Skip to the record
Accept no substitutions.

Original source · versioned page text

Meeting papers

of 731

Page text shows just the words. Original shows the document exactly as it was published.

Very large file (48.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 49, section 1. The text section number identifies this passage in the reader.

GENERAL COMMITTEE MEETING REPORT                                                12 AUGUST 2024


As a result of Council’s decision to refuse the application, the applicant has now lodged an appeal
to the Planning & Environment Court. The applicant seeks that the development be approved
subject to reasonable and relevant conditions.

The site is included in the Major Centre zone – Business Park Precinct and the application sought
approval to develop it for a Childcare centre for up to 96 children and approximately 17 staff. A
single storied building was proposed along the eastern boundary of the site and was proposed to
be setback 10.5 metres. Play areas were proposed along the front, side and rear of the building
and resulted in a landscape setback averaging 4 metres.




                                      Figure 1 – Locality Plan




                                                                                      Page 2 of 4

                                                                                            Page 49 of 731
Log in to download the original file

0ff29e62c2.pdf · 48.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.