FOX BT600 and RIP MANAGEMENT AND MAINTENANCE PLAN
ELEMENT: MAINTENANCE OF RAPID
INFILTRATION PITS (RIP’s)
1. Objective To ensure ongoing function of RIP’s in reintroducing
runoff into the subsoil.
2. Management Strategy RIP to remain free of silt/sediment build-ups.
3. Actions Maintenance contractor to service RIP’s at monthly
intervals.
All removed sediment/silt to be placed in skips or bins for
disposal.
4. Performance Indicators Body Corporate to ensure maintenance schedule adhered
to.
5. Frequency/Deadline Monthly inspections.
6. Responsible Person Body corporate to ensure maintenance schedule adhered
/Organisation to.
Maintenance contractor to make entries in environmental
diary noting date of RIP service, condition of RIP, material
removed and means of disposal.
Random inspection by Council/EPA officers.
7. Reporting and Review Maintenance Contractor to make entries in environmental
diary noting date of RIP service, condition of RIP, material
removed and means of disposal.
Random inspection by Council/EPA officers.
8. Corrective Action Review maintenance schedule as appropriate.
Replace BIDIM A14 filter yearly or more regularly when
necessary.
ELEMENT: MAINTENANCE OF FOX
BT600 Gross Pollutant Traps
1. Objective To ensure ongoing function of Fox BT600 GPTs in
removing oils, hydrocarbons and sediment prior to
discharge to RIPs.
2. Management Strategy FOX BT600 to remain free from silt, sediment, oil and
hydrocarbons build-ups.
3. Actions Licenced FOX maintenance contractor to service BT 600’s
at monthly intervals. Remove silt/sediment from baskets
and pump out oils and hydrocarbons from storage
chamber
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
A6107 Lot9 Stormwater Management Plan (RevB) June 2022.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.