2.   The basement is not a basement and the dwelling is 3 storeys – there is no backfilling proposed to
     ensure the basement is not more than 1 metre from ground level. No more than 2 storeys is
     supported.

     Area on the lower floor under the upper floor is entirely for building services. No area of the
     building is 3 storeys.


3.   GFA: The lower level (not considered a basement - being out of the ground), also has very large areas
     of services and storage that could easily be made into rooms – these areas are considered
     GFA. Storage areas are considered GFA. Some service area for battery/airconditioning and the like is
     accepted. Please be aware that a basement is measured from ground level to the floor level above.

     removed the storage and amended large areas to ensure the areas under the house cannot be
     easily made into rooms. Only building service rooms are proposed. Large service rooms are
     required for the suspended pool, spa, and heating/cooling.

4.   It is noted that the lower terrace is enclosed and is not included in the GFA calculations. Unenclosed
     this space to ensure it does not contribute to GFA.

     updated to show this area fully open. See c1.1 lower floor. This is an unenclosed terrace.

5.   The application does not include a survey plan or does it identify RL’s on the plans. RL’s should be
     from existing and finished ground level to the top of all levels and the roof line. Please note the POD
     has a maximum RL level. No more than 8 metres is supported. The plans should show existing and
     finished ground level – this is important.

     updated ELEVATIONS C2.0 – C2.1 and SECTIONS 3.0 - 3.1 - 3.2 - 3.3 to show building height RL’s.
     survey plan is attached for reference. No part of the building is over the POD max level (RL44) or
     8m.

6.   A geotechnical report and SWMP is required to be submitted. Both plans must consider the other
     constraint. Ie. stormwater not destabilising the stability of the site.

     SCG to provide by 13th of December

7.   Details for the access driveway is required due to slope. Ensure no works are proposed on common
     property.

     SCG to provide by 13th of December

8.   Due to the shape of the driveway, it results in a large expanse of driveway – the landscaped setback
     needs be more significant or the hardstand reduced.

     reduced the size of the driveway. see C1.0 – C1.2


9.   The pool is not on ground level and will overlook the neighbouring property. It will be lit and will effect
     turtle nesting on the coastline. A pool on the upper level in the existing location is not supported or
     any design that allow light spill to the coast.

     removed the pool window to ensure no light will spill onto the coastline from the pool.

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI RESPONSE 08-12-22.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.