Council archive · source document
Operational Works Application - OPW21-0012 - 2nd driveway at 33 Hay St Tewantin · OPW21/0012
Very large file (10.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
[No
PART 3 - DEVELOPMENT DETAILS
Section 1 - Aspects of development
a) What is the type of development? (tick only one box)
Material change of use Reconfiguring a lot Operational work Building work
b) What is the approval type? (tick only one box)
Development permit Preliminary approval Preliminary approval that includes a variation approval
c) What is the level of assessment?
Code assessment Impact assessment (requires public notification)
d) Provide a brief description Of the proposal (e g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3
lots):
dF? tHUDc'l
iv/t*-/ yo V £>/CO + C-OT)£sl* A/£L
e) Relevant plans
Note Relevant plans are required lobe submitted for all aspects of this development application. For further information, see DA Forms guide:
Relevant plans.
Relevant plans of the proposed development are attached to the development application
a) What is the type of development? (tick only one box)
Material change of use Reconfiguring a lot Operational work S' Building work
b) What is the approval type? (tick only one box)
Development permit^/ Preliminary approval Preliminary approval that includes a variation approval
c) What is the level of assessment?
Code assessment Impact assessment (requires public notification)
d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3
lots):
e) Relevant plans
Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms Guide:
Relevant plans
Relevant plans of the proposed development are attached to the development application
Additional aspects of development are relevant to this development application and the details for these aspects that
would be required under Part 3 Section 1 of this form have been attached to this development application
Not required
Section 2 - Further development details
Material change of us¥es - complete division 1 if assessable against a local planning instrument
Reconfiguring a lot Yes - complete division 2
Operational work Yes - complete division 3
Building work Yes - complete DA Form 2 - Building work details
Division 1 - Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m2)
(if applicable)
https://dsdinipDrd.biob.core.windows.net/generai/DAForm1-Developmentapplicationdetaiis.docx 7/1/21, 1:29 pm
Page 3 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application - OPW21-0012 - 2nd driveway at 33 Hay St Tewantin.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.