scenario assessed. The traffic scenario in the TTM report with a 0% grade applied to the Holts Road approach
does fail with a DOS greater than 80% and LOS F, however this scenario has several conservative inputs.
Scenario 5 is at the other end of the spectrum with alternative values for all inputs in Table 1. This Scenario
operates extremely well with significant spare capacity.

Based on the available information, both scenarios are considered to be unlikely. There is a higher likelihood
that the operational characteristics of the Myall Street/Holts Road intersection will be within the range of
Scenarios 1-4. For these scenarios, this intersection operates suitably within acceptable operational
characteristics (DOS below 80% and LOS E or better in urban areas).

6. Conclusion

TTM have undertaken further assessment of the Myall Street/Holts Road intersection to inform Council and
DTMR of the anticipated operation of this intersection in 2029. This assessment identified several likely traffic
and driver behaviour scenarios based on the data provided by DTMR and TTM’s experience where alternative
inputs are reasonable. Under all alternative scenarios, this intersection operates within acceptable
performance characteristics.

Based on this assessment, it is TTM’s opinion that this intersection is likely to perform suitably in its designed
form with the proposed development and no mitigation measures are warranted.

Please call Gary Harris on (07) 3327 9500 should you have any queries in relation to this assessment.

Yours sincerely,




Gary Harris
Lead Consultant
TTM Consulting Pty Ltd

Attachment 1: Noosa Shire Council Information Request MCU16/0066 dated 22 July 2016
Attachment 2: Extract from Pavement Design Report prepared by GHD
                   Appendix A: 2009 Representative Network Count for AM and PM Peak Hours of a Traffic
                   Analysis Report for the Bruce Highway (Cooroy to Curra) Upgrade Section A (Cooroy
                   Southern Interchange to Sankeys Road)
                   Design Future AADT Volumes for ‘Do Nothing’ and ‘Upgrade Option’
Attachment 3: Sidra files in Version 6.1 and 7.0 for the scenarios for the 2029 PM peak hour operation of
              the Myall Street/Holts Road intersection (Electronic)
Log in to download the original file

Traffic Engineering Correspondence.pdf · 2.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.