Skip to the record
Every meeting, every word.

Original source · versioned page text

Stormwater Management Plan - Rev 1

of 93

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                               SITE BASED STORMWATER
                                                                     MANAGEMENT PLAN



                                             PROPOSED TOWNHOUSE DEVELOPMENT AT
                                                       101-105 EUMUNDI NOOSA ROAD
                                                                        NOOSAVILLE



                                                                                                         Prepared for

                                                                                                   Altum Property Group
                                                                                                Attention: Laura Sutton


                                                                                           Document Reference
                                                                                                        20169 - SBSMP/1

Record of Issue:

 Issue        Status             Author           Date           Checked            Date          Authorised          Date
                                                 26 Nov       Henry Morgan         30 Nov       Henry Morgan        30 Nov
   0       For Review         Darren Yuen
                                                  2020         RPEQ 11950           2020         RPEQ 11950          2020
                                                 01 Dec       Henry Morgan         04 Dec       Henry Morgan        04 Dec
   1      For Approval        Darren Yuen
                                                  2020         RPEQ 11950           2020         RPEQ 11950          2020

This investigation and report has been authorised by Mr Henry Morgan, a Director of Morgan
Consulting Engineers Pty Ltd.




Henry J Morgan          RPEQ 11950                                                   Friday, 4 December 2020


D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Current\20169 - SBSMP - Rev 1.docx
Log in to download the original file

Stormwater Management Plan - Rev 1.pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of pages 2 to 57 (of 93)

Page 2

                                                                                             20169 - SBSMP/1
                                                                                                          Page 2




                                           Table of Contents
1     INTRODUCTION ............................................................................................ 3
2     EXISTING SITE CONDITIONS .............................................................................. 4
  2.1    The Site ................................................................................................ 4
  2.2    Surrounding Area ...................................................................................... 4
3     PROPOSED DEVELOPMENT ............................................................................... 5
4     EXISTING DRAINAGE PATTERNS ......................................................................... 6
  4.1    Existing Infrastructure ............................................................................... 6
  4.2    Existing Drainage Patterns ........................................................................... 7
  4.3    Lawful Point of Discharge............................................................................ 7
5     STORMWATER QUANTITY................................................................................. 8
  5.1    Rational Method Assessment ........................................................................ 8
    5.1.1     Design Storms ....................................................................................8
    5.1.2     Rainfall Intensity ................................................................................8
    5.1.3     Times of Concentration .........................................................................8
    5.1.4     Runoff Coefficients ..............................................................................8
    5.1.5     Peak Flows ........................................................................................9
  5.2    Proposed Drainage Patterns ......................................................................... 9
  5.3    On-site Detention ................................................................................... 10
  5.4    Comparison of Peak Flows at Lawful Point of Discharge ...................................... 10
6     STORMWATER QUALITY ................................................................................ 12
  6.1    State Planning Policy Assessment ................................................................ 12
  6.2    Construction Phase ................................................................................. 12
  6.3    Operational Phase .................................................................................. 14
    6.3.1     Sources of Contaminants ..................................................................... 14
    6.3.2     Proposed Treatment Train ................................................................... 15
    6.3.3     Pollutant Export Modelling ................................................................... 15
    6.3.4     MUSIC Modelling Parameters ................................................................. 16
    6.3.5     MUSIC Modeling Results ....................................................................... 16
7     FLOODING ................................................................................................ 18
8     CONCLUSION ............................................................................................. 19
Appendix A DETAILED SITE SURVEY PLAN ................................................................. 20
Appendix B PROPOSED DEVELOPMENT PLANS ............................................................ 21
Appendix C NOOSA COUNCIL INTERACTIVE MAPPING DATA ............................................ 22
Appendix D NSC WATER QUALITY AND DRAINAGE CODE ................................................ 23
Appendix E STORMWATER QUANTITY CALCULATIONS................................................... 24
Appendix F CONCEPT SITE LEVELS AND DRAINAGE PLAN ............................................... 25
Appendix G XPSTORM PRE DEVELOPMENT RESULTS ..................................................... 26
Appendix H XPSTORM POST DEVELOPMENT RESULTS .................................................... 27
Appendix I XPSTORM POST DEVELOPMENT MITIGATED RESULTS ...................................... 28
Appendix J STORMWATER QUALITY AND MAINTENANCE GUIDELINES ................................. 29
Appendix K NSC FLOOD HAZARD OVERLAY MAP .......................................................... 30




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 3

                                                                              20169 - SBSMP/1
                                                                                         Page 3




1 INTRODUCTION
This Site Based Stormwater Management Plan (SBSMP) has been prepared for the proposed
Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville.

This SBSMP has been prepared to investigate the effects the development will have on stormwater
quantity and quality.

The objective of this SBSMP is to ensure that there is no adverse impact by the development on
the environmental value of the receiving waters during the construction and operational phases
of the development. This SBSMP will also provide recommendations to ensure that the post-
development peak outflow conditions are not greater than the pre-development peak outflow
conditions.

In order to achieve this objective, this SBSMP:

    1. Describes the environmental setting of the development site and precinct;
    2. Describes the nature of the proposed development as it relates to stormwater quality;
    3. Calculates the peak flows for both pre and post-development conditions;
    4. Calculates the detention volume required to achieve the pre-development outflow in the
       post-development state; and
    5. Identifies potential sources of contaminants and describes the management techniques
       designed to be employed on the site to achieve the water quality objectives.


The proposed development has been assessed against the following guidelines and planning
documents:


    1. State Planning Policy 2017 (SPP 2017);
    2. Urban Stormwater Quality Planning Guidelines 2010;
    3. The Queensland Urban Drainage Manual (QUDM); and
    4. The Noosa Council Planning Scheme.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 4

                                                                                  20169 - SBSMP/1
                                                                                             Page 4




2 EXISTING SITE CONDITIONS

2.1 The Site
The site, described as Lot 1 on RP849431 and Lot 1 on RP230931, has an approximate area of
5,448m2 (0.545ha). Lot 1 on RP849431 contains an existing residential dwelling while Lot 1 on
RP230931 was an existing commercial business.

Majority of the site generally slopes from northwest to southeast at an average grade of
approximately 4.5% between the elevations of 19.30m AHD and 16.10m AHD. The site is accessible
via Eumundi Noosa Road, which bounds the western property boundary.

Refer to Figure 2.1 for a Locality Plan and Appendix A for the Detailed Site Survey.




   N




                                                     Subject
                                                       Site


                                                                           Regatta Circuit




                        Figure 2.1 – Locality Plan of Site and Surrounding Area

2.2 Surrounding Area
The site is located within the limits of the Noosa Council region within a Medium Density Zoned
area and is bound by Eumundi Noosa Road to the west. The surrounding areas are generally zoned
as Low and Medium Density Residential with Community Facilities located to the south.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 5

                                                                              20169 - SBSMP/1
                                                                                        Page 5




3 PROPOSED DEVELOPMENT
The proposed Townhouse Development will primarily consist of the following:

    1. 14 townhouses with garage spaces;
    2. Two multi-unit buildings with a total of 20 units;
    3. 24 undercover parking spaces for residents;
    4. 12 visitor parking spaces;
    5. Vehicular access from Eumundi Noosa Road at the north-west corner of the site;
    6. Hardstand pavement area for vehicular manoeuvring;

    7. Dedicated landscaping throughout the site; and

    8. Communal pool area located at the south eastern corner of the site.

Refer to Appendix B for the Proposed Development Plans.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 6

                                                                                       20169 - SBSMP/1
                                                                                                Page 6




4 EXISTING DRAINAGE PATTERNS

4.1 Existing Infrastructure
Data obtained from the detailed survey and as-constructed information obtained from Noosa
Council’s interactive mapping show the following existing drainage infrastructure:
    1. An existing 225mm to 300mm dia stormwater pipe running parallel to the south eastern
       boundary of the site within Lot 46 and 62 on SP132578;
    2. An existing gully pit located within the south east corner of the site with a 225mm dia.
       stormwater connection to the existing 300 dia pipe within Lot 46 SP132578;
    3. An existing stormwater structure located at the north-western corner of the site within the
       driveway access of Lot 61 on RP69404, with a kerb adaptor connection to Eumundi Noosa
       Road.
Refer to Figure 4.1 for the existing stormwater infrastructure and drainage patterns, Appendix A
for the Detailed Site Survey and Appendix C for the Noosa Council Interactive Mapping data.




   N




                                                            Subject Site




                                                                           Legend
                                                                           Sheet Flow Path
                                                                           Stormwater Pipe
                                                                           Gully Pit


                         Figure 4.1 – Existing Drainage Paths & Infrastructure


Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 7

                                                                                20169 - SBSMP/1
                                                                                           Page 7




4.2 Existing Drainage Patterns
Data obtained from Noosa Council’s records and detailed site survey indicate that the site has
the following drainage patterns:

Roofwater Runoff
    1. The existing commercial building roofwater appears to travel underground and connect
       into the existing structure located within the driveway access of Lot 61 on RP69404. Hence,
       the roofwater from the existing commercial building was discharged to the Eumundi Noosa
       Road kerb and channel.

    2. A review of the street frontage of the site along Eumundi Noosa Road indicated that there
       is no kerb outlet for Lot 1 on RP849431. Hence, it is assumed that roofwater from the
       existing residential building is discharged to the ground or to the existing underground
       stormwater infrastructure at the rear of the site via downpipes.

Surface Runoff

    1. Surface runoff from the rear portion of Lot 1 on RP230931 generally sheet flows towards
       the adjacent site on Lot 61 on RP69404, north and east of the site.

    2. Surface runoff from the front portion of Lot 1 on RP230931 generally sheet flows towards
       the Eumundi Noosa Road kerb and channel.

    3. Surface runoff from Lot 1 on RP849431 generally sheet flows south east towards Lot 46 and
       62 on SP132578.

External Catchment

    1. There appears to be no external catchment entering the site.


4.3 Lawful Point of Discharge
If pre development flow patterns are to be maintained, the lawful point of discharge for the
proposed development is the existing stormwater drainage infrastructure within Lot 46 and 62 on
SP132578, southeast of the site and the Eumundi Noosa Road kerb and channel.

Refer to Section 5 outlining the Stormwater Quantity aspects of this site and Appendix D for the
Water Quality and Drainage Code.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 8

                                                                               20169 - SBSMP/1
                                                                                           Page 8




5 STORMWATER QUANTITY
A roof and allotment drainage system is to be designed to comply with:

    1. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage;

    2. The Queensland Urban Drainage Manual (QUDM), and;

    3. The Noosa Council Engineering Design Standards – Roads, drainage and earthworks.


5.1 Rational Method Assessment
The Rational Method has been used to calculate the peak discharges from the site under the
existing (pre development) and proposed (post development) conditions.

5.1.1 Design Storms
As defined in the Noosa Council’s Planning Scheme the following design storms were adopted:

    1. Minor Drainage System: 10 year ARI statistical flood (Q10 storm);

    2. Major Drainage System: 100 year ARI statistical flood (Q100 storm).

5.1.2 Rainfall Intensity
Rainfall intensities for this study were obtained from the Australian Bureau of Meteorology.

5.1.3 Times of Concentration
Times of concentration (tc) were calculated as defined in the QUDM. Refer to Table 5-1 for the
adopted tc’s and Appendix E for tc calculations.

                                    Table 5-1 – Adopted tc values
                                  Pre development        Post development
                                      tc (mins)               tc (mins)

                                        11.3                   5.6


5.1.4 Runoff Coefficients
The 10 year runoff coefficient’s (C10) were determined as defined in the QUDM. Refer to Table 5-2
below for the adopted C10 values.

                                     Table 5-2 – Adopted C10 Values

                                        Property State               C10

                                      Pre development                0.75
                                      Post development               0.85




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 9

                                                                                           20169 - SBSMP/1
                                                                                                        Page 9




5.1.5 Peak Flows
Refer to Table 5-3 for a summary of the predicted minor and major discharge rates for pre and
post development conditions and Appendix E for the Rational Method calculations.

                              Table 5-3 – Pre and Post Development Peak Flows

    Property State        Q1 (m3/s) Q2 (m3/s) Q5 (m3/s)     Q10 (m3/s)     Q20 (m3/s)   Q50 (m3/s)   Q100 (m3/s)

   Pre development         0.089       0.106      0.161       0.197          0.235        0.297        0.339
   Post development        0.126       0.151      0.231       0.286          0.342        0.436        0.491


The proposed development will result in an increase in impervious surface areas and will
consequently increase stormwater runoff peak flow rates.

Hence, it is proposed to utilise an on-site detention (OSD) system to mitigate the stormwater
runoff of the proposed development prior to discharging to the existing stormwater infrastructure
within Lot 46 and 62 on SP132578, southeast of the site.

Refer to Section 5.3 for the XPSTORM Modelling analysis of the site, Appendix E for the Stormwater
Quantity Calculations, Appendix F for the Concept Site Levels and Drainage Plan and Section 6 for
the Stormwater Quality Management Plan.


5.2 Proposed Drainage Patterns
The proposed drainage patterns are as follows (Refer to Appendix F):

Roof Catchment:

    1. Runoff from the roof catchment of Townhouse Units 1-8 will flow via downpipes to a
       rainwater tank located at the northwest corner of the site for rainwater reuse with
       overflow discharging to the Lawful Point of Discharge within the Eumundi Noosa Road kerb
       and channel.

    2. Runoff from the roof catchment of the rest of the site will flow via downpipes an internal
       drainage system, where it will be directed to the detention basin located at the southeast
       corner of the site prior to discharge to the Lawful Point of Discharge within Lot 46 and 62
       on SP132578.

Ground Catchment:

    1. Surface runoff from the ground level hardstand and landscaping areas will be collected by
       various stormwater pits connected to the internal drainage network, where it will be
       directed to the detention basin located at the southeast corner of the site prior to
       discharge to the Lawful Point of Discharge within Lot 46 and 62 on SP132578.

Refer to Appendix F for the Concept Site Levels and Drainage Plan.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 10

                                                                                     20169 - SBSMP/1
                                                                                              Page 10




5.3 On-site Detention
In order for the post-development stormwater discharge conditions to match the pre-development
conditions, it is proposed to incorporate an open detention basin with a maximum storage volume
of 240kL. The detention basin is to be located above ground within the southeast corner of the site.

The proposed OSD basin will have the following properties:

       Specified base area = 81m2;

       Specified internal depth = 1.5m;

       Low flow orifice diameter = 0.12m;

       Mid flow top of pit elevation from base of tank = 1.1m;

       Overflow weir elevation from base of tank = 1.4m;

       Overflow weir width = 7.5m;

       Required basin volume = 210kL; and

       Provided basin volume = 240kL.

The detention basin will be designed to contain all flows up to a Q20 storm event. Storm events
exceeding Q20 will be expected to sheet flow across the boundaries at or less than pre development
flows.

Refer to Appendix F for the Concept Site Levels and Drainage Plan which details the proposed on-
site detention system.


5.4 Comparison of Peak Flows at Lawful Point of Discharge
The pre-development and post-development mitigated peak flow rates were compared for each
catchment and are shown in Table 5-4 below.

                                     Table 5-4 - Comparison of Peak Flows
                                                                         XPSTORM
                                       XPSTORM
                  ARI                                              Post-development Flows
                                 Pre-development Flows
                (years)                                                  (Mitigated)
                                         (m3/s)
                                                                           (m3/s)
                   1                      0.035                            0.035

                   2                      0.043                            0.039

                   5                      0.068                            0.051

                   10                     0.087                            0.062

                   20                     0.107                            0.084

                   50                     0.128                            0.119

                  100                     0.145                            0.144




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 11

                                                                               20169 - SBSMP/1
                                                                                          Page 11




The XPSTORM hydraulic modelling has demonstrated that the proposed mitigation implemented will
maintain pre-development flows (or less) for all design storms at the LPD located within Lot 46 and
62 on SP132578, southeast of the site.

Refer to Appendix G for the pre-development XPSTORM results, Appendix H for the post-
development XPSTORM results and Appendix I for the XPSTORM post-development mitigated
results.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 12

                                                                                       20169 - SBSMP/1
                                                                                                  Page 12




6 STORMWATER QUALITY
The following section of the report will outline the potential contaminants and proposed solutions
to be incorporated during the construction and operational phases of the proposed development.


6.1 State Planning Policy Assessment
The purpose of this sub section is to determine if State Planning Policy (SPP 2017) stormwater
quality requirements, as set out by the Department of Environment and Resource Management, will
be triggered for this development. Refer to Table 6.1 for the State Planning Policy Checklist for
stormwater quality.
                               Table 6.1 – State Planning Policy Checklist

                                    Material Change of Use (MCU)                           Y/N?

            MCU for an urban purpose that involves premises ≥ 2500m 2                       Y
            AND
            Will result in 6 or more dwellings
                                                                                            Y
            OR
            Will result in impervious area greater than 25% of the net developable area.
                                                                                            Y

The development has been assessed against the latest State Planning Policy 2017 (SPP 2017). The
proposed development will entail the material change of use for urban purposes, which will involve
a land area greater than 2,500m2. Consequently, State Planning Policy 2017 (SPP 2017) is triggered.

Hence, tertiary stormwater quality treatment is warranted for this development in accordance
with the State Planning Policy 2017 (SPP 2017).


6.2 Construction Phase
Sediment generated during the construction phase shall be dealt with in accordance with an
Erosion and Sediment Control Plan and kept on site during the construction phase.

Erosion and Sediment Control (ESC) Measures such as silt fences, diversion drains, drainage
structure protection and dust control (clearing) will be implemented. Silt fences are to be erected
along the boundary of the site and around the construction area. These fences are to be cleaned
by the contractor when the capacity is reduced by 25%. Where possible, disturbance to the existing
surface is to be limited to the immediate work area. The existing ground cover is not to be stripped
until the contractor is ready for earthworks to begin.

Stockpiles and construction materials are not permitted to be stored within the road reserve and
should be contained using silt fences. Diversion drains are to be provided at upstream catchments
to reduce flows to earthworks areas. In any areas where flows could enter adjacent properties
temporary stabilisation is to be provided.

All ESC measures are to be provided as soon as earthworks have commenced and staged to suit
construction. The contractor is responsible for this action. A temporary construction exit is to be
located at each entry point to the site and will be determined based on the stage of works being
completed. The contractor is to ensure all dust tracked onto surrounding roads is immediately swept
to remove silt/dust.

All new stormwater pits are to be protected from sediment infiltration by wrapping new pits and
grates in geofabric or covering appropriately with timber board. Silt fences are to remain in place
during the maintenance period until the site is established (80% ground cover).

Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 13

                                                                                        20169 - SBSMP/1
                                                                                                    Page 13




Potential sources of contaminants identified for the construction phase of the development are
outlined in Table 6.2 together with proposed stormwater quality improvement devices,
management and maintenance procedures.

                    Table 6.2 - Potential Contaminants and Proposed Treatments

                                                                             Proposed Treatment
                                                   Management /
        Pollutant         Potential Source                                  Device and Maintenance
                                               Maintenance Procedures
                                                                                   Procedure
      Sediment &             Excavated         Provision of sediment and     Sand filled filter socks.
        Eroded              material, fill      silt barriers to the site      Removal of excess
       material          material, exposed      drainage entry and exit       sand/silt build-up at
                         ground, stockpiles              points.              regular intervals and
                            of material.                                       after every storm.
          Dust             Stockpiles of       Covering the material or       Coverage of material
                         material, exposed       wetting it down at          with plastic, geotextile,
                             ground.              regular intervals.        surface binding agents or
                                                                                regular watering.
         Litter          Refuse generated      Construction waste is to       Industrial bin is to be
                             by staff.          be cleaned off the site        provided within the
                                               area and disposed of into    construction area - to be
                                                 an industrial bin then       emptied on at least a
                                                  removed by a refuse             weekly basis.
                                                 collection contractor.
        Concrete            Washing of         Provision of a closed area   Liquids to be removed by
                             concrete          onsite for washing off of       a waste collection
                          trucks/tools to          concrete slurries.        contractor. Solids to be
                              remove                                        placed into a refuse bin.
                            wet/unused
                             concrete.
       Surfactants        Washing down          No cleaning of vehicles     Monitoring & prevention
      (detergents)         operations on       will be permitted on site.
                          hardstand area
                         using detergents.
        Chemical         Typically this may      Where spills occur, the    A temporary containment
         (Paints,           occur due to         containment area is to          area. This is to be
        thinners        spillage of product.        stop escape. The          impermeable and of a
           etc.)                                material is to be treated           size to permit
                                                    (as required) and          mixing/transfer, and
                                                removed and cleaned by      with a storage volume of
                                                 a licensed contractor.           twice the largest
                                                 Minor spillage outside            container used.
                                               this area shall be cleaned    Treatment of spills is to
                                                   up with cloths and             occur on site. No
                                                disposed of to waste via       discharge of treated
                                                   the industrial bin.      water to the stormwater
                                                                                 system is to occur
                                                                            without council approval.
                                                                                Incidents are to be
                                                                               reported to the EPA.
      Wastewater         Spillage from the       A licensed contractor         No leakage is to be
                         relocation of the     shall remove any residue      permitted to enter the
                         existing sewerage       sewage from unused         groundwater or discharge
                           reticulation.       pipes and contaminated          to the stormwater
                                                soils are to be disposed            system.
                                               of via the industrial bin.


Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 14

                                                                                         20169 - SBSMP/1
                                                                                                        Page 14




6.3 Operational Phase
The proposed development has been assessed against the latest State Planning Policy 2017 (SPP
2017). The proposed development will entail the material change of use for urban purposes, which
will involve a land area greater than 2,500m2. Consequently, State Planning Policy 2017 (SPP 2017)
is triggered and stormwater quality treatment is will be required for this development.

Water quality objectives (WQO’s) for South East Queensland as set out in State Planning Policy 2017
(SPP 2017) should be achieved by identifying and adopting best practise techniques in accordance
with the abovementioned guidelines. Refer to Table 6.3 for the target WQO’s.

                          Table 6.3 – Minimum Mean Annual Load Reductions

                                                            Minimum Mean Annual
                                    Contaminant
                                                               Load Reductions

                            Total Suspended Solids (TSS)            ≥ 80%
                               Total Phosphorus (TP)                ≥ 60%
                                Total Nitrogen (TN)                 ≥ 45%
                               Gross Pollutants (GP)                ≥ 90%

6.3.1 Sources of Contaminants
Potential sources of contaminants and stormwater quality improvement devices identified for the
operational phase of the development are outlined in Table 6.4

                                   Table 6.4- Sources of Contaminants

                                                Pollutant
               Target Pollutant Type                             Acceptable Treatment Examples
                                                  Size

         Primary        Screening of gross                     Litter baskets, swales, buffer strips,
                                                >5000um
        Pollutants          pollutants                              GPT’s, Bio-retention basins
                        Sedimentation of
        Secondary                               125um -
                        coarse to medium                       Swales, sedimentation basins, ponds
        Pollutants                              5000um
                            sediment
                                                                Bio-retention basins, constructed
                           Enhanced
                                                  10um –      wetland macrophyte zones, other bio
                      sedimentation of fine
                                                  125um         technologies, proprietary tertiary
                          particulates
                                                                   stormwater treatment dvices
         Tertiary    Adhesion and filtration                 Constructed wetland macrophyte zones,
                                                0.45um –
        Pollutants   of very fine / colloidal                  other bio technologies, proprietary
                                                  10um
                            sediment                          tertiary stormwater treatment dvices

                       Biological uptake of                  Constructed wetland macrophyte zones,
                                                <0.45um
                        dissolved particles                          other bio technologies




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 15

                                                                                     20169 - SBSMP/1
                                                                                                 Page 15




6.3.2 Proposed Treatment Train
The proposed treatment train has been modelled using the following methodology:

    1. Roofwater from Townhouse Units 1-8 will be collected by a 15kL rainwater reuse tank with
       overflow to the Eumundi Noosa Road kerb and channel.

    2. Roofwater from the rest of the proposed development will be collected by the internal
       drainage network which will subsequently direct flow to the end-of-line stormwater quality
       treatment quality treatment device.

    3. Surface runoff from the hardstand areas and landscaping areas will be collected by various
       pits containing litter baskets. The internal drainage networks will subsequently direct flow
       to the end-of-line stormwater quality treatment quality treatment device.

All runoff described above will then discharge to the lawful point of discharge. A Concept Site
Levels and Drainage Plan of the proposed internal drainage network detailing the treatment train
assets is included in Appendix F. Refer to Table 6.5 for details of the proposed treatment train
assets.

                                Table 6.5- Proposed Treatment Assets

          Treatment          Treatment
                                                                    Description
            Level              Asset

                                                   8 x SPEL Environmental Stormsack litter
                                                   baskets will be installed within the
           Primary         Litter Baskets
                                                   stormwater pits in the hardstand pavement
                                                   areas.

                          Rainwater Reuse
           Primary/                                15kL tank installed at the north western
                          Tank (Landscape
          Secondary                                corner of the site.
                           Irrigation Only)


          Primary/
                        Secondary/Tertiary         1 x 8-cartridge SPEL Environmental (EMC 45)
         Secondary/
                        Treatment Devices          SPELFilter system within a precast chamber.
          Tertiary


Refer to Appendix J for the Stormwater Quality Operation Management and Maintenance
Guidelines.

6.3.3 Pollutant Export Modelling
Following the definition of water quality objectives for the site and an assessment of the treatment
options suitable for the development, the most appropriate treatment scheme for the site was
identified. The impact of the stormwater management strategy on the quality of stormwater runoff
discharged from the site has been assessed using the pollutant export model, Model for Urban
Stormwater Improvement Conceptualisation (MUSIC).




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 16

                                                                                         20169 - SBSMP/1
                                                                                                  Page 16




6.3.4 MUSIC Modelling Parameters
The MUSIC model was set up in accordance with the Water-By-Design MUSIC Modelling Guidelines
for South East Queensland to the parameters listed in Table 6.5 and Table 6.6. Refer to Figure 6.1
for source node areas.

                                          Table 6.6 – MUSIC Parameters

                       Parameter                               Data Used

                      Rainfall Data                         40908 TEWANTIN

                  Modelling Timestep                           6 minutes

                        Routing                    No routing drain links were adopted



                             Table 6.7 – Catchment Runoff Generation Parameters

                                  Parameter                        Residential Catchment


                              Rainfall Threshold                              1

                         Soil Storage Capacity (mm)                          500

                    Initial Storage Capacity (% capacity)                    10

                             Field Capacity (mm)                             200

                      Infiltration Capacity Coefficient a                    211

                      Infiltration Capacity Coefficient b                     5

                             Initial Depth (mm)                              50

                           Daily Recharge Rate (%)                           28

                           Daily Baseflow Rate (%)                           27

                        Daily Deep Seepage Rate (%)                           0


6.3.5 MUSIC Modeling Results
Refer to Figure 6.1 for a print screen schematic of the MUSIC model for the proposed development
and Figure 6.2 for the annual pollutant loads that will be discharged from the site for the proposed
development.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 17

                                                                               20169 - SBSMP/1
                                                                                          Page 17




                           Figure 6.1 - MUSIC Model Print Screen Schematic




                                  Figure 6.2 - MUSIC Modelling Results

The modelling results show that the pollutant reduction objectives are met for all contaminants
given in Section 6.

Should operational requirements change, this plan is required to be amended to suit. Substantial
changes may require resubmission to the local authority. Following completion of construction, this
plan is to be incorporated into the total-site management practices.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 18

                                                                              20169 - SBSMP/1
                                                                                        Page 18




7 FLOODING
Information from the Noosa Council Flood Hazard Overlay Map confirms that the site is unaffected
by flooding and inundation.

Refer to Appendix K for the Noosa Council Flood Hazard Overlay Map.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 19

                                                                               20169 - SBSMP/1
                                                                                          Page 19




8 CONCLUSION
The proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville has been
assessed for its impact on the quantity and quality of stormwater drainage.

If the proposed development maintains pre-development drainage patterns, the lawful points of
discharge are the stormwater drainage infrastructure within Lot 46 and 62 on SP132578, southeast
of the site and the Eumundi Noosa Road kerb and channel, west of the site.

No external catchments have been identified.

Onsite detention will be provided in the form of a detention basin to attenuate post development
peak flow rates and ensure non-worsening of flooding to properties and infrastructure adjacent to,
and downstream of the subject site. The detention basin will be designed to contain all flows up to
a Q20 storm event. Storm events exceeding Q20 will be expected to sheet flow across the boundaries
at or less than pre development flows. The volume and configuration of the on-site detention
system will be confirmed during detailed design stage.

Sediment generated during the construction phase shall be dealt with in accordance with an
Erosion and Sediment Control Plan to be kept on site during the construction phase.

The proposed development triggers the State Planning Policy 2017 (SPP 2017). The water quality
objectives (WQO’s) for South East Queensland have therefore been achieved by treating the roof
and surface stormwater runoff via a SPEL Environmental treatment system and a rainwater tank
for rainwater reuse, prior to discharging to the Lawful Points of Discharge.

The subject site is not affected by flooding.




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 20

                                                                           20169 - SBSMP/1
                                                                                    Page 20




                                            APPENDIX A


                                DETAILED SITE SURVEY PLAN




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 21

 

 

NOTES

(1) This plan was prepared for the purpose and exclusive use of

NC OLIVER GROUP of COMPANIES PTY LTD and their other
professional advisers and is not to be used for any other purpose or
by any other person or corporation.

JFP URBAN CONSULTANTS PTY LTD accepts no responsibility for
any loss or damage arising to any person or corporation who may
use or rely on this plan in contravention of these terms.

(2) The title boundaries shown on this plan were not marked at the
time of survey and have been determined from plan dimensions
only and not by field survey.

(3) Services shown hereon have been located where possible by
field survey. If not able to be so located, services have been plotted
from the records of the relevant authorities where available and
have been noted accordingly on this plan. However, the
information shown on these records pertinent to services location
is indicative only and sometimes inadequate.

AutoCAD drawing for all spot heights and codes in layers: X-RL-T,
X-CODE-T & X-NOTES-T.

(7) Tree types are estimated and tree sizes are approximate only. If
accurate identification of tree types is to be relied upon for any
purpose, then all trees shown will require on site verification by a
suitably qualified expert.

(8) These notes form an integral part of this plan. If others use this
information, they should be advised of its purpose and limitations.

(9) This plan may not be reproduced unless these notes are
included.

 

12d Project: S:\M2677\Oliver - Eumundi rd\12D\

SITE_DTM_060116.project a

Contour Interval: 0.5m °
os

PAP 0.3X2 8.0

 

/ /
/
>
(4) Prior to any demolition, excavation or construction on the site, q
the relevant authority should be contacted for possible location of
further underground services and detailed locations of all services. NV
(5) Spot heights and contours are representative of the Q
topographical terrain at time of survey, 06/01/2017.
(6) Only a small number of spot heights are shown. Refer to the

  

PROPERTY DESCRIPTION
LOT 1 on RP230931
TOTAL AREA 3740m? (Deed)
LOT 1 on RP849431

TOTAL AREA 1748m? (Deed)
LOCALITY of NOOSAVILLE
LOCAL GOVERNMENT:
NOOSA SHIRE COUNCIL

Trunk Water Main

 

BRISBANE - SUNSHINE COAST - CENTRAL QLD

PLANNERS

 

 

URBAN DESIGNERS

 

 

    
   
 
  
  
 
  
  
  

 

 

   
  
 
   
  
 
   
   
 
  
   
 
 

 

 

 

 

 

 

 

  
  
  
   
 

  

RP230931

 
  
 

ISSUES:

 

SCALE: @ A3 1:250
°

25 5 18 10 25 15 175
SCALE 1:250 at (A3) size

THIS SCALE SHOWN IS ORIGINAL DRAWING SCALE - (A3 SIZE)

DO NOT SCALE FROM THIS DRAWING - USE ONLY DIMENSIONS PROVIDED - IF IN DOUBT PLEASE ENQUIRE

SITE DETAIL

 

 

 

 

 

 

 

 

 

 

 

 

'
LEGEND
a 8 —
x © It 1} FENCE
/ £9 8, 4_
RP12Z9020 Wg LIGHT POLE, POWER POLE
. g°’——, trom records % 0 A ‘
x oe 4 >| ——a— £ ——i=}— _ UNDERGROUND ELECTRICITY, PIT, BOX
S———. 3 |
—_———s
Z aA ——=— T-6—@x— TELSTRA CABLE, PIT, BOX, POLE
S EMH ZA —_ 2
.
gs | EEE KERB AND CHANNEL, SIGN, GULLY TRAP
—N m7 1f
Retseredecevee) 18.0 wo S——— SEWER PIPE, MANHOLE
_ ae xe} SMH
o —at— D STORM WATER PIPE, FIELD INLET, MANHOLE
> SWMH
g WATER MAIN, VALVE, HYDRANT, METER
06. RETAINING WALL
Xe
TREE
“a Crovel oe TYPE GUM TREE, TRUNK DIAMETER 400mm
2% @ vel Track HEIGHT 15metres
x& » Other types: PN = Pine
& 8 PM=Palm
wv 95°43" g a eee Soret NS = Not specified
55-22)" 7 a
oO
fo
a
» |
sv
ae
9
we 4
be
“ 6/
a
x RP69404

 

NC OLIVER GROUP of COMPANIES PTY LTD

 

DETAILS:
PROJECT: PLAN: ISSUE:

M2677. 03 A

SHEET:

10F2

FILE:

      
  

 

 

: ed SURVEYED | Lem] CHECKED | mip | MORRIE anu 101-105 EUMUNDI NOOSA ROAD M2677-03A Detail.dwg
ACN 050.414 045 Al APE ARCHITECTS A ORIGINAL ISSUE 10-01-2017 __scP. DATE:
DRAWN scp | APPROVED | DNE ve MI70215_RL12.12 AHD ISSUE: DETAILS: DATE. NOOSAVILLE 10th January 2017
com 7 TNS PTD. TH wa ET HOUT TE WATTEN CONST OFT

   

 

     

Page 22

 

NOTES

(1) This plan was prepared for the purpose and exclusive
use of NC OLIVER GROUP of COMPANIES PTY LTD and
their other professional advisers and is not to be used for
any other purpose or by any other person or corporation.
JFP URBAN CONSULTANTS PTY LTD accepts no
responsibility for any loss or damage arising to any person
or corporation who may use or rely on this plan in
contravention of these terms.

(2) The title boundaries shown on this plan were not
marked at the time of survey and have been determined
from plan dimensions only and not by field survey.

(3) Services shown hereon have been located where
possible by field survey. If not able to be so located,
services have been plotted from the records of the
relevant authorities where available and have been noted
accordingly on this plan. However, the information shown
on these records pertinent to services location is
indicative only and sometimes inadequate.

(4) Prior to any demolition, excavation or construction on
the site, the relevant authority should be contacted for
possible location of further underground services and
detailed locations of all services.

(5) Spot heights and contours are representative of the
topographical terrain at time of survey, 06/01/2017.

(6) Only a small number of spot heights are shown. Refer
to the AutoCAD drawing for all spot heights and codes in
layers: X-RL-T, X-CODE-T & X-NOTES-T.

(7) See Sheet 1 for legend

(8) Tree types are estimated and tree sizes are
approximate only. If accurate identification of tree types
is to be relied upon for any purpose, then all trees shown
will require on site verification by a suitably qualified
expert.

(9) These notes form an integral part of this plan. If others
use this information, they should be advised of its
purpose and limitations.

(10) This plan may not be reproduced unless these notes
are included.

12d Project: $:\M2677\Oliver - Eumundi rd\12D\

SITE_DTM_060116. project /

Contour Interval: 0.5m

massa ] Sep) og

MA
URBANCONSULTANTS

 

/

   

   
   
     

VKNO.4 5.0

See Sheet 1
Ry

  
 

( *

) br"
0
vy %

   
 
 

$

&

RP250951

 

RP84943/

 
  
 
 

Residential
Dwelling

 

 

   
   
 

  
 

6/
RP69404

 

578

SP/32.

62
SPIS2578

 

 

RPISIE67

ISSUES:

N SCALE: @ A3 1:250
°

 

25 5 18 10 25 15 175
SCALE 1:250 at (A3) size
THIS SCALE SHOWN IS ORIGINAL DRAWING SCALE - (A3 SIZE)

DO NOT SCALE FROM THIS DRAWING - USE ONLY DIMENSIONS PROVIDED - IF IN DOUBT PLEASE ENQUIRE

 

 

  

SITE DETAIL
NC OLIVER GROUP of COMPANIES PTY LTD
101-105 EUMUNDI NOOSA ROAD

 

 

 

 

 

 

 

HORIZONTAL DATUM:
SURVEYED | LCM| CHECKED | MJD

aa A ORIGINAL ISSUE 10-01-2017 __scP
DRAWN | scP | APPROVED | DNE PM170215_RL12.12 AHD ISSUE: DETAILS: DATE: N

 

NOOSAVILLE

  
 
  
  
 

 

SP1I32578

PROPERTY DESCRIPTION

LOT 1 on RP230931

TOTAL AREA 3740m? (Deed)

LOT 1 on RP849431

TOTAL AREA 1748m? (Deed)

LOCALITY of NOOSAVILLE

LOCAL GOVERNMENT: NOOSA SHIRE COUNCIL

DETAILS:
PROJECT: PLAN: ISSUE:

M2677. 03 A
2 OF 2

M2677-03A Detail.dwg

10th January 2017

 

 

     

NSULTANTS PTY ETD, THIS

 

 

ITTEN CONSENT OF

 

 

Page 23

                                                                           20169 - SBSMP/1
                                                                                    Page 21




                                            APPENDIX B


                            PROPOSED DEVELOPMENT PLANS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 24

(COMMON CLOTHESLINE
AREA FOR APARTMENTS
15, 16,19 & 20,

   
   
 

  
    
     
 
 

       
  
 

   
   

    
  
 
  
  

   

     
     

       

       
  

        
 

 

    
       
   
 

     
 
 
 

 
      
   
   

  
  
 

 

        

 
     

I\ ue
Wey FRR
i |
| — ~~ PT APT DEOL
0: s
a | pT Bet | APT | APT SoA
we ,?\ Ss 09 13 14 lel, a
\ / \_ a7 BLDG 02 “S_UNTTY WATER ACCESS NY
) / 18, ‘.
/ 5.0m X3.0m EXCL
é |
5 |
| i \ /
a
| Sf
I} | /
| | \ V
il b I
ie |
it! =
jl =
pi \
\ \! ~ \|
“1 4h THI 14rd
Ie |
\7
i i 18.75 \ Co
Loyd yo APT | apt T101
| | / 02 | 03 i
=z NL-
i ~ BLDG 04
|
LU ce

   

 
 

REFER CIVIL ENGINEER
PLANS FOR CROSS OVER
DETAIL

    

    
 

 

19.07

  
 

SITE PLAN LEVEL 1 GROUND

1:200

 

issue: 03 date : 01-12-20
ARCHITECTURE | LANDSCAPE | INTERIOR | PROJECT MANAGEMENT

. EUMUN DI NOOSA ROAD, NOOSAVILLE SITE PLAN LEVEL 1 GROUND 7186-DA02 ee

PROPOSED MULTIRESIDENTIAL DEVELOPMENT, —AuTuNconstevcrins consuanons 5°. BLICKBURNEJ/CKSON

operty of Blackburne Jackson Design Pty Lt.

 

Page 25

                                                                           20169 - SBSMP/1
                                                                                    Page 22




                                            APPENDIX C


                   NOOSA COUNCIL INTERACTIVE MAPPING DATA




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 26

Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying   11/27/2020
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
                                                                                                                        1:1500

Page 27

                                                                           20169 - SBSMP/1
                                                                                    Page 23




                                            APPENDIX D


                      NSC WATER QUALITY AND DRAINAGE CODE




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 28

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                     Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

Stormwater Drainage Design
PO1                                                      AO1                                                                   RO1
The development and its stormwater                       A stormwater management plan is prepared                              The proposal complies. Refer to the Site
management system is planned and designed                consistent with PSP6 Engineering Design                               Based Stormwater Management Plan
having regard to:                                        Standards - Roads, drainage and                                       (SBSMP) report prepared by MCE.
 (a) the natural features of the site;                   earthworks.
 (b) the need to avoid impacts and potential risks
     to ecologically important areas;
 (c) the likely effectiveness of erosion and                                                                        
     sediment control and stormwater drainage
     measures during rainfall events during and
     post construction; and
 (d) the need to protect environmental values
     and water quality of receiving waters both
     during and post construction
PO2                                                      AO2.1                                                                 RO2.1
Stormwater drainage infrastructure is planned,           Stormwater drainage planning, design and                              All stormwater design will comply with
designed and                                             construction is in accordance with PSP6                               the PSP6 Engineering Design Standards
constructed to:                                          Engineering Design Standards - Roads,                                - Roads, drainage and earthworks and
 (a) incorporate allowance for increased flood           drainage and earthworks and the latest                                the latest version of the Queensland
     risk and tidal inundation through pipework as       version of the Queensland Urban Drainage                              Urban Drainage Design Manual.
     a result of cilmate change and sea level rise;      Design Manual.
 (b) ensure the development is adequately                AO2.2                                                                 RO2.2
     drained; and                                        The stormwater drainage system connects to                            Refer to the SBSMP prepared by MCE
 (c) ensure stormwater is managed and lawfully           a lawful point of discharge in accordance                            for the lawful points of discharge.
     discharged without altering stormwater              with PSP6 Engineering Design Standards -
     drainage characteristics external to the site.      Roads, drainage and earthworks.
                                                         AO2.3                                                                 RO2.2
                                                         Stormwater flows discharging from the                                 The proposal complies. A detention basin
                                                         development are demonstrated to be                                   will be utilised to mitigate flows prior to
                                                         consistent with pre-development                                       discharge to the legal point of discharge.
                                                         characteristics.                                                      Refer to the SBSMP prepared by MCE.
                                                         AO2.4
                                                         Development provides for the management                    N/A
                                                         of stormwater to incorporate appropriate

1
    Solution:         Acceptable Solution                                                                                                                                                          Page 1 of 10
                A/S    Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                           Rev:      0
Site Address: 101-105 Eumundi Noosa Road, Noosaville                                                                                                                                                   30/11/2020

Page 29

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                      Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                          allowance for climate change impacts
                                                          (including rainfall intensity and sea level
                                                          rise), in accordance with PSP6 Engineering
                                                          Design Standards – Roads, Drainage and
                                                          Earthworks.
PO3                                                       AO3.1
Stormwater drainage infrastructure conveys run-           Stormwater drainage infrastructure meets the
off in a manner that allows roads to deliver              desired standards of service for roads
                                                                                                                     N/A
desired standards of service appropriate to the           functionality set out in PSP6 Engineering
local conditions and local stormwater drainage            Design Standards - Roads, Drainage and
characteristics.                                          Earthworks.
PO4                                                       AO4.1                                                                 RO4.1
Stormwater infrastructure is compatible with              The location, design and construction of                              Refer to RO2.1.
existing infrastructure, allows for easy access for       stormwater drainage structures is in
the ongoing maintenance by Council, is cost               accordance with PSP6 Engineering Design                    
effective across its design life.                         Standards - Roads, drainage and
                                                          earthworks.
                                                          AO4.2
                                                          Where infrastructure is located on private
                                                          land an easement is dedicated over the
                                                                                                                     N/A
                                                          infrastructure in accordance with PSP6
                                                          Engineering Design Standards - Roads,
                                                          drainage and earthworks.
                                                          AO4.3                                                                 RO4.3
                                                          Any alterations or repairs to infrastructure as                       The proposal complies.
                                                          a result of the development are made at no                 
                                                          cost to Council.
                                                          AO4.4                                                                 RO4.4
                                                          Development avoids stormwater inflow and                              The proposal complies. Stormwater will
                                                          infiltration to the sewer infrastructure                             be design to avoid inflow and infiltration
                                                          network.                                                              into the sewer infrastructure network.
                                                          AO4.5                                                                 RO4.5
                                                          Stormwater infrastructure is designed to                              The proposal complies.
                                                          minimise maintenance costs and the                         
                                                          requirement for specialized equipment for


1
    Solution:          Acceptable Solution                                                                                                                                                          Page 2 of 10
                A/S     Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A     Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                            Rev:      0
Site Address: 101-105 Eumundi Noosa Road, Noosaville                                                                                                                                                    30/11/2020

Page 30

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                      Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                          maintenance techniques.
PO5                                                       AO5.1
Stormwater drainage infrastructure is aligned to          Stormwater drainage infrastructure avoids
avoid crossing waterways, wetlands, drainage              crossing waterways, wetlands drainage lines                N/A
lines and ecological important areas, or where it is      and ecologically important areas or follows
demonstrated this is unavoidable, disturbed areas         the edge of existing disturbed areas.
are reinstated and revegetated upon completion            AO5.2
of works.                                                 Stormwater drainage infrastructure avoids
                                                          crossing waterways, wetlands drainage lines                N/A
                                                          and ecologically important areas or follows
                                                          the edge of existing disturbed areas.
                                                          AO5.3
                                                          Temporary vehicular crossings of waterways
                                                          must be designed and constructed to be
                                                                                                                     N/A
                                                          consistent with the current International
                                                          Erosion Control Association Best Practice
                                                          Book Series.
Stormwater quality and protection of receiving waters
PO6                                                       AO6.1                                                                 RO6.1
Development is located, designed, constructed             Stormwater runoff discharging into High                               The proposal complies.
and operated to protect and enhance                       Ecological Value waters as a result of
environmental values and water quality of                 development causes no increase in gross
waterways, wetlands, lakes, ground waters and             pollutants, total suspended solids, total                  
drainage systems.                                         phosphorous or total nitrogen compared to
                                                          a pre-development scenario.
Editor’s note: Environmental values of waters
and water quality objectives are prescribed in            AND
Schedule 1 of the Environmental Protection                AO6.2                                                                 RO6.1
(Water) Policy 2009 and are identified on the             All stormwater runoff is treated to achieve                           The proposal complies. An underground
State Planning Policy Interactive Mapping System          maximum removal of nutrients, gross                                   stormwater filtration treatment system will
                                                          pollutants and suspended solids as                                    be incorporated into the drainage design
                                                          determined by cost to efficiency ratios. (e.g.                       to achieve the target pollutant reduction
                                                          bioretention basins must be sized to                                  loads. Refer to the SBSMP prepared by
                                                          achieve at least 80% reduction in total                               MCE.
                                                          suspended solids, 60% reduction in total

1
    Solution:          Acceptable Solution                                                                                                                                                          Page 3 of 10
                A/S     Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A     Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                            Rev:      0
Site Address: 101-105 Eumundi Noosa Road, Noosaville                                                                                                                                                    30/11/2020

Page 31

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                     Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                         phosphorous, 45% reduction in total nitrogen
                                                         and 90% reduction in gross pollutants >5mm)

                                                         OR
                                                         AO6.3
                                                         Developments achieve a minimum 3 drop
                                                         rating consistent with the Water by Design
                                                         Living Waterways Scoring Guide (Healthy
                                                         Land and Water).
                                                                                                                    N/A
                                                         Editor’s note— PSP6 Engineering Design
                                                         Standards - Roads, Drainage and
                                                         Earthworks provides guidance on stormwater
                                                         design and modelling requirements

PO7                                                      AO7.1
Water quality treatment systems use natural              Water quality treatment systems are
processes and materials, whenever possible, and          designed to be integrated into the landscape
are integrated into development to enhance               consistent with the technical design guideline
biodiversity and landscape benefits                      published by Healthy Land and Water Water
                                                         by Design for the                                          N/A
                                                         feature. (eg. For Bioretention Basins:
                                                         Bioretention Technical Design Guidelines
                                                         (October 2014) and for Wetland Systems the
                                                         Wetland Technical Design Guideline (May
                                                         2017).
PO8                                                      AO8.1
Water quality treatment infrastructure to be             Detailed life cycle costing is provided for the
                                                                                                                    N/A
dedicated as public assets are proven to be              entire treatment train system including
suitable for its use and of a cost                       replacement costs of asset parts.
effective and efficient standard                         AO8.2
                                                         Treatment systems dedicated as public
                                                         assets are designed to minimise
                                                                                                                    N/A
                                                         maintenance, renewal and adaption costs
                                                         and the requirement for specialised
                                                         equipment, material or maintenance

1
    Solution:         Acceptable Solution                                                                                                                                                          Page 4 of 10
                A/S    Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                           Rev:      0
Site Address: 101-105 Eumundi Noosa Road, Noosaville                                                                                                                                                   30/11/2020

Page 32

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                     Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                         techniques.
                                                         AO8.3
                                                         Vegetated stormwater management systems
                                                         to be dedicated as public assets are
                                                         established and maintained during the
                                                         maintenance period to ensure optimal                       N/A
                                                         vegetated growth and that the functional
                                                         elements of the system achieve the design
                                                         function at the end of the maintenance
                                                         period.
PO9                                                      AO9.1                                                                 RO9.1
Treatment systems are designed to eliminate or           Free draining inlets and outlets are provided                         The proposal complies. The proposed
minimise health, safety and aesthetic hazards,           to ensure that waters do not pond for more                           stormwater treatment system will be
including risks associated with insect breeding,         than 24 hours.                                                        design to be free draining.
odour and public safety.                                 AO9.2
                                                         Developments are designed to eliminate
                                                                                                                    N/A
                                                         retaining walls in excess of 0.8m for any
                                                         water quality treatment device.
Hydraulic and Waterway Stability
PO10                                                      AO10                                                                 RO10
Development prevents increased bed and bank               The development is designed to:                                      The proposal complies. Refer to the
erosion and sedimentation in receiving waterways         (a) limit the peak 1 year ARI event discharge                         SBSMP prepared by MCE.
by avoiding changes in low rate, peak flow run-off           within the receiving waterway to the pre-
and flow duration.                                           development peak 1 year discharge;
                                                         (b) maximise pervious areas by using
                                                             pervious alternatives for otherwise
                                                             impervious areas wherever possible;
                                                         (c) provide for capture and reuse of                       
                                                             stormwater for non-potable purposes for
                                                             gardening, toilet flushing, laundry and hot
                                                             water supply uses;
                                                         (d) incorporate appropriate detention
                                                             features; and
                                                         (e) incorporate natural channel design
                                                             principles.

1
    Solution:         Acceptable Solution                                                                                                                                                          Page 5 of 10
                A/S    Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A    Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                           Rev:      0
Site Address: 101-105 Eumundi Noosa Road, Noosaville                                                                                                                                                   30/11/2020

Page 33

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                    Acceptable Outcomes                                    Solution1                       Comments                                    Council Use


                                                        Editor’s note: The Sustainable Building
                                                        Design Code includes requirements for
                                                        stormwater capture and reuse.
PO11                                                    AO11.1
Water sensitive urban design principles are             The design and construction of a natural
applied to achieve multifunctional design of            channel or natural channel rehabilitation
waterways, wetlands and drainage lines that             works are in accordance with the Natural                   N/A
provide for:                                            Channel Design Guidelines (Brisbane City
 (a) stormwater conveyance that uses natural            Council) having regard to local topography,
     channel design;                                    geology and geomorphology.
 (b) protection of landscape features and               AO11.2
     ecological important areas including               Landscape features, plant species and
     terrestrial and aquatic habitat;                   habitat types used in stormwater conveyance                N/A
 (c) aesthetic and passive recreation values;           channels are complementary to the local
 (d) flood management and conveyance of                 context and natural waterways
     external catchment stormwater through the          AO11.3
     development;                                       Bank and bed stability and planting densities
 (e) landscaping that incorporates local native                                                                    N/A
                                                        result in a stable channel over the long term
     species; and                                       and minimal potential for pest plant species.
 (f) bed and bank stability                             AO11.4
                                                        Water Sensitive Design measures are
                                                        incorporated into the development, as
                                                        detailed in the document Water Sensitive
                                                                                                                   N/A
                                                        Designs small improvements, new ideas,
                                                        concepts and sketch designs for stormwater
                                                        filtration systems (Healthy Waterways Water
                                                        by Design).
                                                        AO11.5
                                                        Floodplain management is designed in
                                                        accordance with the Framework for the
                                                        Integration of Flood and Stormwater
                                                                                                                   N/A
                                                        Management into Open Space published by
                                                        Healthy Waterways Water by Design
                                                        (version current at the time of development
                                                        application).

1
    Solution:        Acceptable Solution                                                                                                                                                          Page 6 of 10
                A/S   Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                          Rev:      0
Site Address: 101-105 Eumundi Noosa Road, Noosaville                                                                                                                                                  30/11/2020

Page 34

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                    Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

PO12                                                    AO12.1
Development protects in-stream ecology by               Where run-off from or within the site passes
maintaining pre development low flow discharge          through or drains to natural channels,
regimes and maintaining fish                            waterways or wetlands, development
passages.                                               protects in steam ecology by maintaining
                                                                                                                   N/A
                                                        pre-development low flow discharge regimes
                                                        in accordance with the frequent flow
                                                        management objectives in PSP6 Engineering
                                                        Design Standards - Roads, drainage and
                                                        earthworks
                                                        AO12.2
                                                        Instream structures such as roads, bridges,
                                                        culverts, and other stormwater infrastructure
                                                                                                                   N/A
                                                        do not cause barriers to fish passage and
                                                        facilitate the movement of terrestrial and
                                                        aquatic fauna along waterway corridors
                                                        AO12.3
                                                        Benthic substrate retains a continuous grade
                                                                                                                   N/A
                                                        with the direction of flow consistent with the
                                                        natural bed profile.
PO13                                                    AO13.1
Development is designed and constructed to              The location and form of stormwater
maintain surface and ground water balances that         discharge points do not alter the pre-                     N/A
sustain the environmental values of water               development hydrology of receiving surface
dependent ecosystems, including downstream              water or groundwater.
aquatic, riparian, wetland and terrestrial              AO13.2
ecosystems.                                             Developments located on groundwater
                                                        recharge or discharge areas are designed
                                                        and managed in accordance with a
                                                        groundwater recharge and discharge
                                                        management plan prepared by a suitably                     N/A
                                                        experienced and qualified groundwater
                                                        hydrologist. The groundwater recharge or
                                                        discharge must demonstrate that the
                                                        development does not affect groundwater
                                                        balances beyond the property boundaries

1
    Solution:        Acceptable Solution                                                                                                                                                          Page 7 of 10
                A/S   Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                          Rev:      0
Site Address: 101-105 Eumundi Noosa Road, Noosaville                                                                                                                                                  30/11/2020

Page 35

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                      Acceptable Outcomes                                    Solution1                       Comments                                    Council Use


                                                          Editor's Note— PSP6 Engineering Design
                                                          Standards - Roads, drainage and earthworks
                                                          provides guidance on prepare a groundwater
                                                          recharge and discharge plan.
Construction and establishment of stormwater management systems
PO14                                                      AO14.1                                                                RO14.1
Construction methods provide for appropriate              An erosion and sediment control plan                                  An Erosion and Sedimentation Control
controls to avoid entry and transport of litter,          prepared in accordance with the International                         Plan shall be prepared (prior to
sediment, and associated prescribed water                 Erosion Control Association Best Practice                             commencement of construction) and
contaminants into receiving waters.                       Books demonstrates that the capture and                               maintained for the management of the
                                                          release of stormwater achieves the design                             sediment laden stormwater during the
Editor's note— Water contaminants are                     objectives listed in Table A: Construction                            construction phase in accordance with
prescribed in the                                         phase – stormwater management design                                 IECAs Best Practice guidelines.
Environmental Protection Act 1994                         objectives of the State Planning Policy
                                                          (Appendix 2).

                                                           Editor’s note— PSP6 Engineering Design
                                                           Standards - Roads, drainage and earthworks
                                                           provides guidance on requirements for
                                                           preparing an Erosion Management Plan.
                                                           AO14.2                                                               RO14.2
                                                           Construction works are designed and                                  Unnecessary disturbance to soil shall be
                                                           managed to restrict the extent of clearing and                       avoided and all soil surfaces shall remain
                                                           soil exposure to the minimum necessary for                          stabilized.
                                                           access, and safe construction at any one
                                                           time
                                                           AO14.3                                                               RO14.3
                                                           For buildings:                                                       The proposal complies. Refer to RO14.1.
                                                          (a) upstream runoff is diverted around the
                                                                construction site;
                                                          (b) sediment barriers are provided                         
                                                                downslope of disturbed areas to prevent
                                                                sediment washing into gutters, drains
                                                                and waterways , wetlands or drainage

1
    Solution:          Acceptable Solution                                                                                                                                                          Page 8 of 10
                A/S     Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A     Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                            Rev:      0
Site Address: 101-105 Eumundi Noosa Road, Noosaville                                                                                                                                                    30/11/2020

Page 36

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                    Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

                                                             lines either on or off the site; and
                                                        (c) temporary or permanent downpipes are
                                                             connected to the stormwater system
                                                             before laying the roof; or
                                                        (d) localised erosion is avoided by directing
                                                             flow from downpipes over non-erosive
                                                             areas.
                                                         AO14.4                                                               RO14.4
                                                         Chemical flocculants used as part of an                              The proposal complies. Refer to RO14.1.
                                                         erosion and sediment control plan do not                  
                                                         harm the environmental values within
                                                         receiving waters.
                                                         AO14.5                                                               RO14.5
                                                         Appropriately sized litter containment areas,                        The proposal complies. Refer to RO14.1.
                                                         with provision for sorting recyclables are                
                                                         provided for the type of litter expected to be
                                                         generated onsite.
Wastewater management and effluent disposal
PO15                                                     AO15
Development does not discharge wastewater                Wastewater (non-sewage) generated from
unless it can be demonstrated to not compromise          the development is collected and contained
environmental values of waters and water quality         on-site, and is;
objectives.                                             (a) lawfully disposed to sewer; or
                                                        (b) transferred off-site for treatment/disposal
Editor’s Note—Environmental values of waters                 to an appropriately
and water quality objectives are prescribed in               licenced facility;
Schedule 1 of the Environmental Protection              (c) reused on-site in a closed-cycle irrigation            N/A
(Water) Policy 2009.                                         scheme, industrial processes, washing or
                                                             cleaning or other purpose; or
                                                        (d) treated to meet the drinking water supply
                                                             environmental values prior to release.

                                                        Editor’s Note—The Plumbing and Drainage
                                                        Act 2003 sets out requirements for
                                                        wastewater management.

1
    Solution:        Acceptable Solution                                                                                                                                                          Page 9 of 10
                A/S   Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                          Rev:      0
Site Address: 101-105 Eumundi Noosa Road, Noosaville                                                                                                                                                  30/11/2020

Page 37

Water Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020

Performance Outcomes                                    Acceptable Outcomes                                    Solution1                       Comments                                    Council Use

PO16                                                     AO16
On-site effluent treatment and disposal systems          An onsite effluent system and disposal area
are designed, constructed and managed to not             is:
compromise the environmental values of waters           (a) not located on a slope greater than 1 in
and water quality objectives.                                (10%);
                                                        (b) not located at or below the 1% annual
                                                             exceedance probability (AEP flood
                                                             event);
                                                        (c) not located within a riparian buffer area
                                                             mapped on a Biodiversity, Waterways
                                                             and Wetlands Overlay Map; and
                                                        (d) setback 400 metres minimum from the
                                                             full supply level of Lake Macdonald.

                                                        Editor’s Note—The Plumbing and Drainage
                                                        Act 2003 sets out requirements for on-site
                                                        effluent treatment and disposal. The                       N/A
                                                        Queensland Plumbing and Wastewater Code
                                                        and associated
                                                        guidelines are used to confirm the suitability
                                                        of each site to accommodate an on-site
                                                        sewerage facility; or where a centrally
                                                        located group collection treatment system is
                                                        proposed, confirmation as to the suitability of
                                                        the designated site to accommodate the
                                                        onsite sewerage facility. Additionally, where
                                                        the combined total peak design capacity of
                                                        effluent treatment is less than 21 equivalent
                                                        persons, the design of the system achieves a
                                                        low to medium risk classification in
                                                        accordance with Seqwater’s Land Use Risk
                                                        Tool for onsite sewerage facilities




1
    Solution:        Acceptable Solution                                                                                                                                                        Page 10 of 10
                A/S   Alternative Solution              D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
                N/A   Not applicable to this proposal                                                                                                                                                      Job: 20169
                                                                                                                                                                                                          Rev:      0
Site Address: 101-105 Eumundi Noosa Road, Noosaville                                                                                                                                                  30/11/2020

Page 38

                                                                           20169 - SBSMP/1
                                                                                    Page 24




                                            APPENDIX E


                       STORMWATER QUANTITY CALCULATIONS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 39

                                                  Rational Method Peak Flow Calculations
Job No:            20169                                                                                                                                          MORGAN CONSULTING
Job Type:          Proposed Townhouse Development                                                                                                                  ENGINEERS PTY LTD
Address:           101-105 Eumundi Noosa Road                                                                                                                  1 GREAT GEORGE STREET
Council:           Noosa                                                                                                                                         PADDINGTON QLD 4064


IFD Data:          26.4125 (S),153.0375 (E)                                      Minor Storm: Q10                                                                       Designed:       DY
1
I10                74mm/hr                                                       Major Storm: Q100                                                                      Checked:        HM

Pre-Development                                                                                         Post-Development

Time of Concentration

Standard Inlet Time                                                                                     Standard Inlet Time
      Standard Inlet Time                        mins                                                          Standard Inlet Time                 5   mins

Sheet Flow (Friends Equation)
     Sheet flow length (L)             59.5        m                                                    Pipe Flow
           roughness (n)              0.035               short grass                                                 Flow distance              90     m
              Fall of NSL              2.15       m                                                                  Fall of channel                    m
     Slope of Surface (S)               3.6       %                                                                   Flow Velocity             2.5    m/s
                      total            11.3      mins                                                                           total           0.6    mins
Concentrated Overland Flow                                                                              Concentrated Overland Flow
           Flow distance                          m                                                                 Flow distance                       m
                 velocity                  1.5   m/s                                                                      velocity              1.5    m/s
                    mins                   0.0   mins                                                                        mins               0.0    mins
   Surface type multiplier                 3.0                                                              Surface type multiplier             3.0
                     total                 0.0   mins                                                                         total             0.0    mins

Total tc                                  11.3   mins                                                                    Total tc               5.6    mins



Runoff Volume Calculations

      Name          Area (ha)        tc             fi     C10                                              Name          Area (ha)        tc             fi    C10
                    0.54882                       0.25     0.75                                                            0.5488                       0.77    0.85

           Total      0.549        11.3                    0.75                                                  Total      0.549         5.6                   0.85

                   Frequency                                                                                             Frequency
      ARI                            Cy            Iy                     Qy                                 ARI                           Cy            Iy                 Qy
                     Factor                               A (Ha)                                                           Factor                             A (Ha)
    (years)                       (Fy*C10)       (mm/h)                 (m3/s)                             (years)                      (Fy*C10)       (mm/h)             (m3/s)
                      (Fy)                                                                                                  (Fy)
      3 mth                                                             0.044                               3 mth                                                         0.063
        1             0.800        0.600          97       0.549        0.089                                 1             0.800        0.683          121     0.549     0.126
        2             0.850        0.637          110      0.549        0.106                                 2             0.850        0.725          137     0.549     0.151
        5             0.950        0.712          148      0.549        0.161                                 5             0.950        0.811          187     0.549     0.231
        10            1.000        0.750          173      0.549        0.197                                 10            1.000        0.853          220     0.549     0.286
        20            1.050        0.787          196      0.549        0.235                                 20            1.050        0.896          251     0.549     0.342
        50            1.150        0.862          226      0.549        0.297                                 50            1.150        0.981          291     0.549     0.436
       100            1.200        0.900          247      0.549        0.339                                100            1.200        1.000          322     0.549     0.491




                                                                                          Page 1 of 1                                                                               30/11/2020

Page 40

                                                                           20169 - SBSMP/1
                                                                                    Page 25




                                            APPENDIX F


                    CONCEPT SITE LEVELS AND DRAINAGE PLAN




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 41

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retai ned or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 42

                          ³                                         ³   ³       ³




                                                                ³           ³




                                                                ³           ³




                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retai ned or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 43

                                                                           20169 - SBSMP/1
                                                                                    Page 26




                                            APPENDIX G


                      XPSTORM PRE DEVELOPMENT RESULTS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 44

                                                   INNOVYZE ENSEMBLE STATISTICS UTILITY
                                                             (c) Innovyze 2020

Summary information:

           Total No. of Ensembles:             112
           No. of Storms per ensemble:          10
           No. of AEP Bands:                      7
           Object Name:                  Pre Dev A to LPD
           Result type:                  Max Flow


Results:


                                              AEP: 1% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|    ECN_1pct_10min 0.1165 0.1127 0.1174 0.0999 0.1196 0.0983 0.1157 0.1018 0.1253 0.1116 0.1119 0.0086 0.1142                             |
|    ECN_1pct_12hr 0.0460 0.0489 0.0398 0.0594 0.1915 0.0498 0.0599 0.2116 0.0906 0.0682 0.0866 0.0592 0.0596                             |
|    ECN_1pct_15min 0.1378 0.1425 0.1174 0.1228 0.1560 0.1523 0.1334 0.1671 0.1564 0.1301 0.1416 0.0153 0.1401                             |
|    ECN_1pct_18hr 0.0470 0.0264 0.0415 0.0346 0.0572 0.0555 0.0315 0.0332 0.0470 0.0395 0.0413 0.0097 0.0405                             |
|    ECN_1pct_1_5hr 0.0985 0.1161 0.1203 0.0987 0.1219 0.1194 0.1146 0.1208 0.1082 0.1201 0.1139 0.0085 0.1178                             |
|     ECN_1pct_1hr 0.1820 0.1477 0.1091 0.1252 0.0923 0.1439 0.1004 0.1129 0.1240 0.1051 0.1243 0.0257 0.1185                            |
|    ECN_1pct_20min 0.1430 0.1944 0.1201 0.1147 0.1273 0.1410 0.1216 0.1373 0.1355 0.1586 0.1394 0.0221 0.1364                             |
|    ECN_1pct_24hr 0.0460 0.0330 0.0375 0.0533 0.0329 0.0337 0.0326 0.0370 0.0321 0.0515 0.0390 0.0078 0.0354                             |
|    ECN_1pct_25min 0.1305 0.1843 0.1341 0.1456 0.1452 0.1334 0.1277 0.1534 0.1303 0.1675 0.1452 0.0176 0.1397                             |
|     ECN_1pct_2hr 0.1313 0.0973 0.0975 0.1170 0.1152 0.1069 0.0821 0.0872 0.0999 0.1261 0.1060 0.0154 0.1034                            |
|    ECN_1pct_30min 0.1481 0.1337 0.1895 0.1195 0.1232 0.1264 0.1355 0.1399 0.1505 0.1347 0.1401 0.0190 0.1351                             |
|     ECN_1pct_3hr 0.1018 0.0997 0.1174 0.0839 0.0654 0.0985 0.0598 0.1198 0.0588 0.1289 0.0934 0.0242 0.0991                            |
|    ECN_1pct_45min 0.1926 0.1721 0.1197 0.1573 0.1380 0.1080 0.1202 0.1470 0.0970 0.1350 0.1387 0.0280 0.1365                             |
|    ECN_1pct_4_5hr 0.0934 0.0645 0.0757 0.0772 0.0987 0.0879 0.0733 0.0676 0.0920 0.0954 0.0826 0.0117 0.0825                             |
|     ECN_1pct_6hr 0.1724 0.0784 0.0698 0.0769 0.0569 0.0812 0.0984 0.1211 0.0871 0.0629 0.0905 0.0323 0.0798                            |
|     ECN_1pct_9hr 0.0647 0.0747 0.0310 0.0362 0.1182 0.0960 0.1278 0.0451 0.0665 0.0486 0.0709 0.0318 0.0656                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_1pct_15min.                                       |
| The median pattern for this ensemble is storm 2 (storm name : ECN_1pct_15min_2).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_1pct_15min_8).                              |
*============================================================================================================================================================


                                              AEP: 10% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_10pct_10min 0.0329 0.0339 0.0304 0.0346 0.0387 0.0355 0.0427 0.0380 0.0341 0.0465 0.0367 0.0046 0.0350                               |
|    ECN_10pct_12hr 0.0357 0.0712 0.0320 0.0262 0.0346 0.0385 0.0336 0.0424 0.0415 0.0339 0.0390 0.0116 0.0352                            |
| ECN_10pct_15min 0.0564 0.0632 0.0657 0.0711 0.0615 0.0636 0.0635 0.0634 0.0741 0.0685 0.0651 0.0048 0.0635                               |
|    ECN_10pct_18hr 0.0202 0.0258 0.0389 0.0213 0.0347 0.0224 0.0173 0.0166 0.0212 0.0407 0.0259 0.0085 0.0218                            |
| ECN_10pct_1_5hr 0.1019 0.0637 0.0937 0.0524 0.0700 0.0812 0.0696 0.0523 0.0587 0.0799 0.0723 0.0159 0.0698                               |
|    ECN_10pct_1hr 0.1085 0.0672 0.0650 0.0611 0.0613 0.0801 0.0776 0.0822 0.0610 0.1174 0.0781 0.0191 0.0724                            |
| ECN_10pct_20min 0.0728 0.0692 0.0797 0.0947 0.0763 0.0894 0.0846 0.1062 0.0981 0.0785 0.0850 0.0113 0.0821                               |
|    ECN_10pct_24hr 0.0469 0.0386 0.0241 0.0164 0.0218 0.0219 0.0512 0.0270 0.0267 0.0219 0.0296 0.0112 0.0254                            |
| ECN_10pct_25min 0.0757 0.1223 0.0747 0.0721 0.0631 0.1056 0.0788 0.0787 0.0666 0.1104 0.0848 0.0193 0.0772                               |
|    ECN_10pct_2hr 0.0848 0.0557 0.0735 0.1060 0.0754 0.0618 0.0797 0.0580 0.0798 0.0691 0.0744 0.0140 0.0744                            |
| ECN_10pct_30min 0.0682 0.0599 0.1200 0.0802 0.0759 0.0752 0.1052 0.0807 0.0959 0.1082 0.0869 0.0184 0.0804                               |
|    ECN_10pct_3hr 0.0879 0.0517 0.0520 0.0769 0.0667 0.0430 0.0630 0.0483 0.0566 0.0564 0.0602 0.0131 0.0565                            |
| ECN_10pct_45min 0.0793 0.0725 0.0703 0.0827 0.0861 0.0817 0.0832 0.0625 0.1161 0.1090 0.0844 0.0157 0.0822                               |
| ECN_10pct_4_5hr 0.0441 0.0439 0.0920 0.0571 0.0262 0.0696 0.0343 0.0551 0.0645 0.0726 0.0560 0.0187 0.0561                               |
|    ECN_10pct_6hr 0.0715 0.0918 0.0490 0.0361 0.0448 0.0244 0.0675 0.0450 0.0596 0.0471 0.0537 0.0184 0.0481                            |
|    ECN_10pct_9hr 0.0399 0.0459 0.0376 0.0430 0.0546 0.0266 0.0440 0.0333 0.0400 0.0312 0.0396 0.0076 0.0399                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_45min.                                      |
| The median pattern for this ensemble is storm 4 (storm name : ECN_10pct_45min_4).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_45min_9).                              |
*============================================================================================================================================================


                                     AEP: 2% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|   ECN_2pct_10min 0.0811 0.0805 0.0820 0.0890 0.0853 0.0876 0.0826 0.0906 0.0851 0.0762 0.0840 0.0041 0.0838                              |
|    ECN_2pct_12hr 0.0402 0.0427 0.0347 0.0519 0.1677 0.0435 0.0523 0.1854 0.0792 0.0596 0.0757 0.0519 0.0521                             |
|   ECN_2pct_15min 0.1131 0.1284 0.0998 0.1110 0.1273 0.1288 0.1155 0.1354 0.1329 0.1125 0.1205 0.0110 0.1214                              |
|    ECN_2pct_18hr 0.0408 0.0228 0.0361 0.0300 0.0497 0.0483 0.0273 0.0288 0.0408 0.0342 0.0359 0.0085 0.0351                             |
|   ECN_2pct_1_5hr 0.0852 0.1023 0.1047 0.0876 0.1080 0.1060 0.0989 0.0934 0.0959 0.1064 0.0988 0.0077 0.1006                              |
|    ECN_2pct_1hr 0.1611 0.1312 0.0952 0.1113 0.0822 0.1273 0.0892 0.0912 0.1103 0.0833 0.1082 0.0241 0.1027                             |
|   ECN_2pct_20min 0.1264 0.1721 0.1033 0.1021 0.1126 0.1183 0.1102 0.1231 0.1134 0.1417 0.1223 0.0199 0.1158                              |


[OCR of page images]
Summary information:

Total No. of Ensembles:
No. of Storms per ensemble:
No. of AEP Bands:
Object Name:

Result type:

Results:

1

Pre Dev

INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

12
10
7
Ato LPD

Max Flow

AEP: 1% - Max Flow (m43/s)

 

 

| Ensemble name

Storm 1

Storm 2

Storm 3

Storm4 Storm5 Storm6

Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median

 

 

ECN_1pct_10min
ECN_1pct_12hr
ECN_1pct_15min
ECN_1pct_18hr
ECN_1pct_1_Shr
ECN_1pct_1hr
ECN_1pct_20min
ECN_1pct_24hr

ECN_1pct_2hr
ECN_1pct_30min
ECN_1pct_3hr
ECN_1pct_45min
ECN_1pct_4_Shr
ECN_1pct_6hr
ECN_1pct_9hr

0.1165,
0.0460
0.1378
0.0470
0.0985,
0.1820
0.1430
0.0460
0.1305,
0.1313,
0.1481
0.1018
0.1926
0.0934
0.1724
0.0647

0.1127
0.0489
0.1425,
0.0264
0.1161
0.1477
0.1944
0.0330
0.1843
0.0973
0.1337
0.0997
0.1721
0.0645,
0.0784
0.0747

0.1174
0.0398
0.1174
0.0415,
0.1203
0.1091
0.1201
0.0375,
0.1341
0.0975
0.1895
0.1174
0.1197
0.0757
0.0698
0.0310

0.0999
0.0594
0.1228
0.0346
0.0987
0.1252
0.1147
0.0533
0.1456
0.1170
0.1195
0.0839
0.1573
0.0772
0.0769
0.0362

0.1196
0.1915
0.1560
0.0572
0.1219
0.0923
0.1273
0.0329
0.1452
0.1152
0.1232
0.0654
0.1380
0.0987
0.0569
0.1182

0.0983
0.0498
0.1523
0.0555
0.1194
0.1439
0.1410
0.0337
0.1334
0.1069
0.1264
0.0985,
0.1080
0.0879
0.0812
0.0960

0.1157
0.0599
0.1334
0.0315,
0.1146
0.1004
0.1216
0.0326
0.1277
0.0821
0.1355,
0.0598
0.1202
0.0733
0.0984
0.1278

0.1018
0.2116
0.1671
0.0332
0.1208
0.1129
0.1373
0.0370
0.1534
0.0872
0.1399
0.1198
0.1470
0.0676
0.1211
0.0451

0.1253
0.0906
0.1564
0.0470
0.1082
0.1240
0.1355
0.0321
0.1303
0.0999
0.1505
0.0588
0.0970
0.0920
0.0871
0.0665

0.1116
0.0682
0.1301
0.0395,
0.1201
0.1051
0.1586
0.0515,
0.1675
0.1261
0.1347
0.1289
0.1350
0.0954
0.0629
0.0486

0.1119
0.0866
0.1416
0.0413
0.1139
0.1243
0.1394
0.0390
0.1452
0.1060
0.1401
0.0934
0.1387
0.0826
0.0905,
0.0709

0.0086 0.1142
0.0592 0.0596
0.0153 0.1401
0.0097 0.0405
0.0085 0.1178
0.0257. 0.1185
0.0221 0.1364
0.0078 0.0354
0.0176 0.1397
0.0154 0.1034
0.0190 0.1351
0.0242 0.0991
0.0280 0.1365
0.0117 0.0825
0.0323 0.0798
0.0318 0.0656

 

|
|
|
|
|
|
|
|
| ECN_1pct_25min
|
|
|
|
|
|
I
*

 

| CRITICAL DURATION :

The critical duration for the 1% AEP is the ensemble ECN_1pct_15min.
| The median pattern for this ensemble is storm 2 (storm name : ECN_1pct_15min_2).
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_1pct_15min_8).

 

*

 

AEP: 10% - Max Flow (m43/s)

 

 

| Ensemble name

Storm 1

Storm 2

Storm 3

Storm4 Storm5 Storm6

Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median

 

 

| ECN_10pct_10min
| ECN_10pet_12hr
| ECN_10pct_1Smin
| ECN_10pct_18hr
| ECN_10pct_1_Shr
| ECN_10pct_thr

| ECN_10pct_20min
| ECN_10pct_24hr
| ECN_10pct_25min
| ECN_10pct_2hr

| ECN_10pct_30min
| ECN_10pct_3hr

| ECN_10pct_45min
| ECN_10pct_4_Shr
| ECN_10pct_6hr

| ECN_10pct_9hr
*

0.0329
0.0357
0.0564
0.0202
0.1019
0.1085,
0.0728
0.0469
0.0757
0.0848
0.0682
0.0879
0.0793
0.0441
0.0715
0.0399

0.0339
0.0712
0.0632
0.0258
0.0637
0.0672
0.0692
0.0386
0.1223
0.0557
0.0599
0.0517
0.0725
0.0439
0.0918
0.0459

0.0304
0.0320
0.0657
0.0389
0.0937
0.0650
0.0797
0.0241
0.0747
0.0735,
0.1200
0.0520
0.0703
0.0920
0.0490
0.0376

0.0346
0.0262
0.0711
0.0213
0.0524
0.0611
0.0947
0.0164
0.0721
0.1060
0.0802
0.0769
0.0827
0.0571
0.0361
0.0430

0.0387
0.0346
0.0615
0.0347
0.0700
0.0613
0.0763
0.0218
0.0631
0.0754
0.0759
0.0667
0.0861
0.0262
0.0448
0.0546

0.0355,
0.0385,
0.0636
0.0224
0.0812
0.0801
0.0894
0.0219
0.1056
0.0618
0.0752
0.0430
0.0817
0.0696
0.0244
0.0266

0.0427
0.0336
0.0635,
0.0173
0.0696
0.0776
0.0846
0.0512
0.0788
0.0797
0.1052
0.0630
0.0832
0.0343
0.0675,
0.0440

0.0380
0.0424
0.0634
0.0166
0.0523
0.0822
0.1062
0.0270
0.0787
0.0580
0.0807
0.0483
0.0625
0.0551
0.0450
0.0333

0.0341
0.0415,
0.0741
0.0212
0.0587
0.0610

0.0981

0.0267

0.0666

0.0798

0.0959

0.0566

0.1161

0.0645
0.0596
0.0400

0.0465,
0.0339
0.0685,
0.0407
0.0799
0.1174
0.0785,
0.0219
0.1104
0.0691
0.1082
0.0564
0.1090
0.0726
0.0471
0.0312

0.0367
0.0390
0.0651
0.0259
0.0723
0.0781
0.0850
0.0296
0.0848
0.0744
0.0869
0.0602
0.0844
0.0560
0.0537
0.0396

0.0046 0.0350
0.0116 0.0352
0.0048 0.0635
0.0085 0.0218
0.0159 0.0698
0.0191 0.0724
0.0113 0.0821
0.0112 0.0254
0.0193 0.0772
0.0140 0.0744
0.0184 0.0804
0.0131 0.0565
0.0157 0.0822
0.0187 0.0561
0.0184 0.0481
0.0076 0.0399

 

 

| CRITICAL DURATION

The critical duration for the 10% AEP is the ensemble ECN_10pct_45min.
| The median pattern for this ensemble is storm 4 (storm name : ECN_10pct_45min_4).
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_45min_9).

 

*

 

AEP: 2% - Max Flow (m43/s)

 

 

 

 

| Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
ECN_2pct_10min 0.0811 0.0805 0.0820 0.0890 0.0853 0.0876 0.0826 0.0906 0.0851 0.0762 0.0840 0.0041 0.0838
ECN_2pct_12hr 0.0402 0.0427 0.0347 0.0519 0.1677 0.0435 0.0523 0.1854 0.0792 0.0596 0.0757 0.0519 0.0521
ECN_2pct_15min 0.1131 0.1284 0.0998 0.1110 0.1273 0.1288 0.1155 0.1354 0.1329 0.1125 0.1205 0.0110 0.1214
ECN_2pct_18hr 0.0408 0.0228 0.0361 0.0300 0.0497 0.0483 0.0273 0.0288 0.0408 0.0342 0.0359 0.0085 0.0351
ECN_2pct_1_5hr 0.0852 0.1023 0.1047 0.0876 0.1080 0.1060 0.0989 0.0934 0.0959 0.1064 0.0988 0.0077 0.1006
ECN_2pct_1hr 0.1611 0.1312 0.0952 0.1113 0.0822 0.1273 0.0892 0.0912 0.1103 0.0833 0.1082 0.0241 0.1027
ECN_2pct_2Omin 0.1264 0.1721 0.1033 0.1021 0.1126 0.1183 0.1102 0.1231 0.1134 0.1417 0.1223 0.0199 0.1158

Page 45

|    ECN_2pct_24hr 0.0398 0.0285 0.0324 0.0461 0.0284 0.0291 0.0281 0.0320 0.0277 0.0446 0.0337 0.0068 0.0306                             |
|    ECN_2pct_25min 0.1158 0.1645 0.1059 0.1286 0.1240 0.1210 0.1157 0.1387 0.1181 0.1515 0.1284 0.0172 0.1225                             |
|     ECN_2pct_2hr 0.1157 0.0822 0.0862 0.1033 0.1023 0.0947 0.0729 0.0774 0.0884 0.1065 0.0930 0.0131 0.0916                            |
|    ECN_2pct_30min 0.1330 0.1205 0.1710 0.1080 0.0978 0.0854 0.1227 0.1264 0.1359 0.1196 0.1220 0.0220 0.1216                             |
|     ECN_2pct_3hr 0.0898 0.0880 0.1036 0.0740 0.0577 0.0869 0.0513 0.1058 0.0519 0.1139 0.0823 0.0216 0.0874                            |
|    ECN_2pct_45min 0.1723 0.1480 0.1067 0.1410 0.1236 0.0952 0.1057 0.1189 0.0873 0.1118 0.1211 0.0247 0.1154                             |
|    ECN_2pct_4_5hr 0.0819 0.0565 0.0663 0.0676 0.0832 0.0730 0.0642 0.0591 0.0807 0.0836 0.0716 0.0098 0.0703                             |
|     ECN_2pct_6hr 0.1514 0.0686 0.0612 0.0674 0.0498 0.0711 0.0862 0.1061 0.0764 0.0551 0.0793 0.0284 0.0699                            |
|     ECN_2pct_9hr 0.0564 0.0652 0.0269 0.0315 0.1032 0.0838 0.1117 0.0393 0.0580 0.0423 0.0618 0.0279 0.0572                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_25min.                                       |
| The median pattern for this ensemble is storm 5 (storm name : ECN_2pct_25min_5).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 2 (storm name : ECN_2pct_25min_2).                              |
*============================================================================================================================================================


                                              AEP: 20% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_20pct_10min 0.0242 0.0255 0.0254 0.0287 0.0234 0.0243 0.0253 0.0262 0.0270 0.0239 0.0254 0.0015 0.0254                               |
|    ECN_20pct_12hr 0.0276 0.0358 0.0530 0.0265 0.0228 0.0151 0.0146 0.0614 0.0294 0.0319 0.0318 0.0143 0.0285                            |
| ECN_20pct_15min 0.0371 0.0366 0.0393 0.0340 0.0379 0.0361 0.0399 0.0429 0.0433 0.0492 0.0396 0.0042 0.0386                               |
|    ECN_20pct_18hr 0.0218 0.0320 0.0444 0.0152 0.0112 0.0159 0.0256 0.0328 0.0205 0.0341 0.0254 0.0099 0.0237                            |
| ECN_20pct_1_5hr 0.0584 0.0832 0.0788 0.0487 0.0882 0.0417 0.0566 0.0599 0.0899 0.0713 0.0677 0.0161 0.0656                               |
|    ECN_20pct_1hr 0.0693 0.0429 0.0576 0.0564 0.0766 0.0766 0.0528 0.0537 0.0893 0.0695 0.0645 0.0134 0.0635                            |
| ECN_20pct_20min 0.0566 0.0517 0.0538 0.0562 0.0518 0.0578 0.0556 0.0544 0.0594 0.0775 0.0575 0.0071 0.0559                               |
|    ECN_20pct_24hr 0.0339 0.0152 0.0184 0.0262 0.0232 0.0177 0.0363 0.0226 0.0327 0.0154 0.0242 0.0075 0.0229                            |
| ECN_20pct_25min 0.0517 0.0545 0.0585 0.0531 0.0743 0.0559 0.0627 0.0734 0.0866 0.0818 0.0653 0.0121 0.0606                               |
|    ECN_20pct_2hr 0.0543 0.0480 0.0456 0.0565 0.0706 0.0534 0.0829 0.0502 0.0523 0.0563 0.0570 0.0108 0.0539                            |
| ECN_20pct_30min 0.1036 0.0545 0.0506 0.0643 0.0703 0.0469 0.0741 0.0596 0.0747 0.0764 0.0675 0.0156 0.0673                               |
|    ECN_20pct_3hr 0.0602 0.0659 0.0836 0.0362 0.0448 0.0393 0.0454 0.0357 0.0446 0.0520 0.0508 0.0144 0.0451                            |
| ECN_20pct_45min 0.0519 0.0461 0.0493 0.0635 0.0646 0.0556 0.0559 0.0655 0.0912 0.0884 0.0632 0.0147 0.0597                               |
| ECN_20pct_4_5hr 0.0542 0.0481 0.0693 0.0374 0.0414 0.0623 0.0596 0.0465 0.0508 0.0538 0.0523 0.0092 0.0523                               |
|    ECN_20pct_6hr 0.0345 0.0381 0.0566 0.0420 0.0341 0.0373 0.0422 0.0393 0.0351 0.0317 0.0391 0.0067 0.0377                            |
|    ECN_20pct_9hr 0.0400 0.0318 0.0698 0.0431 0.0435 0.0363 0.0315 0.0204 0.0284 0.0279 0.0373 0.0129 0.0341                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_30min.                                      |
| The median pattern for this ensemble is storm 5 (storm name : ECN_20pct_30min_5).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_20pct_30min_1).                              |
*============================================================================================================================================================


                                              AEP: 5% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|    ECN_5pct_10min 0.0499 0.0514 0.0582 0.0508 0.0596 0.0541 0.0664 0.0584 0.0518 0.0727 0.0573 0.0071 0.0562                             |
|    ECN_5pct_12hr 0.0428 0.0855 0.0384 0.0315 0.0414 0.0461 0.0403 0.0508 0.0497 0.0406 0.0467 0.0140 0.0421                             |
|    ECN_5pct_15min 0.0830 0.0814 0.0918 0.0994 0.0972 0.0858 0.0862 0.0896 0.1086 0.1002 0.0923 0.0083 0.0907                             |
|    ECN_5pct_18hr 0.0245 0.0313 0.0469 0.0258 0.0420 0.0271 0.0211 0.0202 0.0258 0.0491 0.0314 0.0101 0.0265                             |
|    ECN_5pct_1_5hr 0.1195 0.0749 0.1095 0.0712 0.0814 0.0944 0.0820 0.0610 0.0687 0.0937 0.0856 0.0176 0.0817                             |
|     ECN_5pct_1hr 0.1265 0.0844 0.0784 0.0759 0.0898 0.0998 0.0926 0.0990 0.0782 0.1369 0.0961 0.0196 0.0912                            |
|    ECN_5pct_20min 0.0847 0.0840 0.0950 0.1187 0.0964 0.1089 0.1025 0.1364 0.1390 0.0937 0.1059 0.0187 0.0994                             |
|    ECN_5pct_24hr 0.0566 0.0466 0.0292 0.0200 0.0265 0.0266 0.0618 0.0327 0.0324 0.0266 0.0359 0.0134 0.0308                             |
|    ECN_5pct_25min 0.0974 0.1472 0.0858 0.0825 0.0723 0.1353 0.0959 0.0972 0.0906 0.1326 0.1037 0.0241 0.0965                             |
|     ECN_5pct_2hr 0.1003 0.0660 0.0867 0.1254 0.0899 0.0726 0.0948 0.0686 0.0936 0.0930 0.0891 0.0166 0.0914                            |
|    ECN_5pct_30min 0.0779 0.0878 0.1424 0.0919 0.0875 0.1052 0.1364 0.0998 0.1134 0.1248 0.1067 0.0209 0.1025                             |
|     ECN_5pct_3hr 0.1045 0.0651 0.0614 0.0907 0.0789 0.0508 0.0744 0.0570 0.0669 0.0666 0.0716 0.0153 0.0667                            |
|    ECN_5pct_45min 0.0954 0.0873 0.1113 0.0954 0.1000 0.0943 0.0967 0.0725 0.1357 0.1267 0.1015 0.0176 0.0961                             |
|    ECN_5pct_4_5hr 0.0521 0.0519 0.1083 0.0673 0.0310 0.0821 0.0407 0.0754 0.0761 0.0857 0.0671 0.0221 0.0714                             |
|     ECN_5pct_6hr 0.0851 0.1091 0.0584 0.0430 0.0534 0.0292 0.0803 0.0536 0.0709 0.0561 0.0639 0.0218 0.0573                            |
|     ECN_5pct_9hr 0.0475 0.0547 0.0449 0.0512 0.0649 0.0318 0.0524 0.0436 0.0476 0.0373 0.0476 0.0088 0.0476                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_5pct_30min.                                       |
| The median pattern for this ensemble is storm 6 (storm name : ECN_5pct_30min_6).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 3 (storm name : ECN_5pct_30min_3).                              |
*============================================================================================================================================================


                                     AEP: 50% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_50pct_10min 0.0181 0.0190 0.0190 0.0196 0.0165 0.0169 0.0189 0.0180 0.0202 0.0179 0.0184 0.0011 0.0185                               |
|   ECN_50pct_12hr 0.0182 0.0237 0.0354 0.0174 0.0149 0.0097 0.0094 0.0411 0.0194 0.0211 0.0210 0.0097 0.0188                             |
| ECN_50pct_15min 0.0190 0.0214 0.0191 0.0177 0.0154 0.0151 0.0142 0.0145 0.0177 0.0202 0.0174 0.0024 0.0177                               |
|   ECN_50pct_18hr 0.0141 0.0211 0.0294 0.0097 0.0070 0.0102 0.0113 0.0216 0.0133 0.0225 0.0160 0.0068 0.0137                             |
| ECN_50pct_1_5hr 0.0401 0.0329 0.0552 0.0303 0.0618 0.0261 0.0396 0.0279 0.0609 0.0503 0.0425 0.0129 0.0398                               |
|    ECN_50pct_1hr 0.0382 0.0307 0.0265 0.0400 0.0326 0.0417 0.0375 0.0358 0.0597 0.0471 0.0390 0.0088 0.0378                            |


[OCR of page images]
| ECN_2pct_24hr 0.0398 0.0285 0.0324 0.0461 0.0284 0.0291 0.0281 0.0320 0.0277 0.0446 0.0337 0.0068 0.0306
| ECN_2pct_25min 0.1158 0.1645 0.1059 0.1286 0.1240 0.1210 0.1157 0.1387 0.1181 0.1515 0.1284 0.0172 0.1225
| ECN_2pct_2hr 0.1157 0.0822 0.0862 0.1033 0.1023 0.0947 0.0729 0.0774 0.0884 0.1065 0.0930 0.0131 0.0916

| ECN_2pct_30min 0.1330 0.1205 0.1710 0.1080 0.0978 0.0854 0.1227 0.1264 0.1359 0.1196 0.1220 0.0220 0.1216
| ECN_2pct_3hr 0.0898 0.0880 0.1036 0.0740 0.0577 0.0869 0.0513 0.1058 0.0519 0.1139 0.0823 0.0216 0.0874

| ECN_2pct_45min 0.1723 0.1480 0.1067 0.1410 0.1236 0.0952 0.1057 0.1189 0.0873 0.1118 0.1211 0.0247 0.1154
| ECN_2pct_4_5hr 0.0819 0.0565 0.0663 0.0676 0.0832 0.0730 0.0642 0.0591 0.0807 0.0836 0.0716 0.0098 0.0703
| ECN_2pct_6hr 0.1514 0.0686 0.0612 0.0674 0.0498 0.0711 0.0862 0.1061 0.0764 0.0551 0.0793 0.0284 0.0699

| ECN_2pct_9hr 0.0564 0.0652 0.0269 0.0315 0.1032 0.0838 0.1117 0.0393 0.0580 0.0423 0.0618 0.0279 0.0572
*

 

 

| CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_25min. |
| The median pattern for this ensemble is storm 5 (storm name : ECN_2pct_25min_5). |

| The pattern with the greatest <Max Flow> for this ensemble is storm 2 (storm name : ECN_2pct_25min_2).

*

 

 

AEP: 20% - Max Flow (m43/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_20pct_10min 0.0242 0.0255 0.0254 0.0287 0.0234 0.0243 0.0253 0.0262 0.0270 0.0239 0.0254 0.0015 0.0254

| ECN_2Opct_12hr 0.0276 0.0358 0.0530 0.0265 0.0228 0.0151 0.0146 0.0614 0.0294 0.0319 0.0318 0.0143 0.0285

| ECN_20pct_1Smin 0.0371 0.0366 0.0393 0.0340 0.0379 0.0361 0.0399 0.0429 0.0433 0.0492 0.0396 0.0042 0.0386

| ECN_2Opct_18hr 0.0218 0.0320 0.0444 0.0152 0.0112 0.0159 0.0256 0.0328 0.0205 0.0341 0.0254 0.0099 0.0237

| ECN_20pct_1_Shr 0.0584 0.0832 0.0788 0.0487 0.0882 0.0417 0.0566 0.0599 0.0899 0.0713 0.0677 0.0161 0.0656

| ECN_20pet_ihr 0.0693 0.0429 0.0576 0.0564 0.0766 0.0766 0.0528 0.0537 0.0893 0.0695 0.0645 0.0134 0.0635

| ECN_20pct_20min 0.0566 0.0517 0.0538 0.0562 0.0518 0.0578 0.0556 0.0544 0.0594 0.0775 0.0575 0.0071 0.0559

| ECN_2Opct_24hr 0.0339 0.0152 0.0184 0.0262 0.0232 0.0177 0.0363 0.0226 0.0327 0.0154 0.0242 0.0075 0.0229

| ECN_20pct_25min 0.0517 0.0545 0.0585 0.0531 0.0743 0.0559 0.0627 0.0734 0.0866 0.0818 0.0653 0.0121 0.0606

| ECN_20pet_2hr 0.0543 0.0480 0.0456 0.0565 0.0706 0.0534 0.0829 0.0502 0.0523 0.0563 0.0570 0.0108 0.0539

| ECN_20pct_30min 0.1036 0.0545 0.0506 0.0643 0.0703 0.0469 0.0741 0.0596 0.0747 0.0764 0.0675 0.0156 0.0673

| ECN_20pet_3hr 0.0602 0.0659 0.0836 0.0362 0.0448 0.0393 0.0454 0.0357 0.0446 0.0520 0.0508 0.0144 0.0451

| ECN_20pct_45min 0.0519 0.0461 0.0493 0.0635 0.0646 0.0556 0.0559 0.0655 0.0912 0.0884 0.0632 0.0147 0.0597

| ECN_20pct_4 Shr 0.0542 0.0481 0.0693 0.0374 0.0414 0.0623 0.0596 0.0465 0.0508 0.0538 0.0523 0.0092 0.0523

| ECN_20pet_6hr 0.0345 0.0381 0.0566 0.0420 0.0341 0.0373 0.0422 0.0393 0.0351 0.0317 0.0391 0.0067 0.0377

| ECN_20pet_9hr 0.0400 0.0318 0.0698 0.0431 0.0435 0.0363 0.0315 0.0204 0.0284 0.0279 0.0373 0.0129 0.0341

*

| CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_30min. |
| The median pattern for this ensemble is storm 5 (storm name : ECN_20pct_30min_5). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_20pct_30min_1).

*

AEP: 5% - Max Flow (m43/s)

*

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_Spct_10min 0.0499 0.0514 0.0582 0.0508 0.0596 0.0541 0.0664 0.0584 0.0518 0.0727 0.0573 0.0071 0.0562

| ECN_Spct_12hr 0.0428 0.0855 0.0384 0.0315 0.0414 0.0461 0.0403 0.0508 0.0497 0.0406 0.0467 0.0140 0.0421

| ECN_Spct_15min 0.0830 0.0814 0.0918 0.0994 0.0972 0.0858 0.0862 0.0896 0.1086 0.1002 0.0923 0.0083 0.0907

| ECN_Spct_18hr 0.0245 0.0313 0.0469 0.0258 0.0420 0.0271 0.0211 0.0202 0.0258 0.0491 0.0314 0.0101 0.0265

| ECN_Spct_1_Shr 0.1195 0.0749 0.1095 0.0712 0.0814 0.0944 0.0820 0.0610 0.0687 0.0937 0.0856 0.0176 0.0817

| ECN_Spet_ihr 0.1265 0.0844 0.0784 0.0759 0.0898 0.0998 0.0926 0.0990 0.0782 0.1369 0.0961 0.0196 0.0912

| ECN_Spct_20min 0.0847 0.0840 0.0950 0.1187 0.0964 0.1089 0.1025 0.1364 0.1390 0.0937 0.1059 0.0187 0.0994

| ECN_Spct_24hr 0.0566 0.0466 0.0292 0.0200 0.0265 0.0266 0.0618 0.0327 0.0324 0.0266 0.0359 0.0134 0.0308

| ECN_Spct_25min 0.0974 0.1472 0.0858 0.0825 0.0723 0.1353 0.0959 0.0972 0.0906 0.1326 0.1037 0.0241 0.0965

| ECN_Spet_2hr 0.1003 0.0660 0.0867 0.1254 0.0899 0.0726 0.0948 0.0686 0.0936 0.0930 0.0891 0.0166 0.0914

| ECN_Spct_30min 0.0779 0.0878 0.1424 0.0919 0.0875 0.1052 0.1364 0.0998 0.1134 0.1248 0.1067 0.0209 0.1025

| ECN_Spet_3hr 0.1045 0.0651 0.0614 0.0907 0.0789 0.0508 0.0744 0.0570 0.0669 0.0666 0.0716 0.0153 0.0667

| ECN_Spct_45min 0.0954 0.0873 0.1113 0.0954 0.1000 0.0943 0.0967 0.0725 0.1357 0.1267 0.1015 0.0176 0.0961

| ECN_Spct_4_Shr 0.0521 0.0519 0.1083 0.0673 0.0310 0.0821 0.0407 0.0754 0.0761 0.0857 0.0671 0.0221 0.0714

| ECN_Spet_6hr 0.0851 0.1091 0.0584 0.0430 0.0534 0.0292 0.0803 0.0536 0.0709 0.0561 0.0639 0.0218 0.0573

| ECN_Spet_9hr 0.0475 0.0547 0.0449 0.0512 0.0649 0.0318 0.0524 0.0436 0.0476 0.0373 0.0476 0.0088 0.0476

*

| CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_Spct_30min. |
| The median pattern for this ensemble is storm 6 (storm name : ECN_Spct_30min_6). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 3 (storm name : ECN_5pct_30min_3).

*

AEP: 50% - Max Flow (m‘3/s)

*

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_SOpct_10min 0.0181 0.0190 0.0190 0.0196 0.0165 0.0169 0.0189 0.0180 0.0202 0.0179 0.0184 0.0011 0.0185

| ECN_SOpct_12hr 0.0182 0.0237 0.0354 0.0174 0.0149 0.0097 0.0094 0.0411 0.0194 0.0211 0.0210 0.0097 0.0188

| ECN_SOpct_1Smin 0.0190 0.0214 0.0191 0.0177 0.0154 0.0151 0.0142 0.0145 0.0177 0.0202 0.0174 0.0024 0.0177

| ECN_SOpct_i8hr 0.0141 0.0211 0.0294 0.0097 0.0070 0.0102 0.0113 0.0216 0.0133 0.0225 0.0160 0.0068 0.0137

| ECN_SOpct_1_Shr 0.0401 0.0329 0.0552 0.0303 0.0618 0.0261 0.0396 0.0279 0.0609 0.0503 0.0425 0.0129 0.0398

| ECN_SOpet_ihr 0.0382 0.0307 0.0265 0.0400 0.0326 0.0417 0.0375 0.0358 0.0597 0.0471 0.0390 0.0088 0.0378

Page 46

| ECN_50pct_20min 0.0188 0.0186 0.0167 0.0180 0.0166 0.0172 0.0169 0.0150 0.0215 0.0261 0.0185 0.0030 0.0176                               |
|    ECN_50pct_24hr 0.0221 0.0096 0.0117 0.0169 0.0150 0.0113 0.0237 0.0146 0.0213 0.0098 0.0156 0.0050 0.0148                            |
| ECN_50pct_25min 0.0240 0.0214 0.0263 0.0253 0.0329 0.0234 0.0290 0.0299 0.0366 0.0328 0.0282 0.0047 0.0276                               |
|    ECN_50pct_2hr 0.0369 0.0200 0.0317 0.0291 0.0497 0.0365 0.0460 0.0343 0.0360 0.0395 0.0360 0.0079 0.0362                            |
| ECN_50pct_30min 0.0453 0.0300 0.0278 0.0331 0.0294 0.0297 0.0387 0.0284 0.0347 0.0358 0.0333 0.0052 0.0316                               |
|    ECN_50pct_3hr 0.0396 0.0376 0.0581 0.0227 0.0289 0.0269 0.0255 0.0244 0.0308 0.0360 0.0331 0.0100 0.0298                            |
| ECN_50pct_45min 0.0334 0.0294 0.0352 0.0328 0.0305 0.0327 0.0347 0.0430 0.0561 0.0498 0.0378 0.0085 0.0341                               |
| ECN_50pct_4_5hr 0.0372 0.0258 0.0469 0.0254 0.0282 0.0425 0.0354 0.0316 0.0347 0.0368 0.0344 0.0066 0.0350                               |
|    ECN_50pct_6hr 0.0230 0.0253 0.0368 0.0276 0.0228 0.0251 0.0282 0.0262 0.0229 0.0212 0.0259 0.0042 0.0252                            |
|    ECN_50pct_9hr 0.0269 0.0179 0.0473 0.0290 0.0293 0.0244 0.0211 0.0135 0.0190 0.0183 0.0247 0.0090 0.0227                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_1_5hr.                                      |
| The median pattern for this ensemble is storm 1 (storm name : ECN_50pct_1_5hr_1).                                           |
| The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name : ECN_50pct_1_5hr_5).                              |
*============================================================================================================================================================


                                              AEP: 63.2% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_63pct_10min 0.0160 0.0168 0.0168 0.0173 0.0146 0.0149 0.0167 0.0158 0.0178 0.0158 0.0162 0.0010 0.0163                               |
|    ECN_63pct_12hr 0.0153 0.0200 0.0299 0.0146 0.0125 0.0081 0.0078 0.0348 0.0163 0.0178 0.0177 0.0083 0.0158                            |
| ECN_63pct_15min 0.0168 0.0190 0.0170 0.0157 0.0136 0.0133 0.0126 0.0129 0.0157 0.0179 0.0155 0.0021 0.0157                               |
|    ECN_63pct_18hr 0.0097 0.0177 0.0246 0.0081 0.0058 0.0085 0.0094 0.0182 0.0111 0.0190 0.0132 0.0059 0.0104                            |
| ECN_63pct_1_5hr 0.0342 0.0243 0.0477 0.0249 0.0533 0.0224 0.0341 0.0197 0.0505 0.0425 0.0354 0.0118 0.0342                               |
|    ECN_63pct_1hr 0.0257 0.0268 0.0184 0.0331 0.0279 0.0345 0.0326 0.0242 0.0443 0.0395 0.0307 0.0073 0.0303                            |
| ECN_63pct_20min 0.0167 0.0164 0.0148 0.0122 0.0127 0.0150 0.0149 0.0127 0.0155 0.0178 0.0149 0.0018 0.0150                               |
|    ECN_63pct_24hr 0.0187 0.0080 0.0098 0.0143 0.0126 0.0094 0.0201 0.0123 0.0180 0.0081 0.0131 0.0043 0.0124                            |
| ECN_63pct_25min 0.0126 0.0127 0.0139 0.0136 0.0178 0.0136 0.0127 0.0172 0.0198 0.0189 0.0153 0.0027 0.0137                               |
|    ECN_63pct_2hr 0.0315 0.0171 0.0274 0.0193 0.0429 0.0313 0.0396 0.0294 0.0294 0.0340 0.0302 0.0075 0.0303                            |
| ECN_63pct_30min 0.0253 0.0173 0.0180 0.0189 0.0187 0.0179 0.0208 0.0183 0.0207 0.0248 0.0201 0.0027 0.0188                               |
|    ECN_63pct_3hr 0.0329 0.0315 0.0491 0.0194 0.0249 0.0231 0.0206 0.0189 0.0265 0.0311 0.0278 0.0086 0.0257                            |
| ECN_63pct_45min 0.0237 0.0253 0.0301 0.0234 0.0263 0.0282 0.0273 0.0330 0.0373 0.0394 0.0294 0.0052 0.0278                               |
| ECN_63pct_4_5hr 0.0314 0.0207 0.0352 0.0216 0.0241 0.0362 0.0264 0.0269 0.0296 0.0315 0.0284 0.0051 0.0283                               |
|    ECN_63pct_6hr 0.0195 0.0214 0.0294 0.0235 0.0194 0.0214 0.0239 0.0223 0.0191 0.0180 0.0218 0.0031 0.0214                            |
|    ECN_63pct_9hr 0.0228 0.0150 0.0401 0.0246 0.0248 0.0206 0.0178 0.0113 0.0160 0.0154 0.0208 0.0077 0.0192                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_1_5hr.                                    |
| The median pattern for this ensemble is storm 1 (storm name : ECN_63pct_1_5hr_1).                                           |
| The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name : ECN_63pct_1_5hr_5).                              |
*============================================================================================================================================================


[OCR of page images]
 

 

*

 

 

 

 

 

 

| ECN_SOpct_20min 0.0188 0.0186 0.0167 0.0180 0.0166 0.0172 0.0169 0.0150 0.0215 0.0261 0.0185 0.0030 0.0176
| ECN_SOpct_24hr 0.0221 0.0096 0.0117 0.0169 0.0150 0.0113 0.0237 0.0146 0.0213 0.0098 0.0156 0.0050 0.0148
| ECN_SOpct_25min 0.0240 0.0214 0.0263 0.0253 0.0329 0.0234 0.0290 0.0299 0.0366 0.0328 0.0282 0.0047 0.0276
| ECN_SOpet_2hr 0.0369 0.0200 0.0317 0.0291 0.0497 0.0365 0.0460 0.0343 0.0360 0.0395 0.0360 0.0079 0.0362
| ECN_SOpct_30min 0.0453 0.0300 0.0278 0.0331 0.0294 0.0297 0.0387 0.0284 0.0347 0.0358 0.0333 0.0052 0.0316
| ECN_SOpet_3hr 0.0396 0.0376 0.0581 0.0227 0.0289 0.0269 0.0255 0.0244 0.0308 0.0360 0.0331 0.0100 0.0298
| ECN_SOpct_45min 0.0334 0.0294 0.0352 0.0328 0.0305 0.0327 0.0347 0.0430 0.0561 0.0498 0.0378 0.0085 0.0341
| ECN_SOpct_4_Shr 0.0372 0.0258 0.0469 0.0254 0.0282 0.0425 0.0354 0.0316 0.0347 0.0368 0.0344 0.0066 0.0350
| ECN_SOpet_6hr 0.0230 0.0253 0.0368 0.0276 0.0228 0.0251 0.0282 0.0262 0.0229 0.0212 0.0259 0.0042 0.0252
| ECN_SOpet_9hr 0.0269 0.0179 0.0473 0.0290 0.0293 0.0244 0.0211 0.0135 0.0190 0.0183 0.0247 0.0090 0.0227
*
| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_SOpct_1_Shr. |
| The median pattern for this ensemble is storm 1 (storm name : ECN_SOpct_1_5hr_1). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name : ECN_5Opct_1_5hr_5).

AEP: 63.2% - Max Flow (m43/s)
|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
| ECN_63pct_l0min 0.0160 0.0168 0.0168 0.0173 0.0146 0.0149 0.0167 0.0158 0.0178 0.0158 0.0162 0.0010 0.0163
| ECN_63pct_12hr 0.0153 0.0200 0.0299 0.0146 0.0125 0.0081 0.0078 0.0348 0.0163 0.0178 0.0177 0.0083 0.0158
| ECN_63pct_1Smin 0.0168 0.0190 0.0170 0.0157 0.0136 0.0133 0.0126 0.0129 0.0157 0.0179 0.0155 0.0021 0.0157
| ECN_63pct_18hr 0.0097 0.0177 0.0246 0.0081 0.0058 0.0085 0.0094 0.0182 0.0111 0.0190 0.0132 0.0059 0.0104
| ECN_63pct_1_Shr 0.0342 0.0243 0.0477 0.0249 0.0533 0.0224 0.0341 0.0197 0.0505 0.0425 0.0354 0.0118 0.0342
| ECN_63pct_ihr 0.0257 0.0268 0.0184 0.0331 0.0279 0.0345 0.0326 0.0242 0.0443 0.0395 0.0307 0.0073 0.0303
| ECN_63pct_20min 0.0167 0.0164 0.0148 0.0122 0.0127 0.0150 0.0149 0.0127 0.0155 0.0178 0.0149 0.0018 0.0150
| ECN_63pct_24hr 0.0187 0.0080 0.0098 0.0143 0.0126 0.0094 0.0201 0.0123 0.0180 0.0081 0.0131 0.0043 0.0124
| ECN_63pct_25min 0.0126 0.0127 0.0139 0.0136 0.0178 0.0136 0.0127 0.0172 0.0198 0.0189 0.0153 0.0027 0.0137
| ECN_63pct_2hr 0.0315 0.0171 0.0274 0.0193 0.0429 0.0313 0.0396 0.0294 0.0294 0.0340 0.0302 0.0075 0.0303
| ECN_63pct_30min 0.0253 0.0173 0.0180 0.0189 0.0187 0.0179 0.0208 0.0183 0.0207 0.0248 0.0201 0.0027 0.0188
| ECN_63pet_3hr 0.0329 0.0315 0.0491 0.0194 0.0249 0.0231 0.0206 0.0189 0.0265 0.0311 0.0278 0.0086 0.0257
| ECN_63pct_45min 0.0237 0.0253 0.0301 0.0234 0.0263 0.0282 0.0273 0.0330 0.0373 0.0394 0.0294 0.0052 0.0278
| ECN_63pct_4 Shr 0.0314 0.0207 0.0352 0.0216 0.0241 0.0362 0.0264 0.0269 0.0296 0.0315 0.0284 0.0051 0.0283
| ECN_63pet_6hr 0.0195 0.0214 0.0294 0.0235 0.0194 0.0214 0.0239 0.0223 0.0191 0.0180 0.0218 0.0031 0.0214
| ECN_63pct_9hr 0.0228 0.0150 0.0401 0.0246 0.0248 0.0206 0.0178 0.0113 0.0160 0.0154 0.0208 0.0077 0.0192
*

 

 

| CRITICAL DURATION :

*

The critical duration for the 63.2% AEP is the ensemble ECN_63pct_1_Shr.
| The median pattern for this ensemble is storm 1 (storm name : ECN_63pct_1_5Shr_1).
| The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name : ECN_63pct_1_5hr_5).

 

 

Page 47

                                                    INNOVYZE ENSEMBLE STATISTICS UTILITY
                                                              (c) Innovyze 2020

Summary information:

           Total No. of Ensembles:             112
           No. of Storms per ensemble:          10
           No. of AEP Bands:                      7
           Object Name:                  Pre Dev B to Lot 61
           Result type:                  Max Flow


Results:


                                              AEP: 1% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|    ECN_1pct_10min 0.0677 0.0635 0.0682 0.0539 0.0676 0.0530 0.0653 0.0570 0.0686 0.0649 0.0630 0.0058 0.0651                             |
|    ECN_1pct_12hr 0.0276 0.0293 0.0239 0.0357 0.1151 0.0299 0.0360 0.1272 0.0545 0.0410 0.0520 0.0356 0.0358                             |
|    ECN_1pct_15min 0.0848 0.0860 0.0715 0.0742 0.0934 0.0915 0.0806 0.0977 0.0935 0.0787 0.0852 0.0084 0.0854                             |
|    ECN_1pct_18hr 0.0282 0.0158 0.0249 0.0207 0.0343 0.0334 0.0189 0.0199 0.0282 0.0237 0.0248 0.0059 0.0243                             |
|    ECN_1pct_1_5hr 0.0597 0.0703 0.0723 0.0595 0.0730 0.0717 0.0689 0.0727 0.0648 0.0720 0.0685 0.0050 0.0710                             |
|     ECN_1pct_1hr 0.1085 0.0884 0.0661 0.0752 0.0554 0.0865 0.0600 0.0679 0.0744 0.0622 0.0745 0.0153 0.0712                            |
|    ECN_1pct_20min 0.0866 0.1159 0.0729 0.0691 0.0774 0.0851 0.0740 0.0829 0.0821 0.0954 0.0841 0.0129 0.0825                             |
|    ECN_1pct_24hr 0.0276 0.0198 0.0225 0.0320 0.0197 0.0202 0.0195 0.0222 0.0192 0.0309 0.0234 0.0047 0.0212                             |
|    ECN_1pct_25min 0.0790 0.1095 0.0809 0.0873 0.0885 0.0803 0.0763 0.0921 0.0787 0.1005 0.0873 0.0102 0.0841                             |
|     ECN_1pct_2hr 0.0784 0.0587 0.0580 0.0698 0.0692 0.0638 0.0494 0.0523 0.0598 0.0744 0.0634 0.0090 0.0618                            |
|    ECN_1pct_30min 0.0882 0.0809 0.1134 0.0715 0.0739 0.0721 0.0814 0.0838 0.0900 0.0807 0.0836 0.0116 0.0812                             |
|     ECN_1pct_3hr 0.0612 0.0599 0.0705 0.0504 0.0393 0.0592 0.0361 0.0720 0.0354 0.0775 0.0561 0.0145 0.0596                            |
|    ECN_1pct_45min 0.1149 0.1024 0.0725 0.0950 0.0832 0.0655 0.0722 0.0892 0.0583 0.0809 0.0834 0.0165 0.0821                             |
|    ECN_1pct_4_5hr 0.0562 0.0388 0.0455 0.0464 0.0594 0.0536 0.0440 0.0406 0.0553 0.0573 0.0497 0.0071 0.0500                             |
|     ECN_1pct_6hr 0.1036 0.0471 0.0420 0.0463 0.0342 0.0488 0.0591 0.0729 0.0524 0.0378 0.0544 0.0195 0.0480                            |
|     ECN_1pct_9hr 0.0389 0.0449 0.0186 0.0217 0.0710 0.0577 0.0768 0.0271 0.0399 0.0292 0.0426 0.0192 0.0394                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_1pct_15min.                                       |
| The median pattern for this ensemble is storm 2 (storm name : ECN_1pct_15min_2).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_1pct_15min_8).                              |
*============================================================================================================================================================


                                              AEP: 10% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_10pct_10min 0.0137 0.0141 0.0125 0.0161 0.0164 0.0149 0.0183 0.0160 0.0142 0.0200 0.0156 0.0021 0.0154                               |
|    ECN_10pct_12hr 0.0214 0.0428 0.0192 0.0157 0.0207 0.0231 0.0201 0.0255 0.0249 0.0203 0.0234 0.0070 0.0211                            |
| ECN_10pct_15min 0.0331 0.0379 0.0374 0.0409 0.0341 0.0364 0.0375 0.0364 0.0398 0.0366 0.0370 0.0022 0.0370                               |
|    ECN_10pct_18hr 0.0121 0.0155 0.0233 0.0127 0.0208 0.0134 0.0103 0.0099 0.0127 0.0244 0.0155 0.0051 0.0131                            |
| ECN_10pct_1_5hr 0.0607 0.0379 0.0559 0.0321 0.0420 0.0488 0.0415 0.0314 0.0349 0.0477 0.0433 0.0094 0.0418                               |
|    ECN_10pct_1hr 0.0643 0.0407 0.0391 0.0365 0.0365 0.0477 0.0472 0.0492 0.0365 0.0697 0.0467 0.0112 0.0439                            |
| ECN_10pct_20min 0.0436 0.0420 0.0481 0.0561 0.0469 0.0538 0.0505 0.0623 0.0564 0.0466 0.0506 0.0061 0.0493                               |
|    ECN_10pct_24hr 0.0282 0.0231 0.0144 0.0098 0.0131 0.0131 0.0307 0.0161 0.0160 0.0131 0.0177 0.0067 0.0152                            |
| ECN_10pct_25min 0.0463 0.0726 0.0442 0.0432 0.0379 0.0619 0.0481 0.0479 0.0409 0.0663 0.0509 0.0112 0.0471                               |
|    ECN_10pct_2hr 0.0505 0.0331 0.0438 0.0632 0.0443 0.0371 0.0484 0.0345 0.0480 0.0407 0.0444 0.0084 0.0441                            |
| ECN_10pct_30min 0.0409 0.0347 0.0695 0.0479 0.0456 0.0451 0.0622 0.0488 0.0582 0.0649 0.0518 0.0107 0.0484                               |
|    ECN_10pct_3hr 0.0529 0.0310 0.0312 0.0462 0.0401 0.0258 0.0379 0.0290 0.0340 0.0339 0.0362 0.0079 0.0340                            |
| ECN_10pct_45min 0.0478 0.0438 0.0406 0.0495 0.0514 0.0488 0.0494 0.0374 0.0697 0.0646 0.0503 0.0094 0.0491                               |
| ECN_10pct_4_5hr 0.0265 0.0264 0.0553 0.0343 0.0157 0.0419 0.0206 0.0331 0.0388 0.0437 0.0336 0.0112 0.0337                               |
|    ECN_10pct_6hr 0.0430 0.0552 0.0294 0.0216 0.0269 0.0146 0.0406 0.0270 0.0358 0.0283 0.0322 0.0111 0.0289                            |
|    ECN_10pct_9hr 0.0239 0.0276 0.0226 0.0258 0.0328 0.0159 0.0264 0.0200 0.0240 0.0187 0.0238 0.0046 0.0239                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_20min.                                      |
| The median pattern for this ensemble is storm 7 (storm name : ECN_10pct_20min_7).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_10pct_20min_8).                              |
*============================================================================================================================================================


                                     AEP: 2% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|   ECN_2pct_10min 0.0448 0.0428 0.0453 0.0477 0.0456 0.0469 0.0440 0.0504 0.0428 0.0419 0.0452 0.0025 0.0451                              |
|    ECN_2pct_12hr 0.0241 0.0256 0.0208 0.0311 0.1008 0.0261 0.0314 0.1114 0.0476 0.0358 0.0455 0.0312 0.0313                             |
|   ECN_2pct_15min 0.0687 0.0775 0.0607 0.0671 0.0754 0.0769 0.0696 0.0777 0.0789 0.0679 0.0720 0.0058 0.0725                              |
|    ECN_2pct_18hr 0.0245 0.0137 0.0216 0.0180 0.0298 0.0290 0.0164 0.0172 0.0245 0.0205 0.0215 0.0051 0.0211                             |
|   ECN_2pct_1_5hr 0.0516 0.0620 0.0629 0.0528 0.0646 0.0637 0.0594 0.0576 0.0574 0.0638 0.0596 0.0044 0.0607                              |
|    ECN_2pct_1hr 0.0959 0.0785 0.0575 0.0668 0.0493 0.0765 0.0533 0.0545 0.0661 0.0498 0.0648 0.0143 0.0618                             |
|   ECN_2pct_20min 0.0765 0.1024 0.0626 0.0614 0.0682 0.0710 0.0669 0.0742 0.0683 0.0852 0.0737 0.0116 0.0696                              |


[OCR of page images]
Summary information:

Total No. of Ensembles:
No. of Storms per ensemble:
No. of AEP Bands:

Object Name:

Result type:

Results:

INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

112
10
7
Pre Dev B to Lot 61
Max Flow

AEP: 1% - Max Flow (m43/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_ipct_10min 0.0677 0.0635 0.0682 0.0539 0.0676 0.0530 0.0653 0.0570 0.0686 0.0649 0.0630 0.0058 0.0651

| ECN_Apct_12hr 0.0276 0.0293 0.0239 0.0357 0.1151 0.0299 0.0360 0.1272 0.0545 0.0410 0.0520 0.0356 0.0358

| ECN_ipct_15min 0.0848 0.0860 0.0715 0.0742 0.0934 0.0915 0.0806 0.0977 0.0935 0.0787 0.0852 0.0084 0.0854

| ECN_Apct_18hr 0.0282 0.0158 0.0249 0.0207 0.0343 0.0334 0.0189 0.0199 0.0282 0.0237 0.0248 0.0059 0.0243

| ECN_ipct_1_Shr 0.0597 0.0703 0.0723 0.0595 0.0730 0.0717 0.0689 0.0727 0.0648 0.0720 0.0685 0.0050 0.0710

| ECN_ipet_ihr 0.1085 0.0884 0.0661 0.0752 0.0554 0.0865 0.0600 0.0679 0.0744 0.0622 0.0745 0.0153 0.0712

| ECN_ipct_20min 0.0866 0.1159 0.0729 0.0691 0.0774 0.0851 0.0740 0.0829 0.0821 0.0954 0.0841 0.0129 0.0825

| ECN_Apcet_24hr 0.0276 0.0198 0.0225 0.0320 0.0197 0.0202 0.0195 0.0222 0.0192 0.0309 0.0234 0.0047 0.0212

| ECN_ipct_25min 0.0790 0.1095 0.0809 0.0873 0.0885 0.0803 0.0763 0.0921 0.0787 0.1005 0.0873 0.0102 0.0841

| ECN_ipet_2hr 0.0784 0.0587 0.0580 0.0698 0.0692 0.0638 0.0494 0.0523 0.0598 0.0744 0.0634 0.0090 0.0618

| ECN_ipct_30min 0.0882 0.0809 0.1134 0.0715 0.0739 0.0721 0.0814 0.0838 0.0900 0.0807 0.0836 0.0116 0.0812

| ECN_ipet_3hr 0.0612 0.0599 0.0705 0.0504 0.0393 0.0592 0.0361 0.0720 0.0354 0.0775 0.0561 0.0145 0.0596

| ECN_ipct_45min 0.1149 0.1024 0.0725 0.0950 0.0832 0.0655 0.0722 0.0892 0.0583 0.0809 0.0834 0.0165 0.0821

| ECN_ipct_4 Shr 0.0562 0.0388 0.0455 0.0464 0.0594 0.0536 0.0440 0.0406 0.0553 0.0573 0.0497 0.0071 0.0500

| ECN_ipet_6hr 0.1036 0.0471 0.0420 0.0463 0.0342 0.0488 0.0591 0.0729 0.0524 0.0378 0.0544 0.0195 0.0480

| ECN_ipet_9hr 0.0389 0.0449 0.0186 0.0217 0.0710 0.0577 0.0768 0.0271 0.0399 0.0292 0.0426 0.0192 0.0394

*

| CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_1pct_1Smin. |
| The median pattern for this ensemble is storm 2 (storm name : ECN_1pct_15min_2). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_1pct_15min_8).

*

AEP: 10% - Max Flow (m’3/s)

*

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_10pct_10min 0.0137 0.0141 0.0125 0.0161 0.0164 0.0149 0.0183 0.0160 0.0142 0.0200 0.0156 0.0021 0.0154

| ECN_10pct_12hr 0.0214 0.0428 0.0192 0.0157 0.0207 0.0231 0.0201 0.0255 0.0249 0.0203 0.0234 0.0070 0.0211

| ECN_10pct_1Smin 0.0331 0.0379 0.0374 0.0409 0.0341 0.0364 0.0375 0.0364 0.0398 0.0366 0.0370 0.0022 0.0370

| ECN_10pct_i8hr 0.0121 0.0155 0.0233 0.0127 0.0208 0.0134 0.0103 0.0099 0.0127 0.0244 0.0155 0.0051 0.0131

| ECN_10pct_1_Shr 0.0607 0.0379 0.0559 0.0321 0.0420 0.0488 0.0415 0.0314 0.0349 0.0477 0.0433 0.0094 0.0418

| ECN_10pet_ihr 0.0643 0.0407 0.0391 0.0365 0.0365 0.0477 0.0472 0.0492 0.0365 0.0697 0.0467 0.0112 0.0439

| ECN_10pct_20min 0.0436 0.0420 0.0481 0.0561 0.0469 0.0538 0.0505 0.0623 0.0564 0.0466 0.0506 0.0061 0.0493

| ECN_10pct_24hr 0.0282 0.0231 0.0144 0.0098 0.0131 0.0131 0.0307 0.0161 0.0160 0.0131 0.0177 0.0067 0.0152

| ECN_10pct_25min 0.0463 0.0726 0.0442 0.0432 0.0379 0.0619 0.0481 0.0479 0.0409 0.0663 0.0509 0.0112 0.0471

| ECN_10pet_2hr 0.0505 0.0331 0.0438 0.0632 0.0443 0.0371 0.0484 0.0345 0.0480 0.0407 0.0444 0.0084 0.0441

| ECN_10pct_30min 0.0409 0.0347 0.0695 0.0479 0.0456 0.0451 0.0622 0.0488 0.0582 0.0649 0.0518 0.0107 0.0484

| ECN_10pet_3hr 0.0529 0.0310 0.0312 0.0462 0.0401 0.0258 0.0379 0.0290 0.0340 0.0339 0.0362 0.0079 0.0340

| ECN_10pct_45min 0.0478 0.0438 0.0406 0.0495 0.0514 0.0488 0.0494 0.0374 0.0697 0.0646 0.0503 0.0094 0.0491

| ECN_10pct_4_Shr 0.0265 0.0264 0.0553 0.0343 0.0157 0.0419 0.0206 0.0331 0.0388 0.0437 0.0336 0.0112 0.0337

| ECN_10pet_6hr 0.0430 0.0552 0.0294 0.0216 0.0269 0.0146 0.0406 0.0270 0.0358 0.0283 0.0322 0.0111 0.0289

| ECN_10pet_9hr 0.0239 0.0276 0.0226 0.0258 0.0328 0.0159 0.0264 0.0200 0.0240 0.0187 0.0238 0.0046 0.0239

*

| CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_20min. |
| The median pattern for this ensemble is storm 7 (storm name : ECN_10pct_20min_7). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_10pct_20min_8).

*

AEP: 2% - Max Flow (m43/s)

*

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_2pct_10min 0.0448 0.0428 0.0453 0.0477 0.0456 0.0469 0.0440 0.0504 0.0428 0.0419 0.0452 0.0025 0.0451

| ECN_2pct_12hr 0.0241 0.0256 0.0208 0.0311 0.1008 0.0261 0.0314 0.1114 0.0476 0.0358 0.0455 0.0312 0.0313

| ECN_2pct_15min 0.0687 0.0775 0.0607 0.0671 0.0754 0.0769 0.0696 0.0777 0.0789 0.0679 0.0720 0.0058 0.0725

| ECN_2pct_18hr 0.0245 0.0137 0.0216 0.0180 0.0298 0.0290 0.0164 0.0172 0.0245 0.0205 0.0215 0.0051 0.0211

| ECN_2pct_1_Shr 0.0516 0.0620 0.0629 0.0528 0.0646 0.0637 0.0594 0.0576 0.0574 0.0638 0.0596 0.0044 0.0607

| ECN_2pet_ihr 0.0959 0.0785 0.0575 0.0668 0.0493 0.0765 0.0533 0.0545 0.0661 0.0498 0.0648 0.0143 0.0618

| ECN_2pct_20min 0.0765 0.1024 0.0626 0.0614 0.0682 0.0710 0.0669 0.0742 0.0683 0.0852 0.0737 0.0116 0.0696

Page 48

|    ECN_2pct_24hr 0.0239 0.0171 0.0194 0.0277 0.0170 0.0174 0.0168 0.0192 0.0166 0.0268 0.0202 0.0041 0.0183                             |
|    ECN_2pct_25min 0.0698 0.0981 0.0643 0.0770 0.0750 0.0728 0.0691 0.0832 0.0713 0.0908 0.0772 0.0100 0.0739                             |
|     ECN_2pct_2hr 0.0691 0.0500 0.0512 0.0616 0.0615 0.0565 0.0438 0.0464 0.0530 0.0625 0.0556 0.0076 0.0548                            |
|    ECN_2pct_30min 0.0791 0.0728 0.1023 0.0646 0.0591 0.0499 0.0737 0.0757 0.0812 0.0715 0.0730 0.0133 0.0733                             |
|     ECN_2pct_3hr 0.0540 0.0529 0.0623 0.0445 0.0346 0.0522 0.0309 0.0636 0.0311 0.0684 0.0494 0.0130 0.0526                            |
|    ECN_2pct_45min 0.1027 0.0877 0.0648 0.0851 0.0744 0.0575 0.0634 0.0730 0.0524 0.0665 0.0728 0.0145 0.0698                             |
|    ECN_2pct_4_5hr 0.0492 0.0339 0.0399 0.0406 0.0500 0.0443 0.0386 0.0355 0.0485 0.0503 0.0431 0.0059 0.0424                             |
|     ECN_2pct_6hr 0.0910 0.0413 0.0368 0.0405 0.0299 0.0428 0.0518 0.0638 0.0459 0.0331 0.0477 0.0171 0.0420                            |
|     ECN_2pct_9hr 0.0339 0.0392 0.0161 0.0189 0.0621 0.0504 0.0671 0.0236 0.0348 0.0254 0.0371 0.0168 0.0344                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_25min.                                       |
| The median pattern for this ensemble is storm 5 (storm name : ECN_2pct_25min_5).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 2 (storm name : ECN_2pct_25min_2).                              |
*============================================================================================================================================================


                                              AEP: 20% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_20pct_10min 0.0077 0.0081 0.0081 0.0099 0.0079 0.0083 0.0080 0.0089 0.0086 0.0076 0.0083 0.0006 0.0081                               |
|    ECN_20pct_12hr 0.0165 0.0215 0.0318 0.0159 0.0136 0.0090 0.0087 0.0369 0.0176 0.0191 0.0191 0.0086 0.0171                            |
| ECN_20pct_15min 0.0210 0.0199 0.0214 0.0175 0.0204 0.0185 0.0206 0.0224 0.0210 0.0241 0.0207 0.0018 0.0208                               |
|    ECN_20pct_18hr 0.0130 0.0192 0.0267 0.0091 0.0066 0.0095 0.0153 0.0197 0.0122 0.0204 0.0152 0.0059 0.0142                            |
| ECN_20pct_1_5hr 0.0348 0.0495 0.0474 0.0290 0.0530 0.0251 0.0340 0.0354 0.0540 0.0430 0.0405 0.0097 0.0392                               |
|    ECN_20pct_1hr 0.0427 0.0256 0.0348 0.0338 0.0449 0.0454 0.0317 0.0320 0.0534 0.0420 0.0387 0.0080 0.0384                            |
| ECN_20pct_20min 0.0332 0.0313 0.0322 0.0327 0.0308 0.0338 0.0336 0.0321 0.0338 0.0434 0.0337 0.0034 0.0330                               |
|    ECN_20pct_24hr 0.0203 0.0091 0.0110 0.0157 0.0139 0.0105 0.0218 0.0135 0.0196 0.0092 0.0145 0.0045 0.0137                            |
| ECN_20pct_25min 0.0312 0.0326 0.0350 0.0322 0.0429 0.0340 0.0381 0.0436 0.0504 0.0487 0.0389 0.0067 0.0366                               |
|    ECN_20pct_2hr 0.0323 0.0295 0.0267 0.0339 0.0424 0.0318 0.0491 0.0305 0.0315 0.0338 0.0341 0.0063 0.0321                            |
| ECN_20pct_30min 0.0616 0.0326 0.0304 0.0391 0.0422 0.0280 0.0456 0.0371 0.0442 0.0464 0.0407 0.0092 0.0407                               |
|    ECN_20pct_3hr 0.0362 0.0396 0.0502 0.0217 0.0269 0.0236 0.0273 0.0214 0.0268 0.0312 0.0305 0.0087 0.0271                            |
| ECN_20pct_45min 0.0312 0.0280 0.0297 0.0378 0.0386 0.0336 0.0336 0.0391 0.0549 0.0527 0.0379 0.0087 0.0357                               |
| ECN_20pct_4_5hr 0.0326 0.0289 0.0417 0.0224 0.0248 0.0375 0.0358 0.0279 0.0305 0.0323 0.0314 0.0055 0.0314                               |
|    ECN_20pct_6hr 0.0207 0.0228 0.0340 0.0252 0.0204 0.0224 0.0253 0.0236 0.0210 0.0190 0.0234 0.0040 0.0226                            |
|    ECN_20pct_9hr 0.0240 0.0191 0.0419 0.0259 0.0261 0.0218 0.0189 0.0122 0.0170 0.0167 0.0223 0.0077 0.0204                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_30min.                                      |
| The median pattern for this ensemble is storm 5 (storm name : ECN_20pct_30min_5).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_20pct_30min_1).                              |
*============================================================================================================================================================


                                              AEP: 5% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|    ECN_5pct_10min 0.0240 0.0248 0.0303 0.0261 0.0292 0.0263 0.0328 0.0285 0.0250 0.0362 0.0283 0.0037 0.0274                             |
|    ECN_5pct_12hr 0.0257 0.0514 0.0230 0.0189 0.0249 0.0277 0.0241 0.0305 0.0298 0.0244 0.0280 0.0084 0.0253                             |
|    ECN_5pct_15min 0.0501 0.0493 0.0540 0.0589 0.0572 0.0504 0.0520 0.0531 0.0618 0.0568 0.0544 0.0040 0.0536                             |
|    ECN_5pct_18hr 0.0147 0.0187 0.0281 0.0155 0.0252 0.0162 0.0126 0.0121 0.0154 0.0295 0.0188 0.0061 0.0159                             |
|    ECN_5pct_1_5hr 0.0712 0.0445 0.0654 0.0437 0.0489 0.0568 0.0489 0.0366 0.0409 0.0560 0.0513 0.0104 0.0489                             |
|     ECN_5pct_1hr 0.0751 0.0511 0.0474 0.0455 0.0537 0.0598 0.0565 0.0594 0.0470 0.0815 0.0577 0.0114 0.0551                            |
|    ECN_5pct_20min 0.0508 0.0514 0.0575 0.0709 0.0595 0.0657 0.0614 0.0811 0.0824 0.0558 0.0637 0.0107 0.0604                             |
|    ECN_5pct_24hr 0.0340 0.0280 0.0175 0.0120 0.0159 0.0159 0.0371 0.0196 0.0194 0.0159 0.0215 0.0081 0.0184                             |
|    ECN_5pct_25min 0.0583 0.0878 0.0509 0.0495 0.0435 0.0804 0.0577 0.0584 0.0551 0.0799 0.0621 0.0143 0.0580                             |
|     ECN_5pct_2hr 0.0598 0.0392 0.0518 0.0748 0.0530 0.0436 0.0577 0.0408 0.0563 0.0544 0.0531 0.0099 0.0537                            |
|    ECN_5pct_30min 0.0468 0.0508 0.0825 0.0549 0.0526 0.0627 0.0815 0.0609 0.0688 0.0749 0.0636 0.0122 0.0618                             |
|     ECN_5pct_3hr 0.0629 0.0391 0.0369 0.0545 0.0474 0.0305 0.0447 0.0343 0.0402 0.0400 0.0430 0.0092 0.0401                            |
|    ECN_5pct_45min 0.0572 0.0530 0.0665 0.0572 0.0597 0.0564 0.0575 0.0435 0.0814 0.0752 0.0608 0.0104 0.0573                             |
|    ECN_5pct_4_5hr 0.0313 0.0312 0.0651 0.0405 0.0186 0.0493 0.0244 0.0452 0.0457 0.0515 0.0403 0.0133 0.0428                             |
|     ECN_5pct_6hr 0.0512 0.0656 0.0351 0.0258 0.0321 0.0175 0.0482 0.0322 0.0426 0.0337 0.0384 0.0131 0.0344                            |
|     ECN_5pct_9hr 0.0285 0.0328 0.0269 0.0307 0.0390 0.0190 0.0315 0.0261 0.0286 0.0224 0.0286 0.0053 0.0286                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_5pct_30min.                                       |
| The median pattern for this ensemble is storm 6 (storm name : ECN_5pct_30min_6).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 3 (storm name : ECN_5pct_30min_3).                              |
*============================================================================================================================================================


                                     AEP: 50% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_50pct_10min 0.0058 0.0061 0.0061 0.0062 0.0053 0.0052 0.0060 0.0055 0.0064 0.0057 0.0058 0.0004 0.0059                               |
|   ECN_50pct_12hr 0.0109 0.0142 0.0212 0.0104 0.0089 0.0058 0.0055 0.0246 0.0116 0.0126 0.0126 0.0058 0.0112                             |
| ECN_50pct_15min 0.0060 0.0068 0.0061 0.0056 0.0048 0.0046 0.0044 0.0046 0.0056 0.0063 0.0055 0.0008 0.0056                               |
|   ECN_50pct_18hr 0.0084 0.0126 0.0176 0.0058 0.0041 0.0060 0.0067 0.0129 0.0079 0.0134 0.0096 0.0041 0.0081                             |
| ECN_50pct_1_5hr 0.0237 0.0194 0.0332 0.0181 0.0370 0.0157 0.0237 0.0169 0.0368 0.0303 0.0255 0.0078 0.0237                               |
|    ECN_50pct_1hr 0.0230 0.0183 0.0162 0.0239 0.0191 0.0248 0.0225 0.0213 0.0355 0.0283 0.0233 0.0053 0.0228                            |


[OCR of page images]
| ECN_2pet_24hr
| ECN_2pct_25min
| ECN_2pct_2hr

| ECN_2pct_30min
| ECN_2pct_3hr

| ECN_2pct_45min
| ECN_2pct_4_Shr
| ECN_2pct_6hr

| ECN_2pct_9hr
*

0.0239 0.0171 0.0194 0.0277 0.0170 0.0174 0.0168 0.0192 0.0166 0.0268 0.0202 0.0041 0.0183
0.0698 0.0981 0.0643 0.0770 0.0750 0.0728 0.0691 0.0832 0.0713 0.0908 0.0772 0.0100 0.0739
0.0691 0.0500 0.0512 0.0616 0.0615 0.0565 0.0438 0.0464 0.0530 0.0625 0.0556 0.0076 0.0548
0.0791 0.0728 0.1023 0.0646 0.0591 0.0499 0.0737 0.0757 0.0812 0.0715 0.0730 0.0133 0.0733
0.0540 0.0529 0.0623 0.0445 0.0346 0.0522 0.0309 0.0636 0.0311 0.0684 0.0494 0.0130 0.0526
0.1027 0.0877 0.0648 0.0851 0.0744 0.0575 0.0634 0.0730 0.0524 0.0665 0.0728 0.0145 0.0698
0.0492 0.0339 0.0399 0.0406 0.0500 0.0443 0.0386 0.0355 0.0485 0.0503 0.0431 0.0059 0.0424
0.0910 0.0413 0.0368 0.0405 0.0299 0.0428 0.0518 0.0638 0.0459 0.0331 0.0477 0.0171 0.0420
0.0339 0.0392 0.0161 0.0189 0.0621 0.0504 0.0671 0.0236 0.0348 0.0254 0.0371 0.0168 0.0344

 

 

| CRITICAL DURATION :

The critical duration for the 2% AEP is the ensemble ECN_2pct_25min.

| The median pattern for this ensemble is storm 5 (storm name : ECN_2pct_25min_5).
| The pattern with the greatest <Max Flow> for this ensemble is storm 2 (storm name : ECN_2pct_25min_2).
*

 

 

AEP: 20% - Max Flow (m43/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_20pct_10min 0.0077 0.0081 0.0081 0.0099 0.0079 0.0083 0.0080 0.0089 0.0086 0.0076 0.0083 0.0006 0.0081

| ECN_2Opct_12hr 0.0165 0.0215 0.0318 0.0159 0.0136 0.0090 0.0087 0.0369 0.0176 0.0191 0.0191 0.0086 0.0171

| ECN_20pct_15min 0.0210 0.0199 0.0214 0.0175 0.0204 0.0185 0.0206 0.0224 0.0210 0.0241 0.0207 0.0018 0.0208

| ECN_2Opct_i8hr 0.0130 0.0192 0.0267 0.0091 0.0066 0.0095 0.0153 0.0197 0.0122 0.0204 0.0152 0.0059 0.0142

| ECN_20pct_1_Shr 0.0348 0.0495 0.0474 0.0290 0.0530 0.0251 0.0340 0.0354 0.0540 0.0430 0.0405 0.0097 0.0392

| ECN_2Opet_ihr 0.0427 0.0256 0.0348 0.0338 0.0449 0.0454 0.0317 0.0320 0.0534 0.0420 0.0387 0.0080 0.0384

| ECN_20pct_20min 0.0332 0.0313 0.0322 0.0327 0.0308 0.0338 0.0336 0.0321 0.0338 0.0434 0.0337 0.0034 0.0330

| ECN_2Opct_24hr 0.0203 0.0091 0.0110 0.0157 0.0139 0.0105 0.0218 0.0135 0.0196 0.0092 0.0145 0.0045 0.0137

| ECN_20pct_25min 0.0312 0.0326 0.0350 0.0322 0.0429 0.0340 0.0381 0.0436 0.0504 0.0487 0.0389 0.0067 0.0366

| ECN_20pet_2hr 0.0323 0.0295 0.0267 0.0339 0.0424 0.0318 0.0491 0.0305 0.0315 0.0338 0.0341 0.0063 0.0321

| ECN_20pct_30min 0.0616 0.0326 0.0304 0.0391 0.0422 0.0280 0.0456 0.0371 0.0442 0.0464 0.0407 0.0092 0.0407

| ECN_2Opet_3hr 0.0362 0.0396 0.0502 0.0217 0.0269 0.0236 0.0273 0.0214 0.0268 0.0312 0.0305 0.0087 0.0271

| ECN_20pct_45min 0.0312 0.0280 0.0297 0.0378 0.0386 0.0336 0.0336 0.0391 0.0549 0.0527 0.0379 0.0087 0.0357

| ECN_20pct_4_Shr 0.0326 0.0289 0.0417 0.0224 0.0248 0.0375 0.0358 0.0279 0.0305 0.0323 0.0314 0.0055 0.0314

| ECN_20pet_6hr 0.0207 0.0228 0.0340 0.0252 0.0204 0.0224 0.0253 0.0236 0.0210 0.0190 0.0234 0.0040 0.0226

| ECN_20pet_9hr 0.0240 0.0191 0.0419 0.0259 0.0261 0.0218 0.0189 0.0122 0.0170 0.0167 0.0223 0.0077 0.0204

*

| CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_30min. |
| The median pattern for this ensemble is storm 5 (storm name : ECN_20pct_30min_5). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 1 (storm name : ECN_20pct_30min_1).

*

AEP: 5% - Max Flow (m43/s)

*

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_Spct_10min 0.0240 0.0248 0.0303 0.0261 0.0292 0.0263 0.0328 0.0285 0.0250 0.0362 0.0283 0.0037 0.0274

| ECN_Spct_12hr 0.0257 0.0514 0.0230 0.0189 0.0249 0.0277 0.0241 0.0305 0.0298 0.0244 0.0280 0.0084 0.0253

| ECN_Spct_15min 0.0501 0.0493 0.0540 0.0589 0.0572 0.0504 0.0520 0.0531 0.0618 0.0568 0.0544 0.0040 0.0536

| ECN_Spet_i8hr 0.0147 0.0187 0.0281 0.0155 0.0252 0.0162 0.0126 0.0121 0.0154 0.0295 0.0188 0.0061 0.0159

| ECN_Spct_1_Shr 0.0712 0.0445 0.0654 0.0437 0.0489 0.0568 0.0489 0.0366 0.0409 0.0560 0.0513 0.0104 0.0489

| ECN_Spet_ihr 0.0751 0.0511 0.0474 0.0455 0.0537 0.0598 0.0565 0.0594 0.0470 0.0815 0.0577 0.0114 0.0551

| ECN_Spct_20min 0.0508 0.0514 0.0575 0.0709 0.0595 0.0657 0.0614 0.0811 0.0824 0.0558 0.0637 0.0107 0.0604

| ECN_Spct_24hr 0.0340 0.0280 0.0175 0.0120 0.0159 0.0159 0.0371 0.0196 0.0194 0.0159 0.0215 0.0081 0.0184

| ECN_Spct_25min 0.0583 0.0878 0.0509 0.0495 0.0435 0.0804 0.0577 0.0584 0.0551 0.0799 0.0621 0.0143 0.0580

| ECN_Spet_2hr 0.0598 0.0392 0.0518 0.0748 0.0530 0.0436 0.0577 0.0408 0.0563 0.0544 0.0531 0.0099 0.0537

| ECN_Spct_30min 0.0468 0.0508 0.0825 0.0549 0.0526 0.0627 0.0815 0.0609 0.0688 0.0749 0.0636 0.0122 0.0618

| ECN_Spet_3hr 0.0629 0.0391 0.0369 0.0545 0.0474 0.0305 0.0447 0.0343 0.0402 0.0400 0.0430 0.0092 0.0401

| ECN_Spct_45min 0.0572 0.0530 0.0665 0.0572 0.0597 0.0564 0.0575 0.0435 0.0814 0.0752 0.0608 0.0104 0.0573

| ECN_Spct_4_Shr 0.0313 0.0312 0.0651 0.0405 0.0186 0.0493 0.0244 0.0452 0.0457 0.0515 0.0403 0.0133 0.0428

| ECN_Spet_6hr 0.0512 0.0656 0.0351 0.0258 0.0321 0.0175 0.0482 0.0322 0.0426 0.0337 0.0384 0.0131 0.0344

| ECN_Spet_9hr 0.0285 0.0328 0.0269 0.0307 0.0390 0.0190 0.0315 0.0261 0.0286 0.0224 0.0286 0.0053 0.0286

*

| CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_Spct_30min. |
| The median pattern for this ensemble is storm 6 (storm name : ECN_Spct_30min_6). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 3 (storm name : ECN_5pct_30min_3).

*

AEP: 50% - Max Flow (m‘3/s)

*

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_SOpct_10min 0.0058 0.0061 0.0061 0.0062 0.0053 0.0052 0.0060 0.0055 0.0064 0.0057 0.0058 0.0004 0.0059

| ECN_SOpct_12hr 0.0109 0.0142 0.0212 0.0104 0.0089 0.0058 0.0055 0.0246 0.0116 0.0126 0.0126 0.0058 0.0112

| ECN_SOpct_1S5min 0.0060 0.0068 0.0061 0.0056 0.0048 0.0046 0.0044 0.0046 0.0056 0.0063 0.0055 0.0008 0.0056

| ECN_SOpct_i8hr 0.0084 0.0126 0.0176 0.0058 0.0041 0.0060 0.0067 0.0129 0.0079 0.0134 0.0096 0.0041 0.0081

| ECN_SOpct_1_Shr 0.0237 0.0194 0.0332 0.0181 0.0370 0.0157 0.0237 0.0169 0.0368 0.0303 0.0255 0.0078 0.0237

| ECN_SOpet_ihr 0.0230 0.0183 0.0162 0.0239 0.0191 0.0248 0.0225 0.0213 0.0355 0.0283 0.0233 0.0053 0.0228

Page 49

| ECN_50pct_20min 0.0076 0.0073 0.0075 0.0082 0.0081 0.0078 0.0068 0.0068 0.0098 0.0109 0.0081 0.0012 0.0077                               |
|    ECN_50pct_24hr 0.0132 0.0057 0.0070 0.0101 0.0089 0.0067 0.0142 0.0087 0.0127 0.0058 0.0093 0.0030 0.0088                            |
| ECN_50pct_25min 0.0142 0.0125 0.0147 0.0146 0.0170 0.0136 0.0167 0.0159 0.0188 0.0174 0.0155 0.0018 0.0153                               |
|    ECN_50pct_2hr 0.0218 0.0116 0.0185 0.0176 0.0298 0.0217 0.0269 0.0208 0.0216 0.0237 0.0214 0.0047 0.0216                            |
| ECN_50pct_30min 0.0246 0.0181 0.0168 0.0195 0.0179 0.0175 0.0231 0.0170 0.0209 0.0206 0.0196 0.0025 0.0188                               |
|    ECN_50pct_3hr 0.0239 0.0226 0.0349 0.0136 0.0173 0.0161 0.0154 0.0146 0.0184 0.0216 0.0198 0.0060 0.0179                            |
| ECN_50pct_45min 0.0199 0.0171 0.0212 0.0197 0.0183 0.0195 0.0210 0.0256 0.0334 0.0303 0.0226 0.0051 0.0205                               |
| ECN_50pct_4_5hr 0.0223 0.0155 0.0282 0.0152 0.0169 0.0255 0.0210 0.0189 0.0208 0.0221 0.0206 0.0040 0.0209                               |
|    ECN_50pct_6hr 0.0138 0.0151 0.0221 0.0165 0.0136 0.0150 0.0169 0.0157 0.0137 0.0127 0.0155 0.0025 0.0151                            |
|    ECN_50pct_9hr 0.0161 0.0107 0.0284 0.0174 0.0176 0.0146 0.0126 0.0080 0.0113 0.0109 0.0148 0.0054 0.0136                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_1_5hr.                                      |
| The median pattern for this ensemble is storm 7 (storm name : ECN_50pct_1_5hr_7).                                           |
| The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name : ECN_50pct_1_5hr_5).                              |
*============================================================================================================================================================


                                              AEP: 63.2% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_63pct_10min 0.0051 0.0054 0.0053 0.0055 0.0046 0.0046 0.0053 0.0049 0.0057 0.0050 0.0051 0.0003 0.0052                               |
|    ECN_63pct_12hr 0.0091 0.0119 0.0179 0.0087 0.0074 0.0048 0.0046 0.0209 0.0097 0.0106 0.0106 0.0050 0.0094                            |
| ECN_63pct_15min 0.0054 0.0061 0.0054 0.0050 0.0042 0.0041 0.0039 0.0040 0.0049 0.0056 0.0049 0.0007 0.0050                               |
|    ECN_63pct_18hr 0.0058 0.0106 0.0147 0.0048 0.0034 0.0050 0.0055 0.0109 0.0066 0.0113 0.0079 0.0035 0.0062                            |
| ECN_63pct_1_5hr 0.0203 0.0145 0.0286 0.0149 0.0319 0.0134 0.0204 0.0116 0.0305 0.0256 0.0212 0.0072 0.0203                               |
|    ECN_63pct_1hr 0.0151 0.0160 0.0106 0.0197 0.0163 0.0204 0.0196 0.0147 0.0271 0.0237 0.0183 0.0045 0.0180                            |
| ECN_63pct_20min 0.0053 0.0052 0.0047 0.0039 0.0039 0.0048 0.0047 0.0039 0.0049 0.0061 0.0047 0.0007 0.0047                               |
|    ECN_63pct_24hr 0.0112 0.0047 0.0058 0.0085 0.0075 0.0056 0.0120 0.0073 0.0107 0.0048 0.0078 0.0026 0.0074                            |
| ECN_63pct_25min 0.0063 0.0064 0.0066 0.0051 0.0073 0.0055 0.0060 0.0078 0.0081 0.0085 0.0068 0.0011 0.0065                               |
|    ECN_63pct_2hr 0.0186 0.0099 0.0159 0.0118 0.0257 0.0185 0.0231 0.0178 0.0176 0.0204 0.0179 0.0045 0.0181                            |
| ECN_63pct_30min 0.0118 0.0099 0.0104 0.0102 0.0110 0.0100 0.0114 0.0105 0.0119 0.0136 0.0111 0.0011 0.0107                               |
|    ECN_63pct_3hr 0.0198 0.0189 0.0295 0.0116 0.0149 0.0138 0.0123 0.0112 0.0158 0.0186 0.0166 0.0052 0.0154                            |
| ECN_63pct_45min 0.0144 0.0147 0.0181 0.0138 0.0157 0.0168 0.0164 0.0200 0.0217 0.0238 0.0175 0.0032 0.0166                               |
| ECN_63pct_4_5hr 0.0188 0.0124 0.0209 0.0129 0.0144 0.0217 0.0158 0.0161 0.0177 0.0189 0.0170 0.0030 0.0169                               |
|    ECN_63pct_6hr 0.0117 0.0128 0.0177 0.0140 0.0116 0.0128 0.0143 0.0133 0.0115 0.0107 0.0130 0.0019 0.0128                            |
|    ECN_63pct_9hr 0.0136 0.0089 0.0241 0.0147 0.0148 0.0123 0.0106 0.0067 0.0095 0.0092 0.0124 0.0046 0.0115                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_1_5hr.                                    |
| The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_1_5hr_7).                                           |
| The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name : ECN_63pct_1_5hr_5).                              |
*============================================================================================================================================================


[OCR of page images]
|
|
|
|
|
|
|
|
|
|
*

 

 

*

 

 

 

 

 

 

ECN_SOpct_20min 0.0076 0.0073 0.0075 0.0082 0.0081 0.0078 0.0068 0.0068 0.0098 0.0109 0.0081 0.0012 0.0077
ECN_SOpct_24hr 0.0132 0.0057 0.0070 0.0101 0.0089 0.0067 0.0142 0.0087 0.0127 0.0058 0.0093 0.0030 0.0088
ECN_SOpct_25min 0.0142 0.0125 0.0147 0.0146 0.0170 0.0136 0.0167 0.0159 0.0188 0.0174 0.0155 0.0018 0.0153
ECN_SOpct_2hr 0.0218 0.0116 0.0185 0.0176 0.0298 0.0217 0.0269 0.0208 0.0216 0.0237 0.0214 0.0047 0.0216
ECN_SOpct_30min 0.0246 0.0181 0.0168 0.0195 0.0179 0.0175 0.0231 0.0170 0.0209 0.0206 0.0196 0.0025 0.0188
ECN_SOpct_3hr 0.0239 0.0226 0.0349 0.0136 0.0173 0.0161 0.0154 0.0146 0.0184 0.0216 0.0198 0.0060 0.0179
ECN_SOpct_4S5min 0.0199 0.0171 0.0212 0.0197 0.0183 0.0195 0.0210 0.0256 0.0334 0.0303 0.0226 0.0051 0.0205
ECN_SOpct_4 Shr 0.0223 0.0155 0.0282 0.0152 0.0169 0.0255 0.0210 0.0189 0.0208 0.0221 0.0206 0.0040 0.0209
ECN_SOpct_6hr 0.0138 0.0151 0.0221 0.0165 0.0136 0.0150 0.0169 0.0157 0.0137 0.0127 0.0155 0.0025 0.0151
ECN_SOpct_9hr 0.0161 0.0107 0.0284 0.0174 0.0176 0.0146 0.0126 0.0080 0.0113 0.0109 0.0148 0.0054 0.0136
| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_SOpct_1_Shr. |
| The median pattern for this ensemble is storm 7 (storm name : ECN_SOpct_1_5hr_7). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name : ECN_5Opct_1_5hr_5).
AEP: 63.2% - Max Flow (m43/s)
Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
ECN_63pct_10min 0.0051 0.0054 0.0053 0.0055 0.0046 0.0046 0.0053 0.0049 0.0057 0.0050 0.0051 0.0003 0.0052
ECN_63pct_12hr 0.0091 0.0119 0.0179 0.0087 0.0074 0.0048 0.0046 0.0209 0.0097 0.0106 0.0106 0.0050 0.0094
ECN_63pct_1Smin 0.0054 0.0061 0.0054 0.0050 0.0042 0.0041 0.0039 0.0040 0.0049 0.0056 0.0049 0.0007 0.0050
ECN_63pct_18hr 0.0058 0.0106 0.0147 0.0048 0.0034 0.0050 0.0055 0.0109 0.0066 0.0113 0.0079 0.0035 0.0062
ECN_63pct_1_Shr 0.0203 0.0145 0.0286 0.0149 0.0319 0.0134 0.0204 0.0116 0.0305 0.0256 0.0212 0.0072 0.0203
ECN_63pct_thr 0.0151 0.0160 0.0106 0.0197 0.0163 0.0204 0.0196 0.0147 0.0271 0.0237 0.0183 0.0045 0.0180
ECN_63pct_20min 0.0053 0.0052 0.0047 0.0039 0.0039 0.0048 0.0047 0.0039 0.0049 0.0061 0.0047 0.0007 0.0047
ECN_63pct_24hr 0.0112 0.0047 0.0058 0.0085 0.0075 0.0056 0.0120 0.0073 0.0107 0.0048 0.0078 0.0026 0.0074
ECN_63pct_25min 0.0063 0.0064 0.0066 0.0051 0.0073 0.0055 0.0060 0.0078 0.0081 0.0085 0.0068 0.0011 0.0065
ECN_63pct_2hr 0.0186 0.0099 0.0159 0.0118 0.0257 0.0185 0.0231 0.0178 0.0176 0.0204 0.0179 0.0045 0.0181
ECN_63pct_30min 0.0118 0.0099 0.0104 0.0102 0.0110 0.0100 0.0114 0.0105 0.0119 0.0136 0.0111 0.0011 0.0107
ECN_63pct_3hr 0.0198 0.0189 0.0295 0.0116 0.0149 0.0138 0.0123 0.0112 0.0158 0.0186 0.0166 0.0052 0.0154
ECN_63pct_45min 0.0144 0.0147 0.0181 0.0138 0.0157 0.0168 0.0164 0.0200 0.0217 0.0238 0.0175 0.0032 0.0166
ECN_63pct_4_Shr 0.0188 0.0124 0.0209 0.0129 0.0144 0.0217 0.0158 0.0161 0.0177 0.0189 0.0170 0.0030 0.0169
ECN_63pct_6hr 0.0117 0.0128 0.0177 0.0140 0.0116 0.0128 0.0143 0.0133 0.0115 0.0107 0.0130 0.0019 0.0128
ECN_63pct_9hr 0.0136 0.0089 0.0241 0.0147 0.0148 0.0123 0.0106 0.0067 0.0095 0.0092 0.0124 0.0046 0.0115

|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
*

 

 

| CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_1_Shr.
| The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_1_5Shr_7).
| The pattern with the greatest <Max Flow> for this ensemble is storm 5 (storm name : ECN_63pct_1_5hr_5).

*

 

 

Page 50

                                                   INNOVYZE ENSEMBLE STATISTICS UTILITY
                                                             (c) Innovyze 2020

Summary information:

           Total No. of Ensembles:             112
           No. of Storms per ensemble:          10
           No. of AEP Bands:                      7
           Object Name:                  Pre Dev C to Eumundi Noosa Rd
           Result type:                  Max Flow


Results:


                                              AEP: 1% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|    ECN_1pct_10min 0.0685 0.0723 0.0681 0.0726 0.0760 0.0716 0.0740 0.0664 0.0878 0.0709 0.0728 0.0057 0.0720                             |
|    ECN_1pct_12hr 0.0220 0.0233 0.0190 0.0283 0.0904 0.0237 0.0285 0.1000 0.0429 0.0324 0.0411 0.0279 0.0284                             |
|    ECN_1pct_15min 0.0842 0.0717 0.0703 0.0663 0.0795 0.0756 0.0641 0.0962 0.0808 0.0623 0.0751 0.0099 0.0736                             |
|    ECN_1pct_18hr 0.0224 0.0128 0.0199 0.0166 0.0272 0.0264 0.0152 0.0160 0.0224 0.0189 0.0198 0.0046 0.0194                             |
|    ECN_1pct_1_5hr 0.0507 0.0600 0.0579 0.0482 0.0602 0.0568 0.0549 0.0653 0.0526 0.0578 0.0564 0.0048 0.0573                             |
|     ECN_1pct_1hr 0.0916 0.0734 0.0546 0.0606 0.0439 0.0687 0.0494 0.0549 0.0598 0.0587 0.0616 0.0129 0.0592                            |
|    ECN_1pct_20min 0.0723 0.0989 0.0621 0.0597 0.0635 0.0680 0.0598 0.0655 0.0658 0.0754 0.0691 0.0110 0.0657                             |
|    ECN_1pct_24hr 0.0220 0.0159 0.0180 0.0254 0.0158 0.0162 0.0157 0.0177 0.0154 0.0246 0.0187 0.0037 0.0170                             |
|    ECN_1pct_25min 0.0649 0.0978 0.0677 0.0711 0.0766 0.0629 0.0629 0.0744 0.0612 0.0807 0.0720 0.0106 0.0694                             |
|     ECN_1pct_2hr 0.0651 0.0500 0.0502 0.0585 0.0548 0.0529 0.0396 0.0418 0.0488 0.0678 0.0529 0.0086 0.0515                            |
|    ECN_1pct_30min 0.0755 0.0685 0.0931 0.0590 0.0623 0.0885 0.0646 0.0680 0.0749 0.0662 0.0721 0.0106 0.0682                             |
|     ECN_1pct_3hr 0.0483 0.0473 0.0556 0.0398 0.0311 0.0468 0.0287 0.0568 0.0280 0.0610 0.0443 0.0114 0.0470                            |
|    ECN_1pct_45min 0.0967 0.0891 0.0617 0.0759 0.0670 0.0540 0.0583 0.0780 0.0461 0.0673 0.0694 0.0149 0.0671                             |
|    ECN_1pct_4_5hr 0.0443 0.0307 0.0360 0.0366 0.0471 0.0471 0.0349 0.0322 0.0437 0.0453 0.0398 0.0060 0.0402                             |
|     ECN_1pct_6hr 0.0814 0.0373 0.0332 0.0366 0.0272 0.0386 0.0467 0.0573 0.0413 0.0299 0.0429 0.0152 0.0379                            |
|     ECN_1pct_9hr 0.0307 0.0355 0.0149 0.0174 0.0559 0.0456 0.0605 0.0215 0.0316 0.0232 0.0337 0.0150 0.0312                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_1pct_15min.                                       |
| The median pattern for this ensemble is storm 6 (storm name : ECN_1pct_15min_6).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_1pct_15min_8).                              |
*============================================================================================================================================================


                                              AEP: 10% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_10pct_10min 0.0437 0.0427 0.0466 0.0504 0.0434 0.0409 0.0475 0.0427 0.0425 0.0512 0.0452 0.0034 0.0436                               |
|    ECN_10pct_12hr 0.0171 0.0339 0.0154 0.0127 0.0166 0.0184 0.0161 0.0203 0.0198 0.0163 0.0187 0.0055 0.0169                            |
| ECN_10pct_15min 0.0495 0.0486 0.0488 0.0433 0.0424 0.0419 0.0393 0.0389 0.0555 0.0519 0.0460 0.0053 0.0459                               |
|    ECN_10pct_18hr 0.0098 0.0125 0.0186 0.0104 0.0167 0.0109 0.0085 0.0082 0.0103 0.0195 0.0125 0.0040 0.0106                            |
| ECN_10pct_1_5hr 0.0513 0.0328 0.0468 0.0370 0.0335 0.0386 0.0350 0.0319 0.0298 0.0420 0.0379 0.0066 0.0360                               |
|    ECN_10pct_1hr 0.0566 0.0364 0.0353 0.0509 0.0361 0.0414 0.0395 0.0411 0.0308 0.0621 0.0430 0.0096 0.0403                            |
| ECN_10pct_20min 0.0400 0.0407 0.0387 0.0511 0.0462 0.0439 0.0439 0.0598 0.0598 0.0412 0.0465 0.0074 0.0439                               |
|    ECN_10pct_24hr 0.0224 0.0185 0.0117 0.0081 0.0106 0.0106 0.0244 0.0130 0.0129 0.0106 0.0143 0.0052 0.0123                            |
| ECN_10pct_25min 0.0409 0.0642 0.0450 0.0384 0.0456 0.0598 0.0404 0.0399 0.0417 0.0538 0.0470 0.0086 0.0434                               |
|    ECN_10pct_2hr 0.0425 0.0283 0.0368 0.0533 0.0407 0.0347 0.0462 0.0293 0.0381 0.0410 0.0391 0.0071 0.0394                            |
| ECN_10pct_30min 0.0358 0.0417 0.0729 0.0400 0.0364 0.0442 0.0569 0.0416 0.0472 0.0526 0.0469 0.0107 0.0429                               |
|    ECN_10pct_3hr 0.0417 0.0250 0.0248 0.0366 0.0318 0.0205 0.0301 0.0231 0.0270 0.0269 0.0287 0.0061 0.0269                            |
| ECN_10pct_45min 0.0466 0.0386 0.0433 0.0402 0.0429 0.0399 0.0428 0.0306 0.0567 0.0569 0.0438 0.0076 0.0428                               |
| ECN_10pct_4_5hr 0.0211 0.0211 0.0436 0.0272 0.0127 0.0332 0.0166 0.0283 0.0308 0.0347 0.0269 0.0088 0.0278                               |
|    ECN_10pct_6hr 0.0341 0.0436 0.0255 0.0173 0.0214 0.0118 0.0321 0.0215 0.0284 0.0225 0.0258 0.0087 0.0240                            |
|    ECN_10pct_9hr 0.0191 0.0219 0.0180 0.0205 0.0260 0.0128 0.0210 0.0160 0.0191 0.0150 0.0190 0.0036 0.0191                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_15min.                                      |
| The median pattern for this ensemble is storm 2 (storm name : ECN_10pct_15min_2).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_15min_9).                              |
*============================================================================================================================================================


                                     AEP: 2% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|   ECN_2pct_10min 0.0626 0.0603 0.0622 0.0657 0.0633 0.0648 0.0616 0.0600 0.0726 0.0648 0.0638 0.0034 0.0630                              |
|    ECN_2pct_12hr 0.0192 0.0204 0.0167 0.0247 0.0792 0.0208 0.0249 0.0876 0.0376 0.0284 0.0360 0.0245 0.0248                             |
|   ECN_2pct_15min 0.0697 0.0650 0.0642 0.0605 0.0692 0.0669 0.0571 0.0836 0.0717 0.0559 0.0664 0.0076 0.0659                              |
|    ECN_2pct_18hr 0.0195 0.0111 0.0173 0.0144 0.0237 0.0230 0.0132 0.0139 0.0195 0.0164 0.0172 0.0040 0.0169                             |
|   ECN_2pct_1_5hr 0.0433 0.0531 0.0511 0.0427 0.0535 0.0505 0.0483 0.0540 0.0468 0.0513 0.0495 0.0039 0.0508                              |
|    ECN_2pct_1hr 0.0815 0.0655 0.0468 0.0541 0.0392 0.0612 0.0440 0.0471 0.0533 0.0482 0.0541 0.0118 0.0507                             |
|   ECN_2pct_20min 0.0629 0.0891 0.0566 0.0544 0.0559 0.0600 0.0541 0.0580 0.0561 0.0682 0.0615 0.0101 0.0573                              |


[OCR of page images]
Summary information:

Total No. of Ensembles:
No. of Storms per ensemble:
No. of AEP Bands:

Object Name:

Result type:

Results:

INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

112
10
7
Pre Dev C to Eumundi Noosa Rd
Max Flow

AEP: 1% - Max Flow (m43/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_ipct_10min 0.0685 0.0723 0.0681 0.0726 0.0760 0.0716 0.0740 0.0664 0.0878 0.0709 0.0728 0.0057 0.0720

| ECN_Apct_12hr 0.0220 0.0233 0.0190 0.0283 0.0904 0.0237 0.0285 0.1000 0.0429 0.0324 0.0411 0.0279 0.0284

| ECN_ipct_15min 0.0842 0.0717 0.0703 0.0663 0.0795 0.0756 0.0641 0.0962 0.0808 0.0623 0.0751 0.0099 0.0736

| ECN_Apct_18hr 0.0224 0.0128 0.0199 0.0166 0.0272 0.0264 0.0152 0.0160 0.0224 0.0189 0.0198 0.0046 0.0194

| ECN_ipct_1_Shr 0.0507 0.0600 0.0579 0.0482 0.0602 0.0568 0.0549 0.0653 0.0526 0.0578 0.0564 0.0048 0.0573

| ECN_ipet_ihr 0.0916 0.0734 0.0546 0.0606 0.0439 0.0687 0.0494 0.0549 0.0598 0.0587 0.0616 0.0129 0.0592

| ECN_ipct_20min 0.0723 0.0989 0.0621 0.0597 0.0635 0.0680 0.0598 0.0655 0.0658 0.0754 0.0691 0.0110 0.0657

| ECN_Apct_24hr 0.0220 0.0159 0.0180 0.0254 0.0158 0.0162 0.0157 0.0177 0.0154 0.0246 0.0187 0.0037 0.0170

| ECN_ipct_25min 0.0649 0.0978 0.0677 0.0711 0.0766 0.0629 0.0629 0.0744 0.0612 0.0807 0.0720 0.0106 0.0694

| ECN_ipet_2hr 0.0651 0.0500 0.0502 0.0585 0.0548 0.0529 0.0396 0.0418 0.0488 0.0678 0.0529 0.0086 0.0515

| ECN_ipct_30min 0.0755 0.0685 0.0931 0.0590 0.0623 0.0885 0.0646 0.0680 0.0749 0.0662 0.0721 0.0106 0.0682

| ECN_ipet_3hr 0.0483 0.0473 0.0556 0.0398 0.0311 0.0468 0.0287 0.0568 0.0280 0.0610 0.0443 0.0114 0.0470

| ECN_ipct_45min 0.0967 0.0891 0.0617 0.0759 0.0670 0.0540 0.0583 0.0780 0.0461 0.0673 0.0694 0.0149 0.0671

| ECN_ipct_4_Shr 0.0443 0.0307 0.0360 0.0366 0.0471 0.0471 0.0349 0.0322 0.0437 0.0453 0.0398 0.0060 0.0402

| ECN_ipet_6hr 0.0814 0.0373 0.0332 0.0366 0.0272 0.0386 0.0467 0.0573 0.0413 0.0299 0.0429 0.0152 0.0379

| ECN_ipet_9hr 0.0307 0.0355 0.0149 0.0174 0.0559 0.0456 0.0605 0.0215 0.0316 0.0232 0.0337 0.0150 0.0312

*

| CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_1pct_1Smin. |
| The median pattern for this ensemble is storm 6 (storm name : ECN_1pct_15min_6). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_1pct_15min_8).

*

AEP: 10% - Max Flow (m’3/s)

*

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_10pct_10min 0.0437 0.0427 0.0466 0.0504 0.0434 0.0409 0.0475 0.0427 0.0425 0.0512 0.0452 0.0034 0.0436

| ECN_10pct_12hr 0.0171 0.0339 0.0154 0.0127 0.0166 0.0184 0.0161 0.0203 0.0198 0.0163 0.0187 0.0055 0.0169

| ECN_10pct_1Smin 0.0495 0.0486 0.0488 0.0433 0.0424 0.0419 0.0393 0.0389 0.0555 0.0519 0.0460 0.0053 0.0459

| ECN_10pct_18hr 0.0098 0.0125 0.0186 0.0104 0.0167 0.0109 0.0085 0.0082 0.0103 0.0195 0.0125 0.0040 0.0106

| ECN_10pct_1_Shr 0.0513 0.0328 0.0468 0.0370 0.0335 0.0386 0.0350 0.0319 0.0298 0.0420 0.0379 0.0066 0.0360

| ECN_10pet_ihr 0.0566 0.0364 0.0353 0.0509 0.0361 0.0414 0.0395 0.0411 0.0308 0.0621 0.0430 0.0096 0.0403

| ECN_10pct_20min 0.0400 0.0407 0.0387 0.0511 0.0462 0.0439 0.0439 0.0598 0.0598 0.0412 0.0465 0.0074 0.0439

| ECN_10pct_24hr 0.0224 0.0185 0.0117 0.0081 0.0106 0.0106 0.0244 0.0130 0.0129 0.0106 0.0143 0.0052 0.0123

| ECN_10pct_25min 0.0409 0.0642 0.0450 0.0384 0.0456 0.0598 0.0404 0.0399 0.0417 0.0538 0.0470 0.0086 0.0434

| ECN_410pet_2hr 0.0425 0.0283 0.0368 0.0533 0.0407 0.0347 0.0462 0.0293 0.0381 0.0410 0.0391 0.0071 0.0394

| ECN_10pct_30min 0.0358 0.0417 0.0729 0.0400 0.0364 0.0442 0.0569 0.0416 0.0472 0.0526 0.0469 0.0107 0.0429

| ECN_10pet_3hr 0.0417 0.0250 0.0248 0.0366 0.0318 0.0205 0.0301 0.0231 0.0270 0.0269 0.0287 0.0061 0.0269

| ECN_10pct_45min 0.0466 0.0386 0.0433 0.0402 0.0429 0.0399 0.0428 0.0306 0.0567 0.0569 0.0438 0.0076 0.0428

| ECN_10pct_4 Shr 0.0211 0.0211 0.0436 0.0272 0.0127 0.0332 0.0166 0.0283 0.0308 0.0347 0.0269 0.0088 0.0278

| ECN_10pet_6hr 0.0341 0.0436 0.0255 0.0173 0.0214 0.0118 0.0321 0.0215 0.0284 0.0225 0.0258 0.0087 0.0240

| ECN_10pet_9hr 0.0191 0.0219 0.0180 0.0205 0.0260 0.0128 0.0210 0.0160 0.0191 0.0150 0.0190 0.0036 0.0191

*

| CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_15min. |
| The median pattern for this ensemble is storm 2 (storm name : ECN_10pct_15min_2). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_15min_9).

*

AEP: 2% - Max Flow (m43/s)

*

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_2pct_10min 0.0626 0.0603 0.0622 0.0657 0.0633 0.0648 0.0616 0.0600 0.0726 0.0648 0.0638 0.0034 0.0630

| ECN_2pct_12hr 0.0192 0.0204 0.0167 0.0247 0.0792 0.0208 0.0249 0.0876 0.0376 0.0284 0.0360 0.0245 0.0248

| ECN_2pct_15min 0.0697 0.0650 0.0642 0.0605 0.0692 0.0669 0.0571 0.0836 0.0717 0.0559 0.0664 0.0076 0.0659

| ECN_2pct_18hr 0.0195 0.0111 0.0173 0.0144 0.0237 0.0230 0.0132 0.0139 0.0195 0.0164 0.0172 0.0040 0.0169

| ECN_2pct_1_Shr 0.0433 0.0531 0.0511 0.0427 0.0535 0.0505 0.0483 0.0540 0.0468 0.0513 0.0495 0.0039 0.0508

| ECN_2pet_ihr 0.0815 0.0655 0.0468 0.0541 0.0392 0.0612 0.0440 0.0471 0.0533 0.0482 0.0541 0.0118 0.0507

| ECN_2pct_20min 0.0629 0.0891 0.0566 0.0544 0.0559 0.0600 0.0541 0.0580 0.0561 0.0682 0.0615 0.0101 0.0573

Page 51

|    ECN_2pct_24hr 0.0191 0.0137 0.0156 0.0220 0.0137 0.0140 0.0136 0.0154 0.0134 0.0213 0.0162 0.0032 0.0147                             |
|    ECN_2pct_25min 0.0562 0.0883 0.0566 0.0640 0.0635 0.0571 0.0571 0.0675 0.0553 0.0733 0.0639 0.0099 0.0603                             |
|     ECN_2pct_2hr 0.0578 0.0433 0.0446 0.0519 0.0488 0.0470 0.0349 0.0372 0.0433 0.0593 0.0468 0.0076 0.0458                            |
|    ECN_2pct_30min 0.0682 0.0617 0.0843 0.0534 0.0535 0.0729 0.0586 0.0616 0.0678 0.0597 0.0642 0.0090 0.0616                             |
|     ECN_2pct_3hr 0.0427 0.0418 0.0492 0.0352 0.0275 0.0413 0.0244 0.0502 0.0247 0.0539 0.0391 0.0102 0.0415                            |
|    ECN_2pct_45min 0.0869 0.0790 0.0553 0.0676 0.0595 0.0468 0.0521 0.0657 0.0416 0.0587 0.0613 0.0132 0.0591                             |
|    ECN_2pct_4_5hr 0.0389 0.0270 0.0316 0.0322 0.0407 0.0381 0.0306 0.0283 0.0384 0.0398 0.0345 0.0049 0.0352                             |
|     ECN_2pct_6hr 0.0715 0.0328 0.0292 0.0321 0.0238 0.0338 0.0410 0.0502 0.0363 0.0262 0.0377 0.0133 0.0333                            |
|     ECN_2pct_9hr 0.0269 0.0310 0.0130 0.0152 0.0489 0.0398 0.0529 0.0188 0.0276 0.0202 0.0294 0.0131 0.0272                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_15min.                                       |
| The median pattern for this ensemble is storm 6 (storm name : ECN_2pct_15min_6).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_2pct_15min_8).                              |
*============================================================================================================================================================


                                              AEP: 20% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_20pct_10min 0.0381 0.0401 0.0400 0.0409 0.0348 0.0341 0.0398 0.0367 0.0425 0.0376 0.0385 0.0026 0.0390                               |
|    ECN_20pct_12hr 0.0133 0.0172 0.0252 0.0128 0.0111 0.0075 0.0072 0.0292 0.0142 0.0154 0.0153 0.0067 0.0138                            |
| ECN_20pct_15min 0.0399 0.0451 0.0403 0.0372 0.0311 0.0301 0.0326 0.0347 0.0402 0.0449 0.0376 0.0051 0.0386                               |
|    ECN_20pct_18hr 0.0106 0.0154 0.0212 0.0075 0.0056 0.0078 0.0124 0.0158 0.0100 0.0164 0.0123 0.0046 0.0115                            |
| ECN_20pct_1_5hr 0.0296 0.0431 0.0375 0.0249 0.0423 0.0231 0.0272 0.0323 0.0457 0.0352 0.0341 0.0076 0.0338                               |
|    ECN_20pct_1hr 0.0440 0.0239 0.0282 0.0330 0.0432 0.0402 0.0284 0.0271 0.0436 0.0348 0.0346 0.0072 0.0339                            |
| ECN_20pct_20min 0.0397 0.0391 0.0351 0.0330 0.0288 0.0357 0.0382 0.0298 0.0370 0.0516 0.0368 0.0060 0.0364                               |
|    ECN_20pct_24hr 0.0163 0.0075 0.0090 0.0126 0.0113 0.0087 0.0174 0.0110 0.0157 0.0076 0.0117 0.0035 0.0111                            |
| ECN_20pct_25min 0.0288 0.0299 0.0319 0.0309 0.0443 0.0322 0.0357 0.0387 0.0502 0.0427 0.0365 0.0068 0.0340                               |
|    ECN_20pct_2hr 0.0276 0.0305 0.0256 0.0276 0.0356 0.0269 0.0448 0.0491 0.0265 0.0269 0.0321 0.0080 0.0276                            |
| ECN_20pct_30min 0.0542 0.0282 0.0324 0.0363 0.0350 0.0333 0.0444 0.0415 0.0402 0.0404 0.0386 0.0070 0.0382                               |
|    ECN_20pct_3hr 0.0287 0.0322 0.0397 0.0184 0.0214 0.0189 0.0218 0.0172 0.0214 0.0248 0.0244 0.0067 0.0216                            |
| ECN_20pct_45min 0.0384 0.0291 0.0249 0.0333 0.0394 0.0274 0.0267 0.0328 0.0430 0.0445 0.0339 0.0067 0.0330                               |
| ECN_20pct_4_5hr 0.0258 0.0230 0.0330 0.0180 0.0198 0.0298 0.0285 0.0223 0.0243 0.0257 0.0250 0.0043 0.0250                               |
|    ECN_20pct_6hr 0.0166 0.0184 0.0270 0.0201 0.0164 0.0179 0.0203 0.0189 0.0171 0.0153 0.0188 0.0031 0.0181                            |
|    ECN_20pct_9hr 0.0191 0.0153 0.0332 0.0206 0.0208 0.0174 0.0151 0.0099 0.0137 0.0134 0.0179 0.0061 0.0164                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_10min.                                      |
| The median pattern for this ensemble is storm 7 (storm name : ECN_20pct_10min_7).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_20pct_10min_9).                              |
*============================================================================================================================================================


                                              AEP: 5% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|    ECN_5pct_10min 0.0496 0.0484 0.0528 0.0572 0.0534 0.0491 0.0585 0.0524 0.0481 0.0632 0.0533 0.0047 0.0526                             |
|    ECN_5pct_12hr 0.0205 0.0406 0.0184 0.0152 0.0198 0.0220 0.0193 0.0242 0.0237 0.0194 0.0223 0.0066 0.0202                             |
|    ECN_5pct_15min 0.0560 0.0549 0.0552 0.0535 0.0548 0.0489 0.0475 0.0484 0.0691 0.0645 0.0553 0.0066 0.0549                             |
|    ECN_5pct_18hr 0.0119 0.0150 0.0224 0.0125 0.0201 0.0131 0.0102 0.0099 0.0125 0.0234 0.0151 0.0048 0.0128                             |
|    ECN_5pct_1_5hr 0.0597 0.0382 0.0544 0.0431 0.0388 0.0447 0.0407 0.0368 0.0346 0.0488 0.0440 0.0077 0.0419                             |
|     ECN_5pct_1hr 0.0655 0.0457 0.0406 0.0585 0.0459 0.0492 0.0476 0.0480 0.0385 0.0718 0.0511 0.0102 0.0478                            |
|    ECN_5pct_20min 0.0490 0.0462 0.0479 0.0604 0.0568 0.0512 0.0511 0.0715 0.0743 0.0476 0.0556 0.0096 0.0512                             |
|    ECN_5pct_24hr 0.0270 0.0222 0.0141 0.0098 0.0128 0.0128 0.0294 0.0157 0.0156 0.0128 0.0172 0.0063 0.0148                             |
|    ECN_5pct_25min 0.0488 0.0746 0.0511 0.0435 0.0517 0.0714 0.0474 0.0476 0.0527 0.0624 0.0551 0.0101 0.0514                             |
|     ECN_5pct_2hr 0.0500 0.0333 0.0433 0.0626 0.0480 0.0409 0.0543 0.0344 0.0447 0.0528 0.0464 0.0086 0.0464                            |
|    ECN_5pct_30min 0.0407 0.0524 0.0843 0.0457 0.0416 0.0547 0.0682 0.0532 0.0561 0.0602 0.0557 0.0124 0.0540                             |
|     ECN_5pct_3hr 0.0496 0.0318 0.0292 0.0430 0.0375 0.0242 0.0354 0.0272 0.0318 0.0317 0.0341 0.0072 0.0318                            |
|    ECN_5pct_45min 0.0547 0.0461 0.0568 0.0463 0.0494 0.0459 0.0494 0.0353 0.0655 0.0656 0.0515 0.0089 0.0494                             |
|    ECN_5pct_4_5hr 0.0249 0.0248 0.0512 0.0320 0.0149 0.0391 0.0195 0.0380 0.0362 0.0408 0.0321 0.0105 0.0341                             |
|     ECN_5pct_6hr 0.0405 0.0517 0.0320 0.0206 0.0255 0.0141 0.0381 0.0255 0.0337 0.0268 0.0309 0.0103 0.0294                            |
|     ECN_5pct_9hr 0.0227 0.0260 0.0214 0.0244 0.0309 0.0153 0.0250 0.0231 0.0227 0.0179 0.0229 0.0041 0.0229                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_5pct_15min.                                       |
| The median pattern for this ensemble is storm 2 (storm name : ECN_5pct_15min_2).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_5pct_15min_9).                              |
*============================================================================================================================================================


                                     AEP: 50% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_50pct_10min 0.0285 0.0299 0.0299 0.0305 0.0260 0.0251 0.0297 0.0270 0.0318 0.0281 0.0287 0.0020 0.0291                               |
|   ECN_50pct_12hr 0.0089 0.0115 0.0170 0.0085 0.0074 0.0049 0.0048 0.0197 0.0095 0.0103 0.0102 0.0046 0.0092                             |
| ECN_50pct_15min 0.0298 0.0337 0.0301 0.0278 0.0232 0.0224 0.0211 0.0224 0.0272 0.0310 0.0269 0.0041 0.0275                               |
|   ECN_50pct_18hr 0.0070 0.0103 0.0142 0.0049 0.0037 0.0051 0.0059 0.0105 0.0066 0.0109 0.0079 0.0032 0.0068                             |
| ECN_50pct_1_5hr 0.0208 0.0247 0.0267 0.0154 0.0300 0.0166 0.0193 0.0175 0.0311 0.0246 0.0227 0.0053 0.0227                               |
|    ECN_50pct_1hr 0.0256 0.0153 0.0189 0.0201 0.0250 0.0234 0.0191 0.0188 0.0307 0.0226 0.0220 0.0042 0.0214                            |


[OCR of page images]
ECN_2pct_24hr
ECN_2pct_25min
ECN_2pct_2hr
ECN_2pct_30min
ECN_2pct_3hr
ECN_2pct_45min
ECN_2pct_4_Shr
ECN_2pct_6hr

|
|
|
|
|
|
|
|
| ECN_2pct_9hr
*

0.0191 0.0137 0.0156 0.0220 0.0137 0.0140 0.0136 0.0154 0.0134 0.0213 0.0162 0.0032 0.0147
0.0562 0.0883 0.0566 0.0640 0.0635 0.0571 0.0571 0.0675 0.0553 0.0733 0.0639 0.0099 0.0603
0.0578 0.0433 0.0446 0.0519 0.0488 0.0470 0.0349 0.0372 0.0433 0.0593 0.0468 0.0076 0.0458
0.0682 0.0617 0.0843 0.0534 0.0535 0.0729 0.0586 0.0616 0.0678 0.0597 0.0642 0.0090 0.0616
0.0427 0.0418 0.0492 0.0352 0.0275 0.0413 0.0244 0.0502 0.0247 0.0539 0.0391 0.0102 0.0415
0.0869 0.0790 0.0553 0.0676 0.0595 0.0468 0.0521 0.0657 0.0416 0.0587 0.0613 0.0132 0.0591
0.0389 0.0270 0.0316 0.0322 0.0407 0.0381 0.0306 0.0283 0.0384 0.0398 0.0345 0.0049 0.0352
0.0715 0.0328 0.0292 0.0321 0.0238 0.0338 0.0410 0.0502 0.0363 0.0262 0.0377 0.0133 0.0333
0.0269 0.0310 0.0130 0.0152 0.0489 0.0398 0.0529 0.0188 0.0276 0.0202 0.0294 0.0131 0.0272

 

 

| CRITICAL DURATION :

The critical duration for the 2% AEP is the ensemble ECN_2pct_15min. |

| The median pattern for this ensemble is storm 6 (storm name : ECN_2pct_15min_6).
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_2pct_15min_8).
*

 

 

AEP: 20% - Max Flow (m43/s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_20pct_10min 0.0381 0.0401 0.0400 0.0409 0.0348 0.0341 0.0398 0.0367 0.0425 0.0376 0.0385 0.0026 0.0390

| ECN_2Opct_12hr 0.0133 0.0172 0.0252 0.0128 0.0111 0.0075 0.0072 0.0292 0.0142 0.0154 0.0153 0.0067 0.0138

| ECN_20pct_1Smin 0.0399 0.0451 0.0403 0.0372 0.0311 0.0301 0.0326 0.0347 0.0402 0.0449 0.0376 0.0051 0.0386

| ECN_2Opct_18hr 0.0106 0.0154 0.0212 0.0075 0.0056 0.0078 0.0124 0.0158 0.0100 0.0164 0.0123 0.0046 0.0115

| ECN_20pct_1_Shr 0.0296 0.0431 0.0375 0.0249 0.0423 0.0231 0.0272 0.0323 0.0457 0.0352 0.0341 0.0076 0.0338

| ECN_20pet_ihr 0.0440 0.0239 0.0282 0.0330 0.0432 0.0402 0.0284 0.0271 0.0436 0.0348 0.0346 0.0072 0.0339

| ECN_20pct_20min 0.0397 0.0391 0.0351 0.0330 0.0288 0.0357 0.0382 0.0298 0.0370 0.0516 0.0368 0.0060 0.0364

| ECN_2Opct_24hr 0.0163 0.0075 0.0090 0.0126 0.0113 0.0087 0.0174 0.0110 0.0157 0.0076 0.0117 0.0035 0.0111

| ECN_20pct_25min 0.0288 0.0299 0.0319 0.0309 0.0443 0.0322 0.0357 0.0387 0.0502 0.0427 0.0365 0.0068 0.0340

| ECN_20pet_2hr 0.0276 0.0305 0.0256 0.0276 0.0356 0.0269 0.0448 0.0491 0.0265 0.0269 0.0321 0.0080 0.0276

| ECN_20pct_30min 0.0542 0.0282 0.0324 0.0363 0.0350 0.0333 0.0444 0.0415 0.0402 0.0404 0.0386 0.0070 0.0382

| ECN_20pet_3hr 0.0287 0.0322 0.0397 0.0184 0.0214 0.0189 0.0218 0.0172 0.0214 0.0248 0.0244 0.0067 0.0216

| ECN_20pct_45min 0.0384 0.0291 0.0249 0.0333 0.0394 0.0274 0.0267 0.0328 0.0430 0.0445 0.0339 0.0067 0.0330

| ECN_20pct_4_Shr 0.0258 0.0230 0.0330 0.0180 0.0198 0.0298 0.0285 0.0223 0.0243 0.0257 0.0250 0.0043 0.0250

| ECN_20pet_6hr 0.0166 0.0184 0.0270 0.0201 0.0164 0.0179 0.0203 0.0189 0.0171 0.0153 0.0188 0.0031 0.0181

| ECN_20pet_9hr 0.0191 0.0153 0.0332 0.0206 0.0208 0.0174 0.0151 0.0099 0.0137 0.0134 0.0179 0.0061 0.0164

*

| CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_10min. |
| The median pattern for this ensemble is storm 7 (storm name : ECN_20pct_10min_7). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_20pct_10min_9).

*

AEP: 5% - Max Flow (m43/s)

*

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_Spct_10min 0.0496 0.0484 0.0528 0.0572 0.0534 0.0491 0.0585 0.0524 0.0481 0.0632 0.0533 0.0047 0.0526

| ECN_Spct_12hr 0.0205 0.0406 0.0184 0.0152 0.0198 0.0220 0.0193 0.0242 0.0237 0.0194 0.0223 0.0066 0.0202

| ECN_Spct_15min 0.0560 0.0549 0.0552 0.0535 0.0548 0.0489 0.0475 0.0484 0.0691 0.0645 0.0553 0.0066 0.0549

| ECN_Spct_18hr 0.0119 0.0150 0.0224 0.0125 0.0201 0.0131 0.0102 0.0099 0.0125 0.0234 0.0151 0.0048 0.0128

| ECN_Spct_1_Shr 0.0597 0.0382 0.0544 0.0431 0.0388 0.0447 0.0407 0.0368 0.0346 0.0488 0.0440 0.0077 0.0419

| ECN_Spet_ihr 0.0655 0.0457 0.0406 0.0585 0.0459 0.0492 0.0476 0.0480 0.0385 0.0718 0.0511 0.0102 0.0478

| ECN_Spct_20min 0.0490 0.0462 0.0479 0.0604 0.0568 0.0512 0.0511 0.0715 0.0743 0.0476 0.0556 0.0096 0.0512

| ECN_Spct_24hr 0.0270 0.0222 0.0141 0.0098 0.0128 0.0128 0.0294 0.0157 0.0156 0.0128 0.0172 0.0063 0.0148

| ECN_Spct_25min 0.0488 0.0746 0.0511 0.0435 0.0517 0.0714 0.0474 0.0476 0.0527 0.0624 0.0551 0.0101 0.0514

| ECN_Spet_2hr 0.0500 0.0333 0.0433 0.0626 0.0480 0.0409 0.0543 0.0344 0.0447 0.0528 0.0464 0.0086 0.0464

| ECN_Spct_30min 0.0407 0.0524 0.0843 0.0457 0.0416 0.0547 0.0682 0.0532 0.0561 0.0602 0.0557 0.0124 0.0540

| ECN_Spet_3hr 0.0496 0.0318 0.0292 0.0430 0.0375 0.0242 0.0354 0.0272 0.0318 0.0317 0.0341 0.0072 0.0318

| ECN_Spct_45min 0.0547 0.0461 0.0568 0.0463 0.0494 0.0459 0.0494 0.0353 0.0655 0.0656 0.0515 0.0089 0.0494

| ECN_Spct_4_Shr 0.0249 0.0248 0.0512 0.0320 0.0149 0.0391 0.0195 0.0380 0.0362 0.0408 0.0321 0.0105 0.0341

| ECN_Spet_6hr 0.0405 0.0517 0.0320 0.0206 0.0255 0.0141 0.0381 0.0255 0.0337 0.0268 0.0309 0.0103 0.0294

| ECN_Spet_9hr 0.0227 0.0260 0.0214 0.0244 0.0309 0.0153 0.0250 0.0231 0.0227 0.0179 0.0229 0.0041 0.0229

*

| CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_Spct_1Smin. |
| The median pattern for this ensemble is storm 2 (storm name : ECN_Spct_15min_2). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_5pct_15min_9).

*

AEP: 50% - Max Flow (m‘3/s)

*

|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
*

| ECN_SOpct_10min 0.0285 0.0299 0.0299 0.0305 0.0260 0.0251 0.0297 0.0270 0.0318 0.0281 0.0287 0.0020 0.0291

| ECN_SOpct_12hr 0.0089 0.0115 0.0170 0.0085 0.0074 0.0049 0.0048 0.0197 0.0095 0.0103 0.0102 0.0046 0.0092

| ECN_SOpct_1Smin 0.0298 0.0337 0.0301 0.0278 0.0232 0.0224 0.0211 0.0224 0.0272 0.0310 0.0269 0.0041 0.0275

| ECN_SOpct_i8hr 0.0070 0.0103 0.0142 0.0049 0.0037 0.0051 0.0059 0.0105 0.0066 0.0109 0.0079 0.0032 0.0068

| ECN_SOpct_1_Shr 0.0208 0.0247 0.0267 0.0154 0.0300 0.0166 0.0193 0.0175 0.0311 0.0246 0.0227 0.0053 0.0227

| ECN_SOpet_ihr 0.0256 0.0153 0.0189 0.0201 0.0250 0.0234 0.0191 0.0188 0.0307 0.0226 0.0220 0.0042 0.0214

Page 52

| ECN_50pct_20min 0.0296 0.0292 0.0262 0.0215 0.0214 0.0267 0.0258 0.0217 0.0271 0.0303 0.0260 0.0032 0.0264                               |
|    ECN_50pct_24hr 0.0108 0.0049 0.0059 0.0083 0.0074 0.0056 0.0115 0.0072 0.0104 0.0049 0.0077 0.0023 0.0073                            |
| ECN_50pct_25min 0.0213 0.0216 0.0237 0.0228 0.0275 0.0239 0.0215 0.0228 0.0303 0.0258 0.0241 0.0028 0.0232                               |
|    ECN_50pct_2hr 0.0193 0.0179 0.0181 0.0159 0.0238 0.0188 0.0254 0.0351 0.0183 0.0190 0.0212 0.0054 0.0189                            |
| ECN_50pct_30min 0.0326 0.0208 0.0240 0.0241 0.0193 0.0237 0.0269 0.0258 0.0225 0.0230 0.0243 0.0035 0.0239                               |
|    ECN_50pct_3hr 0.0196 0.0179 0.0277 0.0117 0.0140 0.0131 0.0131 0.0119 0.0149 0.0173 0.0161 0.0046 0.0144                            |
| ECN_50pct_45min 0.0282 0.0202 0.0182 0.0218 0.0267 0.0164 0.0178 0.0230 0.0294 0.0280 0.0230 0.0046 0.0224                               |
| ECN_50pct_4_5hr 0.0178 0.0132 0.0226 0.0124 0.0137 0.0205 0.0186 0.0154 0.0168 0.0177 0.0169 0.0031 0.0172                               |
|    ECN_50pct_6hr 0.0113 0.0124 0.0181 0.0133 0.0111 0.0122 0.0138 0.0128 0.0115 0.0104 0.0127 0.0021 0.0123                            |
|    ECN_50pct_9hr 0.0130 0.0088 0.0226 0.0140 0.0141 0.0118 0.0103 0.0067 0.0093 0.0089 0.0119 0.0042 0.0110                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_10min.                                      |
| The median pattern for this ensemble is storm 7 (storm name : ECN_50pct_10min_7).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_10min_9).                              |
*============================================================================================================================================================


                                              AEP: 63.2% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_63pct_10min 0.0251 0.0264 0.0264 0.0269 0.0229 0.0221 0.0262 0.0238 0.0280 0.0248 0.0253 0.0018 0.0257                               |
|    ECN_63pct_12hr 0.0075 0.0098 0.0144 0.0072 0.0062 0.0041 0.0040 0.0167 0.0080 0.0087 0.0087 0.0039 0.0078                            |
| ECN_63pct_15min 0.0265 0.0299 0.0267 0.0246 0.0206 0.0198 0.0187 0.0199 0.0241 0.0274 0.0238 0.0037 0.0244                               |
|    ECN_63pct_18hr 0.0052 0.0087 0.0120 0.0041 0.0031 0.0043 0.0050 0.0089 0.0056 0.0093 0.0066 0.0027 0.0054                            |
| ECN_63pct_1_5hr 0.0180 0.0190 0.0232 0.0126 0.0261 0.0146 0.0168 0.0137 0.0245 0.0206 0.0189 0.0044 0.0185                               |
|    ECN_63pct_1hr 0.0223 0.0133 0.0167 0.0177 0.0200 0.0185 0.0165 0.0147 0.0247 0.0195 0.0184 0.0033 0.0181                            |
| ECN_63pct_20min 0.0262 0.0258 0.0232 0.0190 0.0190 0.0236 0.0228 0.0192 0.0239 0.0268 0.0230 0.0029 0.0234                               |
|    ECN_63pct_24hr 0.0091 0.0041 0.0050 0.0071 0.0063 0.0048 0.0098 0.0061 0.0088 0.0042 0.0065 0.0020 0.0062                            |
| ECN_63pct_25min 0.0189 0.0192 0.0210 0.0202 0.0229 0.0212 0.0180 0.0178 0.0236 0.0229 0.0206 0.0020 0.0206                               |
|    ECN_63pct_2hr 0.0167 0.0156 0.0157 0.0118 0.0207 0.0163 0.0221 0.0308 0.0148 0.0165 0.0181 0.0050 0.0164                            |
| ECN_63pct_30min 0.0250 0.0184 0.0213 0.0213 0.0158 0.0209 0.0234 0.0229 0.0178 0.0200 0.0207 0.0026 0.0211                               |
|    ECN_63pct_3hr 0.0158 0.0153 0.0238 0.0102 0.0121 0.0113 0.0101 0.0099 0.0129 0.0150 0.0136 0.0040 0.0125                            |
| ECN_63pct_45min 0.0249 0.0178 0.0161 0.0192 0.0236 0.0144 0.0146 0.0180 0.0231 0.0223 0.0194 0.0036 0.0186                               |
| ECN_63pct_4_5hr 0.0153 0.0101 0.0185 0.0106 0.0117 0.0176 0.0135 0.0132 0.0144 0.0152 0.0140 0.0026 0.0139                               |
|    ECN_63pct_6hr 0.0096 0.0106 0.0142 0.0114 0.0095 0.0104 0.0118 0.0110 0.0098 0.0089 0.0107 0.0015 0.0105                            |
|    ECN_63pct_9hr 0.0110 0.0074 0.0192 0.0119 0.0120 0.0100 0.0087 0.0056 0.0079 0.0076 0.0101 0.0036 0.0094                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_10min.                                     |
| The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_10min_7).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_63pct_10min_9).                              |
*============================================================================================================================================================


[OCR of page images]
| ECN_SOpct_20min 0.0296 0.0292 0.0262 0.0215 0.0214 0.0267 0.0258 0.0217 0.0271 0.0303 0.0260 0.0032 0.0264
| ECN_SOpct_24hr 0.0108 0.0049 0.0059 0.0083 0.0074 0.0056 0.0115 0.0072 0.0104 0.0049 0.0077 0.0023 0.0073
| ECN_SOpct_25min 0.0213 0.0216 0.0237 0.0228 0.0275 0.0239 0.0215 0.0228 0.0303 0.0258 0.0241 0.0028 0.0232
| ECN_SOpct_2hr 0.0193 0.0179 0.0181 0.0159 0.0238 0.0188 0.0254 0.0351 0.0183 0.0190 0.0212 0.0054 0.0189
| ECN_SOpct_30min 0.0326 0.0208 0.0240 0.0241 0.0193 0.0237 0.0269 0.0258 0.0225 0.0230 0.0243 0.0035 0.0239
| ECN_SOpct_3hr 0.0196 0.0179 0.0277 0.0117 0.0140 0.0131 0.0131 0.0119 0.0149 0.0173 0.0161 0.0046 0.0144
| ECN_SOpct_45min 0.0282 0.0202 0.0182 0.0218 0.0267 0.0164 0.0178 0.0230 0.0294 0.0280 0.0230 0.0046 0.0224
| ECN_SOpct_4 Shr 0.0178 0.0132 0.0226 0.0124 0.0137 0.0205 0.0186 0.0154 0.0168 0.0177 0.0169 0.0031 0.0172
| ECN_SOpct_6hr 0.0113 0.0124 0.0181 0.0133 0.0111 0.0122 0.0138 0.0128 0.0115 0.0104 0.0127 0.0021 0.0123
| ECN_SOpct_9hr 0.0130 0.0088 0.0226 0.0140 0.0141 0.0118 0.0103 0.0067 0.0093 0.0089 0.0119 0.0042 0.0110
*

 

 

| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_SOpct_10min. |
| The median pattern for this ensemble is storm 7 (storm name : ECN_SOpct_10min_7). |

| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_10min_9).
*

 

 

AEP: 63.2% - Max Flow (m43/s)

 

 

| Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median

 

 

| ECN_63pct_10min 0.0251 0.0264 0.0264 0.0269 0.0229 0.0221 0.0262 0.0238 0.0280 0.0248 0.0253 0.0018 0.0257
| ECN_63pct_12hr 0.0075 0.0098 0.0144 0.0072 0.0062 0.0041 0.0040 0.0167 0.0080 0.0087 0.0087 0.0039 0.0078
| ECN_63pct_15min 0.0265 0.0299 0.0267 0.0246 0.0206 0.0198 0.0187 0.0199 0.0241 0.0274 0.0238 0.0037 0.0244
| ECN_63pct_18hr 0.0052 0.0087 0.0120 0.0041 0.0031 0.0043 0.0050 0.0089 0.0056 0.0093 0.0066 0.0027 0.0054
| ECN_63pct_1_5hr 0.0180 0.0190 0.0232 0.0126 0.0261 0.0146 0.0168 0.0137 0.0245 0.0206 0.0189 0.0044 0.0185
| ECN_63pct_lhr 0.0223 0.0133 0.0167 0.0177 0.0200 0.0185 0.0165 0.0147 0.0247 0.0195 0.0184 0.0033 0.0181
| ECN_63pct_20min 0.0262 0.0258 0.0232 0.0190 0.0190 0.0236 0.0228 0.0192 0.0239 0.0268 0.0230 0.0029 0.0234
| ECN_63pct_24hr 0.0091 0.0041 0.0050 0.0071 0.0063 0.0048 0.0098 0.0061 0.0088 0.0042 0.0065 0.0020 0.0062
| ECN_63pct_25min 0.0189 0.0192 0.0210 0.0202 0.0229 0.0212 0.0180 0.0178 0.0236 0.0229 0.0206 0.0020 0.0206
| ECN_63pct_2hr 0.0167 0.0156 0.0157 0.0118 0.0207 0.0163 0.0221 0.0308 0.0148 0.0165 0.0181 0.0050 0.0164
| ECN_63pct_30min 0.0250 0.0184 0.0213 0.0213 0.0158 0.0209 0.0234 0.0229 0.0178 0.0200 0.0207 0.0026 0.0211
| ECN_63pct_3hr 0.0158 0.0153 0.0238 0.0102 0.0121 0.0113 0.0101 0.0099 0.0129 0.0150 0.0136 0.0040 0.0125
| ECN_63pct_45min 0.0249 0.0178 0.0161 0.0192 0.0236 0.0144 0.0146 0.0180 0.0231 0.0223 0.0194 0.0036 0.0186
| ECN_63pct_4_Shr 0.0153 0.0101 0.0185 0.0106 0.0117 0.0176 0.0135 0.0132 0.0144 0.0152 0.0140 0.0026 0.0139
| ECN_63pct_6hr 0.0096 0.0106 0.0142 0.0114 0.0095 0.0104 0.0118 0.0110 0.0098 0.0089 0.0107 0.0015 0.0105
| ECN_63pct_9hr 0.0110 0.0074 0.0192 0.0119 0.0120 0.0100 0.0087 0.0056 0.0079 0.0076 0.0101 0.0036 0.0094
*

 

 

| CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_10min.
| The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_10min_7). |

| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_63pct_10min_9).
*

 

 

Page 53

                                                                           20169 - SBSMP/1
                                                                                    Page 27




                                            APPENDIX H


                     XPSTORM POST DEVELOPMENT RESULTS




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville

Page 54

                                                   INNOVYZE ENSEMBLE STATISTICS UTILITY
                                                             (c) Innovyze 2020

Summary information:

           Total No. of Ensembles:              63
           No. of Storms per ensemble:          10
           No. of AEP Bands:                      7
           Object Name:                  Post Dev A to LPD
           Result type:                  Max Flow


Results:


                                              AEP: 1% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|    ECN_1pct_10min 0.2415 0.2254 0.2400 0.2297 0.2372 0.2266 0.2305 0.2254 0.2786 0.2499 0.2385 0.0154 0.2339                             |
|    ECN_1pct_15min 0.2675 0.2314 0.2479 0.2335 0.2432 0.2305 0.2110 0.3025 0.2501 0.2153 0.2433 0.0253 0.2384                             |
|    ECN_1pct_1_5hr 0.1566 0.1835 0.1737 0.1476 0.1812 0.1696 0.1642 0.2005 0.1585 0.1732 0.1709 0.0145 0.1714                             |
|     ECN_1pct_1hr 0.2781 0.2218 0.1695 0.1826 0.1310 0.2055 0.1492 0.1641 0.1786 0.1816 0.1862 0.0392 0.1801                            |
|    ECN_1pct_20min 0.2289 0.3012 0.2185 0.2100 0.1953 0.2060 0.1826 0.2029 0.2088 0.2245 0.2179 0.0306 0.2094                             |
|    ECN_1pct_25min 0.2085 0.3006 0.2186 0.2137 0.2434 0.1886 0.1896 0.2239 0.1917 0.2421 0.2221 0.0322 0.2161                             |
|     ECN_1pct_2hr 0.1957 0.1533 0.1523 0.1772 0.1635 0.1599 0.1198 0.1245 0.1466 0.2096 0.1602 0.0268 0.1566                            |
|    ECN_1pct_30min 0.2293 0.2211 0.2814 0.1779 0.1906 0.2808 0.1935 0.2048 0.2264 0.1997 0.2206 0.0340 0.2130                             |
|    ECN_1pct_45min 0.2935 0.2727 0.1888 0.2324 0.2055 0.1678 0.1755 0.2394 0.1376 0.2033 0.2117 0.0458 0.2044                             |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_1pct_15min.                                       |
| The median pattern for this ensemble is storm 5 (storm name : ECN_1pct_15min_5).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_1pct_15min_8).                              |
*============================================================================================================================================================


                                              AEP: 10% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_10pct_10min 0.1534 0.1496 0.1635 0.1772 0.1414 0.1433 0.1552 0.1389 0.1489 0.1698 0.1541 0.0119 0.1515                               |
| ECN_10pct_15min 0.1739 0.1706 0.1715 0.1374 0.1367 0.1469 0.1377 0.1291 0.1801 0.1684 0.1552 0.0183 0.1576                               |
| ECN_10pct_1_5hr 0.1546 0.0996 0.1418 0.1278 0.1001 0.1161 0.1048 0.1102 0.0903 0.1289 0.1174 0.0194 0.1132                               |
|    ECN_10pct_1hr 0.1733 0.1185 0.1224 0.1789 0.1125 0.1256 0.1217 0.1244 0.0955 0.1894 0.1362 0.0303 0.1234                            |
| ECN_10pct_20min 0.1301 0.1425 0.1244 0.1569 0.1478 0.1347 0.1345 0.1850 0.1880 0.1395 0.1484 0.0210 0.1410                               |
| ECN_10pct_25min 0.1264 0.1969 0.1580 0.1343 0.1600 0.1854 0.1341 0.1214 0.1424 0.1604 0.1519 0.0237 0.1502                               |
|    ECN_10pct_2hr 0.1289 0.0859 0.1117 0.1616 0.1256 0.1190 0.1460 0.0889 0.1156 0.1309 0.1214 0.0220 0.1223                            |
| ECN_10pct_30min 0.1253 0.1351 0.2310 0.1208 0.1087 0.1387 0.1747 0.1334 0.1433 0.1578 0.1469 0.0331 0.1369                               |
| ECN_10pct_45min 0.1615 0.1339 0.1348 0.1211 0.1292 0.1200 0.1302 0.0920 0.1709 0.1741 0.1368 0.0241 0.1321                               |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_15min.                                      |
| The median pattern for this ensemble is storm 10 (storm name : ECN_10pct_15min_10).                                           |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_15min_9).                              |
*============================================================================================================================================================


                                              AEP: 2% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|    ECN_2pct_10min 0.2204 0.1911 0.2190 0.2080 0.2005 0.2052 0.1949 0.2057 0.2342 0.2281 0.2107 0.0135 0.2068                             |
|    ECN_2pct_15min 0.2251 0.2100 0.2263 0.2131 0.2149 0.2063 0.1925 0.2657 0.2240 0.1965 0.2174 0.0194 0.2140                             |
|    ECN_2pct_1_5hr 0.1357 0.1628 0.1540 0.1309 0.1611 0.1509 0.1454 0.1685 0.1409 0.1540 0.1504 0.0115 0.1524                             |
|     ECN_2pct_1hr 0.2476 0.1978 0.1461 0.1630 0.1169 0.1833 0.1331 0.1426 0.1594 0.1521 0.1642 0.0355 0.1557                            |
|    ECN_2pct_20min 0.2023 0.2728 0.1992 0.1915 0.1740 0.1837 0.1655 0.1785 0.1765 0.2038 0.1948 0.0287 0.1876                             |
|    ECN_2pct_25min 0.1885 0.2720 0.1872 0.1933 0.2052 0.1704 0.1722 0.2034 0.1730 0.2200 0.1985 0.0288 0.1909                             |
|     ECN_2pct_2hr 0.1740 0.1341 0.1354 0.1575 0.1456 0.1423 0.1060 0.1109 0.1304 0.1847 0.1421 0.0237 0.1389                            |
|    ECN_2pct_30min 0.2075 0.1995 0.2550 0.1612 0.1662 0.2350 0.1755 0.1856 0.2052 0.1806 0.1971 0.0284 0.1925                             |
|    ECN_2pct_45min 0.2639 0.2434 0.1697 0.2081 0.1841 0.1462 0.1577 0.2050 0.1241 0.1794 0.1882 0.0409 0.1817                             |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_15min.                                       |
| The median pattern for this ensemble is storm 5 (storm name : ECN_2pct_15min_5).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_2pct_15min_8).                              |
*============================================================================================================================================================


                                     AEP: 20% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_20pct_10min 0.1335 0.1403 0.1402 0.1414 0.1215 0.1160 0.1393 0.1246 0.1491 0.1318 0.1338 0.0098 0.1364                               |


[OCR of page images]
INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

Summary information:

Total No. of Ensembles: 63
No. of Storms per ensemble: 10
No. of AEP Bands: 7
Object Name: Post Dev A to LPD
Result type: Max Flow

Results:

AEP: 1% - Max Flow (m43/s)

 

 

| Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median

 

 

| ECN_ipct_10min 0.2415 0.2254 0.2400 0.2297 0.2372 0.2266 0.2305 0.2254 0.2786 0.2499 0.2385 0.0154 0.2339
| ECN_ipct_15min 0.2675 0.2314 0.2479 0.2335 0.2432 0.2305 0.2110 0.3025 0.2501 0.2153 0.2433 0.0253 0.2384
| ECN_ipct_1_5hr 0.1566 0.1835 0.1737 0.1476 0.1812 0.1696 0.1642 0.2005 0.1585 0.1732 0.1709 0.0145 0.1714
| ECN_1pct_lhr 0.2781 0.2218 0.1695 0.1826 0.1310 0.2055 0.1492 0.1641 0.1786 0.1816 0.1862 0.0392 0.1801

| ECN_ipct_2Omin 0.2289 0.3012 0.2185 0.2100 0.1953 0.2060 0.1826 0.2029 0.2088 0.2245 0.2179 0.0306 0.2094
| ECN_ipct_25min 0.2085 0.3006 0.2186 0.2137 0.2434 0.1886 0.1896 0.2239 0.1917 0.2421 0.2221 0.0322 0.2161
|

|

|

*

 

ECN_ipcet_2hr 0.1957 0.1533 0.1523 0.1772 0.1635 0.1599 0.1198 0.1245 0.1466 0.2096 0.1602 0.0268 0.1566
ECN_ipct_30min 0.2293 0.2211 0.2814 0.1779 0.1906 0.2808 0.1935 0.2048 0.2264 0.1997 0.2206 0.0340 0.2130
ECN_ipct_45min 0.2935 0.2727 0.1888 0.2324 0.2055 0.1678 0.1755 0.2394 0.1376 0.2033 0.2117 0.0458 0.2044

 

 

| CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_1pct_1Smin. |
| The median pattern for this ensemble is storm 5 (storm name : ECN_1pct_15min_5). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_1pct_15min_8).

 

*

 

AEP: 10% - Max Flow (m43/s)

 

 

Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median

 

 

 

ECN_10pct_10min 0.1534 0.1496 0.1635 0.1772 0.1414 0.1433 0.1552 0.1389 0.1489 0.1698 0.1541 0.0119 0.1515
ECN_10pct_iSmin 0.1739 0.1706 0.1715 0.1374 0.1367 0.1469 0.1377 0.1291 0.1801 0.1684 0.1552 0.0183 0.1576
ECN_10pct_1_Shr 0.1546 0.0996 0.1418 0.1278 0.1001 0.1161 0.1048 0.1102 0.0903 0.1289 0.1174 0.0194 0.1132
ECN_10pct_ihr 0.1733. 0.1185 0.1224 0.1789 0.1125 0.1256 0.1217 0.1244 0.0955 0.1894 0.1362 0.0303 0.1234

ECN_10pct_20min 0.1301 0.1425 0.1244 0.1569 0.1478 0.1347 0.1345 0.1850 0.1880 0.1395 0.1484 0.0210 0.1410
ECN_10pct_25min 0.1264 0.1969 0.1580 0.1343 0.1600 0.1854 0.1341 0.1214 0.1424 0.1604 0.1519 0.0237 0.1502
ECN_10pct_2hr 0.1289 0.0859 0.1117 0.1616 0.1256 0.1190 0.1460 0.0889 0.1156 0.1309 0.1214 0.0220 0.1223

ECN_10pct_30min 0.1253 0.1351 0.2310 0.1208 0.1087 0.1387 0.1747 0.1334 0.1433 0.1578 0.1469 0.0331 0.1369
ECN_10pct_45min 0.1615 0.1339 0.1348 0.1211 0.1292 0.1200 0.1302 0.0920 0.1709 0.1741 0.1368 0.0241 0.1321

 

 

| CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_15min. |
| The median pattern for this ensemble is storm 10 (storm name : ECN_10pct_15min_10). |

| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_15min_9).
*

 

 

AEP: 2% - Max Flow (m43/s)

 

 

| Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median

 

 

| ECN_2pct_10min 0.2204 0.1911 0.2190 0.2080 0.2005 0.2052 0.1949 0.2057 0.2342 0.2281 0.2107 0.0135 0.2068
| ECN_2pct_15min 0.2251 0.2100 0.2263 0.2131 0.2149 0.2063 0.1925 0.2657 0.2240 0.1965 0.2174 0.0194 0.2140
| ECN_2pct_1_5hr 0.1357 0.1628 0.1540 0.1309 0.1611 0.1509 0.1454 0.1685 0.1409 0.1540 0.1504 0.0115 0.1524
| ECN_2pct_lhr 0.2476 0.1978 0.1461 0.1630 0.1169 0.1833 0.1331 0.1426 0.1594 0.1521 0.1642 0.0355 0.1557

| ECN_2pct_2Omin 0.2023 0.2728 0.1992 0.1915 0.1740 0.1837 0.1655 0.1785 0.1765 0.2038 0.1948 0.0287 0.1876
| ECN_2pct_25min 0.1885 0.2720 0.1872 0.1933 0.2052 0.1704 0.1722 0.2034 0.1730 0.2200 0.1985 0.0288 0.1909
| ECN_2pct_2hr 0.1740 0.1341 0.1354 0.1575 0.1456 0.1423 0.1060 0.1109 0.1304 0.1847 0.1421 0.0237 0.1389

| ECN_2pct_30min 0.2075 0.1995 0.2550 0.1612 0.1662 0.2350 0.1755 0.1856 0.2052 0.1806 0.1971 0.0284 0.1925
| ECN_2pct_45min 0.2639 0.2434 0.1697 0.2081 0.1841 0.1462 0.1577 0.2050 0.1241 0.1794 0.1882 0.0409 0.1817
*

 

 

| CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_1Smin. |
| The median pattern for this ensemble is storm 5 (storm name : ECN_2pct_15min_5). |

| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_2pct_15min_8).
*

 

 

AEP: 20% - Max Flow (m43/s)

 

 

| Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median

 

 

| ECN_20pct_10min 0.1335 0.1403 0.1402 0.1414 0.1215 0.1160 0.1393 0.1246 0.1491 0.1318 0.1338 0.0098 0.1364

Page 55

| ECN_20pct_15min 0.1398 0.1583 0.1411 0.1301 0.1085 0.1020 0.1062 0.1134 0.1321 0.1477 0.1279 0.0184 0.1311                               |
| ECN_20pct_1_5hr 0.0894 0.1321 0.1129 0.0758 0.1258 0.0800 0.0815 0.1003 0.1392 0.1066 0.1044 0.0216 0.1034                               |
|    ECN_20pct_1hr 0.1409 0.0756 0.0890 0.1065 0.1351 0.1236 0.0914 0.0818 0.1302 0.1061 0.1080 0.0222 0.1063                            |
| ECN_20pct_20min 0.1390 0.1368 0.1228 0.1034 0.0990 0.1249 0.1255 0.1003 0.1234 0.1644 0.1239 0.0191 0.1241                               |
| ECN_20pct_25min 0.0989 0.1005 0.1099 0.1053 0.1396 0.1114 0.1140 0.1186 0.1561 0.1292 0.1184 0.0173 0.1127                               |
|    ECN_20pct_2hr 0.0840 0.0982 0.0791 0.0830 0.1110 0.0813 0.1385 0.1723 0.0819 0.0805 0.1010 0.0298 0.0835                            |
| ECN_20pct_30min 0.1655 0.0961 0.1132 0.1144 0.1052 0.1106 0.1424 0.1311 0.1235 0.1280 0.1230 0.0191 0.1190                               |
| ECN_20pct_45min 0.1330 0.0963 0.0857 0.1074 0.1268 0.0868 0.0808 0.0994 0.1328 0.1351 0.1084 0.0206 0.1034                               |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_10min.                                      |
| The median pattern for this ensemble is storm 7 (storm name : ECN_20pct_10min_7).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_20pct_10min_9).                              |
*============================================================================================================================================================


                                              AEP: 5% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|    ECN_5pct_10min 0.1742 0.1699 0.1857 0.2011 0.1716 0.1627 0.1887 0.1684 0.1691 0.2044 0.1796 0.0138 0.1729                             |
|    ECN_5pct_15min 0.1969 0.1932 0.1942 0.1648 0.1719 0.1664 0.1560 0.1497 0.2204 0.2058 0.1819 0.0221 0.1826                             |
|    ECN_5pct_1_5hr 0.1795 0.1158 0.1645 0.1476 0.1159 0.1348 0.1219 0.1273 0.1048 0.1497 0.1362 0.0226 0.1310                             |
|     ECN_5pct_1hr 0.2003 0.1465 0.1408 0.2057 0.1394 0.1475 0.1449 0.1446 0.1163 0.2191 0.1605 0.0327 0.1457                            |
|    ECN_5pct_20min 0.1576 0.1620 0.1515 0.1832 0.1790 0.1646 0.1551 0.2181 0.2286 0.1585 0.1758 0.0257 0.1633                             |
|    ECN_5pct_25min 0.1480 0.2268 0.1794 0.1525 0.1816 0.2182 0.1522 0.1425 0.1673 0.1919 0.1760 0.0278 0.1733                             |
|     ECN_5pct_2hr 0.1512 0.1008 0.1310 0.1895 0.1477 0.1389 0.1705 0.1043 0.1355 0.1646 0.1434 0.0264 0.1433                            |
|    ECN_5pct_30min 0.1427 0.1639 0.2665 0.1379 0.1243 0.1678 0.2057 0.1666 0.1681 0.1803 0.1724 0.0382 0.1672                             |
|    ECN_5pct_45min 0.1851 0.1536 0.1713 0.1393 0.1487 0.1380 0.1500 0.1059 0.1968 0.2007 0.1589 0.0280 0.1518                             |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_5pct_15min.                                       |
| The median pattern for this ensemble is storm 2 (storm name : ECN_5pct_15min_2).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_5pct_15min_9).                              |
*============================================================================================================================================================


                                              AEP: 50% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_50pct_10min 0.0993 0.1044 0.1043 0.1054 0.0904 0.0862 0.1037 0.0929 0.1110 0.0980 0.0996 0.0073 0.1015                               |
| ECN_50pct_15min 0.1040 0.1178 0.1049 0.0968 0.0806 0.0761 0.0720 0.0778 0.0914 0.1049 0.0926 0.0147 0.0941                               |
| ECN_50pct_1_5hr 0.0634 0.0799 0.0797 0.0472 0.0897 0.0573 0.0581 0.0575 0.0967 0.0752 0.0705 0.0153 0.0693                               |
|    ECN_50pct_1hr 0.0858 0.0494 0.0642 0.0682 0.0820 0.0763 0.0584 0.0580 0.0929 0.0675 0.0703 0.0130 0.0679                            |
| ECN_50pct_20min 0.1033 0.1017 0.0912 0.0740 0.0738 0.0928 0.0866 0.0747 0.0918 0.1042 0.0894 0.0114 0.0915                               |
| ECN_50pct_25min 0.0734 0.0745 0.0815 0.0781 0.0901 0.0825 0.0710 0.0735 0.0977 0.0881 0.0810 0.0083 0.0798                               |
|    ECN_50pct_2hr 0.0590 0.0610 0.0561 0.0506 0.0711 0.0571 0.0799 0.1229 0.0574 0.0570 0.0672 0.0202 0.0582                            |
| ECN_50pct_30min 0.1041 0.0711 0.0835 0.0836 0.0618 0.0796 0.0901 0.0879 0.0732 0.0768 0.0812 0.0111 0.0815                               |
| ECN_50pct_45min 0.0974 0.0676 0.0627 0.0736 0.0928 0.0502 0.0559 0.0710 0.0894 0.0888 0.0749 0.0156 0.0723                               |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_10min.                                      |
| The median pattern for this ensemble is storm 7 (storm name : ECN_50pct_10min_7).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_10min_9).                              |
*============================================================================================================================================================


                                              AEP: 63.2% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_63pct_10min 0.0874 0.0919 0.0918 0.0928 0.0795 0.0758 0.0912 0.0818 0.0977 0.0862 0.0876 0.0065 0.0893                               |
| ECN_63pct_15min 0.0920 0.1043 0.0929 0.0856 0.0713 0.0674 0.0637 0.0688 0.0809 0.0929 0.0820 0.0130 0.0833                               |
| ECN_63pct_1_5hr 0.0550 0.0628 0.0695 0.0384 0.0782 0.0500 0.0506 0.0459 0.0779 0.0621 0.0590 0.0127 0.0585                               |
|    ECN_63pct_1hr 0.0755 0.0435 0.0565 0.0601 0.0676 0.0605 0.0514 0.0467 0.0765 0.0588 0.0597 0.0105 0.0595                            |
| ECN_63pct_20min 0.0912 0.0898 0.0806 0.0654 0.0652 0.0820 0.0766 0.0661 0.0811 0.0921 0.0790 0.0100 0.0809                               |
| ECN_63pct_25min 0.0650 0.0661 0.0723 0.0692 0.0790 0.0731 0.0605 0.0587 0.0778 0.0781 0.0700 0.0069 0.0707                               |
|    ECN_63pct_2hr 0.0511 0.0532 0.0489 0.0386 0.0619 0.0496 0.0681 0.1073 0.0468 0.0496 0.0575 0.0183 0.0504                            |
| ECN_63pct_30min 0.0819 0.0629 0.0737 0.0738 0.0532 0.0703 0.0796 0.0777 0.0588 0.0679 0.0700 0.0089 0.0720                               |
| ECN_63pct_45min 0.0860 0.0597 0.0554 0.0649 0.0818 0.0443 0.0493 0.0573 0.0721 0.0720 0.0643 0.0129 0.0623                               |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_10min.                                     |
| The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_10min_7).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_63pct_10min_9).                              |
*============================================================================================================================================================

|   ECN_50pct_10min 0.0285 0.0299 0.0299 0.0305 0.0260 0.0251 0.0297 0.0270 0.0318 0.0281 0.0287 0.0020 0.0291                             |
|   ECN_50pct_12hr 0.0089 0.0115 0.0170 0.0085 0.0074 0.0049 0.0048 0.0197 0.0095 0.0103 0.0102 0.0046 0.0092                             |
|   ECN_50pct_15min 0.0298 0.0337 0.0301 0.0278 0.0232 0.0224 0.0211 0.0224 0.0272 0.0310 0.0269 0.0041 0.0275                             |
|   ECN_50pct_18hr 0.0070 0.0103 0.0142 0.0049 0.0037 0.0051 0.0059 0.0105 0.0066 0.0109 0.0079 0.0032 0.0068                             |
|   ECN_50pct_1_5hr 0.0208 0.0247 0.0267 0.0154 0.0300 0.0166 0.0193 0.0175 0.0311 0.0246 0.0227 0.0053 0.0227                             |
|    ECN_50pct_1hr 0.0256 0.0153 0.0189 0.0201 0.0250 0.0234 0.0191 0.0188 0.0307 0.0226 0.0220 0.0042 0.0214                            |


[OCR of page images]
 

 

*

 

 

 

 

 

 

 

 

 

 

*

 

 

 

 

 

 

 

 

*

 

 

 

 

 

 

 

 

*

 

 

| ECN_20pct_ismin 0.1398 0.1583 0.1411 0.1301 0.1085 0.1020 0.1062 0.1134 0.1321 0.1477 0.1279 0.0184 0.1311
| ECN_20pct_1_Shr 0.0894 0.1321 0.1129 0.0758 0.1258 0.0800 0.0815 0.1003 0.1392 0.1066 0.1044 0.0216 0.1034
| ECN_2Opet_ihr 0.1409 0.0756 0.0890 0.1065 0.1351 0.1236 0.0914 0.0818 0.1302 0.1061 0.1080 0.0222 0.1063
| ECN_20pct_20min 0.1390 0.1368 0.1228 0.1034 0.0990 0.1249 0.1255 0.1003 0.1234 0.1644 0.1239 0.0191 0.1241
| ECN_20pct_25min 0.0989 0.1005 0.1099 0.1053 0.1396 0.1114 0.1140 0.1186 0.1561 0.1292 0.1184 0.0173 0.1127
| ECN_2Opet_2hr 0.0840 0.0982 0.0791 0.0830 0.1110 0.0813 0.1385 0.1723 0.0819 0.0805 0.1010 0.0298 0.0835
| ECN_20pct_30min 0.1655 0.0961 0.1132 0.1144 0.1052 0.1106 0.1424 0.1311 0.1235 0.1280 0.1230 0.0191 0.1190
| ECN_20pct_45min 0.1330 0.0963 0.0857 0.1074 0.1268 0.0868 0.0808 0.0994 0.1328 0.1351 0.1084 0.0206 0.1034
*
| CRITICAL DURATION : The critical duration for the 20% AEP is the ensemble ECN_20pct_10min. |
| The median pattern for this ensemble is storm 7 (storm name : ECN_20pct_10min_7). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_20pct_10min_9).
AEP: 5% - Max Flow (m43/s)
|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
| ECN_Spct_10min 0.1742 0.1699 0.1857 0.2011 0.1716 0.1627 0.1887 0.1684 0.1691 0.2044 0.1796 0.0138 0.1729
| ECN_Spct_15min 0.1969 0.1932 0.1942 0.1648 0.1719 0.1664 0.1560 0.1497 0.2204 0.2058 0.1819 0.0221 0.1826
| ECN_Spct_1_Shr 0.1795 0.1158 0.1645 0.1476 0.1159 0.1348 0.1219 0.1273 0.1048 0.1497 0.1362 0.0226 0.1310
| ECN_Spet_dhr 0.2003 0.1465 0.1408 0.2057 0.1394 0.1475 0.1449 0.1446 0.1163 0.2191 0.1605 0.0327 0.1457
| ECN_Spct_20min 0.1576 0.1620 0.1515 0.1832 0.1790 0.1646 0.1551 0.2181 0.2286 0.1585 0.1758 0.0257 0.1633
| ECN_Spct_25min 0.1480 0.2268 0.1794 0.1525 0.1816 0.2182 0.1522 0.1425 0.1673 0.1919 0.1760 0.0278 0.1733
| ECN_Spet_2hr 0.1512 0.1008 0.1310 0.1895 0.1477 0.1389 0.1705 0.1043 0.1355 0.1646 0.1434 0.0264 0.1433
| ECN_Spct_30min 0.1427 0.1639 0.2665 0.1379 0.1243 0.1678 0.2057 0.1666 0.1681 0.1803 0.1724 0.0382 0.1672
| ECN_Spct_45min 0.1851 0.1536 0.1713 0.1393 0.1487 0.1380 0.1500 0.1059 0.1968 0.2007 0.1589 0.0280 0.1518
*
| CRITICAL DURATION : The critical duration for the 5% AEP is the ensemble ECN_Spct_1Smin. |
| The median pattern for this ensemble is storm 2 (storm name : ECN_Spct_15min_2). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_5pct_15min_9).
AEP: 50% - Max Flow (m‘3/s)

Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
ECN_SOpct_10min 0.0993 0.1044 0.1043 0.1054 0.0904 0.0862 0.1037 0.0929 0.1110 0.0980 0.0996 0.0073 0.1015
ECN_SOpct_1Smin 0.1040 0.1178 0.1049 0.0968 0.0806 0.0761 0.0720 0.0778 0.0914 0.1049 0.0926 0.0147 0.0941
ECN_SOpct_1_Shr 0.0634 0.0799 0.0797 0.0472 0.0897 0.0573 0.0581 0.0575 0.0967 0.0752 0.0705 0.0153 0.0693

ECN_SOpct_ihr 0.0858 0.0494 0.0642 0.0682 0.0820 0.0763 0.0584 0.0580 0.0929 0.0675 0.0703 0.0130 0.0679
ECN_SOpct_20min 0.1033 0.1017 0.0912 0.0740 0.0738 0.0928 0.0866 0.0747 0.0918 0.1042 0.0894 0.0114 0.0915
ECN_SOpct_25min 0.0734 0.0745 0.0815 0.0781 0.0901 0.0825 0.0710 0.0735 0.0977 0.0881 0.0810 0.0083 0.0798

ECN_SOpct_2hr 0.0590 0.0610 0.0561 0.0506 0.0711 0.0571 0.0799 0.1229 0.0574 0.0570 0.0672 0.0202 0.0582
ECN_SOpct_30min 0.1041 0.0711 0.0835 0.0836 0.0618 0.0796 0.0901 0.0879 0.0732 0.0768 0.0812 0.0111 0.0815
ECN_SOpct_4S5min 0.0974 0.0676 0.0627 0.0736 0.0928 0.0502 0.0559 0.0710 0.0894 0.0888 0.0749 0.0156 0.0723

| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_SOpct_10min. |

| The median pattern for this ensemble is storm 7 (storm name : ECN_SOpct_10min_7). |

| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_10min_9).

AEP: 63.2% - Max Flow (m43/s)
|| Ensemblename Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median
ECN_63pct_10min 0.0874 0.0919 0.0918 0.0928 0.0795 0.0758 0.0912 0.0818 0.0977 0.0862 0.0876 0.0065 0.0893
ECN_63pct_1Smin 0.0920 0.1043 0.0929 0.0856 0.0713 0.0674 0.0637 0.0688 0.0809 0.0929 0.0820 0.0130 0.0833
ECN_63pct_1_Shr 0.0550 0.0628 0.0695 0.0384 0.0782 0.0500 0.0506 0.0459 0.0779 0.0621 0.0590 0.0127 0.0585
ECN_63pct_thr 0.0755 0.0435 0.0565 0.0601 0.0676 0.0605 0.0514 0.0467 0.0765 0.0588 0.0597 0.0105 0.0595
ECN_63pct_20min 0.0912 0.0898 0.0806 0.0654 0.0652 0.0820 0.0766 0.0661 0.0811 0.0921 0.0790 0.0100 0.0809
ECN_63pct_25min 0.0650 0.0661 0.0723 0.0692 0.0790 0.0731 0.0605 0.0587 0.0778 0.0781 0.0700 0.0069 0.0707
ECN_63pct_2hr 0.0511 0.0532 0.0489 0.0386 0.0619 0.0496 0.0681 0.1073 0.0468 0.0496 0.0575 0.0183 0.0504
ECN_63pct_30min 0.0819 0.0629 0.0737 0.0738 0.0532 0.0703 0.0796 0.0777 0.0588 0.0679 0.0700 0.0089 0.0720
ECN_63pct_45min 0.0860 0.0597 0.0554 0.0649 0.0818 0.0443 0.0493 0.0573 0.0721 0.0720 0.0643 0.0129 0.0623
| CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_10min.
| The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_10min_7). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_63pct_10min_9).

ECN_SOpct_10min 0.0285 0.0299 0.0299 0.0305 0.0260 0.0251 0.0297 0.0270 0.0318 0.0281 0.0287 0.0020 0.0291

ECN_SOpct_12hr 0.0089 0.0115 0.0170 0.0085 0.0074 0.0049 0.0048 0.0197 0.0095 0.0103 0.0102 0.0046 0.0092
ECN_SOpct_1Smin 0.0298 0.0337 0.0301 0.0278 0.0232 0.0224 0.0211 0.0224 0.0272 0.0310 0.0269 0.0041 0.0275
ECN_SOpct_18hr 0.0070 0.0103 0.0142 0.0049 0.0037 0.0051 0.0059 0.0105 0.0066 0.0109 0.0079 0.0032 0.0068
ECN_SOpct_1_Shr 0.0208 0.0247 0.0267 0.0154 0.0300 0.0166 0.0193 0.0175 0.0311 0.0246 0.0227 0.0053 0.0227

ECN_SOpct_thr 0.0256 0.0153 0.0189 0.0201 0.0250 0.0234 0.0191 0.0188 0.0307 0.0226 0.0220 0.0042 0.0214

Page 56

| ECN_50pct_20min 0.0296 0.0292 0.0262 0.0215 0.0214 0.0267 0.0258 0.0217 0.0271 0.0303 0.0260 0.0032 0.0264                               |
|    ECN_50pct_24hr 0.0108 0.0049 0.0059 0.0083 0.0074 0.0056 0.0115 0.0072 0.0104 0.0049 0.0077 0.0023 0.0073                            |
| ECN_50pct_25min 0.0213 0.0216 0.0237 0.0228 0.0275 0.0239 0.0215 0.0228 0.0303 0.0258 0.0241 0.0028 0.0232                               |
|    ECN_50pct_2hr 0.0193 0.0179 0.0181 0.0159 0.0238 0.0188 0.0254 0.0351 0.0183 0.0190 0.0212 0.0054 0.0189                            |
| ECN_50pct_30min 0.0326 0.0208 0.0240 0.0241 0.0193 0.0237 0.0269 0.0258 0.0225 0.0230 0.0243 0.0035 0.0239                               |
|    ECN_50pct_3hr 0.0196 0.0179 0.0277 0.0117 0.0140 0.0131 0.0131 0.0119 0.0149 0.0173 0.0161 0.0046 0.0144                            |
| ECN_50pct_45min 0.0282 0.0202 0.0182 0.0218 0.0267 0.0164 0.0178 0.0230 0.0294 0.0280 0.0230 0.0046 0.0224                               |
| ECN_50pct_4_5hr 0.0178 0.0132 0.0226 0.0124 0.0137 0.0205 0.0186 0.0154 0.0168 0.0177 0.0169 0.0031 0.0172                               |
|    ECN_50pct_6hr 0.0113 0.0124 0.0181 0.0133 0.0111 0.0122 0.0138 0.0128 0.0115 0.0104 0.0127 0.0021 0.0123                            |
|    ECN_50pct_9hr 0.0130 0.0088 0.0226 0.0140 0.0141 0.0118 0.0103 0.0067 0.0093 0.0089 0.0119 0.0042 0.0110                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_50pct_10min.                                      |
| The median pattern for this ensemble is storm 7 (storm name : ECN_50pct_10min_7).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_10min_9).                              |
*============================================================================================================================================================


                                              AEP: 63.2% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_63pct_10min 0.0251 0.0264 0.0264 0.0269 0.0229 0.0221 0.0262 0.0238 0.0280 0.0248 0.0253 0.0018 0.0257                               |
|    ECN_63pct_12hr 0.0075 0.0098 0.0144 0.0072 0.0062 0.0041 0.0040 0.0167 0.0080 0.0087 0.0087 0.0039 0.0078                            |
| ECN_63pct_15min 0.0265 0.0299 0.0267 0.0246 0.0206 0.0198 0.0187 0.0199 0.0241 0.0274 0.0238 0.0037 0.0244                               |
|    ECN_63pct_18hr 0.0052 0.0087 0.0120 0.0041 0.0031 0.0043 0.0050 0.0089 0.0056 0.0093 0.0066 0.0027 0.0054                            |
| ECN_63pct_1_5hr 0.0180 0.0190 0.0232 0.0126 0.0261 0.0146 0.0168 0.0137 0.0245 0.0206 0.0189 0.0044 0.0185                               |
|    ECN_63pct_1hr 0.0223 0.0133 0.0167 0.0177 0.0200 0.0185 0.0165 0.0147 0.0247 0.0195 0.0184 0.0033 0.0181                            |
| ECN_63pct_20min 0.0262 0.0258 0.0232 0.0190 0.0190 0.0236 0.0228 0.0192 0.0239 0.0268 0.0230 0.0029 0.0234                               |
|    ECN_63pct_24hr 0.0091 0.0041 0.0050 0.0071 0.0063 0.0048 0.0098 0.0061 0.0088 0.0042 0.0065 0.0020 0.0062                            |
| ECN_63pct_25min 0.0189 0.0192 0.0210 0.0202 0.0229 0.0212 0.0180 0.0178 0.0236 0.0229 0.0206 0.0020 0.0206                               |
|    ECN_63pct_2hr 0.0167 0.0156 0.0157 0.0118 0.0207 0.0163 0.0221 0.0308 0.0148 0.0165 0.0181 0.0050 0.0164                            |
| ECN_63pct_30min 0.0250 0.0184 0.0213 0.0213 0.0158 0.0209 0.0234 0.0229 0.0178 0.0200 0.0207 0.0026 0.0211                               |
|    ECN_63pct_3hr 0.0158 0.0153 0.0238 0.0102 0.0121 0.0113 0.0101 0.0099 0.0129 0.0150 0.0136 0.0040 0.0125                            |
| ECN_63pct_45min 0.0249 0.0178 0.0161 0.0192 0.0236 0.0144 0.0146 0.0180 0.0231 0.0223 0.0194 0.0036 0.0186                               |
| ECN_63pct_4_5hr 0.0153 0.0101 0.0185 0.0106 0.0117 0.0176 0.0135 0.0132 0.0144 0.0152 0.0140 0.0026 0.0139                               |
|    ECN_63pct_6hr 0.0096 0.0106 0.0142 0.0114 0.0095 0.0104 0.0118 0.0110 0.0098 0.0089 0.0107 0.0015 0.0105                            |
|    ECN_63pct_9hr 0.0110 0.0074 0.0192 0.0119 0.0120 0.0100 0.0087 0.0056 0.0079 0.0076 0.0101 0.0036 0.0094                            |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_10min.                                     |
| The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_10min_7).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_63pct_10min_9).                              |
*============================================================================================================================================================


[OCR of page images]
| ECN_SOpct_20min 0.0296 0.0292 0.0262 0.0215 0.0214 0.0267 0.0258 0.0217 0.0271 0.0303 0.0260 0.0032 0.0264
| ECN_SOpct_24hr 0.0108 0.0049 0.0059 0.0083 0.0074 0.0056 0.0115 0.0072 0.0104 0.0049 0.0077 0.0023 0.0073
| ECN_SOpct_25min 0.0213 0.0216 0.0237 0.0228 0.0275 0.0239 0.0215 0.0228 0.0303 0.0258 0.0241 0.0028 0.0232
| ECN_SOpct_2hr 0.0193 0.0179 0.0181 0.0159 0.0238 0.0188 0.0254 0.0351 0.0183 0.0190 0.0212 0.0054 0.0189
| ECN_SOpct_30min 0.0326 0.0208 0.0240 0.0241 0.0193 0.0237 0.0269 0.0258 0.0225 0.0230 0.0243 0.0035 0.0239
| ECN_SOpct_3hr 0.0196 0.0179 0.0277 0.0117 0.0140 0.0131 0.0131 0.0119 0.0149 0.0173 0.0161 0.0046 0.0144
| ECN_SOpct_45min 0.0282 0.0202 0.0182 0.0218 0.0267 0.0164 0.0178 0.0230 0.0294 0.0280 0.0230 0.0046 0.0224
| ECN_SOpct_4 Shr 0.0178 0.0132 0.0226 0.0124 0.0137 0.0205 0.0186 0.0154 0.0168 0.0177 0.0169 0.0031 0.0172
| ECN_SOpct_6hr 0.0113 0.0124 0.0181 0.0133 0.0111 0.0122 0.0138 0.0128 0.0115 0.0104 0.0127 0.0021 0.0123
| ECN_SOpct_9hr 0.0130 0.0088 0.0226 0.0140 0.0141 0.0118 0.0103 0.0067 0.0093 0.0089 0.0119 0.0042 0.0110
*

 

 

| CRITICAL DURATION : The critical duration for the 50% AEP is the ensemble ECN_SOpct_10min. |
| The median pattern for this ensemble is storm 7 (storm name : ECN_SOpct_10min_7). |

| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_50pct_10min_9).
*

 

 

AEP: 63.2% - Max Flow (m43/s)

 

 

| Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median

 

 

| ECN_63pct_10min 0.0251 0.0264 0.0264 0.0269 0.0229 0.0221 0.0262 0.0238 0.0280 0.0248 0.0253 0.0018 0.0257
| ECN_63pct_12hr 0.0075 0.0098 0.0144 0.0072 0.0062 0.0041 0.0040 0.0167 0.0080 0.0087 0.0087 0.0039 0.0078
| ECN_63pct_15min 0.0265 0.0299 0.0267 0.0246 0.0206 0.0198 0.0187 0.0199 0.0241 0.0274 0.0238 0.0037 0.0244
| ECN_63pct_18hr 0.0052 0.0087 0.0120 0.0041 0.0031 0.0043 0.0050 0.0089 0.0056 0.0093 0.0066 0.0027 0.0054
| ECN_63pct_1_5hr 0.0180 0.0190 0.0232 0.0126 0.0261 0.0146 0.0168 0.0137 0.0245 0.0206 0.0189 0.0044 0.0185
| ECN_63pct_lhr 0.0223 0.0133 0.0167 0.0177 0.0200 0.0185 0.0165 0.0147 0.0247 0.0195 0.0184 0.0033 0.0181
| ECN_63pct_20min 0.0262 0.0258 0.0232 0.0190 0.0190 0.0236 0.0228 0.0192 0.0239 0.0268 0.0230 0.0029 0.0234
| ECN_63pct_24hr 0.0091 0.0041 0.0050 0.0071 0.0063 0.0048 0.0098 0.0061 0.0088 0.0042 0.0065 0.0020 0.0062
| ECN_63pct_25min 0.0189 0.0192 0.0210 0.0202 0.0229 0.0212 0.0180 0.0178 0.0236 0.0229 0.0206 0.0020 0.0206
| ECN_63pct_2hr 0.0167 0.0156 0.0157 0.0118 0.0207 0.0163 0.0221 0.0308 0.0148 0.0165 0.0181 0.0050 0.0164
| ECN_63pct_30min 0.0250 0.0184 0.0213 0.0213 0.0158 0.0209 0.0234 0.0229 0.0178 0.0200 0.0207 0.0026 0.0211
| ECN_63pct_3hr 0.0158 0.0153 0.0238 0.0102 0.0121 0.0113 0.0101 0.0099 0.0129 0.0150 0.0136 0.0040 0.0125
| ECN_63pct_45min 0.0249 0.0178 0.0161 0.0192 0.0236 0.0144 0.0146 0.0180 0.0231 0.0223 0.0194 0.0036 0.0186
| ECN_63pct_4_Shr 0.0153 0.0101 0.0185 0.0106 0.0117 0.0176 0.0135 0.0132 0.0144 0.0152 0.0140 0.0026 0.0139
| ECN_63pct_6hr 0.0096 0.0106 0.0142 0.0114 0.0095 0.0104 0.0118 0.0110 0.0098 0.0089 0.0107 0.0015 0.0105
| ECN_63pct_9hr 0.0110 0.0074 0.0192 0.0119 0.0120 0.0100 0.0087 0.0056 0.0079 0.0076 0.0101 0.0036 0.0094
*

 

 

| CRITICAL DURATION : The critical duration for the 63.2% AEP is the ensemble ECN_63pct_10min.
| The median pattern for this ensemble is storm 7 (storm name : ECN_63pct_10min_7). |

| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_63pct_10min_9).
*

 

 

Page 57

                                                    INNOVYZE ENSEMBLE STATISTICS UTILITY
                                                              (c) Innovyze 2020

Summary information:

           Total No. of Ensembles:              63
           No. of Storms per ensemble:          10
           No. of AEP Bands:                      7
           Object Name:                  Post Dev B to Lot 61
           Result type:                  Max Flow


Results:


                                              AEP: 1% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|    ECN_1pct_10min 0.0610 0.0658 0.0615 0.0644 0.0695 0.0635 0.0674 0.0599 0.0793 0.0582 0.0651 0.0058 0.0639                             |
|    ECN_1pct_15min 0.0759 0.0618 0.0562 0.0537 0.0732 0.0691 0.0580 0.0907 0.0750 0.0564 0.0670 0.0112 0.0655                             |
|    ECN_1pct_1_5hr 0.0468 0.0548 0.0520 0.0439 0.0540 0.0508 0.0492 0.0605 0.0473 0.0518 0.0511 0.0045 0.0513                             |
|     ECN_1pct_1hr 0.0834 0.0663 0.0509 0.0545 0.0392 0.0616 0.0445 0.0496 0.0536 0.0546 0.0558 0.0117 0.0540                            |
|    ECN_1pct_20min 0.0682 0.0906 0.0554 0.0494 0.0585 0.0618 0.0550 0.0610 0.0586 0.0674 0.0626 0.0108 0.0598                             |
|    ECN_1pct_25min 0.0617 0.0908 0.0585 0.0640 0.0716 0.0567 0.0567 0.0670 0.0569 0.0726 0.0657 0.0101 0.0629                             |
|     ECN_1pct_2hr 0.0589 0.0459 0.0452 0.0530 0.0490 0.0477 0.0357 0.0373 0.0439 0.0627 0.0479 0.0081 0.0468                            |
|    ECN_1pct_30min 0.0689 0.0620 0.0844 0.0531 0.0574 0.0799 0.0579 0.0612 0.0677 0.0597 0.0652 0.0096 0.0616                             |
|    ECN_1pct_45min 0.0881 0.0820 0.0564 0.0698 0.0613 0.0503 0.0524 0.0723 0.0412 0.0612 0.0635 0.0138 0.0613                             |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_1pct_15min.                                       |
| The median pattern for this ensemble is storm 6 (storm name : ECN_1pct_15min_6).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_1pct_15min_8).                              |
*============================================================================================================================================================


                                              AEP: 10% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_10pct_10min 0.0345 0.0336 0.0368 0.0399 0.0346 0.0322 0.0381 0.0339 0.0334 0.0414 0.0358 0.0029 0.0345                               |
| ECN_10pct_15min 0.0391 0.0384 0.0397 0.0400 0.0387 0.0374 0.0325 0.0359 0.0499 0.0464 0.0398 0.0047 0.0389                               |
| ECN_10pct_1_5hr 0.0464 0.0297 0.0424 0.0297 0.0300 0.0346 0.0316 0.0248 0.0268 0.0382 0.0334 0.0066 0.0308                               |
|    ECN_10pct_1hr 0.0515 0.0322 0.0279 0.0403 0.0335 0.0380 0.0366 0.0373 0.0287 0.0562 0.0382 0.0087 0.0370                            |
| ECN_10pct_20min 0.0322 0.0327 0.0350 0.0473 0.0421 0.0397 0.0402 0.0556 0.0557 0.0376 0.0418 0.0081 0.0400                               |
| ECN_10pct_25min 0.0378 0.0593 0.0355 0.0310 0.0360 0.0557 0.0373 0.0368 0.0383 0.0486 0.0416 0.0090 0.0376                               |
|    ECN_10pct_2hr 0.0385 0.0255 0.0332 0.0482 0.0372 0.0269 0.0411 0.0264 0.0344 0.0380 0.0349 0.0069 0.0358                            |
| ECN_10pct_30min 0.0289 0.0375 0.0679 0.0358 0.0325 0.0412 0.0527 0.0379 0.0435 0.0473 0.0425 0.0107 0.0396                               |
| ECN_10pct_45min 0.0364 0.0318 0.0397 0.0362 0.0386 0.0358 0.0388 0.0273 0.0512 0.0518 0.0388 0.0072 0.0375                               |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_20min.                                      |
| The median pattern for this ensemble is storm 7 (storm name : ECN_10pct_20min_7).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_20min_9).                              |
*============================================================================================================================================================


                                              AEP: 2% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
|    ECN_2pct_10min 0.0497 0.0528 0.0494 0.0580 0.0558 0.0572 0.0541 0.0540 0.0623 0.0515 0.0545 0.0038 0.0541                             |
|    ECN_2pct_15min 0.0598 0.0563 0.0511 0.0489 0.0646 0.0620 0.0524 0.0783 0.0672 0.0508 0.0591 0.0088 0.0580                             |
|    ECN_2pct_1_5hr 0.0405 0.0485 0.0462 0.0389 0.0480 0.0452 0.0437 0.0499 0.0420 0.0461 0.0449 0.0034 0.0456                             |
|     ECN_2pct_1hr 0.0742 0.0590 0.0434 0.0486 0.0350 0.0550 0.0397 0.0432 0.0478 0.0446 0.0490 0.0107 0.0462                            |
|    ECN_2pct_20min 0.0598 0.0820 0.0452 0.0435 0.0521 0.0553 0.0499 0.0533 0.0514 0.0612 0.0554 0.0103 0.0527                             |
|    ECN_2pct_25min 0.0528 0.0821 0.0511 0.0580 0.0573 0.0514 0.0515 0.0609 0.0512 0.0660 0.0582 0.0093 0.0551                             |
|     ECN_2pct_2hr 0.0523 0.0402 0.0401 0.0471 0.0436 0.0424 0.0317 0.0332 0.0391 0.0552 0.0425 0.0071 0.0413                            |
|    ECN_2pct_30min 0.0623 0.0556 0.0764 0.0481 0.0499 0.0625 0.0525 0.0555 0.0613 0.0540 0.0578 0.0078 0.0555                             |
|    ECN_2pct_45min 0.0792 0.0732 0.0506 0.0625 0.0549 0.0434 0.0471 0.0611 0.0371 0.0541 0.0563 0.0124 0.0545                             |
*============================================================================================================================================================
| CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_15min.                                       |
| The median pattern for this ensemble is storm 1 (storm name : ECN_2pct_15min_1).                                            |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_2pct_15min_8).                              |
*============================================================================================================================================================


                                     AEP: 20% - Max Flow (m^3/s)
*============================================================================================================================================================
|    Ensemble name Storm 1 Storm 2 Storm 3 Storm 4 Storm 5 Storm 6 Storm 7 Storm 8 Storm 9 Storm 10 Average Std. Dev. Median                    |
*============================================================================================================================================================
| ECN_20pct_10min 0.0299 0.0315 0.0315 0.0319 0.0272 0.0260 0.0313 0.0281 0.0335 0.0295 0.0300 0.0022 0.0306                               |


[OCR of page images]
INNOVYZE ENSEMBLE STATISTICS UTILITY
(c) Innovyze 2020

Summary information:

Total No. of Ensembles: 63
No. of Storms per ensemble: 10
No. of AEP Bands: 7
Object Name: Post Dev B to Lot 61
Result type: Max Flow

Results:

AEP: 1% - Max Flow (m43/s)

 

 

| Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median

 

 

| ECN_ipct_10min 0.0610 0.0658 0.0615 0.0644 0.0695 0.0635 0.0674 0.0599 0.0793 0.0582 0.0651 0.0058 0.0639
| ECN_ipct_15min 0.0759 0.0618 0.0562 0.0537 0.0732 0.0691 0.0580 0.0907 0.0750 0.0564 0.0670 0.0112 0.0655
| ECN_ipct_1_5hr 0.0468 0.0548 0.0520 0.0439 0.0540 0.0508 0.0492 0.0605 0.0473 0.0518 0.0511 0.0045 0.0513
| ECN_ipct_1hr 0.0834 0.0663 0.0509 0.0545 0.0392 0.0616 0.0445 0.0496 0.0536 0.0546 0.0558 0.0117 0.0540

| ECN_ipct_2Omin 0.0682 0.0906 0.0554 0.0494 0.0585 0.0618 0.0550 0.0610 0.0586 0.0674 0.0626 0.0108 0.0598
| ECN_ipct_25min 0.0617 0.0908 0.0585 0.0640 0.0716 0.0567 0.0567 0.0670 0.0569 0.0726 0.0657 0.0101 0.0629
|

|

|

*

 

ECN_i1pct_2hr 0.0589 0.0459 0.0452 0.0530 0.0490 0.0477 0.0357 0.0373 0.0439 0.0627 0.0479 0.0081 0.0468
ECN_ipct_30min 0.0689 0.0620 0.0844 0.0531 0.0574 0.0799 0.0579 0.0612 0.0677 0.0597 0.0652 0.0096 0.0616
ECN_ipct_45min 0.0881 0.0820 0.0564 0.0698 0.0613 0.0503 0.0524 0.0723 0.0412 0.0612 0.0635 0.0138 0.0613

 

 

| CRITICAL DURATION : The critical duration for the 1% AEP is the ensemble ECN_1pct_1Smin. |
| The median pattern for this ensemble is storm 6 (storm name : ECN_1pct_15min_6). |
| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_1pct_15min_8).

 

*

 

AEP: 10% - Max Flow (m43/s)

 

 

Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median

 

 

 

ECN_10pct_10min 0.0345 0.0336 0.0368 0.0399 0.0346 0.0322 0.0381 0.0339 0.0334 0.0414 0.0358 0.0029 0.0345
ECN_10pct_iSmin 0.0391 0.0384 0.0397 0.0400 0.0387 0.0374 0.0325 0.0359 0.0499 0.0464 0.0398 0.0047 0.0389
ECN_10pct_1_Shr 0.0464 0.0297 0.0424 0.0297 0.0300 0.0346 0.0316 0.0248 0.0268 0.0382 0.0334 0.0066 0.0308
ECN_10pct_ihr 0.0515 0.0322 0.0279 0.0403 0.0335 0.0380 0.0366 0.0373 0.0287 0.0562 0.0382 0.0087 0.0370
ECN_10pct_20min 0.0322 0.0327 0.0350 0.0473 0.0421 0.0397 0.0402 0.0556 0.0557 0.0376 0.0418 0.0081 0.0400
ECN_10pct_25min 0.0378 0.0593 0.0355 0.0310 0.0360 0.0557 0.0373 0.0368 0.0383 0.0486 0.0416 0.0090 0.0376
ECN_10pct_2hr 0.0385 0.0255 0.0332 0.0482 0.0372 0.0269 0.0411 0.0264 0.0344 0.0380 0.0349 0.0069 0.0358
ECN_10pct_30min 0.0289 0.0375 0.0679 0.0358 0.0325 0.0412 0.0527 0.0379 0.0435 0.0473 0.0425 0.0107 0.0396
ECN_10pct_45min 0.0364 0.0318 0.0397 0.0362 0.0386 0.0358 0.0388 0.0273 0.0512 0.0518 0.0388 0.0072 0.0375

 

 

| CRITICAL DURATION : The critical duration for the 10% AEP is the ensemble ECN_10pct_20min. |
| The median pattern for this ensemble is storm 7 (storm name : ECN_10pct_20min_7). |

| The pattern with the greatest <Max Flow> for this ensemble is storm 9 (storm name : ECN_10pct_20min_9).
*

 

 

AEP: 2% - Max Flow (m43/s)

 

 

| Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median

 

 

| ECN_2pct_10min 0.0497 0.0528 0.0494 0.0580 0.0558 0.0572 0.0541 0.0540 0.0623 0.0515 0.0545 0.0038 0.0541
| ECN_2pct_15min 0.0598 0.0563 0.0511 0.0489 0.0646 0.0620 0.0524 0.0783 0.0672 0.0508 0.0591 0.0088 0.0580
| ECN_2pct_1_5hr 0.0405 0.0485 0.0462 0.0389 0.0480 0.0452 0.0437 0.0499 0.0420 0.0461 0.0449 0.0034 0.0456
| ECN_2pct_1hr 0.0742 0.0590 0.0434 0.0486 0.0350 0.0550 0.0397 0.0432 0.0478 0.0446 0.0490 0.0107 0.0462

| ECN_2pct_20min 0.0598 0.0820 0.0452 0.0435 0.0521 0.0553 0.0499 0.0533 0.0514 0.0612 0.0554 0.0103 0.0527
| ECN_2pct_25min 0.0528 0.0821 0.0511 0.0580 0.0573 0.0514 0.0515 0.0609 0.0512 0.0660 0.0582 0.0093 0.0551
| ECN_2pct_2hr 0.0523 0.0402 0.0401 0.0471 0.0436 0.0424 0.0317 0.0332 0.0391 0.0552 0.0425 0.0071 0.0413

| ECN_2pct_30min 0.0623 0.0556 0.0764 0.0481 0.0499 0.0625 0.0525 0.0555 0.0613 0.0540 0.0578 0.0078 0.0555
| ECN_2pct_45min 0.0792 0.0732 0.0506 0.0625 0.0549 0.0434 0.0471 0.0611 0.0371 0.0541 0.0563 0.0124 0.0545
*

 

 

| CRITICAL DURATION : The critical duration for the 2% AEP is the ensemble ECN_2pct_1Smin. |
| The median pattern for this ensemble is storm 1 (storm name : ECN_2pct_15min_1). |

| The pattern with the greatest <Max Flow> for this ensemble is storm 8 (storm name : ECN_2pct_15min_8).
*

 

 

AEP: 20% - Max Flow (m43/s)

 

 

| Ensemble name Storm1 Storm2 Storm3 Storm4 Storm5 Storm6 Storm7 Storm8 Storm9 Storm10 Average Std.Dev. Median

 

 

| ECN_20pct_10min 0.0299 0.0315 0.0315 0.0319 0.0272 0.0260 0.0313 0.0281 0.0335 0.0295 0.0300 0.0022 0.0306

The text continues on page 58.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.