Where drilled piers supporting columns or posts are not poured with the slab they must be connected to the slab
in the following manner:
• 4-N12 bars must be anchored 500mm into the drilled pier and be bent 300mm horizontally into the footing
or slab as required.
• Where a column penetrates a beam or footing 3-N12 bars must be bent around the column to lap the
trench mesh by 500mm both sides.
Drilled Pier Reinforcement
Pier Depth mm Perimeter Piers Slab Piers
up to 1500 None required none required
1500-2500 2xN12bars none required
2500-4000 4xN12bars 2xN12bars
4000-6000 6xN12 bars 4xN12bars
NOTE: The information contained herein has been compiled following our field and laboratory testing,
accepted engineering theory and discussions with and information supplied by our client, whom
is noted on the header page of this report. We offer no warranty for the use of this report by
other parties without prior written consent from this office.
The report must be read in conjunction with the attached appendices. If you do not have a copy
of these please contact our office and a copy can be issued to you.
for and on behalf
SCG CONSULTING ENGINEERS
SCG Consulting Engineers 4 SCG Ref: 29095(S)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix B - SCG Soil Test & Footing Report Dated 26-06-2019.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.