Delegated Report - Code - Planning MCU23 0032 [As Published]
Earthworks
10. All earthworks must include the installation and maintenance of appropriate erosion and
sediment control measures. Prescribed Water Contaminants (as defined in Schedule 10 of
Environmental Protection Regulation 2019) must not be released from the site or to waters
within the site, or be likely to be released should rainfall occur, unless all reasonable and
practicable measures are taken to prevent or minimise the release and concentration of
contamination.
Stormwater Drainage
11. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Easements
12. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
13. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
14. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
15. All fill and associated batters must be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council. All earthworks must be
undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on
Earthworks for Commercial and Residential Developments.
Damage to Services and Assets
16. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Water Supply
17. The approved dwelling must be serviced with a rainwater tank having a minimum storage
capacity of no less than 60,000 litres.
Waste Water Treatment and Disposal
18. The dwelling must be provided with an on-site waste water treatment and effluent disposal
system having a capacity sufficient for the use*.
*(Refer to Advisory Note)
Retention of Existing Trees
19. Existing trees on the site and in the road reserve identified for retention on the approved
plans must be retained in accordance with an Arborist Report (or part thereof) prepared by a
qualified person* and endorsed through an Operational Works approval
*(Refer to Advisory Note)
Page 10 of 12
Document Set ID: 22346763
Version: 6, Version Date: 08/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.