Original source · versioned page text
Appendix E_Geotechnical Investigation
Attached to the e-mail MCU15/0109 Geotech and Bushfire Hazard reports - Links Drive Noosa Heads.
PROPOSED UNIT DEVELOPMENT
PRECINCTS E2 & F, NOOSA SPRINGS
TABLES
Table 1: Stability Risk Levels ............................................................................................................................................ 10
Table 2: Details of Qualitative Risk Assessment for Property (AGS 2007......................................................................... 10
Table 3: Retaining Structure Design Parameters .............................................................................................................. 14
TEXT FIGURES
Text Figure 1: Precincts E2 and F preliminary development layout (courtesy of Blackburne Jackson Design)................... 1
Text Figure 2: Site Location (courtesy NSC Maps) ............................................................................................................. 3
Text Figure 3: Site Location with 1 m contours (courtesy NSC Maps) ................................................................................ 4
Text Figure 4: Looking west towards borehole BH1 (Precinct F2) ...................................................................................... 4
Text Figure 5: Looking north towards borehole BH7 (Precinct E) ....................................................................................... 5
Text Figure 6: Looking south-east towards borehole BH10 (Precinct E2) ....................................................................... 5
Text Figure 7: Looking west towards borehole BH13 (Precinct E2) .................................................................................... 6
Text Figure 8: Extract of Gympie geological map................................................................................................................ 7
Text Figure 9: Extract from NSC Landslide Susceptibility Mapping .................................................................................... 9
Text Figure 10: Slope W model ........................................................................................................................................ 11
Text Figure 11: Footing depth required to minimize risk of undermining........................................................................... 14
FIGURES
Figure 1: Site Plan
APPENDICES
APPENDIX A
Borehole Reports and Explanatory Notes
APPENDIX B
AGS Guidelines - Qualitative Terminology for Use in Assessing Risk to Property
Some Guidelines for Hillside Construction
APPENDIX C
Limitations
11 November 2015
Report No. 15193-002-Rev0 iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.