Original source · versioned page text
Response to Council IR PLAYGROUND
Page 3
Garden beds mulched with rock around flood prone areas of the site
Floor levels of toilet blocks are above flood level
Buildings to be constructed out of materials that will not be damaged by flood water and
can be easily washed down including concrete walks, stainless steel elements,
galvanised iron features and oversized hardwood.
Elevated accessible bridge
Removal of mounding along Maple Street
Removal of lookouts to creek
Reduced surface levels along creek.
Item 8: Provide flood inundation and flood impact mapping for the local flood event associated
with the external urban catchment which flows through the site.
Applicant’s Response to Item 8: Please refer to Attachment A which provides a Flood Assessment for the
proposal prepared by Hydrology and Water Management Consulting.
Item 9: Provide plans/information to indicate the relevant levels of proposed plumbing works
associated with toilet block and clearly specify the measures to prevent any potential of sewer
surcharge during major storm events (1% AEP and over).
Applicant’s Response to Item 9: Please refer to Attachment A which provides a Flood Assessment for the
proposal prepared by Hydrology and Water Management Consulting. The report indicates that Design flood
levels at each of the shelter areas and amenities are provided on Image 7-3. These can be placed onto
relevant plans to describe the immunity of these structures.
Item 10: Update plan where required.
Applicant’s Response to Item 10: Please refer to Attachment B and C which provides plans
summarising the changes to the design.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Response to Council IR PLAYGROUND.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.