Original source · versioned page text
2014-11-20 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
MINUTES
Ordinary Meeting
Thursday, 20 November 2014
commencing at 6pm
Peregian Beach Surf Club, Kingfisher Drive, Peregian Beach
Crs Noel Playford (Chair), Bob Abbot, Sandy Bolton, Joe Jurisevic,
Frank Pardon, Tony Wellington, Frank Wilkie
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 18 sections
Section 2
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
1 ATTENDANCE & APOLOGIES
COUNCILLORS
Councillor N Playford, Mayor
Councillor B Abbot
Councillor S Bolton
Councillor J Jurisevic
Councillor F Pardon
Councillor T Wellington
Councillor F Wilkie
EXECUTIVE
B de Chastel, Chief Executive Officer
A Rogers, Director Community Services
M Shave, Director Corporate Services
M Drydale, Director Planning & Infrastructure
D Iezzi, Executive Manager, Executive Office
APOLOGIES
Nil.
The meeting commenced at 6.03pm
2 CONFIRMATION OF MINUTES
Council Resolution
Moved: Cr Abbot
Seconded: Cr Jurisevic
The Minutes of the Ordinary Meeting held on 23 October 2014 be received and confirmed.
Carried.
Noosa Shire Council Page 2 of 19
This is not an official copy of Council’s Minutes
Section 3
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
3 MAYORAL MINUTES
Cr Playford moved the following Mayoral Minute:
1. NOOSA RIVER ENVIRONMENTAL PROJECTS
That Council note the presentation to a Council workshop on 14 November 2014 from The
Nature Conservancy and the Thomas Foundation in relation to proposed projects to
improve the environmental outcomes for the Noosa River, and
A. Authorise the Chief Executive Officer to write to The Nature Conservancy and the
Thomas Foundation advising that the Council will provide support for the two initial
proposed projects with a Council financial contribution of up to $25,000 and with
Council also providing support for any required interface to government agencies;
and
B. Request the Chief Executive Officer to continue liaison with both The Nature
Conservancy and the Thomas Foundation regarding possible future projects for
consideration and to provide Council with updates as required.
Carried.
Cr Playford moved the following Mayoral Minute:
2. PROCUREMENT OF A SECOND HAND JOHN DEERE 670GP GRADER
That Council authorises the Chief Executive Officer to enter into negotiations to procure a
second hand grader up to the value of $250,000 (excluding GST) utilising available
2014/15 budget funding within the Fleet – Plant Replacement program.
Carried.
4 NOTIFIED MOTIONS
Nil.
Noosa Shire Council Page 3 of 19
This is not an official copy of Council’s Minutes
Section 4
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
5 CONSIDERATION OF COMMITTEE RECOMMENDATIONS
AUDIT COMMITTEE RECOMMENDATIONS
10 NOVEMBER 2014 – Cr Playford, Cr Wellington, Scott Williams, Cameron Jaggers
Other attendees: Brett de Chastel (CEO); Michael Shave (Director Corporate Services);
Debra Iezzi (Executive Manager); Wayne Jensen (Manager Financial Services); Megan
MacMichael (Financial Accountant); Paul Bright (Governance Advisor); Kylie Harris (PA to the
CEO); Patrick Flemming (QAO representative)
The Recommendations from the Audit Committee were adopted without discussion or
further amendment.
Council Resolution
Moved: Cr Wellington
Seconded: Cr Wilkie
The Audit Committee recommendations dated 10 November 2014 be adopted.
Carried.
1 DRAFT FINANCIAL STATEMENTS 30 JUNE 2014
That the Audit Committee note the report by the Manager Financial Services to the Audit
Committee Meeting dated 10 November 2014 regarding the draft financial statements for
the period ended 30 June 2014.
2 INTERNAL AUDIT POLICY
That the Audit Committee note the report by the Executive Manager to the Audit Committee
Meeting dated 10 November 2014 and:
1. Rescind the existing Internal Audit Policy that transferred to Noosa Council from the
Sunshine Coast Regional Council under the Local Government (De-amalgamation
Implementation) Regulation 2013; and
2. Adopt the Internal Audit Policy as set out in Attachment 1 to the report.
3 RISK MANAGEMENT UPDATE
That Council note the report by the Executive Manager to the General Committee Meeting
dated 10 November 2014 regarding the implementation of Council’s Risk Management
Policy and program.
4 OVERVIEW OF COUNCIL DELEGATIONS
That the Audit Committee note the report by the Executive Manager to the Audit Committee
Meeting dated 10 November 2014 providing an over view of Council’s delegations and
associated processes.
5 ANNUAL REPORTING OBLIGATIONS
That the Audit Committee note the report by the Executive Manager to the Audit Committee
Meeting dated 10 November 2014 outlining Council’s annual statutory reporting obligations.
6 PROPOSED TIMETABLE FOR FUTURE MEETINGS
That the Audit Committee endorse the proposed meeting dates for 2015 as detailed in the
Audit Committee Agenda dated 10 November 2014 with a change to the February meeting
date to Wednesday, 4 February 2015.
Noosa Shire Council Page 4 of 19
This is not an official copy of Council’s Minutes
Section 5
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
INFRASTRUCTURE & SERVICES COMMITTEE RECOMMENDATIONS
11 NOVEMBER 2014 - Crs Sandy Bolton (Chair), Bob Abbot, Frank Pardon,
Noel Playford
Other Councillors in Attendance: Cr Jurisevic
The Recommendations from the Infrastructure and Services Committee were
adopted without discussion or further amendment.
Council Resolution
Moved: Cr Pardon
Seconded: Cr Bolton
The Infrastructure & Services Committee recommendations dated 11 November 2014 be
adopted.
Carried.
1 BUS STOP INFRASTRUCTURE PROGRAM 2014/2015
That Council note the report by the Design Services Manager to the Infrastructure &
Services Committee Meeting dated 11 November 2014 and,
A. Delegate authority to the Chief Executive Officer to enter into a contract agreement
for the construction of the ground works associated with the delivery of 15 bus stops
at various locations; and
B. Delegate authority to the Chief Executive Officer to enter into contract agreements
with suppliers for the Noosa style bus shelters on the following basis:
1. supply and installation of 15 coastal style shelters for 2014/2015;
2. a fixed price per each for the supply and installation of the coastal style shelter
for a period of 3 years starting in 2015/2016; and
3. a fixed price per each for the supply and installation of the rural style shelter for
a period of 3 years starting in 2015/2016.
2 PROPOSAL TO RENAME ROAD - DAVID LOW WAY, NOOSA HEADS
That Council note the report by the Project Officer to the Infrastructure & Services
Committee Meeting dated 11 November 2014 and resolve to rename the section of David
Low Way from the intersection of Noosa Drive to the commencement of Edwards Street as
Sunshine Beach Road.
3 REQUEST FOR COMMEMORATION - HERB WOODS
That Council note the report by the Project Officer to the Infrastructure & Services
Committee Meeting dated 11 November 2014 and:
A. Agree to commemorate Herb Woods as the founder of the Noosa River ferry service
with the planting of a tree and installation of a plaque in the area immediately east of
the ferry landing area (as set out in Option 3 of the Report); and
B. Thank Mrs Coral Ross for the Woods’ family contribution of $500 towards the costs
involved.
Noosa Shire Council Page 5 of 19
This is not an official copy of Council’s Minutes
Section 6
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
4 THE J & BICENTENNIAL COMMUNITY CENTRE QUARTERLY REPORT 1 JULY 2014 -
30 SEPTEMBER 2014
That Council note the report by the The J Coordinator to the Infrastructure & Services
Committee Meeting dated 11 November 2014 providing a quarterly update on The J &
Bicentennial Community Centre.
5 NOOSA LEISURE CENTRE (NLC) QUARTERLY REPORT 1 JULY 2014 - 30
SEPTEMBER 2014
That Council note the report by the Noosa Leisure Centre Coordinator to the Infrastructure
& Services Committee Meeting dated 11 November 2014 providing a quarterly update for
the Noosa Leisure Centre.
6 NOOSA COMMUNITY CARE (NCC) QUARTERLY REPORT 1 JULY 2014 - 30
SEPTEMBER 2014
That Council note the report by the Noosa Community Care Coordinator to the
Infrastructure & Services Committee Meeting dated 11 November 2014 providing a
quarterly update on Noosa Community Care.
7 NOOSA AQUATIC CENTRE - QUARTERLY REPORT 1 JULY 2014 - 30 SEPTEMBER
2014
That Council note the report by the Noosa Aquatic Centre Coordinator to the Infrastructure
& Services Committee Meeting dated 11 November 2014 providing a quarterly update on
the Noosa Aquatic Centre.
8 E-WASTE COLLECTION SERVICE 2014-15
That Council note the report by the Manager Waste and Environmental Health to the
Infrastructure & Services Committee Meeting dated 11 November 2014 and:
A. Communicate the closure of the free e-waste recycling scheme for 2014/15 to Noosa
residents and accept future e-waste along with other general waste at the approved
schedule of charges; and
B. Refer concerns about the free e-waste recycling scheme e-waste and the need to
increase funding allocations for continuing the service in 2014/15 via the SEQ Waste
Working Group to the Council of Mayors (SEQ) and LGAQ.
Noosa Shire Council Page 6 of 19
This is not an official copy of Council’s Minutes
Section 7
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
PLANNING & ORGANISATION COMMITTEE RECOMMENDATIONS
11 NOVEMBER 2014 – Crs Frank Wilkie (Chair), Noel Playford, Joe Jurisevic,Tony Wellington
Other Councillors in Attendance: Nil
The Recommendations from the Planning and Organisation Committee were adopted
without discussion or further amendment.
Council Resolution
Moved: Cr Jurisevic
Seconded: Cr Wellington
The Planning & Organisation Committee recommendations dated 11 November 2014 be
adopted.
Carried.
1 REFERRAL AGENCY - BUILDING STATISTICS REPORT
That Council note the report by the Building and Plumbing Manager to the Planning &
Organisation Committee Meeting dated 11 November 2014 providing the quarterly
statistics on decisions in relation to building relaxations.
2 PROPOSED COUNCIL ELECTRICIAN
That Council note the report by the Building and Plumbing Manager to the Planning &
Organisation Committee Meeting dated 11 November 2014 and endorse the proposed full
time position of Council Electrician.
3 PLANNING & ENVIRONMENT COURT APPEAL D 165/14 FOR A DEVELOPMENT
PERMIT FOR SERVICE & UTILITY TYPE 3 (TOWER) SITUATED AT GRAHAMS ROAD,
PINBARREN MCU13/0067
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 11 November 2014 regarding Planning & Environment Court
Appeal D 165/14 and agree to defend the appeal.
4 DEVELOPMENT APPLICATION MCU14/0049 & OPW14/0276 - MATERIAL CHANGE OF
USE FOR INDUSTRIAL BUSINESS TYPE 1 WAREHOUSE (SELF STORAGE FACILITY)
& OPERATIONAL WORKS SIGNAGE AT 64-66 RENE STREET, NOOSAVILLE
Item not dealt with by Planning & Organisation Committee. Referred to General
Committee for consideration.
Reason for referral: Cr Wellington disagrees with the Recommendation.
5 DEVELOPMENT APPLICATION MCU14/0067 - MATERIAL CHANGE OF USE FOR
INDUSTRIAL BUSINESS TYPE 1 WAREHOUSE (SELF STORAGE FACILITY) AT 77
RENE STREET, NOOSAVILLE
That Council note the report by the Senior Development Planner to the Planning &
Organisation Committee Meeting dated 11 November 2014 regarding Application No.
MCU14/0067 for a Development Permit for a Material Change of Use for an Industrial
Business – Type 1 Warehouse (Self Storage) situated at 77 Rene Street, Noosaville and
approve the application in accordance with the following conditions:
Noosa Shire Council Page 7 of 19
This is not an official copy of Council’s Minutes
Section 8
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed below and as
may be amended by the conditions herein.
Plan No. Rev. Plan/Document Name Date
S8166-MS01 A Master Site Plan prepared by Milanovic Neale 20/08/14
Consulting Engineers
WD-03.01 C Proposed Floor Plan – Ground prepared by February 2014
Elevation Architecture Studio
WD-03.02 C Proposed Floor Plan – First prepared by February 2014
Elevation Architecture Studio
WD-03.04 A Proposed Roof Plan prepared by Elevation February 2014
Architecture Studio
SK-03.02 C 3D Views prepared by Elevation Architecture 20/08/2014
Studio
SK-04.01 B Proposed Elevations prepared by Elevation 20/08/2014
Architecture Studio
Nature and Extent of Approved Use
3. No external storage or use areas are approved on the site.
4. Any display and retail sale of goods must remain an ancillary component to the
approved use and must not exceed an area of 100m2.
Built Form
5. The building must incorporate a minimum of 600mm eaves to at least 75% of the
perimeter of the building. Amended plans demonstrating compliance must be
submitted to Council prior to the issue of a Development Permit for Operational
Works.
Building Height
6. The maximum height of the development must not exceed 8metres above the
finished ground level and the natural ground level.
Landscaping
7. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and The Noosa Plan’s Planning
Scheme Policy 3 Landscaping Plants and Guidelines for that specific area and must
include:
a. The landscaped areas as generally shown on the approved Site Plan, except
where amended by conditions contained herein.
b. Trees within the front setback area and to soften building bulk.
c. All plantings near storm water infrastructure are to be coordinated with the
approved hydraulics plans and must not interfere with the operational function
of the storm water devices, either by root interference, shading or other means.
d. Landscaping plans must show the location of all water quality devices.
Noosa Shire Council Page 8 of 19
This is not an official copy of Council’s Minutes
Section 9
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
e. Retention of existing street trees.
8. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
Street Identification
9. The street address of the development must be clearly visible and discernible from
the primary frontage of the site by the provision of a street number and, where
appropriate, the building name.
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Works. The cash
bond or trading bank guarantee will be returned on performance of the conditions of
approval less any costs incurred by Council in respect of enforcing performance of
this permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
ENGINEERING
Carparking and Driveways
11. Sealed car parking and access driveway must be provided generally in accordance
with Drawing No: S8166 – MS01- Revision (A) titled Master Site Plan dated
20/08/2014 by Milanovic Neale Consulting Engineers. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
a. The car parking must be in compliance with the provisions of the current AS/NZS
2890.1 off-street car parking (particularly Section 2.4.4) and the relevant sections of
AS/NZS 2890.6 off-street car parking for people with disabilities.
b. Compliance with the relevant sections of AS/ANZ 2890.2 Off-street commercial
vehicles facilities.
c. Traffic control and directional signage within and at the entry of the site must be
provided in accordance with the design engineer recommendations and in
compliance with the Manual of Uniform Traffic Control Devices (MUTCD).
12. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
13. Any building, structure and/or installation (e.g. sliding gate and associated
mechanism) must not encroach onto, or negate the conditions of, the registered
easement/s along the front boundary of the site.
Stormwater Drainage
14. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval in compliance with the relevant sections of Queensland Urban
Drainage Manual, the relevant Codes and Policies of The Noosa Plan and supported
by a detailed stormwater drainage report and design based on field survey and
prepared and certified by a suitably qualified and experienced Registered
Professional Civil Engineer, and must include in particular:
Noosa Shire Council Page 9 of 19
This is not an official copy of Council’s Minutes
Section 10
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
a. Where is considered effective and practical all roof runoffs should be directed to
water tanks with overflows and surcharge be discharged into a lawful point of
discharge.
b. Stormwater detention to cater for all flows from the outdoor areas and any
possible stormwater surcharge from the roof drainage system during heavy
rainfall events to maintain predevelopment stormwater runoff, and to address
any potential of adverse impact by the development on the existing drainage
conditions on other properties.
c. Plans submitted for operational works approval must include bioretention which
demonstrates that stormwater runoff shall be treated to achieve 80% Reduction
in Total Suspended Solids, 60% Reduction in Total Phosphorous and 45%
Reduction in Total Nitrogen prior to discharge from the site compared to if there
was no water pollutant mitigation incorporated into the design.
d. Where biobasins are proposed on site to achieve compliance with the above
Reduction parameters, calculations to determine filter media area and detail
design must be consistent with current best practice methods as detailed in the
Bioretention Technical Design Guidelines Version 1, October 2012.
e. Bioretention basins must include 1:4 batters between the dedicated filter media
area and the surrounding ground surface. Batters are not included within filter
media footprint area calculation.
f. Bioretention basin layout and setting must be consistent with landscape design
for the site.
15. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Advisory Notes
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH
Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable measures
to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to
fail to comply with the duty of care. Substantial monetary penalties may apply to
individuals or corporations breaching this duty of care. Injunctions may also be issued
by the Land and Resources Tribunal, and the Minister administering the ACH Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal
cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You
should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss
any obligations under the ACH Act.
Equitable Access and Facilities
The plans for the proposed building work have NOT been assessed for compliance
with the requirements of the National Construction Code - Building Code of Australia
(Volume 1) as they relate to people with disabilities. Your attention is also directed to
the fact that in addition to the requirements of the National Construction Code as they
relate to people with disabilities, one or more of the following may impact on the
proposed building work:
1 the Disability Discrimination Act 1992 (Commonwealth);
2 the Anti-Discrimination Act 1991 (Queensland); and
3 the Disability (Access to Premises – Buildings) Standards.
Noosa Shire Council Page 10 of 19
This is not an official copy of Council’s Minutes
Section 11
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
4 The applicant is advised that the development works for this permit may require
payment of a compliance bond (to be determined in Operational Works Permit)
in accordance with Council’s policies. The payment of the bonds will be
required prior the prestart meeting for the Operation Works.
5 The Building and Construction Industry (Portable Long Service Leave) Levy
must be paid prior to the issue of a development permit where one is required
for the 'Building and Construction Industry'. This applies to Building Works,
Operational Works and Plumbing and Drainage Works applications, as defined
under the Sustainable Planning Act 2009, where the works are $80,000 or more
and matching the definition of 'Building and Construction Industry' under the
Building and Construction Industry (Portable Long Service Leave) Act 1991.
Council will not be able to issue a Decision Notice without receipt of details that
the Levy has been paid. Should you require clarification in regard to the
amendments to the Building and Construction Industry (Portable Long Service
Leave) Act 1991, you should contact QLeave on 1800 803 481 (free call) or
(07) 3212 6855
6 SEPTEMBER 2014 QUARTERLY BUDGET REVIEW
Item not dealt with by Planning & Organisation Committee. Referred to General
Committee for consideration.
Reason for referral: Significance of issue and request for a further report amending
Attachment 1.
7 NOOSA NORTH SHORE LANDING GROUND TENURE AMENDMENT (LOT 7
MCH4562)
That Council note the report by the Property & Facilities Property Officer to the Planning &
Organisation Committee dated 11 November 2014 and issue the Trustee Lease and the
Trustee Licence areas to include infrastructure outside of the hangar footprints in
accordance with a revised lease survey plan to be prepared by the two groups (as per
Option 1 in the report):
A. Sunshine Coast Aviators Inc Trustee Lease (proposed lease area B) – over new
hangar and new plumbing infrastructure; and
B. Sunshine Coast Model Flyers Inc Trustee Licence (proposed lease area A) – over
existing hangar and existing plumbing infrastructure.
8 QUARTERLY OPERATIONAL PLAN PROGRESS REPORT
That Council note the report by the Chief Executive Officer to the Planning & Organisation
Committee Meeting dated 11 November 2014 providing an update on progress with the
implementation of the Operational Plan to 30 September 2014 and details of Key
Performance Indicators.
Noosa Shire Council Page 11 of 19
This is not an official copy of Council’s Minutes
Section 12
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
GENERAL COMMITTEE RECOMMENDATIONS
17 NOVEMBER 2014 - Crs Tony Wellington (Chair), Bob Abbot, Joe Jurisevic,
Frank Pardon, Noel Playford, Frank Wilkie.
Apology: Cr Sandy Bolton
The Recommendations from the General Committee were adopted without discussion or
further amendment.
Council Resolution
Moved: Cr Wilkie
Seconded: Cr Bolton
The General Committee recommendations dated 17 November 2014 be adopted.
Carried.
1 DEVELOPMENT APPLICATION MCU14/0049 & OPW14/0276 - MATERIAL CHANGE OF
USE FOR INDUSTRIAL BUSINESS TYPE 1 WAREHOUSE (SELF STORAGE FACILITY)
& OPERATIONAL WORKS SIGNAGE AT 64-66 RENE STREET, NOOSAVILLE
That Council note the report by the Senior Development Planner to the Planning &
Organisation Committee Meeting dated 11 November 2014 regarding Application No.
MCU14/0049 & OPW14/0276 for a Development Permit for a Material Change of Use for
an Industrial Business – Type 1 Warehouse (Self Storage Facility) and Operational Works
(Signage) situated at 64-66 Rene Street, Noosaville and
A. Approve the Material Change of Use application MCU14/0049 subject to the following
conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied
with prior to the use commencing, and then compliance maintained at all times
while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
below and are as amended by the conditions herein.
Plan No. Rev. Plan/Document Name Date
OGSS-001-01 G Site Plan Stage 2 18/9/14
OGSS-001-02 G Stage 2 Basement Floor Plan 18/9/14
OGSS-001-03 G Stage 3 Ground Floor Plan 18/9/14
OGSS-001-04 G Stage 3 Level 1 Floor Plan 18/9/14
OGSS-001-05 G Stage 3 Level 2 Floor Plan 18/9/14
OGSS-001-06 G Elevations 1 & 2 18/9/14
OGSS-001-07 G Elevations 3 & 4 18/9/14
OGSS-001-08 G Sections A-A & B-B 18/9/14
OGSS-001-09 G Basement Location Plan 18/9/14
Noosa Shire Council Page 12 of 19
This is not an official copy of Council’s Minutes
Section 13
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
Nature and Extent of Approved Use
3. No external storage or use areas are approved on the site.
4. Any display and retail sale of goods must remain an ancillary component to the
approved use and must not exceed an area of 100m2.
Signage
5. Signage must comply with the self-assessable provisions for signage identified
in the Advertising Devices Code of the Noosa Plan. In particular,no sign shall
exceed a sign face area of 4m2 and total signage shall not exceed a combined
sign face area of 10m2.
Building Height
6. The maximum height of the development must not exceed 10metres above the
finished ground level and the natural ground level.
7. Certification must be submitted to Council from a Licensed Surveyor which
certifies that the buildings do not exceed the maximum height requirement of
this Decision Notice.
Landscaping
8. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and The Noosa Plan’s
Planning Scheme Policy 3 Landscaping Plants and Guidelines for that specific
area and must include:
a. The landscaped areas as generally shown on the approved Site Plan,
except where amended by conditions contained herein.
b. Trees planted to achieve tall, dense screening vegetation along the
eastern side boundary to assist with screening dust ingress to the site.
Recommended species is Elaeocarpus eumundi or similar.
c. Trees within the front setback area and along western boundary to soften
the visual building bulk.
d. Retention of the existing street trees.
9. All landscape works must be established and maintained in accordance with
the approved design for the life of the development, and in a manner that
ensures healthy, sustained and vigorous plant growth. All plant material must
be allowed to grow to full form and be refurbished when its life expectancy is
reached.
Street Identification
10. The street address of the development must be clearly visible and discernible
from the primary frontage of the site by the provision of a street number and,
where appropriate, the building name.
Performance Bond
11. Security in the form of a cash bond or trading bank guarantee to the sum of
$10,000 must be submitted to Council, to secure performance of all conditions
of this approval, prior to the issue of a Development Permit for Operational
Works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to
call upon the bond or guaranteed sum to effect compliance with conditions.
Noosa Shire Council Page 13 of 19
This is not an official copy of Council’s Minutes
Section 14
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
Staging & Sunset Clause for Completion
12. The development may be completed in stages, as shown on the approved
plans. Pursuant to s342 of the Sustainable Planning Act 2009, any
uncompleted aspects of this development approval lapse if the whole of the
approved use has not happened by 20 November 2020.
ENGINEERING
Site Access and Driveways
13. Concrete driveway and parking areas shall be provided generally in accordance
with Drawing Nos: OGSS-001-01, Rev G dated 18/09/2014 and OGSS-001-01,
Rev G dated 18/09/2014 – respectively titled: Site Plan Stage 2 and Stage 2
Basement Floor Plan, prepared by Steve McGregor Design Service and as may
be amended by the conditions of this permit. The works must be undertaken in
accordance with an engineering design prepared by suitably qualified
registered professional engineer and a Development Permit for Operational
Works, and shall include in particular:
A driveway crossover/s in accordance with IPWEAQ standard drawing SEQ R-
051 and to grades that prevent vehicles from scraping and/or bottoming.
For pedestrian safety between vehicles exiting the site and pedestrians on the
footpath, the driveway and any associated fencing or vegetation near the
driveway shall comply with the minimum sight line requirements as defined in
AS 2890.1, section 3.2.4.
All parking spaces, driveways and circulation lane in compliance with the
relevant sections of the current AS 2890.1 and AS2890.2.
Suitable safety measures, including: traffic directional signage, warning signage and
speed limit/s within the site, to improve driver awareness of pedestrians and enhance
pedestrian safety.
Provision of vandal resistant public lighting with intensities to satisfy the requirements
of Australian Standard AS1158: Public Lighting Code
14. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all
times.
Frontage Works - Footpath
15. Frontage works must be provided for the development. The works must be
undertaken in accordance with a Development Permit for Operational Works
and must include in particular:
a. A two (2) metre wide concrete footpath within the road verge for the entire
length of the site’s frontage to Rene Street in compliance with IPWEAQ
standard drawing SEQ R-065 Concrete Pathway Construction Details.
The footpath must match the levels the driveways to the site without step
or trip hazard. Where necessary existing driveway finish level should be
adjusted to ensure compliance grades for the footpath and driveway.
b. Replacement of any street trees affected by the frontage works.
Stormwater Drainage
16. Prior issue of building works approval for the new building on the eastern
portion of the site, an Operational Works approval for treatment of stormwater
quality must be obtained. The application for Operational Works Approval for
stormwater must provide for treatment of stormwater from the entire site.
Noosa Shire Council Page 14 of 19
This is not an official copy of Council’s Minutes
Section 15
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
17. The stormwater quality treatment system shall be designed and implemented
generally in accordance with “Option 1” presented in the “Site Based
Stormwater Management Plan (4298-1.0) for 66 Rene Street” dated 9 October
2014 by STORMwater Pty Ltd.
18. An ongoing maintenance contract for the stormwater quality treatment devices
must be established and provided to Council prior to commencement of use of
the new building on the eastern portion of the site. The maintenance contract
schedule must be consistent with the manufacturer’s requirements to achieve
an ongoing pollutant reduction efficiency of 80% reduction in Total Suspended
solids, 60% reduction in Total Phosphorous and 45% reduction in Total
Nitrogen in runoff from the site compared to an untreated situation.
19. All copies of stormwater maintenance documentation must be kept for a period
of 5 years and made available to Council officers on request to demonstrate
compliance with the conditions of this approval.
Earthworks
20. Any earthworks required on site shall be carried out in accordance with
Council’s Planning Scheme Policy PSP5 – Engineering Design Standards –
Roads, Drainage and Earthworks and must be undertaken in accordance with a
Development Permit for Operational Works.
21. Earthworks carried out on site shall not affect the structural integrity of any of
the adjoining properties, existing fences or structures that border the
development site. Fences that are affected shall be replaced prior to the
Building Certifier issuing the Certificate of Classification. In this regard any
fences to be replaced shall be clearly shown on the plans submitted for
Operational Works approval.
UNITYWATER
The following Unitywater conditions are applied in accordance with the South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect
which are taken to be a water approval for a staged connection. Any future
applications must be made to Unitywater under South East Queensland (Distribution
and Retail) Restructuring Act 2009. Unitywater can be contacted as follows:
Phone: 1300 0 Unity (1300 086 489)
Email: [email protected]
Web: www.unitywater.com
Water & Sewerage
22. Reticulated water supply and sewerage must be provided to the development.
23. Construction activities must not impede the access of Unitywater or Fire
Brigade personnel to vital infrastructure (eg. valves, fire hydrants and sewer
access chambers).
24. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 30 litres per second.
25. A single Unitywater installed primary water meter must be provided immediately
inside the property boundary. Meters must be Unitywater approved, installed in
accordance with Unitywater requirements and remain accessible at all times for
reading and maintenance purposes.
26. Water meters must be located on alternative boundaries to electrical pillars.
Noosa Shire Council Page 15 of 19
This is not an official copy of Council’s Minutes
Section 16
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
27. Buildings, basements and other structures must maintain a minimum clearance
of 1.5 meters from Unitywater sewer mains, and 1.0 meter from a sewer
manhole chamber or sewer inspection opening.
28. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ
standards. Easements shall be centred over the pipe. Easement terms shall be
the most current registered dealing held by the Department of Natural
Resources & Mines and shall not be altered or amended.
29. Storm water retention systems and gross pollutant traps must maintain a
minimum clearance of 1.5 meters from Unitywater water supply and sewerage
infrastructure.
30. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature,
and suitable approved varieties.
31. Construction works undertaken in the vicinity of Unitywater water supply or
sewerage infrastructure must not adversely affect the integrity of the
infrastructure. All costs associated with repair, replacement or alteration of
infrastructure must be met by the applicant.
Advisory Notes
Unitywater
Connection to Unitywater live water mains and the Unitywater live sewer system must
be undertaken by Unitywater at the applicant’s cost.
A 150mm diameter water main is located within the road boundary fronting the
development site in Rene Street. Construction works, heavy traffic crossing the main,
excessive vibration and excavation close to the main may cause damage to the pipe.
Extreme care is required when working close to this infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH
Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable measures
to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to
fail to comply with the duty of care. Substantial monetary penalties may apply to
individuals or corporations breaching this duty of care. Injunctions may also be issued
by the Land and Resources Tribunal, and the Minister administering the ACH Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal
cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You
should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss
any obligations under the ACH Act.
Equitable Access and Facilities
Noosa Shire Council Page 16 of 19
This is not an official copy of Council’s Minutes
Section 17
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
The plans for the proposed building work have NOT been assessed for compliance
with the requirements of the National Construction Code - Building Code of Australia
(Volume 1) as they relate to people with disabilities. Your attention is also directed to
the fact that in addition to the requirements of the National Construction Code as they
relate to people with disabilities, one or more of the following may impact on the
proposed building work:
• the Disability Discrimination Act 1992 (Commonwealth);
• the Anti-Discrimination Act 1991 (Queensland); and
• the Disability (Access to Premises – Buildings) Standards.
• The applicant is advised that the development works for this permit may require
payment of a compliance bond (to be determined in Operational Works Permit)
in accordance with Council’s policies. The payment of the bonds will be
required prior the prestart meeting for the Operation Works.
• The Building and Construction Industry (Portable Long Service Leave) Levy
must be paid prior to the issue of a development permit where one is required
for the 'Building and Construction Industry'. This applies to Building Works,
Operational Works and Plumbing and Drainage Works applications, as defined
under the Sustainable Planning Act 2009, where the works are $80,000 or more
and matching the definition of 'Building and Construction Industry' under the
Building and Construction Industry (Portable Long Service Leave) Act 1991.
Council will not be able to issue a Decision Notice without receipt of details that
the Levy has been paid. Should you require clarification in regard to the
amendments to the Building and Construction Industry (Portable Long Service
Leave) Act 1991, you should contact QLeave on 1800 803 481 (free call) or
(07) 3212 6855
B. Refuse the Operational Works application OPW12/0276 for the following reasons:
1. The proposal represents excessive signage for a single business that will result
in unnecessary visual clutter and adversely impact on the visual amenity of the
area.
2. The signage is incompatible with the developed character of Noosaville and is
contrary to the Advertising Devices Code.
3. The application proposes signage identified as inconsistent advertising devices
within the Advertising Devices Code of The Noosa Plan.
C. Request the applicant to remove all excess signage and ensure all signage complies
with the acceptable solutions of the Advertising Devices Code of The Noosa Plan. In
particular, no sign shall exceed a sign face area of 4m2 and total signage shall not
exceed a combined sign face area of 10m2.
2 SEPTEMBER 2014 QUARTERLY BUDGET REVIEW - FURTHER REPORT
That Council note the report by the Manager Financial Services to the Planning &
Organisation Committee Meeting dated 11 November 2014 and the Further Report by the
Director Corporate Services to the General Committee dated 17 November 2014 and adopt
the requested changes to the budget for the 2014/2015 financial year, as outlined in the
attached Budget Financial Statements.
Noosa Shire Council Page 17 of 19
This is not an official copy of Council’s Minutes
Section 18
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
3 FINANCIAL PERFORMANCE REPORT OCTOBER 2014
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 17 November 2014 providing the October monthly financial performance
report.
4 REQUEST TO CHANGE A CONDITION OF EXISTING APPROVAL FOR A MATERIAL
CHANGE OF USE AND RECONFIGURING A LOT FOR 174 DETACHED HOUSING
LOTS AT GREENWOOD GROVE, GARNET ST COOROY -132004.240018.A -
FURTHER REPORT DOCUMENT INFORMA TION
That Council note the report by the Senior Development Planner to the Planning &
Organisation Committee Meeting dated 14 October 2014 and the further report to the
General Committee Meeting dated 17 November 2014 regarding a request to change
existing approval 132004.240018 and:
A. Approve a change to Condition 65.1.2 as follows:
Condition 65.1.2
The remaining section of Garnet Street extending from the Pine Street intersection
(and excluding the section to be upgraded to an external Urban Collector Road) to
approximately inline with the eastern boundary of Lot 189 on MCH 976 shall be
upgraded to an External Rural Distributor Road. The upgrading of Garnet Street shall
also be designed to enable flood free access to the site during a 1 in 2 year Average
Recurrence Interval (ARI) flood event with a maximum trafficable depth of 200mm for
a 1 in 10 year ARI flood event and with the product of flow depth and velocity being
less than 0.4m2/s. This part of the road must be completed prior to the sealing of the
survey plan for Stage 3 or any other subsequent stage of the development, unless an
alternative agreement is entered into by the Developer and Council by way of an
Infrastructure Agreement.
B. Include the following additional condition:
The design of the works must be in accordance with the relevant industry standard
blockage factors for pipes, safety barriers, hand rails, fencing and the like and include
appropriate structures to manage debris.
5 2014/2015 COMMUNITY GRANTS SECOND ROUND RECOMMENDATIONS
That Council note the report by the Community Development Coordinator to the General
Committee Meeting dated 17 November 2014 and endorse the second round of
Community Grants recommendations for the financial year 2014/15 as set out in
Attachment 1 to the report.
6 2014/2015 REGIONAL ARTS DEVELOPMENT FUND ROUND 1 GRANT
RECOMMENDATIONS
That Council note the report by the Community Development Officer (Culture) to the
General Committee Meeting dated 17 November 2014 and endorse the first round of
Regional Arts Development Fund (RADF) recommendations for the financial year 2014/15
as set out in Attachment 1 to the report.
7 NOOSA BIOSPHERE RESERVE MANAGEMENT ARRANGEMENTS
That Council note the report by the Executive Manager to the General Committee Meeting
dated 17 November 2014 and authorise the Chief Executive Officer to progress and finalise
the necessary documentation to establish the Noosa Biosphere Reserve Trust, the Noosa
Biosphere Reserve Foundation Ltd and registration of the company.
Noosa Shire Council Page 18 of 19
This is not an official copy of Council’s Minutes
Section 19
ORDINARY MEETING MINUTES 20 NOVEMBER 2014
6 ORDINARY MEETING REPORTS
1. NOOSA BIOSPHERE MANAGEMENT ARRANGEMENTS – FURTHER REPORT
Docum ent in for matio n
Council Resolution
Moved: Cr Abbot
Seconded: Cr Wellington
That Council note the report by the Executive Manager, Executive Office to the General
Committee Meeting dated 17 November 2014 and the Further Report by the Executive
Manager, Executive Office to the Ordinary Meeting dated 20 November 2014 and
A. Adopt the Noosa Biosphere Reserve Trust as set out in Attachment 1 and the
Constitution of Noosa Biosphere Reserve Foundation Ltd as set out in Attachment 2;
and
B. Authorise the CEO to make any minor amendments as required to enable registration
of the Constitution and Trust.
Carried.
7 PETITIONS
1. PETITION: OPPOSITION FOR THE DEVELOPMENT APPLICATION FOR MCU
12/0184 INTENSIVE CHICKEN FARM PROJECT AT 136 TOP FORESTRY ROAD
RIDGEWOOD
Council Resolution
Moved: Cr Jurisevic
Seconded: Cr Pardon
That the petition presented by Cr Jurisevic showing opposition for MCU12/0184
Chicken Farm Project be received and referred to the Chief Executive Officer to
determine appropriate action.
Carried.
8 CLOSED SESSION
Nil
9 NEXT MEETING
The next Ordinary Meeting will be held on 18 December, 2014 in the Council Chambers,
9 Pelican Street, Tewantin, commencing at 6pm.
10 MEETING CLOSURE
The meeting closed at 6.40pm.