Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

001ABA64.001

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

“h       INTEGRATED PLANNING ACT 1997                                                                                    IDAS Assessment Checklist, Version 22
             47        Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
                       interfering with subartesian water (other than using a water truck fo pump water)?
                        [X] No -Gotoazs        [_] Yes
                        IPA, schedule 8 part J. lable 4, tem drei): IP Regulation, schedule 2, table 2, tam 8: [P Regulation, schediile 1, part 3, fable 4. tem 3
                        Water Act 2000. section 986A (wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
                        iid River code (Note: the code dees not currently contain applicable provisicns ior sub artesian water!
             48        Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
|                      interfering with overland flow water (other than using a water truck to pump water)?
                             No -Gotoa49      [_] Yes - Answer both (a) and (b) below
                        IPA, schedule 8 pan i iabie d. vem Tic}(i and aj: IP Regulation, schodule 2. tale 2. hem 9. 1F Regulation, sohecite 1, part 3, lable 4, tom G4: Water Act 2080. section 9858 fwd
                        river areal: relevant wid fiver declaration. Wis Rivers Code.
             49        Is the proposed operational work for the following?
                          ()    For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
                                                                                                                                           & No      [(] Yes
                                Act 2008
                          (ii)  To increase the storage capacity of a referable dam by more than 10%                                       K) No     () Yes       -
                         If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
                                                                   Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as
                                                                   Concurrence Agency.
       @                 IPA, schedule 8, par’ 7. table 4, item 4;1P Regulation, schedule 2. fable 2, item 19
             FINAL WORK WILD         RIVER AE ee oe             Ba ee                 eee Se          AE      A       acca             eee igen     aCe ae
       |     RIDA    WORK: WIED RIVER AREAS UG                           C0                 ee ee eee
             4.10       Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?                     .
                         [_] No -Gotoas11      [XJ Yes - Answer (a) and (b) below                                                              oh
                                (a)  Is any of the proposed tidal work prescribed tidal work?
                                       1] Yes  [_] No
                                       If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild
                                     _ Rivers Act 2005?
                                     . BY No     [J Yes                          a
                                 hy    ey   ‘                        :       .
                                       ,     If no, is the work proposed in a canal?
                                      ,      [-]No     [_] Yes        .
                                (b)  Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?                               —_
                                      (i)       One only local government tidal area                                             [_]   No        [Xx] Yes
                                    (ii)        Starting in one Jocal government tidal area and extending into another local
        @                                                    ;              ;           .       .                                >]    No        []   Yes
                                                government tidal area (but in no strategic port tidal area}
                                      (iii)       two o    ore local gov                                   g in either loca      DJ    No        C]   Yes
                                      iii       In      r more local    government tidal areas but not starting in either local
                                                government tidal area                                        ;
                                    (iv)        One only strategic port tidal area                                               (X]   No        []   Yes
                                      v         A tidal area that is not a strategic port tidal area or a local government tidal.
                                      (v)                                      gic p                       g                     OJ    No        [    Yes
                                                area
 ,                             '      Note: The answers you provide in (i) - (v} above may affect who the Assessment Manager is for the application.                   -
:                        IPA, schedule §. part 1, lable 4, item S: IP Regulation, schedide 2. table 2. items 12, 14 and 17; IP Regulation, schedule 1, part 3, table 4, tems 4A and 5 x
                         Coastal Protection and Management Act 1995, section 104A (wild tiver area)                                                                  “i
             COASTAL MANAGEMENT DISTRICT WILO-RIVER AREA                      cs SUNS ed
             COASTAL MANAGEMENT DISTRICTAWILD RIVER ARE                                                 ee                             ea
             4.14       Is any of the operational work proposed to be carried out within a coastal management district?
                         [_] No -Gotoo4i2       [XJ Yes                                                                                                               “

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001ABA64.001.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.