Original source · versioned page text
Traffic Engineering Correspondence
Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/0133 - email 2 of 3.
Attachment 2: Extract from Pavement Design Report prepared by GHD
Appendix A: 2009 Representative Network Count for AM and PM Peak Hours of a Traffic
Analysis Report for the Bruce Highway (Cooroy to Curra) Upgrade Section A (Cooroy Southern
Interchange to Sankeys Road)
Design Future AADT Volumes for ‘Do Nothing’ and ‘Upgrade Option’
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.