Skip to the record
The only place to find full transcripts.

Council archive · source document

142007.2555.03 Request Extension of Currency Period

of 5

Text shows just the words. Original shows the document exactly as it was published.

                                                                               I


                                                                                                       SOLUTIONS
   In addition to the listed mandatory information and in deciding this request pursuant to
   Section 388 of the Sustainable Planning Act, the Council is requested to take the following

   facts and circumstances into consideration:



   1.   The approval which is the subject of this request to extend the relevant period is for

        Operational Works associated with a parent Material Change of Use approval for Multiple

        Dwelling Units (30 Units) and Accommodation Building (12 Accommodation Units)

        (Council File Reference 2003/221199). The parent Material Change of Use approval has

        had its relevant period extended to 15 October 2013, thus this request is made to bring

        the associated Operational Works approval in to line with the parent approval.



   2.   Section 388 of the Sustainable Planning Act sets out the matters which Council must have
        regard to in their assessment of a request to extend the relevant period of an approval.
        Each of these matters are set out and considered below.


         (a) the consistency of the approval, including its conditions, with the current laws and

                 policies applying to the development, including, for example, the amount and type

                 of infrastructure contributions, or infrastructure charges payable under an

                 infrastructure charges schedule; and



        The consistency of the approval with current scheme policies is assured because;



          (i)       The approval complies with current planning scheme policies and a current
                    development approval for a Material Change of Use for the land as described
                    above;


          (ii)      Infrastructure charges are not relevant to this application as they are set by the

                    parent Material Change of Use approval (2003/221199) which is current until
                    2013.



         (b) the community's current awareness of the development approval; and




                                                                                         P: 07 5443 1444
                                                                                         E: info®ipsptyltd.corn.au
                                                                                         Suite 5.156-158 Alexandra Parade.
                                                                                         Alexandra Headland, Q 4572
Page 2 of 3                                                                              PO Box 1043.
                                                                                         Marooctrydore. QLD 4558
                                                                                          t ow nplanningsunshi necoast.com.au
                                                                                         Member Planning Institute of Australia

Used in these records

About this file

File size
926 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

142007.2555.03 Request Extension of Currency Period.pdf · 926 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.