Alta Projects engineers (formally Tate) were involved in
formulation of the over-arching development approval
document and EMP1.
Such involvement included construction of a prototype RIP on
the Settlers Cove site and field testing to determine infiltration
rates. Results were consistent indicating a liner relationship
between driving head and infiltration rate such that:
Infiltration Rate (mm/s) = 4mm/sec + 13.6 x head (m)
Refer to Appendix C for prototype test results.
In order to model the operation of the RIP’s, a spreadsheet has
been developed and utilised for all previous stages of Settlers
Cove.
Temporal patterns for Zone 3 from the Australian Rainfall and
Runoff, Volume 2 were applied. These temporal patterns were
used in conjunction with the average rainfall intensities for the
Noosa region to create a series of design storms of varying
duration for a 100-year average return interval (ARI).
Temporal patterns were converted to flow rates by breaking
each storm event into a series of short duration storms. A
triangular flow verses time approximation was used for each
sub storm with sub storm flows then added to produce flow Vs
time for RIP inflow.
Outflow and water depth were then calculated through
iterations for the duration of the storm based on the infiltration
rate / head relationship discussed above. A factor of safety of
2.0 was applied to the observed prototype infiltration rate. Each
RIP was then sized to prevent overtopping in a 100-year ARI
storm event of any duration.
Spreadsheet model results for each building are attached in
Appendix D.
6.2 Emergency Overflow (>100year ARI events)
Emergency overflow, for events (>Q100) which cannot be
wholly infiltrated by RIPs, is to be directed to the POSCWP area
__________________________________________________________________________
A6107/L9/SMP/RevB/Jun 2022 Page 5 of 7
SH/pl
Brah101 Pty Ltd t/as ALTA PROJECTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
A6107 Lot9 Stormwater Management Plan (RevB) June 2022.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.