Council archive · source document
St Baker - Plans 100322 · MCU22/0007
Plans and drawings: the text below has words only, no drawings.
100 x 10 PLATE WITH
32¢ HOLE WELDED TO
EACH SIDE OF FIXED CATWALK
1
=
PILE
tt
oT
HEADSTOCK
/
t
---t--
_a-b--
s
x
FIXED CATWALK CATWALK
\ sez HINGE TUBES
192mm LONG TYPICAL
PIANO HINGE
PLAN VIEW
SCALE 1:25
250 S.S BAR
Mi2 S.S BOLT THROUGH
WITH M12 SS NYLOC NUTS
DRILL LUGS #13
50 X 6 FLAT BAR END &
INSIDE END PLATES
‘Smm WIDER THAN GANGWAY-
1650 MAX.
IXED CATWALK BASE
JSPO08 CHANNEL BEARER
CATWALK BASE EXTRUSION
LUGS WELDED TO CHANNEL
JSP 009 ANGLE BRACES WELDED
TO TUBE & CHANNEL
4mm ROLLEPACK GAP BETWEEN PILE
& CAP PLATE AS REQUIRED TO
FULLY SUPPORT ALUMINIUM PLATE
4mm ROLLED TUBE OVER PILE WITH 10mm CLEARANCE
ON DIA INSIDE, CAPPED WITH 6mm CHECKER PLATE
WELDED INSIDE & OUT & WELDED TO JSPOO8 CHANNEL
—{ 191
F
2 / M12 X 65 S.S DYNA BOLTS
FIXING COLLAR TO PILE
FIT BOLTS PERPENDICULAR TO
CATWALK DIRECTION
FOR H.D.P.E SLEEVED STEEL PILE,
PROVIDE M20 S.S THROUGH BOLT
RUNNING THROUGH H.D.P.E TUBE
WELDED TO PILE SLEEVE EACH SIDE
PRIOR TO INSTALLING HEADSTOCK
600
PIANO HINGE SIDE VIEW
SCALE 1:5
HINGE TUBES
WELDED ALTERNATELY
TO CATWALK ENDS
—9PILE—]
PROVIDE EPOXY COATING TO HOLES PRIOR
S.S FASTENING SCREW EACH END TO DYNA BOLT INSTALLATION TO
MAINTAIN CORROSION PROTECTION
PIVOT EN TO PILE REINFORCING END VIEW
, HEADSTOCK DETAIL ©
SCALE 1:25
. 1
|
I
ee Soe DETAR UNNECTION THIS DRAWING IS SUBJECT TO COPYRIGHT AND
CANNOT BE REPRODUCED IN PART OR FULL 1
OR PASSED ON TO A THIRD PARTY 1
WITHOUT THE WRITTEN PERMISSION OF
THE JETTY SPECIAUST. =P |
I ELEVATION
° SCALE 1:25
NOTES:
ALL ALUMINIUM WORK TO COMPLY WITH AS1664.
ALL BUTT WELDS TO BE FULL PENETRATION.
| pig ALUMINIUM TO BE GRADE 6351-15.
ALL BOLTS & FITTINGS: TO BE 304 OR 316 STAINLESS STEEL.
THE MARINA SPECIALIST Cerd CUENT: TC & JK ST BAKER TITLE: )
TRADING AS ACN 010633119 2 INDUSTRIAL AVE @PEME rn: 051 074 992 LOT 92 (7) WITTA CIRCLE HEADSTOCK & CATWALK CONNECTION
THE CALOUNDRA Cardio (Ql) Pry Lid Ph (07) 3369 9822 NOOSA HEADS
E 6/10/10 [DYNA BOLTS REPLACE THROUGH BOLT |USP QLD. AUSTRALIA 4551 | Itevel 1, § Gordner Close, Miton 4064 Fesi(on IsseaToros : DATE: WING NO:
p Wenn Se eT CER Or TaISION Ws Pea PHONE (07)5492 5925 P.0. Box 388, Toowong 4066. Email; [email protected]} | PROJECT: AS SHOWN 25/7/01 JSP—SD-040
B {16/9/02 JAMEND HEADSTOCK DETAILS SH FAX — (07),5492 6699 | [CHECKED: yy R.P.E.Q. DATE: STANDARD DRAWING DRAWN | CHECKED [DIMENSIONS A3
(REV DATE AMENDMENT REQD SPECIALIST GSI No6°7 19.70 A MA MILLIMETERS E v)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
St Baker - Plans 100322.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.