21 March 2022                                                                                  Project No. 22072-001-Rev0


H.M de Groot
Email: [email protected]



SLOPE STABILITY ASSESSMENT FOR PROPOSED SHED
195 TOP FORESTRY ROAD, RIDGEWOOD


Dear Mick

1.0     INTRODUCTION
As requested, Tectonic has undertaken a slope stability assessment for a proposed shed at
195 Top Forestry Road, Ridgewood. This report presents the results of our slope stability assessment,
together with geotechnical advice for the development. In summary, subject to implementation of the
recommendations made herein, there would be a Low Risk of slope instability affecting the proposed
development in accordance with the Australian Geomechanics Society Guidelines for Landslide Risk
Management, dated March 2007 (AGS 2007).

1.1    Details of Site and Development

The property is described as Lot 1 on RP170386, covers an area of 5 ha and is located within the Noosa
Council (NC) area. The proposed shed site was located mid-slope, in the centre of the property, below Top
Forestry Road which follows a local ridgeline. The allotment was densely vegetated and generally fell in a
south-easterly direction. Rural residential properties surrounded the site. Text Figure 1 below illustrates the
site layout. A detailed description of the site is given in Section 2.




                                 Proposed
                                     Shed
                                  Location




Text Figure 1: Aerial image of the site, courtesy QGlobe June 2021


                                                    Tectonic Geotechnical Pty Ltd
                                                    PO Box 899, Buderim, QLD 4556
                                        Office: 07 5478 9016 Email: [email protected]
                                                        www.tectonicgeo.com.au
                                                         A.B.N. 83 165 727 828
Log in to download the original file

Slope Stability Report - 22072-001-Rev0.pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 14 pages

Page 2

H.M de Groot                                                                                 22072-001-Rev0
                                                                                              21 March 2022

At the time of the assessment an existing relatively level building platform (approximately 20 m long by 20 m
wide) had been previously formed by cut and fill earthworks. It was estimated that fill in this area ranged up
to 2.5 m high, with cuts up to 3.0 m depth. It is anticipated that minimal additional earthworks will be
required (i.e. less than 0.5 m depth/height) for the proposed shed building pad. An existing carport was
located on the eastern side of the pad, with the proposed shed is to be located on the western side. The
shed footings are proposed to be wholly found within the exposed weathered rock (phyllite) cut area,
approximately 10 m off the crest of the existing fill batter.
Information supplied by the client indicates the shed will have a plan area of 9 m by 9 m and will comprise a
steel portal frame with light weight corrugated steel cladding on a concrete floor slab. Text Figure 2 below
illustrates the proposed shed design.




Text Figure 2: Proposed shed design (The Shed Company)


1.2   Method and Scope of Investigation
As part of our slope stability assessment, a desk-top study was carried out comprising a review of
published geological maps, council overlays and aerial photographs.
A walk-over survey was conducted to make an appraisal of the general condition of the site regarding
topography, drainage, vegetation cover, geology, erosion and condition of existing structures. The
walkover was undertaken by an experienced geotechnical engineer from Tectonic on 1 March 2022.
The results of the desk-top study and walk-over survey are included in Section 2 below.

1.3   Qualifications of Responsible Engineer
This report has been reviewed by Mr. Ashley Davey, an RPEQ with more than 26 years’ experience in
geotechnical engineering, including numerous slope stability projects.




                                                      2/10

Page 3

H.M de Groot                                                                                   22072-001-Rev0
                                                                                                21 March 2022

2.0      DESCRIPTION OF EXISTING CONDITIONS
2.1    Geology
The 1:100,000 scale Gympie Surface Geology Map (Sheet 9445) indicates that the site is underlain by early
to middle Triassic age phyllite (Rk) of the Kin Kin beds. A fault (black line) is indicated on the mapping at the
southern end of the property approximately 150 m south of the proposed shed site. An extract from the
geological map is shown in Text Figure 3.




                                                                  Approximate site location




Text Figure 3: Extract from geological map
At the time of the assessment, the shed pad cutting ranged up to about 3.0 m deep and typically exposed
residual clays up to 0.3 m below ground level (BGL), overlying very low to low strength phyllite tending
towards medium strength with depth. Text Figure 4 below shows the cut batter at the time of the
assessment.

        Residual clay soils




                                                                  Very low to low strength
                                                                  phyllite grading to
                                                                  medium strength
                                                 Approx.
                                                  45°




Text Figure 4: Upslope building pad cut batter




                                                           3/10

Page 4

H.M de Groot                                                                                   22072-001-Rev0
                                                                                                21 March 2022

2.2    Topography
As illustrated in Text Figures 5, the proposed shed site is located in the centre of the property, mid-slope and
to the south of Top Forestry Road which generally traces a local ridgeline. The allotment generally falls in a
south-easterly direction to a natural gully at the southern end of the property. Downslope to the south-east
of the proposed shed site is a dam that catches surface runoff.
The topographic features observed during the site walkover and ground slopes recorded using a hand-held
clinometer are shown in Text Figure 5. The inferred natural ground slope across the development site (prior
to earthworks) was about 12°, with slopes of 11° to 15° observed above the development area, and slopes of
12° to 25° downslope of the proposed shed site.




                                                 15°           Proposed Shed
                                                               Location




           Existing Residence
                                                           25°
                and Workshop
                                                                   Dam

                                                         12°




Text Figure 5: Image showing ground surface contours (10 m), courtesy QGlobe

Text Figures 6 to 8 below and on the following pages illustrate the general site conditions at the time of the
assessment.




Text Figure 6: Northern view across building platform




                                                        4/10

Page 5

H.M de Groot                                                                                   22072-001-Rev0
                                                                                                21 March 2022




Text Figure 7: Looking south below proposed shed site




Text Figure 8: South-eastern view across proposed shed site

2.3   Groundwater
No seepage or ‘springs’ were observed in the vicinity of the proposed shed site.

2.4   Surface Drainage
Natural surface drainage from the shed site follows surface contours towards the south-east. The natural
slopes appeared to be relatively well drained at the time of the walk-over. Surface water is expected to
drain rapidly from the natural slopes considering the moderate to steep gradients, relatively low permeability
clay soils and shallow depth to rock.
At the time of our visit, the previously formed building pad graded slightly to the north allowing surface water
to pond on the proposed shed pad. It appeared that a small diversion swale had been installed above the
northern end of the cut batter, channelling runoff east away from the proposed shed site down into the
existing dam.

2.5   Vegetation
At the time of the inspection, the proposed development area was free from vegetation with exposed phyllite
at the surface or gravel fill across the access tracks. Dense high grass, shrub vegetation and numerous
large mature trees were observed around the shed site. Most of the trees appeared to be relatively straight,
with no obvious signs of distorted growth which could be attributed to slope instability.




                                                        5/10

Page 6

H.M de Groot                                                                                    22072-001-Rev0
                                                                                                 21 March 2022

2.6   Buildings and Other Structures
At the time of the assessment, a small brick veneer residence and a colourbond clad workshop were located
above the proposed shed site to the north. Based on an external visual assessment, the house and
workshop did not display any obvious signs of distress (e.g. cracking, misalignment, etc.) which could be
attributes to slope instability.


3.0     ASSESSMENT OF LAND STABILITY
3.1   Existing Conditions
As illustrated in Text Figure 9, NC’s landslide hazard overlay map indicates that the proposed shed site has
a Moderate (pale yellow shading) landslide susceptibility, whilst other areas across the site (typically gullies)
are mapped as having a High (orange shading) landslide susceptibility.




                                                                     Proposed Shed Location




Text Figure 9: Extract from NC Landslide Hazard Mapping

It should be noted that the NC map is a broad-scale indication of the potential landslide susceptibility and
is superseded by this site specific assessment. The site did not exhibit any indicators of global, natural
slope instability at the time of our inspection. No landslide back scarps or areas of naturally ‘hummocky’
ground were observed in the vicinity of the proposed building area, with residual soil and exposed rock in
existing cut batters.

3.2   Stability Risk Assessment
The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
Landslide Risk Management. Relative levels of risk and their implications are given in Table 1 overleaf and
the Qualitative Terminology for Use in Assessing Risk to Property is also attached.




                                                          6/10

Page 7

H.M de Groot                                                                                                 22072-001-Rev0
                                                                                                              21 March 2022

 Table 1: Stability Risk Levels

 Risk Level             Example Implications(1)
                        Unacceptable without treatment. Extensive detailed investigation and research, planning
        Very High
 VH                     and implementation of treatment options essential to reduce risk to Low; may be too
        Risk
                        expensive and not practical. Work likely to cost more than value of property.
                        Unacceptable without treatment. Detailed investigation, planning and implementation of
 H     High Risk        treatment options required to reduce risk to Low. Work would cost a substantial sum in
                        relation to the value of the property.
                        May be tolerated in certain circumstances (subject to regulators’ approval) but requires
        Moderate
 M                      investigation, planning and implementation of treatment options to reduce risk to Low.
        Risk
                        Treatment options to reduce to Low risk should be implemented as soon as practicable.
                        Usually acceptable to regulators. Where treatment has been required to reduce the risk
 L     Low Risk
                        to this level, ongoing maintenance required.
        Very Low
 VL                     Acceptable. Manage by normal slope maintenance procedures.
        Risk
 Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
 depend on the nature of the property at risk; these are only given as a general guide.

Considering the existing site conditions (Ref. Section 2), and subject to the implementation of
recommendations given in Section 4, it is assessed that there would be a Low (L) Risk of global slope
instability affecting the proposed shed. Regulators (NC) normally require that a Very Low or Low Risk of
landslide affecting the property must be demonstrated to enable development approval. Summarised in
Table 2 is our qualitative assessment of landslide risk for the site. A summary of qualitative terminology for
use in assessing risk to property is attached (taken from AGS 2007).
 Table 2: Details of Qualitative Risk Assessment for Property (AGS 2007)

                                               Assessed
 Hazard               Likelihood Consequence
                                                 Risk     Comments

                                                          The likelihood of a failure through the existing cut batters or fill
                                                          embankments adjacent to the building platform is considered Unlikely,
 1: Failure through
                                                          given the favourable topography, lack of groundwater, lack of evidence
the existing cut
                       Unlikely   Medium         Low      of existing natural instability and subject to implementation of the
batters or fill
                                                          recommendations specified in Section 4. The consequence of such a
embankments
                                                          failure would remain Medium, with the resultant risk being Low as per
                                                          AGS 2007.


 2: Deep failure                                          The likelihood of a deep failure through the weathered rock is assessed
through weathered                                         as Rare due to the strength of such materials, and no evidence of deep-
                        Rare       Major         Low
rock below the                                            seated instability in the area. Although the consequence of such a failure
foundation depth                                          could be Major, the resultant risk would be Low as per AGS 2007.



The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 4 have been designed to mitigate those impacts.




                                                            7/10

Page 8

H.M de Groot                                                                                       22072-001-Rev0
                                                                                                    21 March 2022

4.0       RECOMMENDATIONS
General recommendations to help maintain the stability of the site are given in the document Some
Guidelines for Hillside Construction, which is attached.

4.1     Earthworks
Based on the proposed development and the existing site conditions it is anticipated minimal cut and fill
earthworks will be required (i.e. less than 0.5 m depth/height). Should proposed cut/fill exceed 0.5 m
depth/height, the impacts on slope stability must be reviewed by Tectonic before construction.
The shed pad should be proof rolled to identify any soft spots, which should be removed and replaced with
select, compacted fill. The pad surface should be re-graded at a minimum 1V:100H ‘into’ the hillside (north)
to prevent surface water overtopping the fill embankment on the southern side.
Excavations in the natural soils and very low to low strength phyllite should be achievable using conventional
earthmoving equipment (e.g. small to medium sized excavators in the 5 tonne to 12 tonne range). However,
excavations into medium strength (or stronger) phyllite may be difficult and may require the use of ripping
tynes and/or rock hammer attachments. Where excavation into rock is required the contractor must consider
the effects of noise and vibrations.
Temporary batters in stiff (or stiffer) natural soils may be formed at 1V:1H; with permanent batters formed no
steeper than 1V:2H in natural soils or 1V:1H in weathered rock. Flatter batters may be required if
groundwater seepage is encountered. Permanent batters will require erosion protection such as covering
with erosion matting or vegetation. Where spatial constraints prevent adoption of the above recommended
batter slopes, cut or fill batters would need to be supported by retaining walls.
Ground surfaces should be graded to shed surface water runoff away from construction areas. It should be
noted that during wet weather, the natural soils may cause turbid stormwater run-off. Appropriate erosion
and sediment control measures must be installed prior to commencement of any further earthworks at this
site.
The above recommendations do not supersede any existing safety regulations or legislation applicable to
excavations (e.g. limits on personnel entry into trenches).

4.2     Retaining Structures
Retaining structures must be founded as described in Section 4.3 below. Retaining structures greater than
1 m high will require engineer design and certification of construction. Retaining structures should be
engineer designed in accordance with AS4678-2002 Earth-retaining structures.
We suggest the following parameters in Table 3 may be adopted for retaining wall design.
 Table 3: Retaining Wall Design Parameters
                                                             Lateral earth pressure coefficients
                          Unit      Friction
 Retained material      weight       angle
                                                         Ka                     Ko
                        (kN/m3)    (Degrees)                                                        Kp
                                                  (Cantilever wall)     (Non-yielding wall)
 Stiff (or stiffer)
                          19           25               0.40                   0.57                2.46
 Clays

 Weathered Rock           21           35               0.27                   0.43                3.69


The values in Table 3 assume that the walls are fully drained and no allowance is included for hydrostatic
pressures, construction loading, up-slope footing loadings, the effects of sloping ground and backfill
compaction stresses.




                                                      8/10

Page 9

H.M de Groot                                                                                      22072-001-Rev0
                                                                                                   21 March 2022

4.3   Footing Design
Footings for the proposed shed and any ancillary structures (e.g. tanks or retaining walls) should penetrate
through any fill, and residual soils, to found a minimum of 0.3 m into very low strength (or stronger) rock.
Footings so founded may be designed using an allowable bearing pressure of 400 kPa. It is understood that
the shed slab and footings will found directly on/into such rock.
Footing design should also account for potential soil reactivity, to be assessed by others.

All footings should found such that they are not adversely affected by any adjacent excavations, trenches, or
retaining walls that are not designed to support building loads. Footings should found at least below a plane
extending 1 m horizontally from the base of trenches/excavations/retaining walls, then rising up at 1V:1H, as
illustrated in Text Figure 10.




                 Text Figure 10: Footing depth required to prevent undermining or surcharge loading

Footing bases must be cleaned following mechanical excavation to expose undisturbed materials over the
full base area. A suitably qualified and experienced RPEQ must inspect the footing excavations to confirm
appropriate foundation materials and cleanliness prior to pouring concrete.
If any soil conditions encountered during construction are found to differ from those noted above, Tectonic
must be notified immediately and an inspection carried out to determine if changes to footing design are
required.

4.4   Drainage
Adequate site drainage must be installed to ensure that surface water flows are controlled, and diverted
away from the building area and batters. Flows must not be allowed to form concentrated streams running
across the building platform, adjacent batter slopes or over top retaining walls. Lined (with turf, rock,
concrete, or similar) cut off/diversion drains should be constructed along the crests and toes of the existing
batters and directed via lined batter chute drains or pipes to discharge at least 5 m down slope of any




                                                        9/10

Page 10

H.M de Groot                                                                                    22072-001-Rev0
                                                                                                 21 March 2022

structures or fill batters and not as concentrated discharge upslope of any neighboring
structures/embankments. The platform should be graded slightly (minimum 1V:100H) back ‘into’ the
exposed rock batter slope to drain appropriately to the diversion drainage system and not allow over topping
of the downslope fill batters.
Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in filter
‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and site-
specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to be
accounted for in the design of the retaining structure.
It would be prudent to construct a rock dissipator or rock contour drain at the drainage outlet point(s) to
minimise erosion. Drains should be directed to discharge towards the natural drainage lines.
Subsurface disposal of stormwater must not be undertaken (including infiltration pits).


5.0     SUMMARY & CONCLUSIONS
Based on the findings of our assessment we consider that there would be a Low Risk of slope instability
affecting the proposed shed, subject to implementation of the recommendations given in this report.



6.0     LIMITATIONS
Your attention is drawn to the document Limitations, which is attached to this letter report.
Please contact the undersigned should you wish to discuss any of the above matters.
Yours faithfully,

TECTONIC GEOTECHNICAL PTY LTD




Jarrad McVey BEng (Civil) (Hons)                           Ashley Davey RPEQ 8159
Geotechnical Engineer                                      Director/Principal Geotechnical Engineer


Attachments: Qualitative Terminology for Use in Assessing Risk to Property
             Some Guidelines for Hillside Construction
             Limitations




                                                       10/10

Page 11

                                      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                                                              APPENDIX C: LANDSLIDE RISK ASSESSMENT
                                    QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY


   QUALITATIVE MEASURES OF LIKELIHOOD

Approximate Annual Probability
                                             Implied Indicative Landslide
                                                                                                                     Description                                           Descriptor               Level
Indicative          Notional                    Recurrence Interval
  Value             Boundary
   10-1                5x10-2
                                              10 years                           The event is expected to occur over the design life.                                ALMOST CERTAIN                   A
                                                                    20 years     The event will probably occur under adverse conditions over the
        -2
   10                                      100 years
                                                                                 design life.
                                                                                                                                                                     LIKELY                           B
                            -3
     -3               5x10                                       200 years
   10                                      1000 years                            The event could occur under adverse conditions over the design life.                POSSIBLE                         C
                      5x10-4                                     2000 years
                                                                                 The event might occur under very adverse circumstances over the
   10-4                                   10,000 years
                                                                                 design life.
                                                                                                                                                                     UNLIKELY                         D
     -5               5x10-5                                     20,000 years
   10                                                                            The event is conceivable but only under exceptional circumstances
                                         100,000 years                                                                                                               RARE                             E
                                                                                 over the design life.
     -6                5x10-6                                    200,000 years
   10                                   1,000,000 years                          The event is inconceivable or fanciful over the design life.                        BARELY CREDIBLE                  F
   Note:     (1)   The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.


   QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

  Approximate Cost of Damage
                                                                                               Description                                                                 Descriptor               Level
Indicative           Notional
  Value              Boundary
                                         Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
   200%                                                                                                                                                             CATASTROPHIC                      1
                                         stabilisation. Could cause at least one adjacent property major consequence damage.
                     100%
                                         Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
   60%                                                                                                                                                              MAJOR                             2
                                         stabilisation works. Could cause at least one adjacent property medium consequence damage.
                       40%
                                         Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
   20%                                                                                                                                                              MEDIUM                            3
                                         Could cause at least one adjacent property minor consequence damage.
                       10%
    5%                 1%                Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                 MINOR                             4
                                         Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
   0.5%                                                                                                                                                             INSIGNIFICANT                     5
                                         notional boundary of 0.1%. See Risk Matrix.)
   Notes:    (2)   The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                   unaffected structures.
             (3)   The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                   works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                   accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
             (4)   The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa


                                                                    Australian Geomechanics Vol 42 No 1 March 2007
Form No. 68039
  68039        RL2Risk
         Landslide August 2010
                       Management Issued 10/7/07

Page 12

                                       PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
               APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


      QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                     LIKELIHOOD                                                  CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                          Indicative Value of         1: CATASTROPHIC                 2: MAJOR                3: MEDIUM                4: MINOR                    5:
                                         Approximate Annual                 200%                         60%                      20%                     5%                INSIGNIFICANT
                                             Probability                                                                                                                         0.5%
A –    ALMOST CERTAIN                             10-1                          VH                         VH                      VH                       H                   M or L (5)
                                                    -2
B -    LIKELY                                     10                            VH                         VH                       H                       M                       L
C -    POSSIBLE                                   10-3                          VH                          H                       M                       M                      VL

D -    UNLIKELY                                   10-4                           H                         M                        L                       L                      VL
                                                    -5
E -    RARE                                       10                             M                          L                       L                      VL                      VL
                                                    -6
F -    BARELY CREDIBLE                            10                             L                         VL                      VL                      VL                      VL
      Notes:   (5)   For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
               (6)   When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                     time.


      RISK LEVEL IMPLICATIONS
                        Risk Level                                                                                  Example Implications (7)
                                                                 Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
        VH                      VERY HIGH RISK                   options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                 property.
                                                                 Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
         H                           HIGH RISK
                                                                 risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                 May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
         M                      MODERATE RISK                    implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                 implemented as soon as practicable.
                                                                 Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
         L                           LOW RISK
                                                                 required.
                                                                 Acceptable. Manage by normal slope maintenance procedures.
         VL                      VERY LOW RISK

       Note:   (7)   The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
                     given as a general guide.




                                                                      Australian Geomechanics Vol 42 No 1 March 2007
 Form No. Landslide
    68039 68039 RL2Risk
                    August 2010
                        Management           Issued 10/7/07

Page 13

           PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007



                 APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

                        GOOD ENGINEERING PRACTICE                                                            POOR ENGINEERING PRACTICE
      ADVICE
      GEOTECHNICAL      Obtain advice from a qualified, experienced geotechnical practitioner at early       Prepare detailed plan and start site works before
      ASSESSMENT        stage of planning and before site works.                                             geotechnical advice.
      PLANNING
      SITE PLANNING     Having obtained geotechnical advice, plan the development with the risk              Plan development without regard for the Risk.
                        arising from the identified hazards and consequences in mind.
      DESIGN AND CONSTRUCTION
                        Use flexible structures which incorporate properly designed brickwork, timber        Floor plans which require extensive cutting and
                        or steel frames, timber or panel cladding.                                           filling.
       HOUSE DESIGN
                        Consider use of split levels.                                                        Movement intolerant structures.
                        Use decks for recreational areas where appropriate.
      SITE CLEARING     Retain natural vegetation wherever practicable.                                      Indiscriminately clear the site.
          ACCESS &      Satisfy requirements below for cuts, fills, retaining walls and drainage.            Excavate and fill for site access before
         DRIVEWAYS      Council specifications for grades may need to be modified.                           geotechnical advice.
                        Driveways and parking areas may need to be fully supported on piers.
      EARTHWORKS        Retain natural contours wherever possible.                                           Indiscriminatory bulk earthworks.
                        Minimise depth.                                                                      Large scale cuts and benching.
            CUTS        Support with engineered retaining walls or batter to appropriate slope.              Unsupported cuts.
                        Provide drainage measures and erosion control.                                       Ignore drainage requirements
                        Minimise height.                                                                     Loose or poorly compacted fill, which if it fails,
                        Strip vegetation and topsoil and key into natural slopes prior to filling.           may flow a considerable distance including
                        Use clean fill materials and compact to engineering standards.                       onto property below.
            FILLS       Batter to appropriate slope or support with engineered retaining wall.               Block natural drainage lines.
                        Provide surface drainage and appropriate subsurface drainage.                        Fill over existing vegetation and topsoil.
                                                                                                             Include stumps, trees, vegetation, topsoil,
                                                                                                             boulders, building rubble etc in fill.
        ROCK OUTCROPS   Remove or stabilise boulders which may have unacceptable risk.                       Disturb or undercut detached blocks or
         & BOULDERS     Support rock faces where necessary.                                                  boulders.
                        Engineer design to resist applied soil and water forces.                             Construct a structurally inadequate wall such as
                        Found on rock where practicable.                                                     sandstone flagging, brick or unreinforced
         RETAINING
                        Provide subsurface drainage within wall backfill and surface drainage on slope       blockwork.
           WALLS
                        above.                                                                               Lack of subsurface drains and weepholes.
                        Construct wall as soon as possible after cut/fill operation.
                        Found within rock where practicable.                                                 Found on topsoil, loose fill, detached boulders
                        Use rows of piers or strip footings oriented up and down slope.                      or undercut cliffs.
          FOOTINGS
                        Design for lateral creep pressures if necessary.
                        Backfill footing excavations to exclude ingress of surface water.
                        Engineer designed.
                        Support on piers to rock where practicable.
      SWIMMING POOLS    Provide with under-drainage and gravity drain outlet where practicable.
                        Design for high soil pressures which may develop on uphill side whilst there
                        may be little or no lateral support on downhill side.
         DRAINAGE
                        Provide at tops of cut and fill slopes.                                              Discharge at top of fills and cuts.
                        Discharge to street drainage or natural water courses.                               Allow water to pond on bench areas.
           SURFACE      Provide general falls to prevent blockage by siltation and incorporate silt traps.
                        Line to minimise infiltration and make flexible where possible.
                        Special structures to dissipate energy at changes of slope and/or direction.
                        Provide filter around subsurface drain.                                              Discharge roof runoff into absorption trenches.
                        Provide drain behind retaining walls.
         SUBSURFACE
                        Use flexible pipelines with access for maintenance.
                        Prevent inflow of surface water.
                        Usually requires pump-out or mains sewer systems; absorption trenches may            Discharge sullage directly onto and into slopes.
           SEPTIC &
                        be possible in some areas if risk is acceptable.                                     Use absorption trenches without consideration
           SULLAGE
                        Storage tanks should be water-tight and adequately founded.                          of landslide risk.
          EROSION       Control erosion as this may lead to instability.                                     Failure to observe earthworks and drainage
         CONTROL &      Revegetate cleared area.                                                             recommendations when landscaping.
        LANDSCAPING
      DRAWINGS AND SITE VISITS DURING CONSTRUCTION
         DRAWINGS       Building Application drawings should be viewed by geotechnical consultant
         SITE VISITS    Site Visits by consultant may be appropriate during construction/
      INSPECTION AND MAINTENANCE BY OWNER
          OWNER’S       Clean drainage systems; repair broken joints in drains and leaks in supply
       RESPONSIBILITY   pipes.
                        Where structural distress is evident see advice.
                        If seepage observed, determine causes or seek advice on consequences.




                                 Australian Geomechanics Vol 42 No 1 March 2007                                                                113
Form No. 68029 RL2 August 2010

Page 14

          PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007




    114                      Australian Geomechanics Vol 42 No 1 March 2007

Form No. 68029 RL2 August 2010

Page 15

                                               LIMITATIONS


This document has been prepared for the purpose outlined in Tectonic’s proposal and no responsibility is
accepted for the use of this document, in whole or in part, for any other purpose.

The scope of Tectonic’s Services are as described in Tectonic’s proposal, and are subject to restrictions
and limitations. Tectonic did not perform a complete assessment of all possible conditions or
circumstances that may exist at the site referenced in the report. If a service is not expressly indicated, do
not assume it has been provided. If a matter is not addressed, do not assume that any determination has
been made by Tectonic in regards to it.

Conditions may exist which were undetectable given that economic and time constraints limit the practical
extent of geotechnical investigation. Variations in conditions may occur between investigation locations,
and there may be special conditions pertaining to the site which have not been revealed by the
investigation and which have not therefore been taken into account in the document. Where variations exist
on site, additional studies and actions may be required.

Tectonic’s opinions are based upon information that existed at the time that the work was performed. The
passage of time, man-made or natural events, may alter the site conditions. It is understood that the
Services undertaken allowed Tectonic to form an opinion of the actual conditions of the site at the time the
site was visited and cannot be used to assess the effect of any subsequent changes in the quality of the
site, or its surroundings, or any laws or regulations.

Any assessments made in the preparation of this document are based on the conditions indicated from
published sources and the findings of the investigation described. Actual subsurface conditions may differ
from those indicated in the document (e.g. between boreholes or test pits). No warranty is included, either
express or implied, that the actual conditions will conform exactly to the assessments contained in this
document.

Where data supplied by the client or other external sources, including previous site investigation data, have
been used, it has been assumed that the information is correct unless otherwise stated. No responsibility is
accepted by Tectonic for incomplete or inaccurate data supplied by others.

This document is provided for the sole use by the Client and its professional advisers. No responsibility
whatsoever for the contents of this document will be accepted to any person other than the Client. Any use
which a third party makes of this document, or any reliance on or decisions to be made based on it, is the
responsibility of such third parties. Tectonic accepts no responsibility for damages, if any, suffered by any
third party as a result of decisions made or actions based on this document.




Rev 1 (March 2016)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.