Council archive · source document
001ABA64.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
“~ INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Attachments and supporting information {Complete Table | Use a separate sow for each type of attachment or information, including information "required Biel
lunde his Par). Please’ ensure al acumaton submited wih tis fom, ining other Pets of Frm. or owner's consent ef are securely atthe tots Pato the Form.
[gee Description of attachment or information "Se)y “Nae Tite ir appicabley Sean | 8 Method of delivery to.
Table | _ (09. Parl C of Farm 1 owners consent evienes ofresouree. |. 6 General authonly Jams SteetTiaic Repord | *” DSC 4 < |-aeéecement manager | |
Hao @allocationfentitement plans, drawings, reports) WIE]. intowaatlar < navraaRe A LeBeate | Gy Saw ES | csmeenanaiy. cree es
, PART P OF FORM 1 PRECRIBED TIDAL WORhS 11-Mar-2009 |mat
, [2 — [ASSESSMENT CHECHLIST ee
ENGINEERS CERTIFICATE CARDNO (QLD) PTY LTO 09-Mar-2009 mai! =
[4 | SITE & WATER ALLOCATION PLAN JSP-SJ-21811 ISSUE A 24-Feb-2009 |mall =
LAYOUT & ELEVATION PLAN JSP-SJ-21810 ISSUE B 02-Mar-2009 |mail =
Portable Long Service Leave (PLSL) levy. (Applicable fr certain bulding and construction work valued over $60,000 on) amc hyenas, atte
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if applicable)
[_] the application seeks a preliminary approval only;
[] the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
@ regrowth, thinning vegetation or controlling weeds or pests);
(X all costs, that relate to the work both directly and indirectly, are less than 480,000, inclusive of GST: or
[_] the work is being carried out under an owner-builder permit issued under the Queensiand Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given. a .
11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)? .
DX] No - End of Part A
Cf Yes - Answer Q12 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
; Receiving officer's Ih Reference
Fee (9)/2.Q 0 | Date received 244 a name Ae — numbers oF / TU
NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER | TUS Sra a)
AP tee st Wit a ee NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTINER eee ee
To: fea 'have been engaged as the private certifier for the building work referred to in this application.
ge Date oF BE | Reh sche Raa, Saisie Tar La Ah aaa SN, ge eee nai] GN oN ANNI late ay ag icatone el
pees ie Fe fe pe Le Name pot : fo a eae e BSA Certification number : r F bulgrg ‘classticatonis :
jeengagement bi aii a till ears MSG aU anelE al ESA Re RE nie vel [Acuna sate lipns nS rs RM oct oxalWi te
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Srnee ne. et RO RRR | Rese: | es | Date receipted.:) age Se aie eee
ai ee ee Mou i a ae ee ea ‘1: form:sighted: by Nate foes oe oncrtet
ee Dect plore the wor ay es Queave Frokeet Number > amount pad (8) | Datespaid “essessment | 5 ei tombani es .
Bienes ae ca oh oe aii oe ts sk oe i uae: Lae pal assessment) 3 i em een ie ee .
Cie ue oe a ee he
ep
Privacy Statement ,
The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by tegistatin (including the Freedom of Information Act 1992} or as
required by Parliament. This information may be stored in @ DIP database. The information. collected will be retained as required by the Public Records Act 2002.
Advice for completing Part ASee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001ABA64.001.pdfRelated documentPublic source context ↗
09/0684 - Operational Works - Prescribed Tidal Works (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.