Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

A6107 Lot9 Stormwater Management Plan (RevB) June 2022 · OPW22/0166

of 31

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

       FOX BT600 and RIP MANAGEMENT AND MAINTENANCE PLAN

ELEMENT:                                                MAINTENANCE OF RAPID
                                                        INFILTRATION PITS (RIP’s)
1.    Objective                To ensure ongoing function of RIP’s in reintroducing
                               runoff into the subsoil.

2.    Management Strategy      RIP to remain free of silt/sediment build-ups.

3.    Actions                  Maintenance contractor to service RIP’s at monthly
                               intervals.

                               All removed sediment/silt to be placed in skips or bins for
                               disposal.

4.    Performance Indicators  Body Corporate to ensure maintenance schedule adhered
                              to.
5.    Frequency/Deadline      Monthly inspections.
6.    Responsible      Person Body corporate to ensure maintenance schedule adhered
      /Organisation           to.

                               Maintenance contractor to make entries in environmental
                               diary noting date of RIP service, condition of RIP, material
                               removed and means of disposal.

                               Random inspection by Council/EPA officers.
7.    Reporting and Review     Maintenance Contractor to make entries in environmental
                               diary noting date of RIP service, condition of RIP, material
                               removed and means of disposal.

                               Random inspection by Council/EPA officers.

8.    Corrective Action        Review maintenance schedule as appropriate.

                               Replace BIDIM A14 filter yearly or more regularly when
                               necessary.




ELEMENT:                                             MAINTENANCE OF FOX
                                                     BT600 Gross Pollutant Traps
1.    Objective                To ensure ongoing function of Fox BT600 GPTs in
                               removing oils, hydrocarbons and sediment prior to
                               discharge to RIPs.

2.    Management Strategy      FOX BT600 to remain free from silt, sediment, oil and
                               hydrocarbons build-ups.

3.    Actions                  Licenced FOX maintenance contractor to service BT 600’s
                               at monthly intervals. Remove silt/sediment from baskets
                               and pump out oils and hydrocarbons from storage
                               chamber

Used in these records

About this file

File size
6.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

A6107 Lot9 Stormwater Management Plan (RevB) June 2022.pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.