROM SITE AS DIRECTED. STRUCTURAL FILL. REQUIREMENTS OF THE GEOTECHNICAL ENGINEER. TEMPORARY
19. DRAWINGS TO BE READ IN CONJUNCTION WITH ARCHITECT, SURVEYOR, 3. UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO TYPICALLY
1. ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN. HYDRAULICS, ETC. CONSULTANT AND CONTRACTOR DRAWINGS. SOFT MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING BE FORMED AT 1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR
SUBGRADE PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE BATTERS UP TO 3M IN HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY
2. ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE 20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT MATERIAL TO BE REMOVED FROM SITE AT CONTRACTORS EXPENSE. THE GEOTECHNICAL ENGINEER.
CONTRACTOR. CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY AUTHORITY: ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN
TO ACCURATELY SETOUT THE WORKS. FOR ALL WORKS WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO 4. COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES 21. WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE
ALLOW FOR ALL COSTS ASSOCIATED WITH IMPLEMENTATION OF THE SUBSTANTIAL VOLUMES OF WATER COMBINED WITH VIBRATORY ACHIEVED, TEMPORARY SHORING WILL BE REQUIRED UNDER THE
3. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT TMP. COMPACTION EQUIPMENT. CARE MUST BE TAKEN TO ENSURE THERE ADVICE OF A SPECIALIST SHORING CONTRACTOR.
SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE ARE NO IMPACTS ON SURROUNDING STRUCTURES. MATERIAL TO BE
CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT 21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL COMPACTED IN ACCORDANCE WITH GEOTECHNICAL REPORT AND 22. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE
GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED AUTHORITY APPROVALS RECEIVED FOR THE PROJECT AND IN AS1289. SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE
STANDARD DRAWINGS AND SPECIFICATIONS U.N.O. ACCORDANCE WITH OPW APPROVALS BY COUNCIL. CARRIED OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ
5. A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE STRUCTURAL ENGINEER.
4. SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED 22. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE REQUIRED ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN
OUTSIDE OF THE TOLERANCES SPECIFIED WITHIN THE PROJECT BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN AREAS TO IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN 23. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT
SPECIFICATION AND LOCAL AUTHORITY REQUIREMENTS, THE OF THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, WOULD BE REQUIRED PRIOR TO MOBILISATION AND TRAFFICKING OF ANY CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES
CONTRACTOR WILL RECTIFY AT THEIR COST INCLUSIVE OF ANY ROAD RESERVE, PARKS/OPENSPACE, EASEMENTS. ANY HEAVY MOBILE PLANT ON THE SITE. ON THE SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM
ADDITIONAL COSTS INCURRED BY RECOR. FACTOR OF SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR
23. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION 6. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND SATISFACTION.
5. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND DRAWINGS AND APPROVALS ON SITE AT ALL TIMES. COMPACTED WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED
AS SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO AND AS OTHERWISE NECESSARY TO OBTAIN SUBGRADE/PLATFORM 24. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS
RESPONSIBILITY IS TAKEN BY RECOR OR THE PRINCIPAL FOR THE LEVEL. IMPORTED GENERAL FILL MATERIAL SHALL BE CLEAN GRADED INCLUSIVE OF TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING
24. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN
ACCURACY AND COMPLETENESS OF THIS INFORMATION. IT IS THE MATERIAL FREE OF ORGANIC MATTER AND STONES, WITH MAXIMUM DRAWINGS FOR BUILDING SLAB THICKNESSES AND HYDRAULIC
ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN
RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY ESTABLISH PARTICLE SIZE OF 100MM AND CAPABLE OF BEING COMPACTED INTO DRAWINGS FOR SUB-FLOOR DRAINAGE FOR DETERMINATION OF
AND CONSTRUCTION CODE (2013).
THE LOCATION AND LEVEL OF ALL EXISTING SERVICES PRIOR THE COHERENT FILLING TO THE SPECIFIED STANDARD. THE MATERIAL REQUIRED BULK EARTHWORKS SURFACE.
COMMENCEMENT OF ANY WORKS. ANY DISCREPANCIES SHALL BE SHALL HAVE A MAXIMUM PLASTICITY INDEX OF 15%, A SHRINK-SWELL
REPORTED TO THE SUPERINTENDENT. CONTRACTOR TO LOCATE AND STANDARD SIGNS AND LINE MARKING NOTES INDEX OF LESS THAN OR EQUAL TO 1% AND A MINIMUM C.B.R. OF 10%. 25. ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE
PROTECT SERVICES AS REQUIRED DURING PROPOSED WORKS. 1. GENERAL GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW
a. ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH 7. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE FOR THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO
6. THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND THE QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC CONTENT FOR STANDARD COMPACTION. UNDERTAKE THE PRELOADING OPERATIONS.
SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS CONTROL DEVICES (CURRENT EDITION).
SHOWN ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING 8. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE
2. SIGNS 26. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
SERVICES CLASHES PRIOR TO COMMENCEMENT OF CIVIL WORKS. PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF
a. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS
CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS
RECOR AND AWAIT FORMAL DIRECTION PRIOR TO COMMENCING CIVIL NOTED OTHERWISE.
IN CUT. RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH
WORKS. b. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO STRUCTURAL ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE INSPECTIONS:
EDGE OF SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE WITH CONSTRUCTION REQUIREMENTS OF GEOTECHNICAL REPORT. THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS
7. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS POSTS BARRIER KERB 300 FROM FACE MOUNTABLE KERB 500 FROM BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR
SHALL BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FACE OF KERB. 9. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR IS TO PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED
FOOTPATHS, CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND CONFIRMATION OF RETAINING WALL COLOUR AND FINISH. INSPECTIONS. SHOULD THE CONTRACTOR FAIL TO REQUEST AN
ROAD PAVEMENTS. c. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING
INSPECTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS TO
TRAFFIC AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS TO ALLOW FOR THE WORKS TO BE INSPECTED TO THE SATISFACTION OF
10. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2'
8. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO BE TURNED AWAY BY 5° FROM THE NORMAL TO APPROACHING RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE RE-INSPECTED WITH ALL
SOIL ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF
AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR HEADLIGHT. AS 3798. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR.
REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE 3. SIGN SUPPORTS PROVIDE CERTIFICATION THAT ALL GENERAL EARTHWORKS
SATISFACTION OF INFRASTRUCTURE OWNER/MANAGER / a. SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS OPERATIONS HAVE BEEN CARRIED OUT IN ACCORDANCE WITH THE a. PRESTART
AUTHORITY/COUNCIL. WHERE THEY ARE IN A PAVED SURFACE. DRAWINGS AND SPECIFICATIONS AND THE CONTROLLED FILL IS
4. LINEMARKING SUITABLE FOR PURPOSE TO THE REQUIRED BEARING CAPACITY UNDER b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF
9. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL a. REDUNDANT LINEMARKING IS TO BE GROUND OFF. THE PLATFORM/STRUCTURES AS SPECIFIED BY THE GEOTECHNICAL SEDIMENT AND EROSION CONTROL MEASURES UNSUITABLE GROUND
WORKPLACE HEALTH AND SAFETY REQUIREMENTS. REPORT.
b. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.
c. SIDE AND CUT OFF DRAINS
10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN 11. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED
CLOSE PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR JOINTING NOTES TO 98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX
INFRASTRUCTURE, CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO OF AT LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
PROVIDE ALL MEASURES NECESSARY TO ENSURE THE INTEGRITY OF 1. ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE IN LAYERS OF 250MM LOOSE THICKNESS (PRIOR TO COMPACTION).
EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE REQUIREMENTS OF AS3727.1:2016.
e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
USE OF LOW VIBRATION EQUIPMENT, TRENCH SHORING ETC AS 2. SAW CUT JOINTS MUST BE:
12. COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO
REQUIRED. a. BETWEEN 1 AND 1 OF CONCRETE PAVEMENT DEPTHS. TESTS PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED
4 3 300MM IN ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE
f. STORMWATER STRUCTURE BASE SLABS
11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON b. CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD. ALL EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL
THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND ENGINEER AND LOCAL AUTHORITY REQUIREMENTS. g. PAVEMENT SUBGRADE
c. PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS.
RECEIVE WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT
13. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN h. PAVEMENT REINFORCING
12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL TO ALLOW EXPANSION AND CONTRACTION MOVEMENTS.
ACCORDANCE WITH LANDSCAPE DRAWINGS.
CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT 4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO
CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES i. PAVEMENT PRIOR TO SEALING (PRESEAL)
REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR 14. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.
CONTRACTOR TO NOTE COUNCILS ADAC REQUIREMENTS. IN THE CONCRETE SLAB AND AVOID MISMATCHED JOINTS.
5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES j. RETAINING WALL FOOTING REINFORCING
ONLY AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB 15. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED
13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH
SURFACE. MANAGEMENT PLANS.
RELEVANT APPROVALS. k. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
6. DOWEL BARS ARE TO BE
a. FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT 16. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES
14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,
400MM CENTRES ARE INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT l. STEEL REINFORCEMENT OF CONCRETE STRUCTURES
LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL
b. FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT FENCE ETC IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL
CONSTRUCTION.
PLAN m. PRACTICAL COMPLETION
300MM CENTRES
15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR c. FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT
17. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL
DEMOLITION WORKS COMMENCING ON SITE. 300MM CENTRES n. ON MAINTENANCE
BATTERS OR RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER
RELEVANT AUSTRALIAN STANDARDS AND LEGISLATION.
16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, o. OFF MAINTENANCE
ROADS AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM EARTHWORKS NOTES 18. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON
SITE U.N.O.
1. FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL UNPAVED ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT p. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER
INVESTIGATION REPORT BY GEOTECHNICAL ENGINEER. IT IS LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS DEVELOPMENT APPROVAL)
17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING ARE TO COVER OR ENCLOSE STOCKPILES WHERE REASONABLY
RECOMMENDED THAT THE GEOTECHNICAL CONSULTANT BE
PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO PRACTICAL TO RESTRICT DUST MOVEMENT.
CONTACTED TO CONFIRM THE SOIL CONDITIONS PRIOR TO
COMMENCEMENT OF ANY WORKS ON SITE.
EARTHWORKS COMMENCING.
19. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
2. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF
IDENTIFIED IN THE APPROVED VEGETATION MANAGEMENT PLAN. WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
100MM OVER THE EXTENT OF THE WORKS UNLESS DIRECTED
CONTRACTOR TO ENSURE ALL TREE ROOTS AND STUMPS ARE
OTHERWISE AND STOCKPILED WHERE REQUIRED FOR FILL OF
COMPLETELY REMOVED AND BACKFILLED TO LEVEL 1 SUPERVISION.
LANDSCAPING AREAS. TOPSOIL MATERIALS MUST NOT BE USED IN 20. ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE
CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION
ENERGY SERVICE PROVIDERS TELECOMMUNICATIONS
SERVICE PROVIDERS elstra Manual of Uniform Traffic Control Devices
BEFORE YOU DIG SERVICE LOCATIONS AGL AUSTRALIA
ERGON. 60
ENERGY
energex ' yes' Telstra
WARNING: OPTIC FIBRE
IT IS THE RESPONSIBILITY OF THE PRINCIPAL visionstream km/h
CONTRACTOR TO CONTACT ALL RELEVANT origin OPTUS
SERVICE AUTHORITIES TO VERIFY THE NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
NOTE: ALL SIGNS & LINE MARKING TO BE IN
LOCATION OF ALL EXISTING SERVICES PRIOR PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO ACCORDANCE WITH THE MANUAL OF
PRIOR TO START OF CONSTRUCTION. PHONE DBYD PRIOR TO START OF CONSTRUCTION. PHONE DBYD
TO THE START OF CONSTRUCTION SERVICE LOCATIONS ON 1100 FOR DETAILS. SERVICE LOCATIONS ON 1100 FOR DETAILS.
BE CONFIRMED PRIOR TO START OF CONSTRUCTION. UNIFORM TRAFFIC CONTROL DEVICES.
North Point Approved Project Address Title
B. PARRY 206 DAVID LOW WAY GENERAL NOTES
RPEQ 28084 PEREGIAN BEACH QLD 4573
For and on behalf of RECOR Pty Ltd.
Scale ENGINEERING + PROJECT MANAGEMENT Client Details PROJECT NAME: Project Number Sheet Size
SUNSHINE COAST | BRISBANE | SYDNEY
B 17.10.23 RFI UPDATE HL BP www.recorconsulting.com | ABN 89 647 469 707 MADELEINE SWETE KELLY PROPOSED UNIT 20230023 A1
A 31.03.23 OPW ISSUE QT BP
AS SHOWN COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's client. This DEVELOPMENT Drawing Number Revision
002 B
drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as 'Issued For Construction' in
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK the revision description.
Section 15
Communica records ater Reticulatiocnords Edge//o/f/ Bitu
Plotted fro
ow
21.09 21.07 21.33
i nd37m
W
p 20.
18.9
EXISTING TELSTRA
o
T RL 17.99
m
tions
Top Window
RL 20.34m
NOTES:
EXISTING SEWER 1. FOR GENERAL NOTES REFER DWG 002, WHICH IS TO BE REQUESTED AND
SewehrolePlonot found
Man
Top Window
W
Plotted fro
RL 20.34m VIEWED PRIOR TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.
WateredRefrtiocm records
Plott
19.21 19.19
21.07 22.3 2. THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF THE EXISTING
tted From
21.06
FEATURES OF THIS SITE AND ENSURE ANY ADDITIONAL WORKS NOT
T
W
m re
SHOWN ON THIS PLAN ARE INCLUDED IN THE CONTRACT.
Water
ulation
Meter 18.33 18.32 18.32 18.18
3. LOCATION AND DEPTH OF EXISTING SERVICES BASED ON SURVEY, DBYD
S
Record
55
Yard RL 15.0m AND COUNCIL RECORDS. IT IS THE CONTRACTORS RESPONSIBILITY TO
WM EXISTING SEWER P9319
CONFIRM ACTUAL LOCATION AND DEPTH PRIOR TO CARRYING OUT ANY
Edge of B
Driveway
MANHOLE 18.04
s
////
W
RL 15.1m EXCAVATION OR TRENCHING WORKS.
PP
90°0' 18.1
T
18.1
W
/ / / 4. CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING SERVICES ON SITE
men ////
itumen
PP 25.293 PRIOR TO COMMENCEMENT OF WORKS.
EXISTING OVERHEAD 15.98m
15.71m
////
ELECTRICITY 16.2
DAVID L
19.22 5. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR TO ANY
DEMOLITION WORKS COMMENCING ON SITE.
/
16.4
W
OE
6. ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE CLEARED, MULCHED
OE
////
OW WAY
////
AND REMOVED FROM SITE IN ACCORDANCE WITH APPROVED VEGETATION
T
16.6
W
CLEARING PLAN (BY OTHERS) OR IF SCHEDULED STOCKPILE FOR USE BY
OE
LANDSCAPER.
EXISTING WATER Garden
16.8 RL 15.75m
////
////
7. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE AND MAKE
SUITABLE ARRANGEMENTS TO HAVE DISCONNECTED PRIOR TO
OE
Garden DEMOLITION WORKS BEGINNING.
W
17.0 RL 16.5m
OET
8. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
////
////
W
Ov
17.2 THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
erh
EXISTING EDGE 21 19.21 19.2
WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
ead
OF BITUMEN P9313
17.4
Ele
/
Conc Slab RL 17.46m 9. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING
ctr
////
////
ic
PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO
ity
W
COMMENCEMENT OF ANY WORKS ON SITE.
OE
OE
10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES,
/
T
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
W
////
OE
////
ROADS AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \
Bench Mark 54 U.N.O.
EXISTING DRIVEWAY
Nail in Bitumen P9319 21.98
182°13'20"
CROSSOVER TO BE RL 16.78m Pool Area
22.128
REMOVED Carport Eave RL 17.25m 11. WHERE NECESSARY, CONTRACTOR SHALL OBTAIN ALL NECESSARY
/
RL 19.5m
22.303
352°30'
Top Window
Roof Peak RL 24.2m APPROVALS TO CARRY OUT SERVICES RELOCATION OR ALTERATIONS.
RL 21.36m
////
////
W
First Floor
RL 20.13m
T
Ground Floor
W
OE ////
OE
RL 17.49m
519 sq.m
////
23.63
Concrete CP
Driveway SP204267
17.58m
23.55 23.64
Top Window
W
RL 21.59m
////
////
/
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
LEGEND:
\ \
T
W
OE
OE
23.63
23.53 ADJACENT BOUNDARY
////
////
Concrete Path
23.64
EXISTING MINOR CONTOUR
Water
W
Meter 17.0 EXISTING MAJOR CONTOUR (INTERVAL 0.2m)
Top Window
EXISTING BUILDING, STRUCTURES
RL 21.3m
AND IMPERVIOUS SURFACES TO
////
////
WM BE REMOVED U.N.O EXISTING MINOR CONTOUR (INTERVAL 0.1m)
T
W
FH .4
18
18.13m
18.0m
/ 21.525
/ EXISTING FENCE
Comms 270°0' 22.0
Pit WM \ \ \ \ \ \ \ \ \ \ \ EXISTING BUILDING
////
////
Water
Meter
OE
OE EXISTING OVERHEAD ELECTRICITY
OE
21.91
W
21.9
Top Wall RL 22.7m
26.46 SW EXISTING STORMWATER
T
W
////
51
////
W EXSTING WATER
WateredRefrtiocm records
Plott
26.47
P9319
Top Wall RL 22.87m
21.87
26.46
FH S EXISTING SEWER
T EXISTING TELSTRA
////
ulation
////
OE
21.9
OE
EXISTING TELSTRA PIT
FH
EXISTING WATER FIRE HYDRANT
Bench Mark
////
////
Nail in Bitumen WM
RL 17.86m EXISTING WATER METER
EXISTING SEWER MANHOLE
EXISTING TREE
OE
OE
1 0 1 2 3 4 5
OE
OE
SCALE (metres)
1 : 100 (FULL SIZE)
North Point Approved Project Address Title
B. PARRY 206 DAVID LOW WAY EXISTING LAYOUT PLAN
N RPEQ 28084 PEREGIAN BEACH QLD 4573
OE
OE
For and on behalf of RECOR Pty Ltd.
Scale ENGINEERING + PROJECT MANAGEMENT Client Details PROJECT NAME: Project Number Sheet Size
SUNSHINE COAST | BRISBANE | SYDNEY
B 17.10.23 RFI UPDATE HL BP www.recorconsulting.com | ABN 89 647 469 707 MADELEINE SWETE KELLY PROPOSED UNIT 20230023 A1
A 31.03.23 OPW ISSUE QT BP
AS SHOWN COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's client. This DEVELOPMENT Drawing Number Revision
003 B
drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as 'Issued For Construction' in
Rev Date Revision Description Drawn Section 16
Check the revision description.
OE
DO NOT SCALE, IF IN DOUBT ASK
OE
Section 17
T
W
S
55
WM P9319
////
W
////
PROPOSED PP
GROUTED ROCK
T
W
SCOUR PROTECTION
PP
////
////
DAVID L
W
FFL 17.135
OE
SWIMMING POOL
////
OW WAY
////
FFL 15.54
T
W
OE
////
////
FFL 18.18
FFL 16.50
W
FFL 17.53
OET
////
////
FFL 17.53
W
FFL 17.25
21
UNIT 1 P9313
NOTE:
////
////
GARAGE
FFL 17.53 EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN DRAWINGS,
W
ALL IN-GROUND SERVICES WITHIN THE PROPERTY BOUNDARY INCLUDING
OE
OE
BUT NOT LIMITED TO: STORMWATER DRAINAGE, SEWERAGE, WATER, GAS,
T
W
PROPOSED 18kL ELECTRICAL AND COMMUNICATIONS TO BE SAFELY BE DISCONNECTED,
////
////
CONCRETE WATER TANK REMOVED FROM SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR
TO ARRANGE ALL NECESSARY APPLICATIONS AND PERMITS WITH THE
RELEVANT AUTHORITIES. SERVICES TO BE CAPPED IN ACCORDANCE WITH
PROPOSED 5.5m WIDE VEHICLE
RELEVANT SERVICE PROVIDER SPECIFICATIONS AND STANDARD DETAILS
////
CROSSOVER IN ACCORDANCE
////
W
WITH IPWEA STD DRG RS 049 AND FFL 17.58
RS 050 LEGEND:
T
W
OE ////
OE
////
SWIMMING ADJACENT BOUNDARY
GARAGE CP
POOL
FFL 17.53 UNIT 2 FFL 15.93
SP204267 PROPOSED BOUNDARY
FFL 17.53 EXISTING FENCE
W
////
////
\ \ \ \ \ \ \ \ \ \ \ EXISTING BUILDING
T
W
FFL 17.53
OE
OE
OE EXISTING OVERHEAD ELECTRICITY
////
////
SW EXISTING STORMWATER
FFL 17.45
W EXSTING WATER
W
FFL 18.08
S EXISTING SEWER
////
////
WM
T
PROPOSED
W
FH T EXISTING TELSTRA
600mm WIDE
DISH DRAIN EXISTING TELSTRA PIT
WM
////
FH
////
EXISTING WATER FIRE HYDRANT
OE
WOE
WM
EXISTING WATER METER
T
W
////
51 EXISTING SEWER MANHOLE
////
MATCH NEATLY TO P9319
EXISTING SURFACE EXISTING TREE
FH
PROPOSED RETAINING WALL
////
////
OE
OE
PROPOSED STORMWATER PIPE
PROPOSED CONCRETE PAVEMENT
////
////
PROPOSED CONCRETE DISH DRAIN
PROPOSED GROUTED ROCK SCOUR PROTECTION
OE
OE
1 0 1 2 3 4 5
OE
OE
SCALE (metres)
1 : 100 (FULL SIZE)
North Point Approved Project Address Title
B. PARRY 206 DAVID LOW WAY OVERALL LAYOUT PLAN
N RPEQ 28084 PEREGIAN BEACH QLD 4573
OE
OE
For and on behalf of RECOR Pty Ltd.
Scale ENGINEERING + PROJECT MANAGEMENT Client Details PROJECT NAME: Project Number Sheet Size
SUNSHINE COAST | BRISBANE | SYDNEY
B 17.10.23 RFI UPDATE HL BP www.recorconsulting.com | ABN 89 647 469 707 MADELEINE SWETE KELLY PROPOSED UNIT 20230023 A1
A 31.03.23 OPW ISSUE QT BP
AS SHOWN COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's client. This DEVELOPMENT Drawing Number Revision
010 B
drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as 'Issued For Construction' in
Rev Date Revision Description Drawn Check the revision description.
OE
DO NOT SCALE, IF IN DOUBT ASK
OE
Section 18
CUT/FILL DEPTH RANGE CUT/FILL DEPTH RANGE
LOWER VALUE UPPER VALUE COLOUR LOWER VALUE UPPER VALUE COLOUR
-2.20 TO -2.10 m -0.20 TO -0.10 m
-2.10 TO -2.00 m -0.10 TO 0.00 m
-2.00 TO -1.90 m 0.00 TO 0.10 m
-1.90 TO -1.80 m 0.10 TO 0.20 m
-1.80 TO -1.70 m 0.20 TO 0.30 m
-1.70 TO -1.60 m 0.30 TO 0.40 m
-1.60 TO -1.50 m 0.40 TO 0.50 m
-1.50 TO -1.40 m 0.50 TO 0.60 m
-1.40 TO -1.30 m 0.60 TO 0.70 m
-1.30 TO -1.20 m 0.70 TO 0.80 m
C
-1.20 TO -1.10 m 0.80 TO 0.90 m
C21
-1.10 TO -1.00 m 0.90 TO 1.00 m
T
W
-1.00 TO -0.90 m 1.00 TO 1.10 m
-0.90 TO -0.80 m 1.10 TO 1.20 m
S
TOW 17.88 TOW 16.09 TOW 16.10 TOW 17.53 TOW 17.53 -0.80 TO -0.70 m 1.20 TO 1.30 m
WM BOW 15.92 BOW 15.54 BOW 16.20 BOW 16.20
BOW 16.59 -0.70 TO -0.60 m 1.30 TO 1.40 m
////
W
////
H = 1.29m H = 0.17m H = 0.56m H = 1.33m H = 1.33m
PP -0.60 TO -0.50 m 1.40 TO 1.50 m
T
W
PP -0.50 TO -0.40 m 1.50 TO 1.60 m
15
.8
////
16.2
////
BATTER 1 IN 5 -0.40 TO -0.30 m
DAVID L
-0.30 TO -0.20 m
16.2
/
16.4
16
W
FFL 17.135
OE
.0
SWIMMING POOL
////
OW WAY
////
FFL 15.54
T
16.6
W
16.4 EARTHWORKS VOLUMES
OE
EARTHWORKS VOLUMES FROM STRIPPER EXISTING SURFACE LEVEL
16.8
////
16.
////
FFL 18.18 (100mm OF TOPSOIL STRIPPING OF THE EXISTING SURFACE) TO BULK
2
FFL 16.50 EARTHWORKS SURFACE LEVELS.
OE
W
17.0 CUT = 68.05 m³
FFL 17.53
OET
FILL = 105.14 m³
////
////
FFL 17.53
W
BALANCE = 37.08 m³
FFL 17.25 17.2
UNIT 1 CUT & FILL VOLUME NOTES
17.4 1. BULK EARTHWORKS LEVEL REPRESENTS
/
TOW 17.25 - 200mm BELOW DESIGN SURFACE LEVEL FOR BUILDING
////
////
BOW 16.50 GARAGE
FFL 17.53 - 225mm BELOW DESIGN SURFACE LEVEL FOR DRIVEWAY
H = 0.75m
W
2. BULK EARTHWORKS VOLUMES EXCLUDE A NOMINAL 100mm OF
TOW 17.40
TOPSOIL STRIPPING VOLUME WITHIN EARTHWORKS AREA
OE
OE
/ BOW 16.82
T
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
W
H = 0.58m
////
OE
////
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \
.8
/
B
16
////
////
17.0
W
C21
FFL 17.58
LEGEND:
T
W
OE ////
OE
17.2
////
SWIMMING ADJACENT BOUNDARY
GARAGE POOL
FFL 17.53 UNIT 2 FFL 15.93 PROPOSED BOUNDARY
A FFL 17.53
W
17.0 EXISTING MAJOR CONTOUR (INTERVAL 0.2m)
////
////
C21
/
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ EXISTING MINOR CONTOUR (INTERVAL 0.1m)
T
W
FFL 17.53
OE
OE
TOW 17.50
EXISTING FENCE
BOW 17.32
////
H = 0.18m
////
\ \ \ \ \ \ \ \ \ \ \ EXISTING BUILDING
FFL 17.45
OE EXISTING OVERHEAD ELECTRICITY
W
FFL 18.08
SW EXISTING STORMWATER
18.2
////
////
WM
T
W
FH .4 W EXSTING WATER
18
18.4
/ /
S EXISTING SEWER
WM
////
////
T EXISTING TELSTRA
TOW 18.39 BATTER 1 IN 4
OE
TOW 18.08 TOW 18.00
WOE
BOW 17.45 BOW 17.90 BOW 17.90 EXISTING TELSTRA PIT
H = 0.63m H = 0.49m H = 0.1m
FH
T
W
////
EXISTING WATER FIRE HYDRANT
////
WM
EXISTING WATER METER
FH
EXISTING SEWER MANHOLE
////
////
OE
OE
EXISTING TREE
17.0 EARTHWORKS CONTOUR MAJOR (INTERVAL 0.2m)
////
////
EARTHWORKS CONTOUR MINOR (INTERVAL 0.1m)
PROPOSED RETAINING WALL
OE
OE
NOTE:
EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN DRAWINGS, ALL IN-GROUND SERVICES
WITHIN THE PROPERTY BOUNDARY INCLUDING BUT NOT LIMITED TO: STORMWATER DRAINAGE,
SEWERAGE, WATER, GAS, ELECTRICAL AND COMMUNICATIONS TO BE SAFELY BE DISCONNECTED,
REMOVED FROM SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR TO ARRANGE ALL
1 0 1 2 3 4 5
OE
NECESSARY APPLICATIONS AND PERMITS WITH THE RELEVANT AUTHORITIES. SERVICES TO BE CAPPED
OE
IN ACCORDANCE WITH RELEVANT SERVICE PROVIDER SPECIFICATIONS AND STANDARD DETAILS SCALE (metres)
1 : 100 (FULL SIZE)
North Point Approved Project Address Title
B. PARRY 206 DAVID LOW WAY BULK EARTHWORKS LAYOUT PLAN
N RPEQ 28084 PEREGIAN BEACH QLD 4573
OE
OE
For and on behalf of RECOR Pty Ltd.
Scale ENGINEERING + PROJECT MANAGEMENT Client Details PROJECT NAME: Project Number Sheet Size
SUNSHINE COAST | BRISBANE | SYDNEY
B 17.10.23 RFI UPDATE HL BP www.recorconsulting.com | ABN 89 647 469 707 MADELEINE SWETE KELLY PROPOSED UNIT 20230023 A1
A 31.03.23 OPW ISSUE QT BP
AS SHOWN COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's client. This DEVELOPMENT Drawing Number Revision
020 B
drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as 'Issued For Construction' in
Rev Date Revision Description Drawn Check the revision description.
OE
DO NOT SCALE, IF IN DOUBT ASK
OE