Original source · versioned page text
Swmp
Original PDF page 39, section 1. The text section number identifies this passage in the reader.
DRAINS Modelling Results Project number: 20220116 Calculations: B. Parry Street Address: 206 David Low Way Locality: Peregian Beach, NSC Date: 17/03/2023 Pre / Post Comparison 3 3 3 A.E.P Qy Pre (m /s) Qy Post (m /s) Qchange (m /s) Qchange (%) 1 EY 0.014 0.015 0.001 7% 50% AEP 0.016 0.018 0.002 13% 0.2 EY 0.024 0.026 0.002 8% 10% AEP 0.031 0.031 0.000 0% 5% AEP 0.035 0.036 0.001 3% 2% AEP 0.041 0.041 0.000 0% 1% AEP 0.046 0.045 -0.001 -2% Pre / Post w/ OSD Comparison Tank Node Assumptions 3 3 3 A.E.P Qy Pre (m /s) Qy Post (m /s) Qchange (m /s) Qchange (%) https://kingspanwatertanks.com.au/product/2000-litre-skinny-slimline-water-tank/ 1 EY 0.014 0.013 -0.001 -7% 2x2kL slimline tanks 50% AEP 0.016 0.014 -0.002 -13% Total Area 2.31 m² 0.2 EY 0.024 0.021 -0.003 -13% Low flow orifice 50 mm 10% AEP 0.031 0.027 -0.004 -13% 35 mm/tank 5% AEP 0.035 0.033 -0.002 -6% Overflow 100 mm 2% AEP 0.041 0.040 -0.001 -2% Tank Height 1.86 m 1% AEP 0.046 0.044 -0.002 -4% Overlow height 1.76 m
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.