Council archive · source document
Rfi Response 08-12-22 · MCU22/0195
11. We require a roof plan to accurately calculate site cover, although it appears to comply with 40/40%.
See C7.0 ROOF PLAN/ SITE COVER PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI RESPONSE 08-12-22.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.