Stormwater Management Plan - Rev 1

of 93

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
    7. Confined Spaces
    Confined space entry procedures are not covered in this manual. It
                                                                                      CHAPTER   3
    is requested that all personnel carrying out maintenance of the SPEL
    StormSack must evaluate their own needs for confined space entry and
    compliance with occupational health and safety regulations
    When maintenance operations cannot be carried out from the surface and
    there is a need to enter confined space, only personnel that currently hold
    a Confined Space Entry Permit are allowed to enter the confined space. All
    appropriate safety equipment must be worn, and only trained personnel are
    permitted to use any required breathing apparatus gear. Necessary measures
    and controls must always be exercised to meet the confined space entry
    requirements. Non trained staff are not permitted to participle in any confined
    space entries.




    8. Traffic Management
    Typically stormwater gully pits are situated on roads and carparks, or
    adjacent to roads in a footpath or swale. As traffic requirements vary
    depending on the circumstance of the site, separate traffic control plans
    should be prepared for each site.
    The specific road safety requirements for each site can be obtained from the
    relevant road authority to ensure all maintenance operations comply with the
    laws and regulations. State government publications can also be useful to
    find out the signage requirements, placement of safety cones and barricades
    that are required when working on public roads.




5    SPEL StormSack | Operations & maintenance                                          www.spel.com.au
Log in to download the original file

Stormwater Management Plan - Rev 1.pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.