Noosa Shire Council
Adopted Infrastructure Charges Resolution (No. 1) 2014
2.5 Categorisation of uses to development classes
(1) A use under an applicable local planning instrument as stated in column 1 of Table
13.1 (Schedule of adopted charges) is included within the infrastructure State
planning regulatory provision development class stated in column 2 of Table 13.1
(Schedule of adopted charges).
(2) The Council and the distributor-retailer are to allocate a use not otherwise stated
under subsection (1) to an applicable development class based on an assessment of
use and demand.
3. Assumptions about future development
3.1 Purpose
Section 3 states the assumptions about the type, scale, location and timing of
future development for the purpose of the following:
(a) code assessment under section 313(2)(f) (Code assessment—generally)
of the Sustainable Planning Act 2009;
(b) impact assessment under section 314(2)(k) (Impact assessment—
generally) of the Sustainable Planning Act 2009.
3.2 Development inconsistent with assumptions about future development
Development is inconsistent with the assumptions about:
(a) the type of development, if the type of development of the premises is
not consistent with the type of development for the area in which the
premises is located as identified in the applicable local planning
instrument as referenced in section 17.1 (Future development
assumptions); or
(b) the scale of the development, if the demand of the development of the
premises exceeds the planned demand for the development of premises
as referenced in section 17.1 (Future development assumptions); or
(c) the location of development, if the development is located outside the
priority infrastructure area as referenced in section 4.2 (Priority
Infrastructure Area); or
(d) the timing of development, if the development results in trunk
infrastructure being supplied earlier than planned for in the schedule of
works for trunk infrastructure in section 15 (Schedule of works for trunk
infrastructure).
Council Resolution dated 6 February 2014