earthworks code assessment
Performance outcomes Acceptable Outcomes
Extent of earthworks
PO8 AO8
The layout of the development provides adequate, clearly All earthworks, including cut and fill batters, retaining walls
defined and easily accessible— and the like are contained within the subject site.
(a) onsite vehicle parking and manoeuvring areas; and Able to comply
(b) loading and manoeuvring areas for delivery and service
vehicles.
Sloping sites
PO9 AO9
On sloping sites development follows the natural landform Cut or fill is less than 1.5 metres in depth relative to the
wherever practical and excavation or filling is minimal. natural ground level. Able to comply
Infrastructure protection
PO10
Earthworks and vehicular access do not adversely impact on the No acceptable outcome provided
capacity, operations and maintenance of existing infrastructure. No Acceptable Outcome Applicable
Environmental protection
PO11
Earthworks minimise any adverse impact upon groundwater, No acceptable outcome provided
watercourses, drainage lines, wetlands, and native vegetation. No Acceptable Outcome Applicable
Dams
PO12 AO12.1
Dam location and construction does not impact upon Where the site is in the Rural zone—
neighbouring properties or road reserves, in terms of— (a) the land has a slope of less than 25% (1:4);
(a) hydrology; (b) the earthworks including cut and fill batters and retaining
(b) alteration of existing overland flow paths and patterns; walls are setback a minimum of 50 metres from the
(c) landslide or failure of dam wall; and property boundary; and
(d) effluent disposal areas. (c) the size of the lot is greater than 5 hectares.
AO12.2
Where the site is in the Rural residential zone or the Rural
zone and the lot is less than 5 hectares:
(a) the land has a slope of less than 1:6;
(b) the earthworks including cut and fill batters and retaining
walls are setback a minimum of 20 metres from the
property boundary; and
(c) the dam work involves less than 500m³ of material.
Not Applicable as not for a dam - Furthermore the site is 2.8ha, slope is flat,
there will beAO12.3
no fill batters associated with 100mm of fill over 1000m2.
For all other zones—
No acceptable outcome provided
NOOSA PLAN 2020 AMENDED AT 25 SEPTEMBER 2020 Page 3 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.