[Sunshine Coast Checklist - Applications Involving Land _ :
egional Counc .
g Development & Land Use Sections.
: {OAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter. .
4: APPLICATIONFORMS: 20 See EB st RE ht eh
1.4 Form1PartA
1.1.1 Ensure that the form is fully completed and is a current version.
1.1.2 In the case of an MCU or Op Works below the high-water mark, owner's consent is required.
1.1.2.1. If there are multiple owners, the consent of each owner is required.
. 1.1.2.2 If the owner of the fand is a company, either ACN No, Company name clearly indicated by
signatory) or Company Seal required.
4.2. Form1 Part B-R Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached.
a ne 1.1.2.1 _ Ensure that each of Forms B-R which are attached are fuily completed.
8. IBAS: ASSESSMENT CHECKLIST: Mice gsc sk CMs PER EEE os eR
2.1 Ensure that relevant sections have been checked and/or completed with regard to referrals C7] Ke
ae NG . : ;
2.2 Ensure correct parts of Form 1 are provided where required (ie most common are Part J for
Clearing Vegetation, Part N for Contaminated tand and Part P for Prescribed Tidal Works) f "|
326° SENVIRONMENTALLY RELEVANT AGTIVITIES =
3.1 Ensure that Part G is completed if EPA referral is required.
3.2 ‘Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application ,
fee is paid and recorded on the application. (Refer Environmental Health for fees)
| °° FORIM2 - REQUEST TO CHANGE APPROVALS? e200 O° A OO
4.1. Ensure that relevant itéms have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records.
If over multiple properties on one or more sites, consent of Body Corporate is required. .
6° PLANS. “Se i ee ea ee ee EB eee.
@ 5.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompany the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
. unbound. :
6.» SUPPORTINGINFORMATIONS "oop ME ous oR E ss? NAUPE Bes oetiyte ecg
}
6.1. Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. - . [ =]
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. ,
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping
7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees, <
accompanies the application or has been paid. [
e Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational
- Work if Jetty or if including Landscaping.
e Land Development Lot Reconfiguration applications and Operational Work not including Landscaping
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
NSC g:Manduse\administrative processes\application checklist.doc , . :See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 33 sections
Section 2
Pe ea Ny ED US gy COMMENT
DAS REFERRAL AGENCIES TRIGGERS (Most frequent referrals) &.< S}- PI Sa fick a aa
‘Please refer to IDAS Checklist for complete list Cog mE ee ee 8 ma a ek
! ne ° Ae . ° q , Bote *y - . ‘ re : . , : , * 2 o "
Department of Main Roads (Concurrence or Advice)
e State Controlled Road ‘
Dept Natural Resources & Water
« Acid sulphate soils (Advice)
e Clearing of native vegetation on freehold land (Concurrence)
Environmental Protection Agency (Concurrence)
e¢ Environmentally Refevant Activity (for non-devolved Council as EPA)
« Contaminated land
* Environmental Management/Contaminated Land Register
. * Land recently used as a ‘notifiable activity’
* Industrial land changed to sensitive uses (eg school) JS
e Coastal related development.
e Koala habitat
e Wetlands (Advice onl
Queensland Transport (Concurrence) @
e Railway Masel e bevaye .
° Public Passenger Transport YL
| Sa, |
Energex or other responsible entity (Advice)
e Electricity Easements/Substations
DIP (Concurrence)
e SEQ Regional plan
‘ VARIOUS, -
e Conservation estate (Advice)
“OTHER STATE AGENCIES + TRIGGERS 300 kgf Bo ge] Elli P i 3 te
NA boty SRB eo Uy RR a GEE ea oe HIN eg at Be ey: i ee ee
.OWNER’S CONSENT,(State land) Sg ys ones I Ee URE) Sepa |Get Me @
Were Sie ¢ “s Ma ‘ sac ety : aa! ee we Lo ne Ma less en RS : : tee . cate 7 i gh 4 aa ” Ce
Department of Natural Resources and Mines f
EPA We
For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning. : .
NSC g:Manduse\administrative processes\application checklist.dac . :Section 3
TR Ea en mg RE ge nD SAN oe TTR
. , . . - 4
. aa
Trish Sweeney si
y fs
sXe
. + A,
From: Trish Sweeney + 4
Sent: Thursday, 28 May 2009 4:23 PM wire
To: ‘[email protected]' =
Subject: FOR STEVE BELT - Application 98 Hilton Tce ~ #5
" 74
Hi Steve, . eo gd
| am in receipt of your application for a jetty at the above address - everything appears to be in order, however, Council -“* :
imposes a refundable bond of $500 for jetties, payable at lodgement to ensure compliance with the approval. The A fy
application is deemed "properly made" but please provide at your earliest convenience. oe Bi
Regards, Trish ry
- of
a . os a
ey . woe : . ‘ sey
*s Trish Sweeney | Administration Officer Lege
+, » Planning Assessment’- North | Tewantin Office “ - . woop
" . : 8 . - € “lt 2 4
y Sunshine Coast Regional Council | LS, wits
. Ph: (07) 5449 5293 | Fax: (07) 5447 1062 - . , wath
~ ey
o ' a an . al . c ew " re Mt - am en a,
. . we le ‘ . . Sy
. ; og:
Ae
a
. Yee
, “Be . at
eo ot . fyi
‘ ; : ee
. ‘ . : ¢ ve _s #
. yt ” ve sh
/ _ ™ + ve
' i ‘ h 4
. ‘. os
. at ee
. : . we a ae a
a Pe gas sth
et, ‘af
ot a : Be eT cyt ad
' hig wo ee me a .
. ‘ oe ms . 2 % a Fy,
. ae thet
- 4 . ;
. lt a4
: ‘ . ate
. was ma HS
' ge 5
” : het
ke ; : o * . : Ws
ates 4 6 ; . 37"
: . coe Se ee . tae
. . t . we wd : >» oat ; ne ey »
“1 . ti .. ; “yt o sw ed : cs . a. '. . ‘ ve
te Ry ge te
: 4 oy v . aa og! ‘. & . A 4 . ge we yt . ; 4“ yt “ ae ot.
ee ccc tame a GN EME ete hadi ork igs te pete ne ec name. ne weet ppt a) om, vee TQSection 4
Be fel fh? i Ss
. “vw el :
y a
‘ge E T a C 'y- 3)
‘ae 7
b db eS
Bie
i SPECIALIST
ee | SERVICING THE EAST COAST OF AUSTRALIA AND SOUTH PACIFIC REGIONS ‘
i "
( 27th May 2009 *
co Sunshine Coast Regional Council |
vad PO Box 141 Ue
inl ‘, . TEWANTIN QLD 4565 \
Uutpne, a AY
re i , iN
oo . oils
oe ATTENTION:- DANA McKENZIE ° iy
@ RE: TH OFFERMANN fm,
— _ LOT 6 (98) HILTON TCE | | AH _
- , NOOSAVILLE QLD 4566 | NE
Pursuant to the Coastal Protection and Management and Other a b
Legislation Amendment Regulation (No.1) 2005, we wish to make AY
application for Prescribed Tidal Works under the new Code that on
was adopted on 17 November, 2005. ~
: fie :
Please find attached: oo i a
| Do! 1. IDAS A and P forms and Assessment Checklist Mie:
| 2. Two full sets of plans including constructional details . % _ : io
' LS 3.. Proof of the land owner LADDER | ty.
4. Concurrence response from Queensland Transport (Regional Harbour 4 tet Fi is
| Master) OR Ihde te
a 5. Resource entitlement and concurrence response from Department of Ps Nene
: @ Environmental and Resource Management o ak eNne
6. Required Fee % So
. Please note the existing jetty will be removed upon approval of this proposal. ED
. . %,
ts Pursuant to Section 3.2.3 of IPA, we look forward to your Acknowledgement @m» i
Hee! Notice within 10 business days after receiving this application. Ash. 8,7 ie
- Yours faithfully : fy REA A oT Com "
The Jetty Specialist fe] A CEIvE RB Ye\ :
fl OG re)
! \ | Feeveuantin hy 72 a
MR STEVE BELT Oy meee J :
Applications Officer a NL .
| . — Bh
|. _ THE MARINA SPECIALIST PTY LTD TRADING AS THE JETTY SPECIALIST - ABN 32 010 633 119 iu iy
oi yate vi2 Industrial'Avenue, Caloundra Queensland 4551 Australia , E lt
se ai 4. 4 Telephone 07, 5492 5925 Freecall 1300 133,155, Facsimile 0754926699; * ™ Quai
rates Me ‘:"” Web: Page - www.thejettyspecialist.com.au:. \1’.Email - [email protected] ‘; a, ° Campany |
wd Ae dates ‘ . Ps I no oer
et Bre eg Fagin’ bore th
2 boy elena, 4 iy + wwe bs at : . . oe ae oatSection 5
* te . 4 .
7 INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
7 ‘eel er a A
Form 1 Development Application. ~~. idas
7 Part A
oe
say
ie .
\ Common details
ae
NOTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.
‘Applicant detallS: (he Appicant i he person responsibe for making tte applicalion and Reed not be the ounerof fe and, The AppICaTT mS /eaponsible for ONSUFTG Te |
{information provided oh the-1DAS Application Form is correct. This information is Felied.upan by the Assessment Mariager and any referral.agencles when assessing and 4
decidiig this applidation,” By lodging this application, the Applicant incurs the obligations and résponsibiities prescribed by the IPA Any development permit or preliminary’ i
approval that may be issited as a conSequerice of this application will be issued fo the Applicant) ESAS sei’. Gita Sihik aN eta
Individual applicant/Contact person {if there is more than one applicant, provide additional applicant details on an attachment to this form)
Title First name Lastname [OFFERMANN
Postal address C/- 2INDUSTRIAL AVE, CALOUNDRA QLD 4551
Contact telephone number [07 5492 5925 Mobile phone number [fr ssiszY
Facsimile number 07 5492 6699 e-mail address [
Details of the premises (fe. the and on which the develooments proposed velar ine odeeatmeendolmelom i in nik tat
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
[TREE seo na eve eee we a oie a enporay ERA ope oreo
A
OR
Table B Street address for the premises (fick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
@ (i) (_] Street address / lot on plan for the premises (Appropriate for most applications including building applications); or
(ii) [X] Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.9. jetty
pontoon etc) (Note: Loton plan details may be obtained from title documents, a ‘Rate’ notice, or from the local govemment.)
On ae ae eon eae peeeeag tae
Unit, | Street ier oe AE ep nan of Pee HE, dios .caims sgl oe
hee | Ne E Sibel nome and ofl ibrar sears pine | Plan Number; MA a ANT Sn neta
[1 | fos | HILTON TCE, NOOSAVILLE }4566 [6 | sP116708_| SUNSHINE COAST REGIONAL COUNCIL
AND/OR
Table C Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay} etc.)
tas Nate: fe isl icf onotl Fear By er ee ae | 2 g.batin ig ai eeecnes
oe ee cna a ee er ees
go Cam: © Nething eee cag [ie eeu Reference: Be AS emuudeas ey tse (if epplicableje sie
Pe de a ee a
Past: ced [ieee cage a ek hae Nite L PHP aaa te, agen | Bae go ue Mt ee a
[J pepags
LI wese4
[_] Other -
. 2. _ Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)Section 6
te
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
be ath 28s ohh Gx. Name of water body, watercourse or aquifer (if known) i. goed, a. ae
1 | NOOSA RIVER
Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
‘uti, _ Lot on plan description for strategic port land 0.2%]. albeit _g Port Authority for the lot xdligees al
Table F Complete if the premises are in tidal water
«casitalame of local government for the tidal area (if applicable)..." “&¢, Name of port authority for the tidal area (if applicable): « y
3. _ Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
athaiis... enrAsde Totalareaof premises <3 sa Sakis. 4
oso DX) m2 [J hectares (Tick applicable unit}
Existing use of the premises og). duce oie le a ge cathe, an
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overtand flow, water efc.)?
&X] No C] Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
Proposaldetails. eee v mr — *
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 Jot residential subdivision; a bore, aquaculture)
TIMBER JETTY ,
7. Does the poposal include new buildings or operational work {including any services) on the premises?
CL No — [X] Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
Resource entitlement (i applicable) :- futher information Is provided in the advice section at the end of the form ak sai, Syetuoemes, A a. aged
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc. )
Cj No - Goto a9 XX Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section
Nature of State-owned resource 6. Land that is unallocated State land under the Land Act 1994, other than to the extent that item 17 applies
AS OSU erate, Ck oa sae:
ue ve Se sgt 9 CYUGHOFH WH GHSVIEGP ICMAMLID) WH DOGAPWL994 LY VOMMIIHS—{D) WH GHYHBSP HOAY FROMIANOWZ IW OO
Table G Nature of evidence required | allocation / entitlement; or (b) the development application may proceed in the absence of an allocation /
See aE es pe eT ment”
Allocation/entitlement |, Name of authorising | Position of authorising} State Government * | * Date of » | Date of
reference number "Officer 2 © officer Department . issue), | expiry .
SE981AP2861; MCYg| BEN SALE DELEGATE DERM 2506/2009 | 25/11/2009
Owner's consent (if applicable) :- further information is provided in the advice section at the end ofthe form. ake Mm
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal! Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.
“Premises Owner'snamels | Details of the premises owned etnies ey »,;, | Date consent ,
Table H and postal address 2%] (street address oat on plan descition) f°: | Cwners So Ta ee” | “was obtained
“ Owners signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the [PA website .Section 7
“~ INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Attachments and supporting information {Complete Table | Use a separate sow for each type of attachment or information, including information "required Biel
lunde his Par). Please’ ensure al acumaton submited wih tis fom, ining other Pets of Frm. or owner's consent ef are securely atthe tots Pato the Form.
[gee Description of attachment or information "Se)y “Nae Tite ir appicabley Sean | 8 Method of delivery to.
Table | _ (09. Parl C of Farm 1 owners consent evienes ofresouree. |. 6 General authonly Jams SteetTiaic Repord | *” DSC 4 < |-aeéecement manager | |
Hao @allocationfentitement plans, drawings, reports) WIE]. intowaatlar < navraaRe A LeBeate | Gy Saw ES | csmeenanaiy. cree es
, PART P OF FORM 1 PRECRIBED TIDAL WORhS 11-Mar-2009 |mat
, [2 — [ASSESSMENT CHECHLIST ee
ENGINEERS CERTIFICATE CARDNO (QLD) PTY LTO 09-Mar-2009 mai! =
[4 | SITE & WATER ALLOCATION PLAN JSP-SJ-21811 ISSUE A 24-Feb-2009 |mall =
LAYOUT & ELEVATION PLAN JSP-SJ-21810 ISSUE B 02-Mar-2009 |mail =
Portable Long Service Leave (PLSL) levy. (Applicable fr certain bulding and construction work valued over $60,000 on) amc hyenas, atte
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if applicable)
[_] the application seeks a preliminary approval only;
[] the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
@ regrowth, thinning vegetation or controlling weeds or pests);
(X all costs, that relate to the work both directly and indirectly, are less than 480,000, inclusive of GST: or
[_] the work is being carried out under an owner-builder permit issued under the Queensiand Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given. a .
11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)? .
DX] No - End of Part A
Cf Yes - Answer Q12 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
; Receiving officer's Ih Reference
Fee (9)/2.Q 0 | Date received 244 a name Ae — numbers oF / TU
NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER | TUS Sra a)
AP tee st Wit a ee NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTINER eee ee
To: fea 'have been engaged as the private certifier for the building work referred to in this application.
ge Date oF BE | Reh sche Raa, Saisie Tar La Ah aaa SN, ge eee nai] GN oN ANNI late ay ag icatone el
pees ie Fe fe pe Le Name pot : fo a eae e BSA Certification number : r F bulgrg ‘classticatonis :
jeengagement bi aii a till ears MSG aU anelE al ESA Re RE nie vel [Acuna sate lipns nS rs RM oct oxalWi te
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Srnee ne. et RO RRR | Rese: | es | Date receipted.:) age Se aie eee
ai ee ee Mou i a ae ee ea ‘1: form:sighted: by Nate foes oe oncrtet
ee Dect plore the wor ay es Queave Frokeet Number > amount pad (8) | Datespaid “essessment | 5 ei tombani es .
Bienes ae ca oh oe aii oe ts sk oe i uae: Lae pal assessment) 3 i em een ie ee .
Cie ue oe a ee he
ep
Privacy Statement ,
The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by tegistatin (including the Freedom of Information Act 1992} or as
required by Parliament. This information may be stored in @ DIP database. The information. collected will be retained as required by the Public Records Act 2002.
Advice for completing Part ASection 8
a? a
le INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008
a We
» % Form 1 Development Application . - 7 oFeIS
3 Prescribed tidal work
Naturg.of the prescribed tidal works Sots.) oy Move Ee wee ee
PO a eee eee = ee atunmtetn Leone 1. ic ee, Ge en ee ee eee
1. Whatis the nature of the proposed prescribed tidal work and the type of approval sought? (Tick applicable box/es)
| rico | Rises tan Demet ompoalst
~ He Nature of use ay 187 Estimated value ‘of [i sae iy Pisin es aridity
: DB] (i) Jetty, pier or wharf DalPrivate use es 162.00
i etty, pier or wha . 162.
P (1) Non-private use
0 i Boat ‘I [“] Private use
i oat ramp or spillwa
porspuey [-] Non-private use
@ (_) Private use
LI i oP (_] Non-private use vA P
iii Mooring pile Development Permit
CJ. (iv) Deck or boardwalk UW L] Preliminary approval
Private use imi
(J Non-private use
C] Pontoon EI
; Private use
(_] Non-private use
; _ ["] Private use
[] (i) Revetment, sea wall or retaining wall
(_] Non-private use
g (vii) Other (e.g. abutment, basin, bridge, breakwater, dam,
dock, dockyard, embankment, groyne, pipeline or other C] Private use
underground service etc.) - Provide details below
© 2. __ Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of the lot connected to the
work and neighbouring lots are not at right angles to the waterway?
<] No
C] Yes - Submit, with the application, photos of any constructed neighbouring structures. or information about approved but unconstructed
neighbouring structures.
Prd tT oe Neon a sera) Canree dg AMT! Tne NOE EOC Ty Meee ao oo ee eae
Adjoining property access and evidence of support A ee ee ee ee
3. __|s the application supported by evidence that the proposed work will not prejudice the access rights of adjoining property owners?
[-]No [1 Yes - Complete Q3(a}
3(a) What is the nature of the evidence?
[_] Letters of support from adjoining property owner - Submit, with the application, the letters of support.
(X] Plans illustrating a water allocation area - Submit, with the application, the plans iltustrating the water allocation area.Section 9
INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008 *”
Ce ee ee es ee ee ee ee ee ee ee
4. Has a Registered Professional Engineer of Queensland (RPEQ) or interstate equivalent certified that the works comply with the design
and safety provisions of the State IDAS code for Prescribed Tidal Works contained in the Coastal Protection and Management
Regulation 2003?
[-] No
[IX] Yes - Provide details below
Name of RPEQ or equivalent ~~ ae CARDNO (QLD) PTY LTD
RPEQNo. or equivalent’ NR SRE "1667
Contact mailingaddess. A ge P.O. BOX 388 TOOWONG QLD 4066
Contact telephone number = E107 3369 G09
Contact facsimile number Gye Me “107 3369 9722
Reference number of all plans to which this certification relates |JSP-SJ-21811A / JSP-SJ-21810B
5. Confirm the following mandatory information accompanies this application.
“Confirmation of 2 |<. #088 Minne
"Sfodgement °° Method of lodgement
Bete ren a
Plans and written documentation. i Unies wha, Ga, lean tli, ac. lS,
{i) The location and dimensions of the proposed tidal work in relation to the lot/s abutting the proposed & Confirmed
work and the tidal land on which the work is proposed to be located
(ii) All other structures on the waterfront and within 20 metres of the proposed works Confirmed P|
(iii) — The current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide (HAT) and Confirmed
Mean High Water Springs (MHWS} ao
(iv) The slope angles of the beds and banks of the tidal area EX] Confirmed P|
(v) Details of the proposed work in accordance with the IDAS code for prescribed tidal work in the
Coastal Protection and Management Regulation 2003, schedule 4A (e.g. physical appearance, fighting, |[<] Confirmed
signage, earthworks, public access, infrastructure, structural components, engineering design standards)
(vi) The finished levels of the proposed works [X] Confirmed po
[X] Confirmed
(vii) Details of the largest vessel, if any, to be moored at the structure
[_] Not applicable
{vii} Evidence that the proposed work will not prejudice the access rights of adjoining property XJ Confirmed
owners [_] Not applicable
eee
OFFICE USE ONLY
Date Received Reference Numbers [ T EPA cost code | 433061Section 10
4
* t °
ng INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
oa aN i i mo s e 5
1% ‘3 Form 1 Development Application foFeKs
rig
oy Assessment Checklist
ee eee dase be AND eda a moe ee ee ie pe es es are | 4
IDAS Development Application Form: 1'is-‘the’approved form-for-all development applications under the Integrated Planning Act 4
wo dees #4 uo Raa aaiellige” SZ RRSRNER A IRR Ef caer RN Sy Saal! te ani 1 RERSES SRE e TS k Fi Sa SUES RHR CE Gog ag EMER aa gic
tS was eee eae. -1997.1PA)® Form.1-is made up of various Parts-<. Goa ta, eee ts Eek.
Be ee ARE Tee EE Sai EID ea APSE a aM I ae a HL toa ee ee
Part A (Common.details) of. Form: 1 must be.completed for all-applications«: The relevance of other Parts of Form 1. depends on...
* Pi piten en : a i ee i ee ee Gee ‘the nature of! the application: “4 es ate ee i eee SRK seh cats ee - ;
rt a -. é ile Ber eh ioe saat eee tee eg a BS Po sae a Si eg A fee Set 4
k: Form 4.also. includes.this IDAS Assessment Checklist, which Is used to assist.in determining State assessment and:referral oh
Berar eee Vathiuals a fequirements,"and the Parts of Form ‘(relevant to the application) 20 eee
Ese aS NET SSSI a Saeco QE i MC ARE eS Se LESSON e's ge ru SE Nie cn aaa rtm ah a AR Lag acd Ih ul CA cata ad a carl ie akg
Gas Oe PUNY Sree td AMID. SR ack NE maine Se ute. Bam pemeel SA a: Sea ater my HR cael: Sn Aten hd SPEER ay Wah SER Sette 4
re, Section, 1 and-all other relevant’ sections ofthe: IDAS-Assessment Checklist,as identifies rin:the Table-belo F must: beste tox
fi Sen bre nah ut ator deen ieee me Te, Under agape edie, es nad seidine ie gh aalpamdilbrte oe. Maran iaaee ekg re G
jcompleted for. all. development applications except those proposed on. land in an urban. development area, or.for: building work...’
Pe ee | 3 requiring assessment against the Building Act 1975 only: = ety. ie eet ees
Co ee ee ee ee a eee
f) Eor:more:information:about development applications:on,tand in, an.urban.development:area, refer:to.www.ulda gld.gov.aus <4
Fee rhs a eee han rt NG oan oa, eeu ate abate IS Vy IED Teas alee MENTE estate gamer ete
pee For more advice about building applications feter to Part B of the IDAS Application Form. a py 4
i ae Be Ca RRR a mer Dn UN ne eA ae aia mn ara EP Ae tecacek
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local government or log onto the DIP website www.dip.qid.gov.au for help
For all IDAS development applications (except those tor building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist
Does the application seek approval to make a material change of use of the premises? Ces |5gNo
ifyes - complete Section 2 of this checklist
Does the application seek approval to reconfigure a lot?
if yes - complete Section 3 of this checklist and Part F of DAS Application Form 1. If the premises are completely within a single };L] Yes |(X)No
local government area assessment is by the focal government. ,
Does the application seek approval to carry out operational work? ; pay N
if yes - complete Section 4 of this checklist es |LNo
@ Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Ces |BQNo
if yes - complete Section 5 of this checklist
Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?
if yes - complete Section 6 of this checklist & Yes
Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? L)Yes |XINo
if yes - complete Form 1 Part E of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. CiYes |—JNo
Assessment is by a building certifler
Do you wish the application to be assessed against a superseded planning scheme? ae
If yes - complete Form 1 Attachment 1 OCYes |&No
ls the application for development completely or partly on Cairns and Mackay airport land under the Airport Assets
(Restructuring and Disposal) Act 2008?
if yes - Assessment is by the Department of Infrastructure and Planning. Complete Form 1 Part D of IDAS Application Form 1 ifthe |) Yes |No
application is for a material change of use. and Part E if for building or operational work, Also, the application must be referred to the
local government as Advice Agency.Section 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
ETHAN 4 cote ect epee col a ON eaU ERI Ma OREM Cee CMO ME RC Meee | ea
nS ECTIO N Al = Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist’. ° 9/484
1.4A Is any part of the proposal intended to be carried out on a Queenstand heritage place under the Queensland Heritage Act 1992?
XX] No-Goto178 [_] Yes
IPA, schedule 2. part 7. fable 5, tem ZIP Reguistion. schedule 2. table 2, Hem 18.
1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
(X] No-Gotoa12 [-]} Yes
IPA, schedule 8. part 7. table 5. tem 2A, if Regulstion, schedule 1. part 2. table 5. tem 2.
REMOVING QUARRY MATERIAL; WILD RIVERAREA Sac), Gia gms: wear «wea om
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
DX] No-Gotoat.3 [_] Yes
. IPA, schedule 8, part 1, lable 5. Hen: 1; IP Regulation, schedule 2, table 2, item 11; IP Regulation, schedille 1, table 5, tem 2 (wild river areal: Water Act 2000,
section 965C; Wild Rivers Act 2005, sestion 43A
[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA ee: So Lie he ih Se cae dl
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gotogt.4¢ [_] Yes
IPA, schedule 8, part 1, table 2. item 1; IPA, schedule &, part 1, table 5, tems 3 and 4: IP Regulation, schedule Z, table 2, tems 1 and 2: Environmental Protection Act 194, ssction
734A (wid river area}; Witt Rivers Act 2005, section 434: relevant wed river dectarahon; Wid Rivers Coda.
WITHIN THE LIMITSOFAPORT ee wie se
1.4 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
BX] No - Goto Q1.5
[_] Yes
iP Regulation, schedule 2, table 2. items 15 and 76
DECLARED FISHHABITAT AREA. Bee xa
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
DX] No - Goto 01.6
CJ Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, sch@
, 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). ff DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2, table 2, item 26
COMMUNITY INFRASTRUCTURE 2 Ee eee
1.6 Is any part of the premises designated for community infrastructure?
[X] No - Goto 01.7
[_] Yes
IP Regulelion, schediile 2, table 3, tem 7
WASTE WATER MANAGEMENT. ae See NS me Pe ee ey
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[X] No - End of Section? [_] Yes
IP Regulation, schedule 2, table 3, item 5Section 12
af .
“s INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 22
CE FOTIA NA ee EES Oe ee er oo ee a enna °
EGE 0 Ds Ap ee eee el ce Sa ARRAN Ca) Hie aaa she lors Mn On ajc vi pe vs Ns SSP MEE ane Aa aa
SECTION? 4 sccion 4 must be completed when the application seeks'approval (6 camry out operational work su ac
. UTTAR ES OP Ie Re ee i ag he ee re ee ee Mt Re Le PEP TEC EMME ER op trea he ee
41 ls the proposed operational work assessable under any State planning regulatory provisions?
- []No XJ Yes
. "If yes, is the proposed operational work assessable under the planning scheme?
;: [X] No - Answer 04.1.1- 4.1.7 [[] Yes - Complete Form 1, Part E and answer 04.1.1 - 4.1.7 below
| So ee ee ee oo ae
<br ah; ; LED: Dinges oecaa Ng ae ge gant se RIS ae EY 8 a fi ase eM ds dane erie eine Sano palais teaite atest sien SRM RNa aut a ete ce
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[X}No [] Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, ;
schedule 5 and does it exceed the threshold? ;
; [X] No - Gotoa4.1.2
C Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation. schedule 2. table 3, tam 3; IP Regulation, schedule 2. table 3, item 1(b)
QO NCDSULEATE: SOLS ee a ee fe
Sd ht ie dati atc ds EGG we Pd AONE SELL ie ee Se Re ee NT eg eR Re ra SRE EEE: iene ni nea
4.1.2 Is any of the operational work proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
[[] No -Gotoa4.1.3 X] Yes
4Taurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
[_] No
Yes -
mo, .. If yes, does the proposed operational work involve the following?
(i) Excavating more’ than 1,000m? of soil or sediment at or below 5m AHD No 4: (J Yes
(ii) Filling the premises with 1,000m? or more of material with an average depth of & No CT] Yes -
0.5m on land, soil or sediment at or below 5m AHD ,
2
If yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Water (NRW)
©} as Advice Agency
IP Regulalion, schedule 2, table 3. tem 4; Slate Planning Policy 2/02: Pianning and Managing Development involving Acid Suffate Soils, section 3.6
EASEMENTS AND SUBSTATIONS: Si ee
EASEMENTS ANO-SURGTATIONG. Conte ee ee ea eh ee an
H f i . eee f ‘id, aay ete taht ae Kiso ote tae let EWEN Loic e cheat yee Pha ah gen rere ne oa Bias ae
4.1.3 Is any of the proposed operational work for filling or excavation?
IX] No -Goto 4.14
[_] Yes
IP Reguiation, schedule 2, tadie 3 tem 10(a), IP Regulation. schedule 2. table 3, item 10/b) .
4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
XJ No -Gotoa47.5 [] Yes
IP Regulation, schedule 2, table 3, lem 17
PUBLIC PASSENGER TRANSPORT gh ie ee
ES ee a eee Cen. See me eee EMR Ree ee a eee ee
4.1.5 Is any of the proposed operational work listed in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the .
specified threshold?
No- Go to 04.1.6 [_] Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
. IP Reguiation, schedule 2, table 3. item 14Section 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
RAILWAY SAFETY AND EFFICIENCY. Be De lgaaae, ]
4.1.6 1s any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
& No- Go to 04.1.7 CI Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 18
KOALA CONSERVATION (outside SEQ urban footprint) eGR CR oe ow Site HERE
4.1.7 Is any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
DX} No -Gotoaz2 ([] Yes
IP Regulation, schedule 2, table 3, item 19
WILD RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and industrial 4
~ Pa SOE AEE ovis Fate? ¢ Fe ee eg TORY Ce ee SR RE RF Pees I SOS RE eRe lant ee ot . : ee
development for the purposes of the Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers‘:
Weenies eral ee A ae ee Se S98 Gigs Oe ea eee i oe
ode to thal type of development. ss as ee hs ee a og
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
“hg Bet . OR eg hy PRE pode es
AREA a reg 2 es
4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
[X] No -Gotoas3 [[] Yes @
IPA, schedule 8, part 1, table 4, tem 2; iP Regulation, schedule 1, part 2, table 5, item tfc}
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or conmmercial development iaside a designated urban
aed}
KOALA CONSERVATION (Inside SEQ urban footprint) ee ee
4.3A Is any part of the premises in an interim koala habitat protection area?
. [EX] No -Gotoas3a [[] Yes
IP Regulation, schedule 2, table 2, iteni 344
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA 98 "yo, Suge) SWI oe",
4.3B Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
No -Gotoa44 ([_] Yes
IPA, schedule 8, part 1, table 4, items 14-1G: iP Regulation, schedule 2, table 2. item 5 {vegetation clearing}: IP Regulation, schedule 2. table 2, dem 34 (koala
conservation); 1P Regulation, schedule 4, part 3, table 4. item (vegetation clearing/wild river area): Vegetation Management Act 1999. section 22A (vegetation
cleaing/wild river area); Wild Rivers Act 2005, sections 31F and 434
[TAKING OR INTERFERING WITH WATER; WILD RIVER AREA 1 0 8 a [email protected] Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
BX] No -Gotoass [[] Yes - Answer (a) and (b) below
IPA. schediae 6, pitt 1, table 4. kems Sia): IP Reaulation, schedule 2, table 2, tem & IP Regulation, schedule 1, part 3, table 4, items 3 and GA: Weier Aet 2000, section 965A Wid vier
areal: Wild Rivers Act 2005, section 43A; relevant wiki ver dectaration; Witt Rivers Code
45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
[EX] No Gotoos6 [C] Yes - (Complete Form 1, Part K,) This application requites assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule &, part 1. table 4, lem 3(b}. (P Regulation, schedule 2, table 2. item 8; /P Regulation, schedule 1, part 3, table 4, fie 3
Wild Rivers code (Note: the code dees no? curently contain applicable provisions fer taking or interfering with artesian water}
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water}?
EX] No -Gotoas7 —[_] Yes - Answer (a) and (b) below
IPA, schedule 8. part 1, table 4. em Sich: 1P Requiation. schedule 2, lable 2. tem 8, iP Reguilalign, schedule 1, part 2, lable 4, item 2, Water Act 2000. section 96GA {wid ever area}:
Wikt Rivers Act 2005, section 434; relevant! wild river deciaration: Wiki Rivers Cote.Section 14
“h INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck fo pump water)?
[X] No -Gotoazs [_] Yes
IPA, schedule 8 part J. lable 4, tem drei): IP Regulation, schedule 2, table 2, tam 8: [P Regulation, schediile 1, part 3, fable 4. tem 3
Water Act 2000. section 986A (wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
iid River code (Note: the code dees not currently contain applicable provisicns ior sub artesian water!
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
| interfering with overland flow water (other than using a water truck to pump water)?
No -Gotoa49 [_] Yes - Answer both (a) and (b) below
IPA, schedule 8 pan i iabie d. vem Tic}(i and aj: IP Regulation, schodule 2. tale 2. hem 9. 1F Regulation, sohecite 1, part 3, lable 4, tom G4: Water Act 2080. section 9858 fwd
river areal: relevant wid fiver declaration. Wis Rivers Code.
49 Is the proposed operational work for the following?
() For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
& No [(] Yes
Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% K) No () Yes -
If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
@ IPA, schedule 8, par’ 7. table 4, item 4;1P Regulation, schedule 2. fable 2, item 19
FINAL WORK WILD RIVER AE ee oe Ba ee eee Se AE A acca eee igen aCe ae
| RIDA WORK: WIED RIVER AREAS UG C0 ee ee eee
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA? .
[_] No -Gotoas11 [XJ Yes - Answer (a) and (b) below oh
(a) Is any of the proposed tidal work prescribed tidal work?
1] Yes [_] No
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild
_ Rivers Act 2005?
. BY No [J Yes a
hy ey ‘ : .
, If no, is the work proposed in a canal?
, [-]No [_] Yes .
(b) Is any of the proposed tidal work to be carried out in one or more of the following tidal areas? —_
(i) One only local government tidal area [_] No [Xx] Yes
(ii) Starting in one Jocal government tidal area and extending into another local
@ ; ; . . >] No [] Yes
government tidal area (but in no strategic port tidal area}
(iii) two o ore local gov g in either loca DJ No C] Yes
iii In r more local government tidal areas but not starting in either local
government tidal area ;
(iv) One only strategic port tidal area (X] No [] Yes
v A tidal area that is not a strategic port tidal area or a local government tidal.
(v) gic p g OJ No [ Yes
area
, ' Note: The answers you provide in (i) - (v} above may affect who the Assessment Manager is for the application. -
: IPA, schedule §. part 1, lable 4, item S: IP Regulation, schedide 2. table 2. items 12, 14 and 17; IP Regulation, schedule 1, part 3, table 4, tems 4A and 5 x
Coastal Protection and Management Act 1995, section 104A (wild tiver area) “i
COASTAL MANAGEMENT DISTRICT WILO-RIVER AREA cs SUNS ed
COASTAL MANAGEMENT DISTRICTAWILD RIVER ARE ee ea
4.14 Is any of the operational work proposed to be carried out within a coastal management district?
[_] No -Gotoo4i2 [XJ Yes “Section 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
If yes, Is the proposed operational work for the following?
. {i) Interfering with quarry material on State coastal land above high-water mark No [1 Yes
(ii) DLVSRVIQg Ri GLHGgH VSRIGRURWKHUVRGG wOWMl P DMMLUIDOLO WEDOwDWLA &) No CI Yes
; (iii) Draining or allowing drainage or flow water or other matter across State costal land above No C1] Yes
high-water mark
{iv) Constructing or installing works in a watercourse where the works are not assessable under 6} No OC Yes
IPA, schedule 8, part 1, table 4, items 3 or 4
(v) RHFGIP [OQ @0G uQGHJMGOOWDM & No (Yes
(vi) Constructing an artificial waterway, other than a canal, associated with reconfiguring a lot — No C) Yes
(vil) Constructing an artificial waterway that is a canal, associated with reconfiguring alot © —J No Yes
(viii) Constructing an artificial waterway not associated with reconfiguring a lot on land, other than BJ No CD Yes
State coastal land, above high-water if the maximum surface area of water on the waterway
is at least 5,000m?
{ix) Constructing a bank or bund wall to establish a ponded pasture on land, other than State &) No CJ Yes
coastal land, above high-water mark
(x) Removing or interfering with coastal dunes on land, other than State coastal land, that is in i} No C Yes
an erosion prone area and above high-water mark
IPA. schedule 8, part 1, table 4, dem 5: IP Regulation, schedule 2, table 2. tems 12 and 14; IP Regulation, schedule 1. part 3. table 4, items 44 and 5 @
Coastai Protection and Management Act 1995 Act 1995, section 104A (wild river area): Wild Rivers Act 2008, section 434
WATERWAY BARRIER WORKS; WILD RIVER AREA’ * : Zz "ust -
4.12 ls any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No -Gotoa413 [_] Yes
IPA, schedule 8, part 1, taba 4, dem 6: IPA, schedule &. pari 2, table 4, tem 2; Fisharies Regulation 1995 1124 {sell-assessabla codgs!: iP Regulation, schedule 2, iable 2, Rein 28: IP
Reguistion, schedule 1. part 4 lable 4. item 6; Fisheries Aci 1994, section 78D twits river areal, Wild Rivers Ace 2005. section 434.
DECLARED FISH HABITAT AREA; WILD RIVERAREA "=. « a oe lect
4.13 ls any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No - Goto Q4.14
[_] Yes
IPA, schedule §, part 1, table 4, item 7: IPA. schedule &, part 2. table 4. dein 3: Fishores Regulation 1995 $1134 jself-assessable codzs), 1 Regulation, scheuulz 2, iable 2. item 25: PF
Regulation, schedula 1, part 3 lable 4, iteni 7: Wild Rivers Act 2005, sections 43A; Fisheries Act. section 76DC pwild river area}. .
REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVERAREA
4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994? ©
EX] No -Gotoas15 [_] Yes
IPA, schedule 9, part 1 fable 4, tent 8: IPA. schaduls 8, pert 2. ble 4, dem 4; Fishenes Regulation 1996 s112A jself-assessable codes}: i Regulation. schedule 2. table 2, item 20: iP
Reguiation. scheduly 1, parl 3. labie 4, tem 8: Fisheries Aci 1994, section 768 (wild river area); Wiki Rivers Act 2005, section 43A; iaievant wild rivar decaration; Witt Rivers Code.
WILD RIVER AREA eee Ter ae aaa
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No -Gotoo416 [_] Yes
IPA, schedule 8, part 1, table 4, item 10; IP Regulation, schedule 2, tabie 2, tem 37; Wild Rivers Act 2605, sections 42, 434
STATE-CONTROLLED ROAD "* nr rd ee ee
4.16 1s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
DX] No -Endofsection4 [_] Yes
IP Requiation, schedule 2. table 2, itam 3
& .
4
‘Section 16
Of oa Pera. Roast - ee "agen + “ + ma mo . i ae ° . nd a Sao cow Do sie bo
er ss . «+ eR eieer 4 ¥ : “Ae é “ So ‘ a te y “he : Te. . my ae “ Hg cote
: ohm . rr” yer * : ma
: ; my : a
: 3
me
fs
. sya
i? *
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checktist, Version 22 a
“Bet we
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA*® Coane OC a " i” 4
4.11 | \s any of the operational work proposed to be carried out within a coastal management district? dy “3
[]No-Gotoos12 [] Yes ae
. * ‘ ex
__tf yes, is the proposed operational work for the FOO? pe wy
'(i) Interfering with quarry material on State coastal land above high-water mark ‘LJNo |LJ Yes | - 7 ‘. o
:(ii) Disposing of dredge spoil or other solid waste materialintidal wate = ==-ss/§$- -»§-_—=Ss—s ss J No [CJ Yes | ” fy
(ii) Draining or allowing drainage or flow water or other matter across State costal land above high-water (_1No |() Yes | cu Fi we
mark LL | peta
a aa rr i a re
. ; (iv) Constructing or installing works in a watercourse where the works are not assessable under IPA, ‘CINo |) Yes: - " ae ;
t - . . ? . tae ee 3
i “schedule 8, part 1, table 4, items3or4 ee Pi
mo i (v) ,Reclaiming land undertidal watert oe. No [Dyes |} et a.
. |(v) Constructing an artificial waterway, other than a canal, associated with reconfiguring a lot »~-: HE)No|(CVYes j} esi
ai rr a ee
Wee | (vii) Constructing an artificial waterway that is a canal, associated with. reconfiguring a lots. ~-: ~~. {(1No |(] Yes. 1 fie
J | (viii) Constructing an artificial waterway not associated with reconfiguring a lot on land, other than State =| [1] No | LJ Yes } wea oe
f : ~ coastal land, above high-water if the maximum surface area of water an the waterway is at least 5,000m? | [ | Afton
fove cee ma I Te cence fname ance a u
| (ix) Constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land, |] No | C1 Yes | * “ if
@ |G above high-water mark ” et Ay i ; | Moana
, fe tts cred | SN
en : (x) Removing or interfering with coastal dunes on land; other than State coastal land, that is in an erosion (1-No.} C1 Yes | hae
ie 5 . ‘| | _.prone area and above high-watermark. ee | at oy
Lois -~o4 - . . we . a a . ‘ . “a yt . oF Ph . _
o. . es ee De at ee in Re td eg ee ge TA a ai oa
i eS - |” Ifyés to one or more of (i) ~ (x) above, is any of the proposed work,to.be carried out in'a wild river area under the Wild Rivers Act =.) *y"+"" om ‘
‘ , CJ No - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency {EPA}. HfEPA is not the'Assessment ‘Y . a .
‘ foo i. Manager for the application, the agency has jurisdiction as Concurrence Agency. If yes, above, to any Shown bold and marked with the symbol 4, . me Wes :
. pote the application also requires assessment by Queensiand Transport (Marine Safety Qid) as Concurrence Agency. ; o ote a
£] Yes , Me,
4 ® . Spd.
If oY is all of the proposed operational work for specified works under the Wild Rivers Act 2005? . ih
‘ YeS - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it 2 a
we (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is not the Assessment Be Fy
5 ; __ Manager for the application, the agency has jurisdiction as concurrence Agency. it yes, above, fo any shown bold and marked with the symbol 1, the ay a
: | >... application also requires assessment by Queensland Transport (Marine Satety Qid):as Concurrence Agency. Subject to the declaration for the relevant |. u. ra
ca, . wfc yt he wild river arba, thé application also requires asséésment for the purposes of the Wild Rivers Act 2008. ys
af + | -,” [6] No- Aa application for the operational work will be taken to be not properly made ‘and the Assessment Manager must refuse fo receive it. . oy vn o 3
r oa : ie we : a" — . “ : eo " x . . rs,
; IPA. schedule 8. part F tably'd, Kisin 5; 1P Requiation, schedule 2, table 2. tems 12 ond 74: IP Regufation schedule 1, nant 3 lable ’4. itenis 4A end & Coastel Protection and Monogemani atk woe dg
+ | Aol 7898 Act 1995, section 104A fad “ver areas: Wid Rivers Act 2008, section 434. “ St . : ae : re ‘ ess
i Fr a te ee tot at rr ‘ n> ap rarer te eases cenit elmer Oe ee ee ee re ee 1 kES SOR Tale oe he Pg ae hes "
# WATERWAY. BARRIER WORKS; WILD RIVER AREA #2257 a SE OS STR gee LE ote 9° aerate a ote A AR BY 5 Sub tn
4.12 ||s any of the proposed operatinal work for constnucting or raising waterway barrier works under the Fisheries Act 1994? ye
. LIJNo-=Gotoagi3 » Lh¥es sm mo Ba oo ag Fa
* © If yes; is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005? wae gd
" . OO No - ’ j : te a
« : ; . “
i” If no, is all of the operational work for constructing or raising waterway barrier works - tick applicable boxes and answer (a) and/or (b) below “Foc
a i) temporary No | C1 Yes. of
‘ a i . 3 ue
we (0) minor /CINo | DYes lhe,
7 ' . Fi) rahuiltonarenularhasie. ——— . . 2
~ (ii) rebuit on aregularbasis = | [No [Yes | . a
ne (a) If yes to one or more of (i) - (iii above, does all the proposed operational work comply with any applicable Department Be get
yea of.Primary Industries and Fisheries (DPI&F) seif-assessable code? oe eget
oie LJ Yes - A permit foe that aspect Gf the operational wark is nol required. Go to Q4.13 1 No- Go to (0) Oe fay fb 4
‘ ¥. . (b) If rio to aif of (i) - (iii) or no to (a) above - (Complete Form 1. Part Ox) This application requires assessment by the Department of Primary TO ig
. , industries and Fisheries (DPI&F). if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. -? tia vs
‘LD Yes - eo
. If yes, is any of the proposed operational work to be carried out in a wild river high preservation area? ae EL
. OC No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive |. ~ * 2 : J
‘ it (Complete Form 1, Part Os) This application requires assessment by the Department of Primary industries and Fisheries {DPI&F). and. ay
subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is not the hee © 4
. Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. ot 4 hy
. CT Yes - An application for the operational work will be taken to be nat properly made and the Assessment Manager must refuse fo receive it poe Yen 0
‘s ;
a IPA, scheduln & part i, table 4, tain & IPA, schedule 8. parl 2, table 4. tem 2: Fisheries Regulation 1096 5 1154 isei-ossessoble andes): iF Regulation, schettile 2, tabi 2. dens 22: iP “ a” ye ‘
7 Reguiston, sohediie 1, part 3 table 4. tam 6: Aisheries Act 1994, section 760 (wild nver area); Wid Rivers Act 2605, section 43. ® \ en 4
7 5 yee 4
a ee Page 36 . oo . 2 AL
| 7 . . ‘4 : . te . Ae ry
my . : . toe, : : . , ., ‘ : . set sgt hg ah A:
: ‘< a mM e / ie . . : , coe gy A are i
. a woe a7 ~ . 2 +
oh 2 - a . . a ae oY
. "ha we _ or som Lae e ty EO
a Loe ht eee “ers garnet ntact” tae: Oi ate nae ‘epacriaphidagnsa ned yrmmatgebcttinsmbanaltn 6, Ni Beate amb ete sa ptSection 17
= t
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
3 ECTIO NG compte Sete Git you se econ acetals agency: response about an aspect of yout ‘proposa¥ prior. t6 making}
eS REO, TEER ERE Se grate oy ray ees ste oe me Pettis condi catch paagn age ae
Rage SAGs Attar one jon eae ee” Pa Ae, Le EIA oS aa RGR aa hk ade Sed nok
PRE APPLIGATION REFERRAL AGENCYRESPOMSE Ue ST ee
PoE rar PEA): AAV & De EC EEE g SEUSS, EO, ERE oe ee
6.1
REFERRAL MATTERS FOR WHICH A REFERRAL AGENCY. RESPONSE HAS 3# |have you satisfied any conditions ae
BEEN DEC ERIEDTINBES 1D kOe 58 eee ee row src le [og Seay ati «oes a email, AR
BEEN RECEIVED'UNDER IPA S3.2.2"- lista separate mattér inveach row actgue (|stated inthe response? (a aa 6
1 Maritime Safety - Queensland Transport []No (Yes ( No Conditions
Environmental Protection Agency [No (Yes (1 No Conditions
ff yes for any of the referral matters listed in the table above - A referral for this matter is nol required, and the relevant Part identified in the IDAS Assessment
Checklist is not required to be completed. A copy of the referral agency response and evidence
of how you have satisfied any conditions stated in the response must be attached to your
: application.
if no for any of the referral matters listed in the table above - The relevant Part identified in the IDAS Assessment Checklist is required to be completed. The
, application must be referred to the relevant referral agency, unless the referral agency is the
Assessment Manager.
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
@ this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
: To the full extent permitted by law DIP expressly disclaims alll liability {including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.
,Section 18
SAN Te ay : ,
Queensland Land Titles pO Page | of 1
; CURRENT TITLE SEARCH
NATURAL RESOURCES AND WATER, QUEENSLAND :
Request No: 5900729 .
Search Date: 13/02/2009 13:24 Title Reference: 50275041
Date Created: 28/07/1999
"ss previous Title: 14511043
REGISTERED OWNER .
Dealing No: 703372223 02/06/1999 ‘
THOMAS HANS OFFERMANN
ESTATE AND LAND So mo ,
Estate in Fee Simple
LOT 6°: SURVEY PLAN 116708 7
County of MARCH Parish of TEWANTIN .
Local Government: SUNSHINE COAST .
Qeaserenrs, ‘ENCUMBRANCES AND INTERESTS
1. Rights and interests reserved to the Crown by . . Lota . .
Se “Deed of Grant No. 10334173 (POR-151) - °. oo
--2. MORTGAGE No 703163965 11/02/1999 at 08:29 | .
BANK OF QUEENSLAND LIMITED A.C.N. 009 656 740
3. MORTGAGE No 703372238 02/06/1999 at 14:14
BANK OF QUEENSLAND LIMITED A.C.N. 009 656 740
4. MORTGAGE No 710530473 26/04/2007 at 09:40 —
BANK OF QUEENSLAND LIMITED A.B.N. 32 009 656 740 ©
ADMINISTRATIVE ADVICES - NIL - 2 a a
UNREGISTERED DEALINGS - NIL : ,
CERTIFICATE OF TITLE ISSUED - No Lo CS
ous ~'Charges do not necessarily appear in order of priority , .
, ** End of Current Title Search ** ‘
COPYRIGHT THE STATE OF QUEENSLAND (NATURAL RESOURCES AND WATER) [2009]
Requested By: D APPLICATIONS ABR - os
, , me , Page 1/1 .
http://www.abr.com.au/live/qldlt/formprocess.php Dos Oo ~ 13/02/2009Section 19
weetinad reer pers RTT BRT RTT Se aT EA scepinestt . wt Looe . a :
Shh rr—<“—~—~—~—~—s—~—~—~—~—~—<“—S SE
ee es :
Ee GE, Be ee he ea Le : s
REID MEE te ee Ce er BEEN OE ° N oti ,
SR ee sere DG Dy -: °°: Coastal development |
a -. Notice of decision — Provision of evidence of resource entitlement :
oo This notice is issued by the Department of Environment and Resource Management pursuant to section 3.2. 1 of the. o ~ , Lo
_"... “Integrated Planning Act 1997 to.provide resource entitlement as delegated under the Land Act (Tidal works and prescribed ~~
“Mr Thomas Offerman. CC: Queensland Primary Industries and Fisheries
:» - Clo The Jetty Specialist: ' Planning and-Assessment (South) Dy
@ Zindustrial Avenue” eee POBox 76
SM CALOUNDRA QLD“4551. 2 DECEPTION'BAY QLD 4508 2
ge “Our reference: , SE981AP2861; MCY2119
. |...’ Attention: Mr Steve Belt a ee
"Ret Request for evidence of resource entitlement for the prescribed tidal works application fora new
“~~ timber jetty in the Noosa River at 96-98 Hilton Terrace, Noosaville, otherwise known as Lot6on
_. >": §P416708 , pursuant to section 3.2.1 of the /ntegrated Planning Act 1997, by Thomas Offermann. -
a DearMrBelt. 2 ©. 0 ua ot. So Te er ee
“+... The Department of Environment and-Réesource Management, under the Land Act (Tidal works and prescribed
: -.. tidal work) Delegation (No. 1) 2008, has considered your request received on 20 March 2009 .and wishes to
"advise you of the decision as specified bélow: oO oe a
oo + | Properyownee: | Thomas fermen Cs SO 7
- [pew Prescribed tidal work son pe a, de.
_-, | Activity description: . _. | Construction of a new timber jetty: , TR -_
Do os 5: | Plan Layout & Elevation JSP-SJ-21810 ~ Revision B dated 2/03/09. =: - os,
> | Plan? Drawing number’ =| [2 _ ns . seine oS
ee ee, 9 "..” | Site Plan, General Layout & Water Allocation JSP-SJ-218113 — Issue A dated
me one © + 1:24/2/09 ae Ft HS oo,
_ | Description of subject land: | 96 to 98 Hilton Terrace, NOOSAVILLE 2 9 0 | py
"| Page 1 of 2+ 080131 eG FS Se eg
oo . Department of Environment and Resource Management. - ae a a
[°° wyewiderm.qid.gov.au: ABN 87 221168786 2 OT aSection 20
eee TENE : : oo a
... @coaccess. - i Mae
"7 7. @aidronmental licences and permits | a SE IS
, Se De oo es | Notices le
Se, __” Notice of decision — Provision of evidence of resource entitlement. .:*.
ee Lot6 Plan.SP116708 = eet
Evidence of resource entitlement is granted. - - i:
oo essen mie: |esReomasee8 ee ey a)
. | +} This decision.is current for 6 The evidence of resource entitlement can be used to support a development | -
os, | Months appliction for six (6). months from the date of this notice. ©.
_". "You aré advised that all applications involving disturbance of marine plants requiré a development approval oo
__~ from the Department of Employment, Economic Development and Innovation (IDAS Form 1 Part Oz). .
i @' is important to note that the provision of evidence of resource entitlement ‘over State land means that the State
. = has no.objection to the lodgement of the application for development approval. Itdoes not) =. 22. me,
an ~e “imply approval of the development application; or OT os oS .
- . € affect functions the agency may exércise as the assessment manager. or.afeferralagency;or: =
“authorise a right to use and occupy land. | BT
- You may need to.comply with the cultural heritage duty of care guidelines under the Aboriginal Cultural Heritage |
_-_. Act 2003 and the Torres Strait Islander Cultural Heritage Act 2003, refer tothe guidelineson 2 |
Wwww.enrm.gid.gov.au, © 0 . a a
a Ifyou require more information, pléase contact Louise Pinn, the Project Manager, on the telephone number listed ~ 7
i Below, Ce 8 et,
Yours sincerely ° ee ye ee ge
pon Sate eB pguittgse eg
- --. Delegate — oO oy oi.” ES -Reg Serv - Bne North.-.Sunshine Coast ak
_.< Environmental Services | . ea oO 468 re oe
__+ Department of Environment and Resource Management... COPTON TREE QLD 4558 speek g
os Do es. Phone: (07) 54596132 5 oo
EE Bas” (07) 443.9927 en
7 Page 2 of 2 + 080131 os . os a, : ” oo : os a - Department of Environment and Resource Management - Oo 4 :Section 21
ee BO eee “ ro
Pe Bees ee Ber fee a eo
rae Ra EEN MSI ten se ee cue er ene ee RSE edn oases cs Seas . So oo 7! “
a ES Se Be : ta
ee A nace PE ee
RSME CS a ee . oO ce ee
OT SE Integrated Planning Act 1997...
- _ Early Concurrence Agency Response _
: ‘ 2 * . . . os — = — — . ~ a
CC This notice is issued by the Department of Environment and Resource Management pursuant to Sections 3.3.2,3.3.16 9
coy)” ahd:3.3:18 of the Integrated Planning Act 1997 to advise of a decision or action. = Bs
-. :i::, Mr Thomas Offerman. ss. CC: Chief Executive Officer So
. ©. Clo The Jetty Specialist - Pepe ty f° ” Sunshine Coast Regional Council. or
gee 2industrialAvenue core oe 6 booked Bag720
* @_. CALOUNDRA LD .4551 eo 2 SOME, QLD. 4560 8” _
Sp re er Our réference:” SE981AP2861; MCY2119
«Attention: Mr Steve Belt a
. Re:. -- Request for early concurrence response a a oo! ae
a _ The Department of Environment and:Resource Management (DERM), wishes to advise that the request for Se
': -. @arly concurrence agency response, received on 20 March 2009, has been assessed, and on 27 May 2009: |
i). adecision was made to issue a response for consideration of the assessment manager when the application”
7... "becomes properly made. © 7 eo
foe “AL : Property/Location: a o ee i
*. gt. | Street Address 96 to 98 Hilton Terrace oe
Oye NOOSAVILLE QLD 4566-0 0
0 LovPlan” | Lot 6 Plan SP116708 BE
4° 2, Details ofthe recommendation == i ne a
ee Pe Aspectof =| _ >|. EPA Decision. . ad
So |. Activity (Referral Triggers , Recommendation | os ri
Sola ts ye ity ( ee ‘ager ) Development naan _ Number i
| Preseribed Tidal Work being” | . Early Concurrence - - rt oo
“-: 1 1. for.removal of the existing «|: Ress snse for “| Granted in full with IPCC01428009 tg
. . ..:| ‘timber jetty and construction . 0 vation Work: '. gonditions STI Pe
Be Pe . ay
he Page Lof2AFO80109 EP of
_.“* Department of Environment and Resource Management aid
. www.derm.ald.aov.au- ABN 87221158786 - . an ok,Section 22
ee cemmena texéze eid pommt Cea eh eek SE CL ad
. 6, OS i ve a Se oo _-. Notice oF e
a __-_._». ‘Early Concurrence Agency Response | ne
“". . -".. "This approval.will lapse Unless substantially started within the currency périod/s set by the Assessment
J...) Manager OR the:standard currency periods stated in section 3,5.21 of the Integrated Planning Act oe
. . | *. 1997 applying to each aspect of development in this approval AND/OR the following currency periods a
_-.._, applying to.aspects of developmentinthis approval. a Se
_ |. 2, °. This approval will lapse unless substantially startedwithin two years,
ls 4 The approved plans
or "- “The' approved plans and/or documents for this approval are;
..-. |: PlanDocument No. |.“ -Plan/Document Name eee | -
- @ © | usp-su-21810. PLAN LAYOUT & ELEVATION. Revision B dated 2/03/09 oe
| SSP-8J-21811. - | SITEPLAN,GENERALLAYOUT&. _—| IssueAdated24/209.° |
. 5. Codes for self-assessable development Sf BO
| - Any self-assessable development for ari environmentally relevant activity conducted in conjunction.
“. ..” with this approval, must comply with. the relevant code of environmental compliance. 8 8
_ &. “Assessment Manager Responsibiities”
fon. ‘Please note that it is a requirement under Sections 3.5.15 and 3.5.17 of the Integrated Planning Act 1997.
._» .that'a copy.of the final Decision Notice (which includes DERM's concurrence response) for this application =.
~-.», issued by the. Sunshine Coast Regional Council, be forwarded to each referral agency..Therefore.could you.
. :|\ » please send a signed hardcopy to DERM’s Ecoaccess Customer Service Unit, PO Box 15155 CITY EAST So
a 4002 and an electronic copy to [email protected]. a ‘
©@ _ In adaltion, the State's Native Title Work Procedures indicate that responsibility for assessment of native title
- . issues for an-IDAS application rest with the Assessment Manager. Therefore in this instance, DERM has not .
.-_. provided a notification to native tile patties. =. -
Ifyou require more information, please contact Louise Pin, the Project Manager, on the telephone number
. 2 listed below. .” a Ct ah pee 8 .
“Yours sincstely
ms EW ee oo . ee Enquiries: a So, et
me DA po . ° + ' +1. ES = Reg Serv - Bne North - Sunshine Coast- - -’
.. «Ben Sale ae oo POBOX 168
‘Delegate .. . 1. ...... COTTON TREE QLD 4558: ep a
_ . ..: Environmental Services. oe _ Phone: (07).54596132- 0 we ce
_°. _» ; ‘Department of Environment and Resource Management ‘Fax: (07) 54439927 Ss
27 May 2008 as rrr } oe oe
pe a | — — rer eee : — —_—ao “ a .
| Page 2of2-arosoiog | | | Department of Environinent and Resource Management +Section 23
Reta et ey eee NG yar eee fas an np aT nS a . mo ce . :
ee
ere ries nae Re ee ee a ee . er Tete,
Perea, © a 82 RRA Me ms
ORSAY SMe RM OR er a ey ip Ae RN NE CE a a gg. Je,
ee ee Sections 9.3.25 5:16 and 3'3.18 Integrated Planning Act 1997
Be eS I a
- 8 Be i os” DERM Permit: number: . : .1PCC01428009 - -.
--) | DERM Permit’ number: - IPCCO1428009 Do”
| Assessment Manager reference: © N/A i
-! > | Applicant: 05.2000 2.2. Thomas Offermann —— : Po pe
“.” ‘1 Date application received by DERM: :20March2009 ee Pe
-.. | Permit’ Type: ©0005)... <>... «Early Concurrence Response for Operational Work. : =. 2 7: on
@ Dat ofDecision: © 2): (27May2009° CP ,
~. < |Decision. : ° 2 - Granted in full with conditions’
. Relevant Laws and Policies: °.- -. ‘Coastal Protection and Management Act 1995andany =». |.
eT i “ +." . “gubordinate legislation - os Se,
~! | Jurisdiction: "Item 9 in Table 2 of Schedule 2 of the. Integrated Planning. 2 ||
ns _ Regulation 1998 a PO,
“.." Development Description St
|... [Property 2: Lot#Plan. ss pectof Development...
. " |96'to 98 Hilton Terrace. . | - _— | Prescribed: Tidal Work being for removal ofthe = |
. NOOSAVILLE QLD’4566 | Lot6PlanSP116708 [existing timber jetty and. construction ofanew ~. |.
on. ep EP timberjetty
“.. -. Reasons for inclusion of development conditions Do
— @_ inaccordance with section 3.3.18(8) of the Integrated Planning Act 1997 and section 27B of the Acts’ ©
-... |. Interpretation Act 1954, the reasons for the inclusion of development conditions are;
".. “The Department of Environment.and Resource Management (DERM) is a concurrence agency under the .
.. | Integrated Planning Regulation 1998 for coastal management under the Coastal Protection and Management
a ' Act 1995, excluding amenity or aesthetic significance orvalue..- = ;
:.: » Additional information for applicants Ss er a,
. "> The standard currency periods stated in section 3.5.21 of the Integrated Planning Act 1997 or thanominated =
".” “. gurrency period, apply to each aspect of development in this permit'. For information on when this permit’takes
'..:. effect and the relevant currency periods, please see point 3 in the Early Concurrence Agency Response Notice... .
_. ' Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalent/similaras =
“+: required by legislation administered by the Department of Environment and Resource Management. - ae
So Page tofa a .
|: ,Department of Environmont'and Resource Management: Q ueznstandcovern
a a QueenslandGovernment .
cr www.derm.qid.gov.au- ABN 87 221 158786 «|. °° Queensland Parkas and Wilditfe Serve = -
“grSection 24
wo | DERM Permit number: IPCC01428009°) =.
: ; Contaminated Land ee oe i! - ot ms ee a oe 7 ES Be me can -
_. ‘« Itis a requirement of the Environmental Protection Act 1994 that if an owner.or occupier of land becomes aware |: .
.. -: @ Notifiable Activity (as defined by Schedule 2 of the Environmental Protection Act 1994) is being carried out on- °°,”
-”..” the land or-that the land has been affected by.a hazardous contaminant, they must, within 30 days after’. =. -
"=, becoming so.aware, give notice to:the Department of Environment and Resource Management. =
- Delegate ST - To a a a
Environmental Services: co Se eh Se EU Tw OO a
oth :, Department of Environment and Resource Management; © Te .
: Page 2efas UES co Stan _ +. Dapartment of Environment and Resource Management. -Section 25
Ay TTAB , ‘ ee
me ot (DERM Permit-number: IPCC01428009°. wo
>) : General Permit Condition = pa a
pe ~~” Agency Interest: Coastal | " : - : . | oe
"4" ": All works are to be constructed in accordance with the attached approved drawings and specifications
. °° ...> listed.in'the approved plans section in the notice.attached to this permit. °°.
5 2. The chief executive administering the Coastal Protection and Management Act.1995'may order the |. ~
ss works to be removed or modified, within a reasonable time, if the works have or.are likely tohavea =... -
te SS . Significant effect on coastal management because.the works; 2 .. Pe a ar.
SF (a) eréate'a navigation hazard:or othier danger tothe publicor
SO , .-(b) cause erosion or land‘degradation; or. =
ae — {e) are unstable or have not been constructed according.to the approved plans. = Os
"+ -" 3: “All reasonable and practicable measures must be taken to prevent pollution of watercourses or.
@ . : Stormwater systems as a result of silt run-off, oil and grease spills from machinery, concrete truck
_ 7” > washout and alike: Concrete agitator wash out must only be conducted in a specified area to facilitate = —
OOD. the removal of waste concrete from the area to landfill. Wastewater from cleaning equipment must not. -
Do . be discharged directly or in-directly to.any. watercourses or stormwater systems... 0. an
= Ageney Interest: Water
..., 4° . There is to be no visible sediment plume greater than 30 metres from the proposed structure. Ifa
So... visible plume exists 30 metres:from the: proposed structure, works-must immediately cease anda .
"J+... , .$ediment curtain must be ‘positioned around the plume. until it has.settled and is no longer visible. ©
page seta Bepatment of Environment and Resource ManagementSection 26
t “ : ao ie ve
Te DERM Permit number: IPCC01428009
Words and phrases used throughout this permit’ are defiried below. Where a definition for a term used in this.
permit’ is sought and the term is not defined within this permit’ the definitions provided. in the relevant legislation
- shall be used. eo a, BO oo wo,
__:,"approval" means ‘notice of development application decision’ or ‘notice of concurrence agency response’
under the Integrated Planning Act 1997. Po Be me
. *. “approved plans” means the plans and documents listed in the approved plans section. in thie notice attached’
SO to this development approval. : we eg ates bre bs
‘« . \” “Department of Environment arid Resource Management” means the department or agency (whatever. .
fo called) administering the ‘Coastal Protection and Management Act 1995 or thé Environmental Protection Act: oo
os): “land: in.the "land schedule” of this document means land excluding waters and the atmosphere. : >
"|. “site” means land or tidal waters on or in which it is proposed to carry out the development approved under this . |
..." @evelopment approval. © Mi
© @ watercourse" means a river, créek or stream in which water flows permanently or intermittently:
“a> in’a natural channel, whether artificially improved ormotor BU a oe
+ inanartficial channe! that has ctianged the course of the watercourse, "8
. |: “waters” includes river, stream, lake, lagoon, pond, swamp, wetland; unconfined surface water, unconfined: .: -
_ "Water natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal waters (including the. .
_. + $@a), stormwater.channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater and any part-..
-. thereof ee
~~” |, “works” of “operation” means the development approved under this development approval, 9
"you means the holder of this development approval or owner / occupier of the land which is the subjectof
_., this developmentapproval = re
se a ‘Page 4.0t 4 = Me : epee Se: . : ca, a Oo . Bopartment of Environment and Resource Management - heSection 27
ve pighee SCoema lara ewe" mes af oT ost tp . . ote at ke
ce Woe, . 0 .
. A,
WW Queensland
| ANS Government
& 2 ya :
~ >
16 March 2009 Maritime Safety .
Queensland
. The Jetty Specialist Queenstand Transport
_ 2 Industrial Avenue
Caloundra Qld 4551
. Dear Sir .~ - 19 MAR 2008 |
oe . . . — © BY.
Operational Work, Prescribed Tidal Works — Request for comments Torsten
, Jetty - T H Offermann,.98 Hilton Tce, Noosaville (Lot 6) ,
O Thank you for your letter of 5 March 2009 about your proposal to construct a jetty at the location .
mentioned above. a, Fe, .
As a concurrence agency, Maritime Safety Queensland has no.objection to'the proposal provided the
following navigation and marine safety conditions are complied with. =~
1. The contractor must build the jetty according to The Jetty Specialist, Drawings No JSP-SJ-21811
Issue A and JSP-SJ-21810 Issue B, attached to your letter dated 5 March 2009. ,
2. No part of the structure or any ship berthed at this structure is to come closer than 1.5metres from
the'side boundariés of the allocated water space as shown on the submitted water allocation plan.
_ 3. Inthe’absence of a designated quayline, the structure and any part thereof must not extend beyond
_ that of neighbouring approved structures.
-. O oo 4, | The jetty and all freestanding piles must be lit and clearly visible to approaching vessels. The |
, contractor must position all lighting so it does not cause a risk to the safe navigation of other
vessels.
' §. The applicant or his agent is responsible for the removal of any existing structure above or below
: the waterline, and must contain and remove any debris. Any pile that needs to be removed must
. . be totally extracted... a ne . . :
; 6. The’ship moored at this pontoon must follow the most direct course from this structure to open
waters.and a similar direct course when returning to this pontoon: ,
, Maritime Safety Queensland , Our ref . 710/01649(1) P39654 E30068 F11
Marine Operations (Brisbane) — . . “Your ref .
. MacArthur Avenue East : Enquiries James O'Connor. .
Pinkenba Queensland 4008 , - Telephone +61 7 3860 3504
So _ " . .* Facsimile +61 7 3860 3571
ABN 13 200 330 620. . .Website © www.msq.qid.gov.au .
: . oe ; ~~ Email —_ [email protected]
. : . uo tbe ig
. . / .Section 28
nah " BEY Te . 7 . Motee sry OMe lg tf , Pe sae . . .
how . i i
7. The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
clearance at all stages of tide. The ship must comply with any local restrictions placed on channel
depths and draft restrictions.
| 8. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1995.
-9. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
1994 and the Transport Operations (Marine Safety) Regulation 2004.
- oo, 10. Any ship moored at this jetty must not impede the safe navigation of other ships.or restrict safe
| _ access to or from neighbouring structures. ; -
* 11. Any ship, dry berth or device (including Air Lifting Pontoons) berthed, moored or attached to the
pontoon/structure must not exceed thé following sizes: ,
® Wet Berth _ Dry Berth . Fe :
BS Length Overall-10 metres an NIA -
Beam- . = 4 metres Se oO |
12. The contractor must construct the jetty within two years from the date of approval. If —- .
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.
Maritime Safety.Queensland does not need to be further consulted if all of the above conditions are |
met. co CO 2S |
a The above conditions must be included in your application to the assessment manager. .
This agency will also forward a copy of this letter to the Assessment Manager. __ .
Yours sincerely
. Niu Gull . Bo .
, One Captain Richard C Johnson . a : -
C Regional Harbour Master (Brisbane) _ - SO _
: - Maritime Safety Queensland _ . Page 2o0f2 .Section 29
OurRef B7900-05-008 (026 Cc ) Cardno :
wrRe (026) Ullman& Nolan.
Conact Paul Calver .
Shaping the Future “
9 Warch 2009
The Manager |
| Cardno Ullman & Nolan Pty Ltd
The Jetty Specialist Pty Lid ABN 36 103 205 170
2 Erdustrial Ave
CALOUNDRA QLD 4551
ie G 1s WE Level 11 Green Square Nth Tower
D Sir $15 St Paul's Terrace
“ws 10 MAR 2009 Fortitude Valley Qld 4006
; Lockd Bag 4006 Fortitude Valley
Structural Design Advice BY Queensland 4006 Australia
Dane ee nee ee en eee ene Telephone: 07 3100 2199
ae Facsimile: 07 3369 9722 |
Project: Proposed Jetty International: +61 7 3100 2199
Owner: T Offermann [email protected]
Address: Lot 6 (98) Hilton Terrace, Noosaville www.cardno.com.au
We, Cardno Ullman & Nolan Pty Ltd, advise that the proposal to construct the Offices - Australia
works described above has been checked by us. When the works are constructed Queensland
in accordance with the approved drawings and in the location shown, the Cairns
proposed works are structurally adequate for the anticipated usage in this location Townsville
and should comply with the design and safety provisions of the Prescribed Tidal meney
Work Code (Schedule 4A of the Coastal Protection and Management Regulation Bundaten
2003), based on the design criteria, and assumptions listed below. Hervey Bay
Sunshine Coast
Taowoomba
: ow . Springfield
Basis of Design Advice Gold Coast
New South Wales
* The works do not impose loads that would significantly affect existing Sydney
structures. . Neweastie ,
* The works do not adversely affect the stability of the bed and banks in ——_Watongong
the near vicinity of the structure. Deniliquin i
e Structural design criteria: Canberra nf
Victorla
O Maximum Wave Height 600mm wind wave Bendige “
400mm boat wake Dandenong
Wind Classification N3 Western Australia
Max. Current 1.4 m/s parallel to face of pontoon Perth
Kalgoorlie
Scour Reasonable scour effects from flood flows and Busselton
tidal flows have been considered Northern Territory
Debris Load To AS 3962 Darwin .
Impact Loads Minor loads without some damage to structure - -
Max Vessel Size berthed 10.0 metres length (wet) & 4.0 m beam (wet) I SA | tee |
Relevant Codes AS1170, AS 3962 and AS 3600, except where RASSN |:
varied by the Prescribed Tidal Work Code Sinan al *
Belgium Brussels Indonesia Jakarta Kenya Nairobi New Zealand Auckland Christchurch Wellington
Papua New Guinea Port Moresby Sri Lanka Colombo United Arab Emirates Abu Dhabi United Kingdom London
United States of America Portland Washington Phoenix Sacramento Boise Las Vegas Charlotte 4
L:\87900-05\Sub008\026-TH Offermann\Word\Design Advice.doc . . ong
, 5
esSection 30
: 2 CJ » Cardno
9 March 2009 Uliman& Nolan
Ths design advice does not cover the construction or installation of the works on site. The Builder shall
co nfirm the adequacy of the site conditions during installation and shall advise the Engineer if variation
from details shown on the drawings occur. No detailed site investigation or studies have been carried
out by us or provided to us. The design review has been carried out on the basis of limited enquiry only.
Pile and footing depths shown are applicable to founding in stiff clay or dense sand. There is some
additional risk of failure should the above design criteria be exceeded, or actual site conditions be
inferior to those assumed. If ground conditions other than those described above are encountered
duting construction or seabed levels encountered are deeper than those shown on the drawings,
further advice should be sought.
This design advice relies on designs prepared by other consultants, but does not warrant them.
The structure is to be built in accordance with the following referenced documentation, using good
building practice. .
© Referenced documentation .
e Drawing No. JSP-SJ-21810 B
e Drawing No. JSP-SJ-21811 A '
Competent Person Details .
Name: Paul Calver BE RPEQ 1667
Name of firm for and on behalf person is signing:
Cardno Uliman & Nolan Pty Ltd
Level 11, Green: Square North Tower y
515 St Paul’s Terrace
FORTITUDE VALLEY QLD 4006 ;
Postal address:
Locked Bag 4006 o
© FORTITUDE VALLEY QLD 4006
Phone: (07) 3100 2199 Fax: (07) 3369 9722
Reference: 8790005-008 (026)
Signature of competent person: Loy
ce fh
for Cardno Ullman & Nolan r
LAB7900-05\Sub008\026-TH Offermann\Word\Design Advice.doc .Section 31
Tah
*
= \ - -
we Ey
~NOOSA RIVER #4 4, 2
B..,
TT [—~~4350 Ph scan i | MOORING FACE
24020 a ~
eR '
FEND :POSTS TO
=
rs | & +. a
>
:
ty / +. %
Note: E-] +.
Existing structures shown oa
in approximate position only. . eo
EXISTING HWM — P.B = pe. ~~ ft ¢*
oT She o SF Ro ca, > fy fy e % ty =
pia
= ———— + Saad at. ron
Nig a as e * Hy OWER ‘ Leven”, ;
a? Wa ——— cas STEPS 170, u
toim OO | ey * Ps * FLURO LIGHT per “$
ben
iN Ni ae PE ACTIVATED ” on
yt
OF JV ———
ey
{2 ———>
-———— = cin
' rl,
LOT 6 I — | v +
———— 1 4-O AR
SP 116708 SS oe
-———— a
———
SF
i SITE. PLAN & —
/ WATER ALLOCATION / ———S
Po
f SCALE 1:500 “| SS or EXISTING JETTY TO BE REPLACED
ss} roa ~ WHH NEW TIMBER JETTY
*
ti ————
Ait "f p————
1D —
Or +
Nicg mf ———— GENERAL LAYOUT PLAN 5
lio
™ RV
uO ——————
hp
iy — SCALE 1:100
fa “4
/N
—— fz
————
—— EXISTING H.W.M — P.B
=
—
———
-—————
———
Q7 i DESIGN LOADINGS: J % ed
i
29 I? LIVE LOAD: ot eee . Le
Fn, Jetty Deck — 2.0kPa aa ~
~~
se OF Lf os \EXISTING BEACH
Sw ———
BERTHING: LF " XISTING Low RETAINING WALL
Maximum wet .vessel length - 10,0m eS
Maximum wet vessel beam - 4.0m 9100
(Ef THE MARINA SPECIALIST ; Carino CUENT: T OFFERMANN THLE: . Site PUN, GENERAL LAYOUT
TRADING AS . ACN 010633119 2 INDUSTRIAL AVE Cardno (Qld) Py Ltd ACN: 051 074 992 LOT 6 (98) HILTON TCE " & WATER ALLOCATION
THE CALOUNDRA Level 1, 5. Gardner Close, Milton 4084 Ph (07) 3369 9822 NOOSAVILLE ~ 4-100 4 500
| Jerri QLD. AUSTRALIA 4551 .0. Box 388, Toowong -4066. - a Fax (07) 3369 9722 PROJECT: PROPOSED JETTY ” tte [AE own [AIS
PHONE (07)5492° 5925 - ‘Email: [email protected]
eon | MENON _$ P Eccl AtCi § TF FAX (07) 5492 6699 CHECKED: E.Q 7-3-9} + * a
SOO7 :
. ma .
a - aS > ~Section 32
5-7 «get re,
4 we io
“aE.
4
te: fe
RAMP UP CONCRETE 125 x 5 FI7 it _ $8P-003 RHS HANDRAI
128 X 63.5 X 8/6 125 x 38 F17. HARDWOOD DECKING HARDWOOD |NOISTS 70 X 10 ‘CLEATS 100 HIGH oe” 50 x 3. SHS: HANDRAIL POST
@ 4 CRS
OVER ENTIRE DECK AREA
ALUMINIUM CHANNEL BEARER PLAN VIEW 315% 46kNm JETTY WALKWAY HEADSTOCKS BOLTEO TO EACH BEARER
TYPICAL TO ALL WALKWAY PILES R.C INSITU PILES / 100 X 100 TO CARRY JOISTS
SCALE 1:100 HWD FENDER POSTS
at
‘0000 i ALONG JETTY -FACE 1500
50 X 50 TOE RAIL
SS SS Ot oe i en ON ALL SIDES Fa 125 X 38 DECKING
—_
" i n i N ti Ki
Qa oe SS ae i"! — =!" —) 2 / M12 SS BOLTS
Oso === =h5 a tl
ire) re —_ — os OT —5 —l} EACH ‘JOIST
SSS Es SF] 0
=
—1700 — _—~ — — Wi — fn ow —! t me i XC rx Fe pai ey
pn ee ee EEE eS ry yy
iM f
2850 2850 2850 2850 2850 ay tee he oy A oe It
lk n HW W ay -4 eX
It ’
+t
— Pe ad + © 128 omy Jed 3.7-M12 S.S BOLTS
HANDRAIL POSTS | —T 4 128 X 63.5 CHANNEL
BOLTED TO EACH BEARER amy
DOUBLE 200 X 50 HARDWOOD BEARERS a ro 7 GAMES 980-006" FIXED
WITH 2 M12 S.S BOLTS FULL WIDTH OF JETTY HEAD oon fa 100° X 50 X 6 ANGLE BRACES sn~ wiTH 4 / M12 SS BOLTS
DOUBLE 200 X 50 HARDWOOD BEARERS u i WITH 6mm -PLATE TO TOP oe aed M16 S.S THREADED RoD THROUGH |
iI y -T
FIXED 525mm LOWER FOR SET DOWN SECTION ved r +t PILE & COL
ALL BEARERS FIXED TO PILES WITH 4mm ROLLED COLLAR WITH ry dad
2 M16 S:S BOLTS THROUGH PILES 5mm FULLY WELDED CAPPING PLATE tt -4 6 / Y16 BARS
= 315¢ 46kNm & 4-7 FULL LENGTH
er
R.C INSITU -PILES . Lb-T aeat * z
re HEUX 7 + a
+="
aed fn 4d
65 PITCH Lt")
3159 HUMES
MASS CONCRETE ABUTMENT ALUMINIUM ALUMINIUM LIGHT POST 7 4 UPVC_ FORMER
‘V0
REINFORCED WITH G445A MESH’ CAGE PILE HEADSTOCKS HWD FENDER POSTS
100 X +,
—<— Cd rd UN TY D . 5 DOUBLE 200 xX 50 MASS CONCRETE REINFORCING TO EXTEND TO
wT
Ud HARDWOOD BEARERS TO BASE OF PILE 300 FROM BOTTOM OF PILES
Pt
Pmt | == 7HAT RL 051m
peepee Tt PT
i ee
im! | ~MH.W.S. RL 0.26m TYPICAL WALKWAY PILE
-AH.O RL 0.00m
- +
- = ee ew
JOISTS FIXED TO . SM.LW.S, RL -0.17m & HEADSTOCK DETAIL
ABUTMENT WITH ‘LAT R.L -0.34m SCALE 1:25
AL. BRACKETS &
M12 S.S BOLT
TO EACH LEG 4 / 125 X 38 HWD DECKING
FIXED TO EACH JOIST. WITH
2 / 14g S.S SCREWS sy =
at
wt P
a%
MIN EMBEDMENT INTO
DENSE -SAND SIDE ELEVATION 315¢ 46kNm we
OR STIFF CLAY R.C INSITU PILES
TYPICAL ALL PILES SCALE 1:100 TYPICAL TT eae / 190 X 25 HWD FACIA BOARDS
FIXED TO 100 X 50 HWD POSTS
Ny NY WITH 2 / 149 S.S SCREWS PER POST
§ i;
2,/ M16 S.S BOLTS Lae ty
100 X. 50 HWD POSTS FIXEO TO
JOISTS & BEARERS WITH M12 S.S BOLTS
SJ
BS —
RS rh 100 X 100 HWD FENDER POSTS FIXED TO
RY
ES + tb N FACIA BOARDS WITH 4 / M12-S.S BOLTS
SECTION (A)
RUN LOW FRONT BEARER
SCALE 1:25 *PILE FULL WIDTH OF JETTY HEAD
*
THE MARINA. SPECIALIST Cardno ACN: 051 074 992 CLIENT: T OFFERMANN 4 THLE PLAN LAYOUT & ELEVATION
TRADING AS ACN 010633119 2 INDUSTRIAL AVE Cartino {Qtd) ry ltd Ph (07) 3369 9822 LOT 6 (98) HILTON TCE ee ee
THE CALOUNDRA P.O. "Box 388, Toowong 406: a NOOSAVILLE mit 1:100- 1:25. ee ee
eee QLO. AUSTRALIA 4551 Levet_1, 5 Gardner Goss, suiton 4064 - Fox (07) 3369 9722 ye LE:
HEA CHANGED, SECTION A ADDED JSP PHONE (07)5492 5925 CHECKED: SE fo -Emoil:_ [email protected] PROJECT: PROPOSED JETTY
JSP AX (07) 5492 6699
eee [ANE 7:3:09 &
REQD S$ P E ¢ AL | $ T hat . “ wt *
“| Me
ey » hen ekeSection 33
1 . , . . . .
, . .
: | Sunshine Coast AND USE SECTION FEES a
Regional Council
RECEIPT TYPE
' SALE OF DOCUMENTS ;
Superseded Planning Scheme Documentation - 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation — 111 ;
APPLICATION FEES: ~——- " ;
Material Change of Use - Code/tmpact , oo ' -
Consistent ‘ yO on ($21 7 SoS
__ Inconsistent a . . 7 “B24. soe
_ Assessment under Superseded Planning Scheme mo _ «$24 mos ,
Modification to a Development Permit “ «$24 oo,
Extension of a Currency Period . ms S's . §21 :
Operational Works - Landscaping 521
e@ Bidg Work assessable against the Planning Scheme. oe , —s, §21 on ie,
PRE-LODGEMENT REVIEW — ot | | " rer
. Half Hour BO oe . . 522. 2 -
One Hour Pe So mo _ ~- §22° co,
ADVERTISING ° - : oO
a, Purchase, Advertised Applications §23 a
JETTIES oe . ; , : a
Jetty.Application Fee — . oe 2(Jo 524
Jetty Bond So oe 51 .
; oo s ep a ts, (Category 4). oo
BONDS cS -” * ot
’ Performance Bond coe, v 4 7 Bee Loe he,
, ‘ co, yo, ! .. 7 O (Category 9). i.
SIGNS 2 oO yo -, a oo. {
Registration Fee ; ae os "222 ook
Search of Land Use Section file. 112
- Liquor Licensing Request oO, oo L
ee . TOTAL .$ | |
. 7 tows yr. . ‘ ; 7 ; . . . * .
NAME: five fed 5 BB ce eA Is —., re
- ADDRESS: 2 Dol he 2 Ae | Lo
; . - po . ‘ 1 . . | . . : . .
FILE NO: "= OF poets DATE: 23 <] 09 __
RECEIPTNO: SIS QKS _ Signature of TP Officer: [7% - ee
‘AUTHORITY NO: : , . _ _
| : ae | [209 [oap (1 ee oe
. . we gee lowes 7 3 . . : : . :Section 34
: a CALCULATION OF FEES | a |
APPLICATION FEE TOTAL |
. FEES \
MCU - CODE ASSESSMENT
Details of Development —
Consistent 1.0
Inconsistent 3.0
FEE CALCULATION |
MCU - IMPACT ASSESSMENT a
Details of Development @
jConsistent 1.0.
‘” Inconsistent 3.0
FEE CALCULATION ~
< < : . , .
{OPERATIONAL WORKS
Details of Development
FEE CALCULATION _ 7 |
TOTAL FEES _ $s. otUsed in these records
001ABA64.001.pdfRelated documentPublic source context ↗
09/0684 - Operational Works - Prescribed Tidal Works (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.