Skip to the record
For the highest quality transcripts.

Original source · versioned page text

1907-12187 SRA Information request (MCU190073)

Attached to the e-mail SARA Information Request - MCU19/0073.

of 3

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                            1907-12187 SRA




                 The Noise Impact Assessment must:
                    a) be conducted in accordance with the Road Traffic Noise Management Code of
                       Practice Volume 1
                    b) be prepared in accordance with the SDAP Supporting Information: Environmental
                       emissions in a state-controlled road environment, Department of Transport and
                       Main Roads 2017
                    c) be prepared and certified by a Registered Professional Engineer of Queensland
                    d) demonstrate that the development can achieve the relevant environmental
                        emission criteria under the SDAP, State code 1: Development in a state-controlled
                        road environment, Table 1.2.2: Environmental emissions.

                 Please refer to attachment 1 for further advice regarding Noise Impact Assessments.

How to respond
You have three months to respond to this request and the due date to SARA is 14 November 2019.
You may respond by providing either: (a) all of the information requested; (b) part of the information
requested; or (c) a notice that none of the information will be provided. Further guidance on responding to
an information request is provided in section 13 of the Development Assessment Rules (DA Rules).

It is recommended that you provide all the information requested above. If you decide not to provide all
the information requested, your application will be assessed and decided based on the information
provided to date.

You are requested to upload your response and complete the relevant tasks in MyDAS2.

As SARA is a referral agency for this application, a copy of this information request will be provided to the
assessment manager in accordance with section 12.4 of the DA Rules.

If you require further information or have any questions about the above, please contact Jamaica
Hewston, Principal Planning Officer, on (07) 5352 9718 or via email [email protected]
who will be pleased to assist.

Yours sincerely




Paul Gleeson
Principal Planning Officer

cc        Noosa Shire Council, [email protected]


 Development details

 Description:                  Development permit                  Material change of use for 52-bed residential care facility, chapel and
                                                                   community hall

 SARA role:                  referral agency

 SARA trigger:               Schedule 10, Part 9, Division 4, Subdivision 2, Table 4 (Planning Regulation 2017)




 Department of State Development, Manufacturing, Infrastructure and Planning                                                     Page 2 of 3
Log in to download the original file

1907-12187 SRA Information request (MCU190073).pdf · 224 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.