     2. A shakedown area is to be installed at the construction entry/exit to the proposed development area to
        minimise sediment being transported to and from the site.

     3. Diversion of upstream catchments around any exposed areas using diversion drains around the site.

     4. Returfing or stabilisation of disturbed areas once earthworks and activities within that area are completed.


     4.2. Operational Phase
The proposed works will involve and result in a residential dwelling on a large lot. The resulting pollutant
generation is considered consistent with the existing use of the site, and therefore no stormwater quality treatment
is proposed for the development.




Project number 20220217
                                                                                                         Page 12 of 16
File 20220217 Pavilion St SWMP Rev1.docx, 2023-04-19 Revision 1

P +61 7 5211 1003                  A 75 Noosa Drive, Noosa Heads,Qld 4567   E [email protected]    recorconsulting.com
Log in to download the original file

Revised SWMP.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.