Skip to the record
Accept no substitutions.

Council archive · source document

Town Planning Report 1-27 Duke St Sunshine Beach QLD 4567 Rev A · 132004.4552.01

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                        5

Frontage Works
21.    Footpath improvements such as topsoiling, grassing, and tree planting are required to the Duke Street
       frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass
       shall be couch, free of weeds.

22.    All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel and
       landscaping such as trees and grasses in accordance with Council’s Standard specifications prior to
       commencement of the use permitted by this permit.
Pathway Contributions
23.    A pathway contribution of $247 towards external major pathways, in accordance with Planning Scheme
       Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior to obtaining a
       Development Permit for Operational Works. This amount will be subject to variations in the Consumer
       Price Index, All Groups Brisbane from September 2004 until the date of payment.
Stormwater Drainage
24.    All stormwater drainage collected on the proposed buildings and landscaped areas shall be collected on
       site and discharged to Council’s street drainage system in Duke Street. Plans of the drainage design shall
       be prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
       Development Permit for Operational Works.
       The maximum discharge of stormwater drainage allowable to Council’s street drainage system at any one
       location is 25 litres/second.
25.    All stormwater drainage collected on the proposed driveways shall be disposed of on site. To this end, a
       detailed design and maintenance plan for the on site disposal system shall be submitted to the Council for
       approval prior to obtaining a Development Permit for Operational Works.
       A Development Permit for Building Works shall not be granted until a Development Permit for Operational
       Works has been issued in regard to the drainage scheme.
26.    All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
27.    The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
       accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
28.    The site shall be connected to Council’s existing town water supply and be constructed in accordance with
       Council’s standards and requirements at no cost to Council.

29.    Each water connection to the water reticulation system shall extend to the property boundary and be
       metered. Where multiple units including leased buildings are served by a single service, multiple water
       meters to each individual unit or leased building shall be installed. All fees for the supply of water meters
       shall be paid to the Council.
Headworks
30.    Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on
       Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the
       rates applicable at the time of payment. An estimate only of the contribution rates as of September 2004
       under the current policies is as follows:
       Water Supply            $4,269
       Sewerage                $2,915
       TOTAL                   $7,184
       All headworks contributions must be paid prior to the issue of a Development Permit for Operational
       Works.
       Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks
       contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
       In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
       the contribution or trading bank guarantee will be returned.




SEP c:\users\noo.ecm.prod.web.svc\appdata\local\temp\fd3806e8-0058-435c-a2ab-46954e3601d5.tmp

Used in these records

About this file

File size
902 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Town Planning Report 1-27 Duke St Sunshine Beach QLD 4567 Rev A.pdf · 902 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.