                                                                   Pivotal Perspective Pty Ltd
                                                  Local and International Development Planning
                                                                       4/59 Mary St, Noosaville
                                                                            QLD, Australia 4565
                                                               [email protected]
                                                                             +61 0406 334 227



21 November 2023


Noosa Council
[email protected]

RE:    Change Representations – MCU22/0145 & OPW22/0212 – 3 Henderson St,
       Sunshine Beach


In accordance with the Planning Act 2016, we seek to suspend the appeal period and
extend the change representations period by agreement until 8 December 2023. We also
seek to make the following change representations:

MCU - Condition 3 - Plans




The plans have been amended to incorporate all suggested changes including:

   -   Remove/setback architectural features including the rendered concrete façade
       profiles and flat roof at Level 3 to a minimum of 10m from the front boundary.
Log in to download the original file

change reps - zauss.pdf · 815 KB (small file)

Full text of the other 2 pages

Page 2

    -    Revise as per Condition 9 – ‘With the exception of the lift shaft and stairs, no wall
         or privacy screen at Level 4 must be higher than 1.7 metres’.




The approval plans are listed below:

 Plan No.               Rev   Plan/Document Name                                 Date
 C0.1                         Site Plan prepared by Chris Clout Design           21.11.23
 C1.0                         Basement Floor prepared by Chris Clout Design      21.11.23
 C1.1                         Ground Floor prepared by Chris Clout Design        21.11.23
 C1.2                         Level 2 prepared by Chris Clout Design             21.11.23
 C1.3                         Level 3 prepared by Chris Clout Design             21.11.23
 C1.4                         Level 4 prepared by Chris Clout Design             21.11.23
 C2.0                         Elevation prepared by Chris Clout Design           21.11.23
 C2.1                         Elevation prepared by Chris Clout Design           21.11.23
 C2.2                         Elevation prepared by Chris Clout Design           21.11.23
 C2.3                         Elevation prepared by Chris Clout Design           21.11.23
 C3.0                         Section 1 prepared by Chris Clout Design           21.11.23
 C3.1                         Section 2 prepared by Chris Clout Design           21.11.23
 C3.2                         Section 3 prepared by Chris Clout Design           21.11.23
 C3.3                         Section 4 prepared by Chris Clout Design           21.11.23
 C3.4                         Section 5 prepared by Chris Clout Design           21.11.23
 C3.5                         Section 6 prepared by Chris Clout Design           21.11.23
 C3.6                         Section 7 prepared by Chris Clout Design           21.11.23
 C3.7                         Section 8 prepared by Chris Clout Design           21.11.23
 C3.8                         Section 9 prepared by Chris Clout Design           21.11.23
 C4.0                         Areas prepared by Chris Clout Design               21.11.23
 C4.1                         Areas prepared by Chris Clout Design               21.11.23




 FM6002Q/1-01/07/2017                                                            Page 2 of 3

Page 3

OPW PLANS – CONDITION 1




The landscape plans have been updated in accordance with MCU condition 23 for waste
management to include wheelie bins located behind the front fence. There is still ample
landscaping areas in front of the building and fence to screen the bulk of the building,
whilst providing for bin storage at the front of the site.

Please update condition 1 to include the following landscape plans:

 Plan No.                  Rev      Plan/Document Name                                                Date
 ED22266OPW - 01           F        Site Layout Plan prepared by element design                       21.11.23
 ED22266OPW – 02           F        Planting Plan (Ground Level) prepared by element design           21.11.23
 ED22266OPW – 03           F        Planting Plan (Level 04) prepared by element design               21.11.23
 ED22266OPW – 04           F        Details Plan prepared by element design                           21.11.23
 ED22266OP - 05            F        Plant List & Specification Plan prepared by element               21.11.23
                                    design

--------------------------------------------------------------------------------------------------------------------

If you have any further queries in relation to the above, please do not hesitate to contact
myself.


Regards,




Jack Lewis B.Sc Hons UNSW M.Plan Otago MPIA
Planner/Director
Pivotal Perspective Pty Ltd
0406 334 227




 FM6002Q/1-01/07/2017                                                                                 Page 3 of 3

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.