Revised SWMP
Attached to the e-mail RAL23_0002 - LATE Response to Information Request - 35 Pavilion Street_ Pomona.
2. A shakedown area is to be installed at the construction entry/exit to the proposed development area to
minimise sediment being transported to and from the site.
3. Diversion of upstream catchments around any exposed areas using diversion drains around the site.
4. Returfing or stabilisation of disturbed areas once earthworks and activities within that area are completed.
4.2. Operational Phase
The proposed works will involve and result in a residential dwelling on a large lot. The resulting pollutant
generation is considered consistent with the existing use of the site, and therefore no stormwater quality treatment
is proposed for the development.
Project number 20220217
Page 12 of 16
File 20220217 Pavilion St SWMP Rev1.docx, 2023-04-19 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads,Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.