Skip to the record
Accept no substitutions.

Original source · versioned page text

Traffic Engineering Correspondence

Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/0133 - email 2 of 3.

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

3. Site Access (Items 16 and 17)

TTM acknowledge Council’s concerns with the two way operation of the southern site access. This is not
essential to site operation as the northern access is a dedicated exit only driveway. TTM have therefore
provided a signage and line marking plan to identify the southern access as entry only and the northern access
as exit only. These recommendations are provided in Appendix B (TTM reference: 16BRT0201-01 Revision D).

4. Site Grades (Items 19)

Covey and Associates are preparing plans identifying site levels which will be submitted in an Operational
Works application. TTM have reviewed preliminary site levels, however these plans are currently not available
for issue. Site gradients should comply with specifications set out in Table 1.

Table 1: Maximum Site Gradients

 Location                                                      Design Vehicle           Maximum Grade

 Ramps – forward gear only                                           AV                   1:6.5 (15.4%)

 Change of grade – forward gear only                                 AV              1:16 (6.25%) over 10m

 Manoeuvring Area – where reverse movement likely
                                                                     HRV                   1:8 (12.5%)
 (i.e. fast food servicing)

 Servicing Areas                                                     AV                    1:25 (4.0%)

 First 9.5m from northern exit driveway                              AV                    1:20 (5.0%)

 Parking Area – General                                              B99                  1:16 (6.25%)

 Parking Area – parallel to parking spaces                           B99                   1:20 (5.0%)

 Parking Area – PWD Parking                                          B99                   1:40 (2.5%)

Site gradients will be considered suitable where the above gradients are met.

5. Pedestrian Access (Item 19)

Existing paths are currently located along the Taylors Road site frontage as shown in Figure 1 (source:
Nearmap).
Log in to download the original file

Traffic Engineering Correspondence.pdf · 2.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.