OPW16/0020 - Delegated Report
1. APPLICATION DETAILS Application No: OPW16/0020 Street Address: 47 Witta Cir NOOSA HEADS QLD 4567 Real Property Description: Lot 112 N 21845 Planning Scheme: The Noosa Plan (16 September 2013) 2. DECISION DETAILS The following type of approval has been issued: Development Permit for Operational Work Excavation, Extraction or Filling - Earthworks 3. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is 2 years starting the day that this development approval takes effect. 4. ASSESSMENT MANAGER CONDITIONS APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 25353-B1 Basement De-watering prepared by SCG Consulting Engineers October 2015 25353-B2 Basement Drainage & Waterproofing prepared by SCG Consulting Engineers October 2015 25353-B3 Basement Pumping Schematic prepared by SCG Consulting Engineers October 2015 SITE SPECIFIC CONDITIONS Water Quality A performance bond of $5,000 must be provided to Council prior to commencement of works. This will be refunded where the applicant demonstrates that all waters released from the site were tested and complied with conditions of this approval. All runoff from the site, including treated groundwater, must be discharged to Council’s drainage system in Witta Circle. PRIOR TO COMMENCEMENT OF WORKS Engineering All necessary approvals from external service providers (eg Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting / prior to any works commencing. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council at the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6244. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Erosion and sediment control works; Other relevant parties A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased Proposed fencing to the site during the construction phase of the development Adequate parking arrangements for construction workers No queuing of trucks is permitted on residential streets, especially prior to 7.00am. Further parked trucks must have engines turned off Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures Works programme identifying key components of the works and their respective durations Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses to advise of agreed construction times, impacts on traffic and services and other relevant issues identification of complaint management procedures including: contact details for the on-site manager dispute resolution procedures For haulage operations involving significant volumes of fill material or excavated material being transported onto or off the site: details on the location of external fill sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they must certify that all works conform to the Operational Works permit. Where municipal works are involved, such confirmation must be submitted for the respective hold points prior to any site inspection by Council Officers. All works must be constructed and work procedure undertaken in accordance with: The approved plans/documents and conditions detailed in this Decision Notice The relevant conditions of the higher order approval viz.RAP15/0034 to which this approval relates All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site Design and Construction Design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the works, driveway and car park areas will remain the responsibility of the property owner/developer and must be certified by an RPEQ. Works within Road Reserve/Reinstatement Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All frontage works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Earthworks and Retaining Walls All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical testing undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ and submitted to Council prior to Council signing the Plan of Survey. Stormwater Drainage Appropriate scour protection must be provided at the outlet of all stormwater pipes including temporary outlets. Works associated with this permit must not adversely impact on the existing drainage conditions on other properties (eg by blocking or interfering with natural overland flows). Erosion & Sediment Control All reasonable and practical measures must be installed and maintained, and contingency measures to cover exposed soils during rain events must be stored on site to ensure any waters discharged from the site up to and including a 46mm rainfall event, contain less than 50mg Total Suspended Solids per litre, and to minimise the amount of sediment leaving the site in rainfall events that exceed 46mm. During the construction phase, offsite run-off must be diverted around exposed soils on the site without entraining additional sediments. Discharge from measures to divert the offsite water must not cause impacts to other properties. Measures installed to divert the upstream water must be provide a 150mm freeboard and convey a 1 in 2 year event without resulting in visible scour within flow paths: Appropriate measured must be installed to prevent sediment tracking from the site onto the road carriageway or kerb and channelling. Where sediments do accumulate on the roadway they must be removed daily and prior to rainfall events. Sediments must not be removed by hosing or the like into kerb and channelling. Prior to the completion of the development, all site surfaces must be effectively stabilised. For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination. Acid Sulfate Soil Excavations must not exceed the RL of 2m below the existing ground level at the location of the Groundwater Bore, this may include a reduction of ceiling heights proposed on the approved MCU plans to facilitate compliance with this condition, OR Where it is not possible to reduce ceiling heights to elevate excavations to above 2m below the existing ground level, all the following Acid Sulfate Soils Management Conditions must be implemented: All works must be carried out in accordance with the Acid Sulfate Soil Management Plan for Proposed Residential Development 47 Witta Circle, Noosa Heads by SCG Consulting Engineers Feb 2016 Report Number J000154-002-R-Rev0 (The ASSMP). Prior to commencement of construction, evidence must be provided to Council that The Author, of the ASSMP or other appropriate person of equivalent qualification and experience is satisfied the site foreman is competent to provide the Acid Sulfate Soils training to all site staff and contractors. All treated material must undergo verification testing to achieve neutralisation in accordance with the Queensland Acid Sulfate Soil Technical Manual: Soil Management Guidelines v4.0. All waters must be sampled and tested at a NATA certified laboratory to confirm the following water parameters are met prior to release from the site. All water Quality monitoring results must be provided to Council on request: a pH range of 6.5-8.5 pH units; 50mg/L maximum total suspended solids concentration; 0.3mg/L maximum total iron concentration; 0.2mg/L maximum total aluminium concentration. Groundwater levels within the onsite Groundwater Monitoring Bore must, be monitored weekly for at least one month prior to activities likely to affect groundwater levels and daily during operation of those activities . Within 24 hours of identifying a reduction in groundwater levels below the lowest measured pre-construction levels, the Geotechnical Engineer must provide Council and Contractor with remediation strategies to ensure any cone of depression does not affect adjacent properties or result on oxidation of surrounding potential acid sulphate soils, and these must be implemented to prevent harm to receiving environments. Where the onsite Groundwater Monitoring Bore will not be able to remain for the duration of the dewatering works, a new groundwater monitoring bore must be established and installed by a Geotechnical Engineer or other suitably qualified person experienced with Acid Sulfate Soils Management in a more appropriate location onsite. The location of the groundwater monitoring bore must be certified by the Geotechnical Engineer or other suitably qualified person to be sufficient to identify any changes in groundwater levels as a result of proposed construction activities. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. FOLLOWING CONSTRUCTION Certification Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the Operational Works permit. A final inspection of the completed works by Council’s Inspector is required. Please contact Council on 5329 6244 to arrange for the inspection. 5. REFERRAL AGENCIES Not Applicable. 6. ADVISORY NOTES The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As the structures are private structures, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the works Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart, On and Off Maintenance Inspections Request Contact Council on 5329 6244 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. A minimum maintenance period of 12 months will apply to all municipal works and thereafter until such time as the works are performing in accordance with the approved design unless noted otherwise Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include: the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council; Best Practice Erosion and Sediment Control, International Erosion Control Association (2008) As a general rule, a site is determined to have achieved effective short-term stabilisation if at the completion of the works: Methods of stabilisation are: appropriate for slopes and slope lengths; and are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any obligations under the ACH Act. 7. PROPERTY NOTES Not Applicable. 8. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable. 9. FURTHER DEVELOPMENT PERMITS REQUIRED Not Applicable Note: do not include Plumbing and Drainage Work 10. SELF ASSESSABLE CODES Not Applicable. 11. SUBMISSIONS Not Applicable. 12. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable. 13. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. 14. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. END OF APPENDIX
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW16/0020 - Delegated ReportRelated documentApplication case desk ↗
About this file
- File size
- 40 KB (small file)
- File type
- DOCX
No other editions are linked here.