Log in to see the plans as drawnWater Quality and Drainage Code
Noosa Council Plan July 2020
Performance and Acceptable Outcomes Table
Version: 2020
Performance Outcomes Acceptable Outcomes Solution1 Comments Council Use
Editor's Note— PSP6 Engineering Design
Standards - Roads, drainage and earthworks
provides guidance on prepare a groundwater
recharge and discharge plan.
Construction and establishment of stormwater management systems
PO14 AO14.1 RO14.1
Construction methods provide for appropriate An erosion and sediment control plan An Erosion and Sedimentation Control
controls to avoid entry and transport of litter, prepared in accordance with the International Plan shall be prepared (prior to
sediment, and associated prescribed water Erosion Control Association Best Practice commencement of construction) and
contaminants into receiving waters. Books demonstrates that the capture and maintained for the management of the
release of stormwater achieves the design sediment laden stormwater during the
Editor's note— Water contaminants are objectives listed in Table A: Construction construction phase in accordance with
prescribed in the phase – stormwater management design IECAs Best Practice guidelines.
Environmental Protection Act 1994 objectives of the State Planning Policy
(Appendix 2).
Editor’s note— PSP6 Engineering Design
Standards - Roads, drainage and earthworks
provides guidance on requirements for
preparing an Erosion Management Plan.
AO14.2 RO14.2
Construction works are designed and Unnecessary disturbance to soil shall be
managed to restrict the extent of clearing and avoided and all soil surfaces shall remain
soil exposure to the minimum necessary for stabilized.
access, and safe construction at any one
time
AO14.3 RO14.3
For buildings: The proposal complies. Refer to RO14.1.
(a) upstream runoff is diverted around the
construction site;
(b) sediment barriers are provided
downslope of disturbed areas to prevent
sediment washing into gutters, drains
and waterways , wetlands or drainage
1
Solution: Acceptable Solution Page 8 of 10
A/S Alternative Solution D:\JOBS\20-Jobs\20169 - 101 & 105 Eumundi Noosa Road, Noosaville\Civil\Reports\SBSMP\Working\Appendices\20169 - NSC Water Quality and Drainage Code 2020.docx
N/A Not applicable to this proposal Job: 20169
Rev: 0
Site Address: 101-105 Eumundi Noosa Road, Noosaville 30/11/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.