Skip to the record
The only place to find full transcripts.

Council archive · source document

St Baker - Plans 100322 · MCU22/0007

of 7

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

100 x 10 PLATE WITH
32¢ HOLE WELDED TO
EACH SIDE OF FIXED CATWALK

1
=

PILE
tt
oT

HEADSTOCK

 

 

 

 

 

/
t
---t--
_a-b--
s
x

FIXED CATWALK CATWALK

 

 

 

 

 

 

 

 

 

 

\ sez HINGE TUBES
192mm LONG TYPICAL

PIANO HINGE

PLAN VIEW
SCALE 1:25

250 S.S BAR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mi2 S.S BOLT THROUGH
WITH M12 SS NYLOC NUTS
DRILL LUGS #13

50 X 6 FLAT BAR END &

   

INSIDE END PLATES
‘Smm WIDER THAN GANGWAY-
1650 MAX.

IXED CATWALK BASE
JSPO08 CHANNEL BEARER

CATWALK BASE EXTRUSION

 

LUGS WELDED TO CHANNEL

JSP 009 ANGLE BRACES WELDED
TO TUBE & CHANNEL

4mm ROLLEPACK GAP BETWEEN PILE
& CAP PLATE AS REQUIRED TO
FULLY SUPPORT ALUMINIUM PLATE

4mm ROLLED TUBE OVER PILE WITH 10mm CLEARANCE
ON DIA INSIDE, CAPPED WITH 6mm CHECKER PLATE
WELDED INSIDE & OUT & WELDED TO JSPOO8 CHANNEL

—{ 191

F

2 / M12 X 65 S.S DYNA BOLTS
FIXING COLLAR TO PILE

FIT BOLTS PERPENDICULAR TO
CATWALK DIRECTION

FOR H.D.P.E SLEEVED STEEL PILE,
PROVIDE M20 S.S THROUGH BOLT
RUNNING THROUGH H.D.P.E TUBE
WELDED TO PILE SLEEVE EACH SIDE
PRIOR TO INSTALLING HEADSTOCK

600

     
 
   
    

 

 

 

 

PIANO HINGE SIDE VIEW

 

 

SCALE 1:5

  
 

HINGE TUBES
WELDED ALTERNATELY
TO CATWALK ENDS

 

 

 

 

 

 

 

 

 

 

 

 

 

—9PILE—]
PROVIDE EPOXY COATING TO HOLES PRIOR
S.S FASTENING SCREW EACH END TO DYNA BOLT INSTALLATION TO
MAINTAIN CORROSION PROTECTION
PIVOT EN TO PILE REINFORCING END VIEW
, HEADSTOCK DETAIL ©
SCALE 1:25
. 1
|
I
ee Soe DETAR UNNECTION THIS DRAWING IS SUBJECT TO COPYRIGHT AND
CANNOT BE REPRODUCED IN PART OR FULL 1
OR PASSED ON TO A THIRD PARTY 1
WITHOUT THE WRITTEN PERMISSION OF
THE JETTY SPECIAUST. =P |
I ELEVATION
° SCALE 1:25
NOTES:
ALL ALUMINIUM WORK TO COMPLY WITH AS1664.
ALL BUTT WELDS TO BE FULL PENETRATION.
| pig ALUMINIUM TO BE GRADE 6351-15.
ALL BOLTS & FITTINGS: TO BE 304 OR 316 STAINLESS STEEL.
THE MARINA SPECIALIST Cerd CUENT: TC & JK ST BAKER TITLE: )
TRADING AS ACN 010633119 2 INDUSTRIAL AVE @PEME rn: 051 074 992 LOT 92 (7) WITTA CIRCLE HEADSTOCK & CATWALK CONNECTION
THE CALOUNDRA Cardio (Ql) Pry Lid Ph (07) 3369 9822 NOOSA HEADS
E 6/10/10 [DYNA BOLTS REPLACE THROUGH BOLT |USP QLD. AUSTRALIA 4551 | Itevel 1, § Gordner Close, Miton 4064 Fesi(on IsseaToros : DATE: WING NO:
p Wenn Se eT CER Or TaISION Ws Pea PHONE (07)5492 5925 P.0. Box 388, Toowong 4066. Email; [email protected]} | PROJECT: AS SHOWN 25/7/01 JSP—SD-040
B {16/9/02 JAMEND HEADSTOCK DETAILS SH FAX — (07),5492 6699 | [CHECKED: yy R.P.E.Q. DATE: STANDARD DRAWING DRAWN | CHECKED [DIMENSIONS A3
(REV DATE AMENDMENT REQD SPECIALIST GSI No6°7 19.70 A MA MILLIMETERS E v)

 
 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

St Baker - Plans 100322.pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.