Skip to the record
Search everything, all in one place.

Original source · versioned page text

2014-11-20 Ordinary Meeting Minutes

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                    MINUTES


           Ordinary Meeting


       Thursday, 20 November 2014

                  commencing at 6pm
 Peregian Beach Surf Club, Kingfisher Drive, Peregian Beach




Crs Noel Playford (Chair), Bob Abbot, Sandy Bolton, Joe Jurisevic,
Frank Pardon, Tony Wellington, Frank Wilkie
Log in to download the original file

2014-11-20 Ordinary Meeting Minutes(PDF, 129KB).pdf · 132 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 18 sections

Section 2

ORDINARY MEETING MINUTES                                                    20 NOVEMBER 2014


1   ATTENDANCE & APOLOGIES

    COUNCILLORS
    Councillor N Playford, Mayor
    Councillor B Abbot
    Councillor S Bolton
    Councillor J Jurisevic
    Councillor F Pardon
    Councillor T Wellington
    Councillor F Wilkie

    EXECUTIVE
    B de Chastel, Chief Executive Officer
    A Rogers, Director Community Services
    M Shave, Director Corporate Services
    M Drydale, Director Planning & Infrastructure
    D Iezzi, Executive Manager, Executive Office


    APOLOGIES
    Nil.


    The meeting commenced at 6.03pm




2   CONFIRMATION OF MINUTES

    Council Resolution

    Moved:            Cr Abbot
    Seconded:         Cr Jurisevic

    The Minutes of the Ordinary Meeting held on 23 October 2014 be received and confirmed.

                                                                                      Carried.




Noosa Shire Council                                                               Page 2 of 19
                        This is not an official copy of Council’s Minutes

Section 3

ORDINARY MEETING MINUTES                                                    20 NOVEMBER 2014


3    MAYORAL MINUTES

     Cr Playford moved the following Mayoral Minute:

     1.    NOOSA RIVER ENVIRONMENTAL PROJECTS

     That Council note the presentation to a Council workshop on 14 November 2014 from The
     Nature Conservancy and the Thomas Foundation in relation to proposed projects to
     improve the environmental outcomes for the Noosa River, and

     A.    Authorise the Chief Executive Officer to write to The Nature Conservancy and the
           Thomas Foundation advising that the Council will provide support for the two initial
           proposed projects with a Council financial contribution of up to $25,000 and with
           Council also providing support for any required interface to government agencies;
           and

     B.    Request the Chief Executive Officer to continue liaison with both The Nature
           Conservancy and the Thomas Foundation regarding possible future projects for
           consideration and to provide Council with updates as required.
                                                                                Carried.



    Cr Playford moved the following Mayoral Minute:

    2.     PROCUREMENT OF A SECOND HAND JOHN DEERE 670GP GRADER

    That Council authorises the Chief Executive Officer to enter into negotiations to procure a
    second hand grader up to the value of $250,000 (excluding GST) utilising available
    2014/15 budget funding within the Fleet – Plant Replacement program.
                                                                                       Carried.




4   NOTIFIED MOTIONS
    Nil.




Noosa Shire Council                                                               Page 3 of 19
                        This is not an official copy of Council’s Minutes

Section 4

ORDINARY MEETING MINUTES                                                      20 NOVEMBER 2014


5    CONSIDERATION OF COMMITTEE RECOMMENDATIONS

AUDIT COMMITTEE RECOMMENDATIONS

10 NOVEMBER 2014 – Cr Playford, Cr Wellington, Scott Williams, Cameron Jaggers
Other attendees:    Brett de Chastel (CEO); Michael Shave (Director Corporate Services);
Debra Iezzi (Executive Manager); Wayne Jensen (Manager Financial Services); Megan
MacMichael (Financial Accountant); Paul Bright (Governance Advisor); Kylie Harris (PA to the
CEO); Patrick Flemming (QAO representative)
The Recommendations from the Audit Committee were adopted without discussion or
further amendment.

Council Resolution
Moved:            Cr Wellington
Seconded:         Cr Wilkie
The Audit Committee recommendations dated 10 November 2014 be adopted.
                                                                                        Carried.


1    DRAFT FINANCIAL STATEMENTS 30 JUNE 2014
     That the Audit Committee note the report by the Manager Financial Services to the Audit
     Committee Meeting dated 10 November 2014 regarding the draft financial statements for
     the period ended 30 June 2014.

2    INTERNAL AUDIT POLICY
     That the Audit Committee note the report by the Executive Manager to the Audit Committee
     Meeting dated 10 November 2014 and:
     1.     Rescind the existing Internal Audit Policy that transferred to Noosa Council from the
            Sunshine Coast Regional Council under the Local Government (De-amalgamation
            Implementation) Regulation 2013; and
     2.     Adopt the Internal Audit Policy as set out in Attachment 1 to the report.

3    RISK MANAGEMENT UPDATE
     That Council note the report by the Executive Manager to the General Committee Meeting
     dated 10 November 2014 regarding the implementation of Council’s Risk Management
     Policy and program.

4    OVERVIEW OF COUNCIL DELEGATIONS
     That the Audit Committee note the report by the Executive Manager to the Audit Committee
     Meeting dated 10 November 2014 providing an over view of Council’s delegations and
     associated processes.

5    ANNUAL REPORTING OBLIGATIONS
     That the Audit Committee note the report by the Executive Manager to the Audit Committee
     Meeting dated 10 November 2014 outlining Council’s annual statutory reporting obligations.

6    PROPOSED TIMETABLE FOR FUTURE MEETINGS
    That the Audit Committee endorse the proposed meeting dates for 2015 as detailed in the
    Audit Committee Agenda dated 10 November 2014 with a change to the February meeting
    date to Wednesday, 4 February 2015.
Noosa Shire Council                                                          Page 4 of 19
                          This is not an official copy of Council’s Minutes

Section 5

ORDINARY MEETING MINUTES                                                       20 NOVEMBER 2014


INFRASTRUCTURE & SERVICES COMMITTEE RECOMMENDATIONS

11 NOVEMBER 2014 - Crs Sandy Bolton (Chair), Bob Abbot, Frank Pardon,
Noel Playford
Other Councillors in Attendance: Cr Jurisevic

The Recommendations from the Infrastructure and Services Committee were
adopted without discussion or further amendment.

Council Resolution

Moved:           Cr Pardon
Seconded:        Cr Bolton

The Infrastructure & Services Committee recommendations dated 11 November 2014 be
adopted.
                                                                          Carried.

1    BUS STOP INFRASTRUCTURE PROGRAM 2014/2015
     That Council note the report by the Design Services Manager to the Infrastructure &
     Services Committee Meeting dated 11 November 2014 and,
     A.     Delegate authority to the Chief Executive Officer to enter into a contract agreement
            for the construction of the ground works associated with the delivery of 15 bus stops
            at various locations; and
     B.     Delegate authority to the Chief Executive Officer to enter into contract agreements
            with suppliers for the Noosa style bus shelters on the following basis:
            1.   supply and installation of 15 coastal style shelters for 2014/2015;
            2.   a fixed price per each for the supply and installation of the coastal style shelter
                 for a period of 3 years starting in 2015/2016; and
            3.   a fixed price per each for the supply and installation of the rural style shelter for
                 a period of 3 years starting in 2015/2016.

2    PROPOSAL TO RENAME ROAD - DAVID LOW WAY, NOOSA HEADS
     That Council note the report by the Project Officer to the Infrastructure & Services
     Committee Meeting dated 11 November 2014 and resolve to rename the section of David
     Low Way from the intersection of Noosa Drive to the commencement of Edwards Street as
     Sunshine Beach Road.

3    REQUEST FOR COMMEMORATION - HERB WOODS
     That Council note the report by the Project Officer to the Infrastructure & Services
     Committee Meeting dated 11 November 2014 and:
     A.     Agree to commemorate Herb Woods as the founder of the Noosa River ferry service
            with the planting of a tree and installation of a plaque in the area immediately east of
            the ferry landing area (as set out in Option 3 of the Report); and
     B.     Thank Mrs Coral Ross for the Woods’ family contribution of $500 towards the costs
            involved.


Noosa Shire Council                                                                     Page 5 of 19
                          This is not an official copy of Council’s Minutes

Section 6

ORDINARY MEETING MINUTES                                                    20 NOVEMBER 2014


4    THE J & BICENTENNIAL COMMUNITY CENTRE QUARTERLY REPORT 1 JULY 2014 -
     30 SEPTEMBER 2014
     That Council note the report by the The J Coordinator to the Infrastructure & Services
     Committee Meeting dated 11 November 2014 providing a quarterly update on The J &
     Bicentennial Community Centre.

5    NOOSA LEISURE CENTRE (NLC) QUARTERLY REPORT 1 JULY 2014 - 30
     SEPTEMBER 2014
     That Council note the report by the Noosa Leisure Centre Coordinator to the Infrastructure
     & Services Committee Meeting dated 11 November 2014 providing a quarterly update for
     the Noosa Leisure Centre.

6   NOOSA COMMUNITY CARE (NCC) QUARTERLY REPORT 1 JULY 2014 - 30
    SEPTEMBER 2014
     That Council note the report by the Noosa Community Care Coordinator to the
     Infrastructure & Services Committee Meeting dated 11 November 2014 providing a
     quarterly update on Noosa Community Care.

7   NOOSA AQUATIC CENTRE - QUARTERLY REPORT 1 JULY 2014 - 30 SEPTEMBER
    2014
    That Council note the report by the Noosa Aquatic Centre Coordinator to the Infrastructure
    & Services Committee Meeting dated 11 November 2014 providing a quarterly update on
    the Noosa Aquatic Centre.

8   E-WASTE COLLECTION SERVICE 2014-15
    That Council note the report by the Manager Waste and Environmental Health to the
    Infrastructure & Services Committee Meeting dated 11 November 2014 and:
    A.    Communicate the closure of the free e-waste recycling scheme for 2014/15 to Noosa
          residents and accept future e-waste along with other general waste at the approved
          schedule of charges; and
    B.    Refer concerns about the free e-waste recycling scheme e-waste and the need to
          increase funding allocations for continuing the service in 2014/15 via the SEQ Waste
          Working Group to the Council of Mayors (SEQ) and LGAQ.




Noosa Shire Council                                                               Page 6 of 19
                        This is not an official copy of Council’s Minutes

Section 7

ORDINARY MEETING MINUTES                                                   20 NOVEMBER 2014


PLANNING & ORGANISATION COMMITTEE RECOMMENDATIONS

11 NOVEMBER 2014 – Crs Frank Wilkie (Chair), Noel Playford, Joe Jurisevic,Tony Wellington
Other Councillors in Attendance: Nil

The Recommendations from the Planning and Organisation Committee were adopted
without discussion or further amendment.

Council Resolution

Moved:          Cr Jurisevic
Seconded:       Cr Wellington

The Planning & Organisation Committee recommendations dated 11 November 2014 be
adopted.
                                                                        Carried.


1    REFERRAL AGENCY - BUILDING STATISTICS REPORT
     That Council note the report by the Building and Plumbing Manager to the Planning &
     Organisation Committee Meeting dated 11 November 2014 providing the quarterly
     statistics on decisions in relation to building relaxations.

2    PROPOSED COUNCIL ELECTRICIAN
     That Council note the report by the Building and Plumbing Manager to the Planning &
     Organisation Committee Meeting dated 11 November 2014 and endorse the proposed full
     time position of Council Electrician.

3    PLANNING & ENVIRONMENT COURT APPEAL D 165/14 FOR A DEVELOPMENT
     PERMIT FOR SERVICE & UTILITY TYPE 3 (TOWER) SITUATED AT GRAHAMS ROAD,
     PINBARREN MCU13/0067
     That Council note the report by the Development Planner to the Planning & Organisation
     Committee Meeting dated 11 November 2014 regarding Planning & Environment Court
     Appeal D 165/14 and agree to defend the appeal.

4    DEVELOPMENT APPLICATION MCU14/0049 & OPW14/0276 - MATERIAL CHANGE OF
     USE FOR INDUSTRIAL BUSINESS TYPE 1 WAREHOUSE (SELF STORAGE FACILITY)
     & OPERATIONAL WORKS SIGNAGE AT 64-66 RENE STREET, NOOSAVILLE
     Item not dealt with by Planning & Organisation Committee. Referred to General
     Committee for consideration.
     Reason for referral: Cr Wellington disagrees with the Recommendation.

5    DEVELOPMENT APPLICATION MCU14/0067 - MATERIAL CHANGE OF USE FOR
     INDUSTRIAL BUSINESS TYPE 1 WAREHOUSE (SELF STORAGE FACILITY) AT 77
     RENE STREET, NOOSAVILLE

     That Council note the report by the Senior Development Planner to the Planning &
     Organisation Committee Meeting dated 11 November 2014 regarding Application No.
     MCU14/0067 for a Development Permit for a Material Change of Use for an Industrial
     Business – Type 1 Warehouse (Self Storage) situated at 77 Rene Street, Noosaville and
     approve the application in accordance with the following conditions:

Noosa Shire Council                                                              Page 7 of 19
                       This is not an official copy of Council’s Minutes

Section 8

ORDINARY MEETING MINUTES                                                     20 NOVEMBER 2014


    PLANNING
    When Conditions must be Complied With
    1.   Unless otherwise stated, all conditions of this Decision Notice must be complied with
         prior to the use commencing, and then compliance maintained at all times while the
         use continues.
    Approved Plans
    2.   Development undertaken in accordance with this approval must generally comply
         with the approved plans of development. The approved plans are listed below and as
         may be amended by the conditions herein.
              Plan No.        Rev.   Plan/Document Name                             Date
              S8166-MS01      A      Master Site Plan prepared by Milanovic Neale   20/08/14
                                     Consulting Engineers
              WD-03.01        C      Proposed Floor Plan – Ground prepared by       February 2014
                                     Elevation Architecture Studio
              WD-03.02        C      Proposed Floor Plan – First prepared by        February 2014
                                     Elevation Architecture Studio
              WD-03.04        A      Proposed Roof Plan prepared by Elevation       February 2014
                                     Architecture Studio
              SK-03.02        C      3D Views prepared by Elevation Architecture    20/08/2014
                                     Studio
              SK-04.01        B      Proposed Elevations prepared by Elevation      20/08/2014
                                     Architecture Studio
    Nature and Extent of Approved Use
    3.   No external storage or use areas are approved on the site.
    4.   Any display and retail sale of goods must remain an ancillary component to the
         approved use and must not exceed an area of 100m2.
    Built Form
    5.   The building must incorporate a minimum of 600mm eaves to at least 75% of the
         perimeter of the building. Amended plans demonstrating compliance must be
         submitted to Council prior to the issue of a Development Permit for Operational
         Works.
    Building Height
    6.   The maximum height of the development must not exceed 8metres above the
         finished ground level and the natural ground level.
    Landscaping
    7.   The development site must be landscaped. The works must be undertaken in
         accordance with an Operational Works approval and The Noosa Plan’s Planning
         Scheme Policy 3 Landscaping Plants and Guidelines for that specific area and must
         include:
         a.      The landscaped areas as generally shown on the approved Site Plan, except
                 where amended by conditions contained herein.
         b.      Trees within the front setback area and to soften building bulk.
         c.      All plantings near storm water infrastructure are to be coordinated with the
                 approved hydraulics plans and must not interfere with the operational function
                 of the storm water devices, either by root interference, shading or other means.
         d.      Landscaping plans must show the location of all water quality devices.

Noosa Shire Council                                                                 Page 8 of 19
                         This is not an official copy of Council’s Minutes

Section 9

ORDINARY MEETING MINUTES                                                        20 NOVEMBER 2014


          e.    Retention of existing street trees.
    8.    All landscape works must be established and maintained in accordance with the
          approved design for the life of the development, and in a manner that ensures
          healthy, sustained and vigorous plant growth. All plant material must be allowed to
          grow to full form and be refurbished when its life expectancy is reached.
    Street Identification
    9.    The street address of the development must be clearly visible and discernible from
          the primary frontage of the site by the provision of a street number and, where
          appropriate, the building name.
    Performance Bond
    10.   Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
          must be submitted to Council, to secure performance of all conditions of this
          approval, prior to the issue of a Development Permit for Operational Works. The cash
          bond or trading bank guarantee will be returned on performance of the conditions of
          approval less any costs incurred by Council in respect of enforcing performance of
          this permit. Council reserves the right to call upon the bond or guaranteed sum to
          effect compliance with conditions.
    ENGINEERING
    Carparking and Driveways
    11.   Sealed car parking and access driveway must be provided generally in accordance
          with Drawing No: S8166 – MS01- Revision (A) titled Master Site Plan dated
          20/08/2014 by Milanovic Neale Consulting Engineers.      The works must be
          undertaken in accordance with an Operational Works approval and must include in
          particular:
    a.    The car parking must be in compliance with the provisions of the current AS/NZS
          2890.1 off-street car parking (particularly Section 2.4.4) and the relevant sections of
          AS/NZS 2890.6 off-street car parking for people with disabilities.
    b.    Compliance with the relevant sections of AS/ANZ 2890.2 Off-street commercial
          vehicles facilities.
    c.    Traffic control and directional signage within and at the entry of the site must be
          provided in accordance with the design engineer recommendations and in
          compliance with the Manual of Uniform Traffic Control Devices (MUTCD).
    12.   All car parking areas and access driveways must be maintained exclusively for
          vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
    13.   Any building, structure and/or installation (e.g. sliding gate and associated
          mechanism) must not encroach onto, or negate the conditions of, the registered
          easement/s along the front boundary of the site.
    Stormwater Drainage
    14.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval in compliance with the relevant sections of Queensland Urban
          Drainage Manual, the relevant Codes and Policies of The Noosa Plan and supported
          by a detailed stormwater drainage report and design based on field survey and
          prepared and certified by a suitably qualified and experienced Registered
          Professional Civil Engineer, and must include in particular:



Noosa Shire Council                                                                   Page 9 of 19
                            This is not an official copy of Council’s Minutes

Section 10

ORDINARY MEETING MINUTES                                                     20 NOVEMBER 2014


           a.    Where is considered effective and practical all roof runoffs should be directed to
                 water tanks with overflows and surcharge be discharged into a lawful point of
                 discharge.
           b.    Stormwater detention to cater for all flows from the outdoor areas and any
                 possible stormwater surcharge from the roof drainage system during heavy
                 rainfall events to maintain predevelopment stormwater runoff, and to address
                 any potential of adverse impact by the development on the existing drainage
                 conditions on other properties.
           c.    Plans submitted for operational works approval must include bioretention which
                 demonstrates that stormwater runoff shall be treated to achieve 80% Reduction
                 in Total Suspended Solids, 60% Reduction in Total Phosphorous and 45%
                 Reduction in Total Nitrogen prior to discharge from the site compared to if there
                 was no water pollutant mitigation incorporated into the design.
           d.    Where biobasins are proposed on site to achieve compliance with the above
                 Reduction parameters, calculations to determine filter media area and detail
                 design must be consistent with current best practice methods as detailed in the
                 Bioretention Technical Design Guidelines Version 1, October 2012.
           e.    Bioretention basins must include 1:4 batters between the dedicated filter media
                 area and the surrounding ground surface. Batters are not included within filter
                 media footprint area calculation.
           f.    Bioretention basin layout and setting must be consistent with landscape design
                 for the site.
     15.   Stormwater runoff from the development must be disposed of on-site without causing
           scour or damage to the subject site or any adjoining property.
           Advisory Notes
           Aboriginal Cultural Heritage Act 2003
           There may be a requirement to establish a Cultural Heritage Management Plan
           and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH
           Act).
           The ACH Act establishes a cultural heritage duty of care which provides that: “A
           person who carries out an activity must take all reasonable and practicable measures
           to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to
           fail to comply with the duty of care. Substantial monetary penalties may apply to
           individuals or corporations breaching this duty of care. Injunctions may also be issued
           by the Land and Resources Tribunal, and the Minister administering the ACH Act can
           also issue stop orders for an activity that is harming or is likely to harm Aboriginal
           cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You
           should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss
           any obligations under the ACH Act.
           Equitable Access and Facilities
           The plans for the proposed building work have NOT been assessed for compliance
           with the requirements of the National Construction Code - Building Code of Australia
           (Volume 1) as they relate to people with disabilities. Your attention is also directed to
           the fact that in addition to the requirements of the National Construction Code as they
           relate to people with disabilities, one or more of the following may impact on the
           proposed building work:
           1     the Disability Discrimination Act 1992 (Commonwealth);
           2     the Anti-Discrimination Act 1991 (Queensland); and
          3   the Disability (Access to Premises – Buildings) Standards.
Noosa Shire Council                                                                 Page 10 of 19
                         This is not an official copy of Council’s Minutes

Section 11

ORDINARY MEETING MINUTES                                                   20 NOVEMBER 2014


         4     The applicant is advised that the development works for this permit may require
               payment of a compliance bond (to be determined in Operational Works Permit)
               in accordance with Council’s policies. The payment of the bonds will be
               required prior the prestart meeting for the Operation Works.
         5     The Building and Construction Industry (Portable Long Service Leave) Levy
               must be paid prior to the issue of a development permit where one is required
               for the 'Building and Construction Industry'. This applies to Building Works,
               Operational Works and Plumbing and Drainage Works applications, as defined
               under the Sustainable Planning Act 2009, where the works are $80,000 or more
               and matching the definition of 'Building and Construction Industry' under the
               Building and Construction Industry (Portable Long Service Leave) Act 1991.
               Council will not be able to issue a Decision Notice without receipt of details that
               the Levy has been paid. Should you require clarification in regard to the
               amendments to the Building and Construction Industry (Portable Long Service
               Leave) Act 1991, you should contact QLeave on 1800 803 481 (free call) or
               (07) 3212 6855

6   SEPTEMBER 2014 QUARTERLY BUDGET REVIEW
    Item not dealt with by Planning & Organisation Committee.              Referred to General
    Committee for consideration.
    Reason for referral: Significance of issue and request for a further report amending
    Attachment 1.

7   NOOSA NORTH SHORE LANDING GROUND TENURE AMENDMENT (LOT 7
    MCH4562)
    That Council note the report by the Property & Facilities Property Officer to the Planning &
    Organisation Committee dated 11 November 2014 and issue the Trustee Lease and the
    Trustee Licence areas to include infrastructure outside of the hangar footprints in
    accordance with a revised lease survey plan to be prepared by the two groups (as per
    Option 1 in the report):

    A.   Sunshine Coast Aviators Inc Trustee Lease (proposed lease area B) – over new
         hangar and new plumbing infrastructure; and
    B.   Sunshine Coast Model Flyers Inc Trustee Licence (proposed lease area A) – over
         existing hangar and existing plumbing infrastructure.

8   QUARTERLY OPERATIONAL PLAN PROGRESS REPORT
    That Council note the report by the Chief Executive Officer to the Planning & Organisation
    Committee Meeting dated 11 November 2014 providing an update on progress with the
    implementation of the Operational Plan to 30 September 2014 and details of Key
    Performance Indicators.




Noosa Shire Council                                                               Page 11 of 19
                       This is not an official copy of Council’s Minutes

Section 12

ORDINARY MEETING MINUTES                                                      20 NOVEMBER 2014


GENERAL COMMITTEE RECOMMENDATIONS

17 NOVEMBER 2014 - Crs Tony Wellington (Chair), Bob Abbot, Joe Jurisevic,
Frank Pardon, Noel Playford, Frank Wilkie.
Apology: Cr Sandy Bolton

The Recommendations from the General Committee were adopted without discussion or
further amendment.

Council Resolution

Moved:             Cr Wilkie
Seconded:          Cr Bolton

The General Committee recommendations dated 17 November 2014 be adopted.
                                                                                          Carried.



1    DEVELOPMENT APPLICATION MCU14/0049 & OPW14/0276 - MATERIAL CHANGE OF
     USE FOR INDUSTRIAL BUSINESS TYPE 1 WAREHOUSE (SELF STORAGE FACILITY)
     & OPERATIONAL WORKS SIGNAGE AT 64-66 RENE STREET, NOOSAVILLE
     That Council note the report by the Senior Development Planner to the Planning &
     Organisation Committee Meeting dated 11 November 2014 regarding Application No.
     MCU14/0049 & OPW14/0276 for a Development Permit for a Material Change of Use for
     an Industrial Business – Type 1 Warehouse (Self Storage Facility) and Operational Works
     (Signage) situated at 64-66 Rene Street, Noosaville and
     A.     Approve the Material Change of Use application MCU14/0049 subject to the following
            conditions:
            PLANNING
            When Conditions must be Complied With
            1.     Unless otherwise stated, all conditions of this Decision Notice must be complied
                   with prior to the use commencing, and then compliance maintained at all times
                   while the use continues.
            Approved Plans
            2.     Development undertaken in accordance with this approval must generally
                   comply with the approved plans of development. The approved plans are listed
                   below and are as amended by the conditions herein.
                 Plan No.           Rev.   Plan/Document Name                             Date
                 OGSS-001-01        G      Site Plan Stage 2                              18/9/14
                 OGSS-001-02        G      Stage 2 Basement Floor Plan                    18/9/14
                 OGSS-001-03        G      Stage 3 Ground Floor Plan                      18/9/14
                 OGSS-001-04        G      Stage 3 Level 1 Floor Plan                     18/9/14
                 OGSS-001-05        G      Stage 3 Level 2 Floor Plan                     18/9/14
                 OGSS-001-06        G      Elevations 1 & 2                               18/9/14
                 OGSS-001-07        G      Elevations 3 & 4                               18/9/14
                 OGSS-001-08        G      Sections A-A & B-B                             18/9/14
                 OGSS-001-09        G      Basement Location Plan                         18/9/14



Noosa Shire Council                                                                 Page 12 of 19
                          This is not an official copy of Council’s Minutes

Section 13

ORDINARY MEETING MINUTES                                                    20 NOVEMBER 2014


         Nature and Extent of Approved Use
         3.    No external storage or use areas are approved on the site.
         4.    Any display and retail sale of goods must remain an ancillary component to the
               approved use and must not exceed an area of 100m2.
         Signage
         5.    Signage must comply with the self-assessable provisions for signage identified
               in the Advertising Devices Code of the Noosa Plan. In particular,no sign shall
               exceed a sign face area of 4m2 and total signage shall not exceed a combined
               sign face area of 10m2.
         Building Height
         6.    The maximum height of the development must not exceed 10metres above the
               finished ground level and the natural ground level.
         7.    Certification must be submitted to Council from a Licensed Surveyor which
               certifies that the buildings do not exceed the maximum height requirement of
               this Decision Notice.
         Landscaping
         8.    The development site must be landscaped. The works must be undertaken in
               accordance with an Operational Works approval and The Noosa Plan’s
               Planning Scheme Policy 3 Landscaping Plants and Guidelines for that specific
               area and must include:
               a.     The landscaped areas as generally shown on the approved Site Plan,
                      except where amended by conditions contained herein.
               b.     Trees planted to achieve tall, dense screening vegetation along the
                      eastern side boundary to assist with screening dust ingress to the site.
                      Recommended species is Elaeocarpus eumundi or similar.
               c.     Trees within the front setback area and along western boundary to soften
                      the visual building bulk.
               d.     Retention of the existing street trees.
         9.    All landscape works must be established and maintained in accordance with
               the approved design for the life of the development, and in a manner that
               ensures healthy, sustained and vigorous plant growth. All plant material must
               be allowed to grow to full form and be refurbished when its life expectancy is
               reached.
         Street Identification
         10.   The street address of the development must be clearly visible and discernible
               from the primary frontage of the site by the provision of a street number and,
               where appropriate, the building name.
         Performance Bond
         11.   Security in the form of a cash bond or trading bank guarantee to the sum of
               $10,000 must be submitted to Council, to secure performance of all conditions
               of this approval, prior to the issue of a Development Permit for Operational
               Works. The cash bond or trading bank guarantee will be returned on
               performance of the conditions of approval less any costs incurred by Council in
               respect of enforcing performance of this permit. Council reserves the right to
               call upon the bond or guaranteed sum to effect compliance with conditions.



Noosa Shire Council                                                              Page 13 of 19
                        This is not an official copy of Council’s Minutes

Section 14

ORDINARY MEETING MINUTES                                                    20 NOVEMBER 2014


         Staging & Sunset Clause for Completion
         12.   The development may be completed in stages, as shown on the approved
               plans.  Pursuant to s342 of the Sustainable Planning Act 2009, any
               uncompleted aspects of this development approval lapse if the whole of the
               approved use has not happened by 20 November 2020.
         ENGINEERING
         Site Access and Driveways
         13.   Concrete driveway and parking areas shall be provided generally in accordance
               with Drawing Nos: OGSS-001-01, Rev G dated 18/09/2014 and OGSS-001-01,
               Rev G dated 18/09/2014 – respectively titled: Site Plan Stage 2 and Stage 2
               Basement Floor Plan, prepared by Steve McGregor Design Service and as may
               be amended by the conditions of this permit. The works must be undertaken in
               accordance with an engineering design prepared by suitably qualified
               registered professional engineer and a Development Permit for Operational
               Works, and shall include in particular:
               A driveway crossover/s in accordance with IPWEAQ standard drawing SEQ R-
               051 and to grades that prevent vehicles from scraping and/or bottoming.
               For pedestrian safety between vehicles exiting the site and pedestrians on the
               footpath, the driveway and any associated fencing or vegetation near the
               driveway shall comply with the minimum sight line requirements as defined in
               AS 2890.1, section 3.2.4.
               All parking spaces, driveways and circulation lane in compliance with the
               relevant sections of the current AS 2890.1 and AS2890.2.
         Suitable safety measures, including: traffic directional signage, warning signage and
         speed limit/s within the site, to improve driver awareness of pedestrians and enhance
         pedestrian safety.
         Provision of vandal resistant public lighting with intensities to satisfy the requirements
         of Australian Standard AS1158: Public Lighting Code
         14.   All car parking areas and access driveways must be maintained exclusively for
               vehicle parking and manoeuvring and kept in a tidy and safe condition at all
               times.
         Frontage Works - Footpath
         15.   Frontage works must be provided for the development. The works must be
               undertaken in accordance with a Development Permit for Operational Works
               and must include in particular:
               a.     A two (2) metre wide concrete footpath within the road verge for the entire
                      length of the site’s frontage to Rene Street in compliance with IPWEAQ
                      standard drawing SEQ R-065 Concrete Pathway Construction Details.
                      The footpath must match the levels the driveways to the site without step
                      or trip hazard. Where necessary existing driveway finish level should be
                      adjusted to ensure compliance grades for the footpath and driveway.
               b.     Replacement of any street trees affected by the frontage works.
         Stormwater Drainage
         16.   Prior issue of building works approval for the new building on the eastern
               portion of the site, an Operational Works approval for treatment of stormwater
               quality must be obtained. The application for Operational Works Approval for
               stormwater must provide for treatment of stormwater from the entire site.
Noosa Shire Council                                                                Page 14 of 19
                        This is not an official copy of Council’s Minutes

Section 15

ORDINARY MEETING MINUTES                                                   20 NOVEMBER 2014


         17.   The stormwater quality treatment system shall be designed and implemented
               generally in accordance with “Option 1” presented in the “Site Based
               Stormwater Management Plan (4298-1.0) for 66 Rene Street” dated 9 October
               2014 by STORMwater Pty Ltd.
         18.   An ongoing maintenance contract for the stormwater quality treatment devices
               must be established and provided to Council prior to commencement of use of
               the new building on the eastern portion of the site. The maintenance contract
               schedule must be consistent with the manufacturer’s requirements to achieve
               an ongoing pollutant reduction efficiency of 80% reduction in Total Suspended
               solids, 60% reduction in Total Phosphorous and 45% reduction in Total
               Nitrogen in runoff from the site compared to an untreated situation.
         19.   All copies of stormwater maintenance documentation must be kept for a period
               of 5 years and made available to Council officers on request to demonstrate
               compliance with the conditions of this approval.
         Earthworks
         20.   Any earthworks required on site shall be carried out in accordance with
               Council’s Planning Scheme Policy PSP5 – Engineering Design Standards –
               Roads, Drainage and Earthworks and must be undertaken in accordance with a
               Development Permit for Operational Works.
         21.   Earthworks carried out on site shall not affect the structural integrity of any of
               the adjoining properties, existing fences or structures that border the
               development site. Fences that are affected shall be replaced prior to the
               Building Certifier issuing the Certificate of Classification. In this regard any
               fences to be replaced shall be clearly shown on the plans submitted for
               Operational Works approval.
         UNITYWATER
         The following Unitywater conditions are applied in accordance with the South East
         Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
         Connections Policy. The conditions below form part of a water connection aspect
         which are taken to be a water approval for a staged connection. Any future
         applications must be made to Unitywater under South East Queensland (Distribution
         and Retail) Restructuring Act 2009. Unitywater can be contacted as follows:
         Phone: 1300 0 Unity (1300 086 489)
         Email: [email protected]
         Web: www.unitywater.com
         Water & Sewerage
         22.   Reticulated water supply and sewerage must be provided to the development.
         23.   Construction activities must not impede the access of Unitywater or Fire
               Brigade personnel to vital infrastructure (eg. valves, fire hydrants and sewer
               access chambers).
         24.   The fire-fighting demand on Unitywater’s water supply system from the
               development must not exceed 30 litres per second.
         25.   A single Unitywater installed primary water meter must be provided immediately
               inside the property boundary. Meters must be Unitywater approved, installed in
               accordance with Unitywater requirements and remain accessible at all times for
               reading and maintenance purposes.
         26.   Water meters must be located on alternative boundaries to electrical pillars.


Noosa Shire Council                                                               Page 15 of 19
                       This is not an official copy of Council’s Minutes

Section 16

ORDINARY MEETING MINUTES                                                  20 NOVEMBER 2014


         27.   Buildings, basements and other structures must maintain a minimum clearance
               of 1.5 meters from Unitywater sewer mains, and 1.0 meter from a sewer
               manhole chamber or sewer inspection opening.
         28.   Easements of between 3 and 10 metres must be provided over all Unitywater
               sewers located within property boundaries in accordance with the SEQ
               standards. Easements shall be centred over the pipe. Easement terms shall be
               the most current registered dealing held by the Department of Natural
               Resources & Mines and shall not be altered or amended.
         29.   Storm water retention systems and gross pollutant traps must maintain a
               minimum clearance of 1.5 meters from Unitywater water supply and sewerage
               infrastructure.
         30.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
               Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
               Landscaping plants within these clearances must be low growing when mature,
               and suitable approved varieties.
         31.   Construction works undertaken in the vicinity of Unitywater water supply or
               sewerage infrastructure must not adversely affect the integrity of the
               infrastructure. All costs associated with repair, replacement or alteration of
               infrastructure must be met by the applicant.
         Advisory Notes
         Unitywater
         Connection to Unitywater live water mains and the Unitywater live sewer system must
         be undertaken by Unitywater at the applicant’s cost.
         A 150mm diameter water main is located within the road boundary fronting the
         development site in Rene Street. Construction works, heavy traffic crossing the main,
         excessive vibration and excavation close to the main may cause damage to the pipe.
         Extreme care is required when working close to this infrastructure. All costs
         associated with repair, replacement or alteration of infrastructure must be met by the
         applicant.

         Aboriginal Cultural Heritage Act 2003
         There may be a requirement to establish a Cultural Heritage Management Plan
         and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH
         Act).
         The ACH Act establishes a cultural heritage duty of care which provides that: “A
         person who carries out an activity must take all reasonable and practicable measures
         to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to
         fail to comply with the duty of care. Substantial monetary penalties may apply to
         individuals or corporations breaching this duty of care. Injunctions may also be issued
         by the Land and Resources Tribunal, and the Minister administering the ACH Act can
         also issue stop orders for an activity that is harming or is likely to harm Aboriginal
         cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You
         should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss
         any obligations under the ACH Act.
         Equitable Access and Facilities




Noosa Shire Council                                                              Page 16 of 19
                      This is not an official copy of Council’s Minutes

Section 17

ORDINARY MEETING MINUTES                                                     20 NOVEMBER 2014


          The plans for the proposed building work have NOT been assessed for compliance
          with the requirements of the National Construction Code - Building Code of Australia
          (Volume 1) as they relate to people with disabilities. Your attention is also directed to
          the fact that in addition to the requirements of the National Construction Code as they
          relate to people with disabilities, one or more of the following may impact on the
          proposed building work:
          •     the Disability Discrimination Act 1992 (Commonwealth);
          •     the Anti-Discrimination Act 1991 (Queensland); and
          •     the Disability (Access to Premises – Buildings) Standards.
          •     The applicant is advised that the development works for this permit may require
                payment of a compliance bond (to be determined in Operational Works Permit)
                in accordance with Council’s policies. The payment of the bonds will be
                required prior the prestart meeting for the Operation Works.
          •     The Building and Construction Industry (Portable Long Service Leave) Levy
                must be paid prior to the issue of a development permit where one is required
                for the 'Building and Construction Industry'. This applies to Building Works,
                Operational Works and Plumbing and Drainage Works applications, as defined
                under the Sustainable Planning Act 2009, where the works are $80,000 or more
                and matching the definition of 'Building and Construction Industry' under the
                Building and Construction Industry (Portable Long Service Leave) Act 1991.
                Council will not be able to issue a Decision Notice without receipt of details that
                the Levy has been paid. Should you require clarification in regard to the
                amendments to the Building and Construction Industry (Portable Long Service
                Leave) Act 1991, you should contact QLeave on 1800 803 481 (free call) or
                (07) 3212 6855
     B.   Refuse the Operational Works application OPW12/0276 for the following reasons:
          1.    The proposal represents excessive signage for a single business that will result
                in unnecessary visual clutter and adversely impact on the visual amenity of the
                area.
          2.    The signage is incompatible with the developed character of Noosaville and is
                contrary to the Advertising Devices Code.
          3.    The application proposes signage identified as inconsistent advertising devices
                within the Advertising Devices Code of The Noosa Plan.

     C.   Request the applicant to remove all excess signage and ensure all signage complies
          with the acceptable solutions of the Advertising Devices Code of The Noosa Plan. In
          particular, no sign shall exceed a sign face area of 4m2 and total signage shall not
          exceed a combined sign face area of 10m2.

2   SEPTEMBER 2014 QUARTERLY BUDGET REVIEW - FURTHER REPORT
    That Council note the report by the Manager Financial Services to the Planning &
    Organisation Committee Meeting dated 11 November 2014 and the Further Report by the
    Director Corporate Services to the General Committee dated 17 November 2014 and adopt
    the requested changes to the budget for the 2014/2015 financial year, as outlined in the
    attached Budget Financial Statements.




Noosa Shire Council                                                                Page 17 of 19
                        This is not an official copy of Council’s Minutes

Section 18

ORDINARY MEETING MINUTES                                                     20 NOVEMBER 2014


3   FINANCIAL PERFORMANCE REPORT OCTOBER 2014
    That Council note the report by the Manager Financial Services to the General Committee
    Meeting dated 17 November 2014 providing the October monthly financial performance
    report.

4   REQUEST TO CHANGE A CONDITION OF EXISTING APPROVAL FOR A MATERIAL
    CHANGE OF USE AND RECONFIGURING A LOT FOR 174 DETACHED HOUSING
    LOTS AT GREENWOOD GROVE, GARNET ST COOROY -132004.240018.A -
    FURTHER REPORT      DOCUMENT INFORMA TION




    That Council note the report by the Senior Development Planner to the Planning &
    Organisation Committee Meeting dated 14 October 2014 and the further report to the
    General Committee Meeting dated 17 November 2014 regarding a request to change
    existing approval 132004.240018 and:
    A.   Approve a change to Condition 65.1.2 as follows:
         Condition 65.1.2
         The remaining section of Garnet Street extending from the Pine Street intersection
         (and excluding the section to be upgraded to an external Urban Collector Road) to
         approximately inline with the eastern boundary of Lot 189 on MCH 976 shall be
         upgraded to an External Rural Distributor Road. The upgrading of Garnet Street shall
         also be designed to enable flood free access to the site during a 1 in 2 year Average
         Recurrence Interval (ARI) flood event with a maximum trafficable depth of 200mm for
         a 1 in 10 year ARI flood event and with the product of flow depth and velocity being
         less than 0.4m2/s. This part of the road must be completed prior to the sealing of the
         survey plan for Stage 3 or any other subsequent stage of the development, unless an
         alternative agreement is entered into by the Developer and Council by way of an
         Infrastructure Agreement.
    B.   Include the following additional condition:
         The design of the works must be in accordance with the relevant industry standard
         blockage factors for pipes, safety barriers, hand rails, fencing and the like and include
         appropriate structures to manage debris.

5   2014/2015 COMMUNITY GRANTS SECOND ROUND RECOMMENDATIONS
    That Council note the report by the Community Development Coordinator to the General
    Committee Meeting dated 17 November 2014 and endorse the second round of
    Community Grants recommendations for the financial year 2014/15 as set out in
    Attachment 1 to the report.

6   2014/2015 REGIONAL                          ARTS   DEVELOPMENT   FUND   ROUND    1   GRANT
    RECOMMENDATIONS
    That Council note the report by the Community Development Officer (Culture) to the
    General Committee Meeting dated 17 November 2014 and endorse the first round of
    Regional Arts Development Fund (RADF) recommendations for the financial year 2014/15
    as set out in Attachment 1 to the report.

7   NOOSA BIOSPHERE RESERVE MANAGEMENT ARRANGEMENTS
    That Council note the report by the Executive Manager to the General Committee Meeting
    dated 17 November 2014 and authorise the Chief Executive Officer to progress and finalise
    the necessary documentation to establish the Noosa Biosphere Reserve Trust, the Noosa
    Biosphere Reserve Foundation Ltd and registration of the company.

Noosa Shire Council                                                                 Page 18 of 19
                       This is not an official copy of Council’s Minutes

Section 19

ORDINARY MEETING MINUTES                                                                          20 NOVEMBER 2014


6                          ORDINARY MEETING REPORTS

                           1.    NOOSA BIOSPHERE MANAGEMENT ARRANGEMENTS – FURTHER REPORT
Docum ent in for matio n




                           Council Resolution

                           Moved:          Cr Abbot
                           Seconded:       Cr Wellington

                           That Council note the report by the Executive Manager, Executive Office to the General
                           Committee Meeting dated 17 November 2014 and the Further Report by the Executive
                           Manager, Executive Office to the Ordinary Meeting dated 20 November 2014 and
                           A.    Adopt the Noosa Biosphere Reserve Trust as set out in Attachment 1 and the
                                 Constitution of Noosa Biosphere Reserve Foundation Ltd as set out in Attachment 2;
                                 and
                           B.    Authorise the CEO to make any minor amendments as required to enable registration
                                 of the Constitution and Trust.
                                                                                                            Carried.



7                          PETITIONS

                           1.    PETITION: OPPOSITION FOR THE DEVELOPMENT APPLICATION FOR MCU
                                 12/0184 INTENSIVE CHICKEN FARM PROJECT AT 136 TOP FORESTRY ROAD
                                 RIDGEWOOD

                                 Council Resolution

                                 Moved:          Cr Jurisevic
                                 Seconded:       Cr Pardon

                                 That the petition presented by Cr Jurisevic showing opposition for MCU12/0184
                                 Chicken Farm Project be received and referred to the Chief Executive Officer to
                                 determine appropriate action.
                                                                                                       Carried.

8                          CLOSED SESSION
                           Nil

9                          NEXT MEETING

                           The next Ordinary Meeting will be held on 18 December, 2014 in the Council Chambers,
                           9 Pelican Street, Tewantin, commencing at 6pm.

10                         MEETING CLOSURE

                           The meeting closed at 6.40pm.



Noosa Shire Council                                                                                    Page 19 of 19
                                              This is not an official copy of Council’s Minutes

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.