LATE RFI - Revised SWMP
S
97
96
89
8
93
97
91
90
92
96
S
97
S
94
TURNOUT DRAINAGE SWALE
THROUGH LEVEL SPREADER
SPILLWAY OF MINIMUM 4M
95
TYPICALLY AS PER IECA STD
DWG LS-01
S
S
MINIMUM 3KL RAINWATER REUSE
TANK TO BE PROVIDED FOR FUTURE
DWELLINGS ON NEW LOT. TANK TO PROVIDE TABLE DRAIN
BE CONNECTED FOR INTERNAL AND 300mm DEEP WITH 1V:2H
S
EXTERNAL NON-POTABLE REUSE BATTERS TO DIVERT
UPSTREAM RUN-OFF
97
UPSTREAM STORMWATER CATCHMENT
AREA: 0.25Ha
S
Fi: 31.0%
tc (FRIENDS EQN): 10 Min
Itc (1%): 235mm/hr
93
RATIONAL METHOD
S
1hr10: 65.2mm/hr
C10: 0.73
Fy: 1.2
CLIMATE FACTOR: 1.2
S
95
Qy = 1/360 * 0.25 * (1.2*0.73) * 235 *1.2
= 0.172m³/s
93
91
S
90
92
89
300mm 1V:2H
94
96
S
97
CHANNEL FLOW (MANNINGS EQN)
Sf: 4.4%
DEPTH: 0.30m
SIDE SLOPES: 1V:2h
S
BASE: 0m
WETTED PERIMETER: 1.34m
AREA: 0.18m²
HYDRAULIC RADIUS (A/P): 0.134m
MANNINGS n (GRASS): 0.035
S
CAUTION: SEWER LINE IN V: 1.57m/s
VICINITY. POTHOLE TO LOCATE FLOW CAPACITY (Qcap) = 0.283m²
AND ENSURE MINIMUM 600mm
COVER TO FINISHED SURFACE Qcap > Qmax = TRUE
S
98
98
S
S 98
S
S S
98
98
INDICATIVE NEW DRIVEWAY
92
LOCATION. FINAL DESIGN TO
BE CONFIRMED
93
95
95
94
97
90
96
91
98
90
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
PROPOSED RESIDENTIAL SUBDIVISION
NEIL GAGHAN TITLE: STATUS:
35 PAVILION STREET STORMWATER LAYOUT FOR APPROVAL - NOT FOR
© ABN 89 647 469 707
02 26/05/23 RFI UPDATE BRP BRP
POMONA, 4568, QLD BEN PARRY PLAN CONSTRUCTION
75 NOOSA DRIVE RPEQ: 28084
01 30/09/22 MCU ISSUE BRP MVP BRP SCALE: 1:250
NOOSA HEADS, QLD 4567
5 15 25m CPEng NER DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
DATE: 26/05/2023 SIZE:
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK
040 20220206 A1 02
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.