                                              Officer:          Denis Wallace
                                              Direct Telephone: (07) 5449 5179
                                              Response Address: PO Box 141, Tewantin QLD 4565
                                              Email:            [email protected]
                                              Our Reference:    2008/299
                                              Your Reference:   00786 LO4 NG
9 June 2009

Linda Staley
CARE Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567



Dear Madam

                                        Decision Notice
                                   Integrated Planning Act 1997

I refer to your application and advise that on 9 June 2009 Council decided to approve the application
in full subject to conditions.
Details of the decision are as follows:

1        APPLICATION DETAILS

    Application No:                  2008/299
    Street address:                  14 & 16 Duke Street, Sunshine Beach & 1 & 3 Douglas Street,
                                     Sunshine Beach
    Real property description:       5 SP 194338 & Lots 339 - 341 RP 48111
    Planning Scheme:                 The Noosa Plan

2        DECISION DETAILS

The following type of approval has been issued:
        Development Permit for Material Change of Use - Visitor Accommodation Type 4 - Visitor
         Hostel

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4        ASSESSMENT MANAGER CONDITIONS

1.       Development undertaken in accordance with this approval must generally comply with the
         approved plans of development. The approved plans are titled and numbered below: -
          Plan / Document No.     Rev.    Plan / Document Name                          Date
          SD.102                  P12     Proposed Site Plan – Kidd & Co                April 2007
                                          Designers
          SD.201a                 P12     Residence – Ground Level Plan – Kidd          April 2007
                                          & Co Designers

                                                                                         Page 1 of 11
Full text of the other 10 sections

Section 2

                                                                                      2008/299



      SD.202a                  P12     Residence – Roof Plan – Kidd & Co          April 2007
                                       Designers
      SD.501a                  P12     Residence – Elevations – Kidd & Co         April 2007
                                       Designers
      SD.502a                  P12     Residence – Elevations – Kidd & Co         April 2007
                                       Designers
      SD.201b                  P12     Backpackers – Ground Level Plan –          April 2007
                                       Kidd & Co Designers
      SD.202b                  P12     Backpackers – Upper Level Plan – Kidd      April 2007
                                       & Co Designers
      SD.202b                  P12     Backpackers – Roof Plan – Kidd & Co        April 2007
                                       Designers
      SD.501b                  P12     Backpackers – Elevations – Kidd & Co       April 2007
                                       Designers
      SD.502b                  P12     Backpackers – Elevations – Kidd & Co       April 2007
                                       Designers
      0293 – T02                       Existing Layout Plan – Carpark             10 March 2009
                                       Alterations – Contour Consulting
                                       Engineers

     and as may be amended by the conditions herein.
General
2.   The development must be undertaken and operated in a manner that causes no detrimental
     effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
     lighting nuisance or other emissions.
3.   A sign shall be erected at the entrance to the driveway to Ferguson Street clearly indicating
     “Visitor Parking” within the site.
4.   With the exception of the manager’s residence, all windows to the northern elevations of the
     buildings shall be double glazed.
5.   Alcohol shall not be sold on the premises.
6.   Amplified music must not be audible at the boundaries of the site between 10pm and 7am.
Landscaping & Vegetation
7.   Screening vegetation shall be established between the new bathroom and the northern
     boundary of the site.
8.   Existing trees on the site and within road reserves are to be retained, except where required to
     be removed due to building operations or the conduct of the approved use. These landscape
     plans required to be submitted are to denote areas of existing vegetation or existing trees
     proposed or required to be retained.
Energy Efficiency
9.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
     with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
     Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
     Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
     System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
     Dishwashers and washing machines are excluded from this requirement.

                                                                                   Page 2 of 11

Section 3

                                                                                        2008/299



10.   All hot water systems installed shall be either solar systems; electric heat pump systems; or
      gas systems (LPG or natural).
Security Bond
11.   Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for operational works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
12.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
Relevant Period
13.   The Development Permit for a material change of use lapses if the use has not happened by 9
      June 2013, unless an application to extend the currency is approved by Council.
Lot Amalgamation
14.   All separate, adjoining lots that form the southern part of the site (i.e. Lots 339, Lot 340 and
      Lot 341 on RP 48111) shall be amalgamated into one undivided allotment in accordance with
      Section 3.7.3 of the Integrated Planning Act and the Plan of Survey submitted for registration
      at the Land Titles Office. Proof of title being issued for the amalgamated lot shall be submitted
      to Council prior to the commencement of the Use.
Vehicle Access
15.   A vehicular access driveway to serve the bus loading zone generally as shown on Drawing No
      SD.201a Issue P12 dated April 2007 by Kidd & C0 shall be constructed from the Duke Street
      frontage of the site with a maximum width of 5.5m. The driveway shall allow for the
      manoeuvrings of passengers bus in compliance with AS 2890.2:2002. A Development Permit
      for Operational Works shall be required.
16.   All driveways shall be in compliance with Council’s design standards and to grades that
      prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements
      along the footpath without any step or level difference. Should any driveways be constructed
      to grades that do not comply with AS/NZS 2890.1-2004 or AS 2890.2:2002 as applicable,
      Council will require that the driveway be removed and reconstructed to levels that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
      to have the footpath continue at a constant grade to minimise the potential for pedestrians to
      trip or fall.
17.   To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
      the driveway and any associated fencing or vegetation near the driveway shall comply with the
      minimum sight line requirements as defined in AS 2890.1:2004, section 3.2.4. The applicant
      shall demonstrate compliance by illustrating these sight lines on the plans submitted for both
      Operational Works approval and Building Works approval.
18.   All vehicles shall enter and leave the site in a forward direction.
19.   The vehicle manoeuvring areas shall be contained within the boundaries of the lots.
Car Parking
20.   Carparking shall be provided within the site as shown on drawing number 0293-TO1 dated 10
      March 2009 by DM Hayes Traffic Engineering Consultant, except as modified herein.
21.   A minimum of 5 uncovered carpark spaces and 2 covered carpark spaces shall be provided
      on site.

                                                                                     Page 3 of 11

Section 4

                                                                                          2008/299



22.   The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
      for user class 2 with allowance for vehicles to enter and leave the site in a forward gear and
      with a minimum head clearance (headroom) at any point of 2.3m.
23.   All carparking shall be clearly line-marked in accordance with the approved plans and be kept,
      maintained and in a condition fit for use.
24.   The “existing carpark and access driveway” shown accessible from Douglas Street in the
      southeast corner of the site on some of the submitted plans is NOT an existing site condition
      and does not form part of this approval.
Roof Water & Stormwater Drainage
25.   Roof runoff from the existing and new buildings on the site shall be directed to a rainwater
      storage system or tank that is installed to ensure water from the rainwater storage system or
      tank is used for external uses (such as watering gardens, irrigation, ornamental ponds, water
      features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use
      in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and
      installed in accordance with the Queensland Development Code (QDC) current at the time of
      building approval, and shall be part of the plumbing application for approval. The location and
      capacity of the tanks shall be clearly shown on the plans submitted for Building Works
      approval and any overflow shall be directed to Council’s stormwater drainage systems in the
      adjoining roads.
26.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the carparking area on Lot 5 SP 194338 shall have the first flush (the
      first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap to be
      incorporated into the existing drainage collection pit in the carparking area prior to being
      permitted to discharge into Council’s drainage system.
      A detailed maintenance plan shall be prepared for the grease/oil arrestors/gross pollutant trap.
      The maintenance plan shall be incorporated in the developed site management scheme and a
      copy of this shall be provided for Council’s records prior to commencement of the approved
      Use.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly into the existing drainage system, bypassing
      the grease/oil arrestor/gross pollutant trap.
27.   All site stormwater drainage shall be by means of a gravity system.
Fire Hydrants
28.   Fire hydrants are to be provided on the development site in accordance with Council
      Engineering Design Standards and in accordance with Queensland Fire Service Standards.
      The provision of fire hydrants and any required booster pump shall be in accordance with the
      Building Code of Australia, and consultation may also be needed with Queensland Fire
      Services to ensure suitable fire fighting infrastructure is provided. To this end any necessary
      fire hydrants shall be clearly shown on the plans submitted for Building Works approval and if
      a booster pump is deemed necessary, the plans shall indicate where the fire truck is to be
      accommodated in order to provide boosting to the water supply.
Erosion and Sediment Control
29.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.




                                                                                      Page 4 of 11

Section 5

                                                                                         2008/299



Contributions Towards Council Infrastructure
30.     Monetary contributions shall be paid to Sunshine Coast Regional Council towards the cost of
        providing and/or upgrading various infrastructure at the rates applicable at the time of
        payment. An estimate only of the contribution amounts under the current Council policies and
        requirements is outlined in the table below:

         Contribution Required For:                                                    Amount:
         PSP12 – Public Open Space Contributions (Park)                                $17,873
         PSP16 – Sewerage Headworks Contributions                                      $18,353
         PSP17 – Water Supply Headworks Contributions                                  $31,609
         PSP20 – Pathway Trunk Network Contributions                                   $5,443
         TOTAL Contribution Amount =                                                   $73,278
         Please note, that these amounts are all subject to variations in the Consumer Price Index, All
         Groups Brisbane from March 2009 until the date of payment.

        All contributions must be paid prior to Council’s endorsement of the plan of survey.
        In the event that the Development Permit for Material Change of Use of Premises lapses or is
        cancelled, any paid contributions and/or the trading bank guarantee will be returned.
General
31.     Any damage caused to any public utility during the course of construction shall be repaired to
        Council’s standards and at no cost to Council.
32.     Any alteration of any public utility or other facilities necessitated by the development of the
        land or associated construction works external to the site shall be at no cost to Council.
33.     The transportation of all materials to and from the site shall be undertaken in a manner such
        that no particle matter escapes onto a public road. All vehicles carrying materials either to or
        from the site shall be covered to prevent materials including dust being windblown from the
        vehicle.
Refuse
34.     Paved waste storage areas shall be provided on site for all wheelie bins.
35.     The existing wheelie bin cleaning contract shall be continued, or alternatively, an on-site bin
        washing facility connected to the sewer shall be provided.
Health
36.     The development shall comply with all the health-related requirements of Local Law No. 22 for
        Rental Accommodation.
Noise
37.     Noise emission from mechanical equipment shall comply with the following requirements:
        37.1      Air-conditioning and Refrigeration
                     7am to 10pm: Maximum background + 5dB(A)
                     10pm to 7am: Maximum background + 3dB(A)
        37.2      Pumps
                     7am to 7pm: Maximum background + 5dB(A)
                     7pm to 10pm: Maximum background + 3dB(A)

                                                                                      Page 5 of 11

Section 6

                                                                                         2008/299



                    10pm to 7am: No audible noise.
5      REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency      Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.    Plan / Document Name                     Date
 SD.102                    P12     Proposed Site Plan – Kidd & Co           April 2007
                                   Designers
 SD.201a                   P12     Residence – Ground Level Plan – Kidd     April 2007
                                   & Co Designers
 SD.202a                   P12     Residence – Roof Plan – Kidd & Co        April 2007
                                   Designers
 SD.501a                   P12     Residence – Elevations – Kidd & Co       April 2007
                                   Designers
 SD.502a                   P12     Residence – Elevations – Kidd & Co       April 2007
                                   Designers
 SD.201b                   P12     Backpackers – Ground Level Plan –        April 2007
                                   Kidd & Co Designers
 SD.202b                   P12     Backpackers – Upper Level Plan – Kidd    April 2007
                                   & Co Designers
 SD.202b                   P12     Backpackers – Roof Plan – Kidd & Co      April 2007
                                   Designers
 SD.501b                   P12     Backpackers – Elevations – Kidd & Co     April 2007
                                   Designers
 SD.502b                   P12     Backpackers – Elevations – Kidd & Co     April 2007
                                   Designers
 0293 – T02                        Existing Layout Plan – Carpark           10 March 2009
                                   Alterations – Contour Consulting
                                   Engineers

7      ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.     The applicant is advised that development contributions and infrastructure charges applicable
       to this development approval have been based on the following Uses Class/ Uses and
       applicable quantities:-




                                                                                   Page 6 of 11

Section 7

                                                                                          2008/299




                  Existing Development                              Approved Development
        Existing Use Class                              Approved Use Class
                                 Existing Quantity                                 Approved Quantity
               / Use                                          / Use
       Semi-Attached            1 detached house        Visitor                   17 accommodation
       Housing                  on 3 lots               Accommodation Type        rooms sleeping total
                                                        4 - Hostel                60 persons + 1 x 3
       Multiple Housing         7 x 2 bedroom units                               bedroom manager’s
       Type 4                   on 1 lot.                                         residence

2.    The applicant is informed that approval of this development application will trigger an
      Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
      Charges Plan for the estimated amount of $14,547 and is subject to variations in the
      Consumer Price Index, All Groups Brisbane from March 2009 until the date of payment. An
      Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
      Planning Act 1997.
3.    The applicant is informed that payment via credit card transaction will not be an acceptable
      method of payment for development contributions conditioned in this permit or for
      infrastructure charge notices issued separately.
4.    The applicant is advised that a Compliance Permit for all plumbing and drainage works within
      the boundaries of the development site shall be obtained from Council’s Plumbing Services
      Section prior to obtaining a Development Permit for Building Works.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES
Not applicable

9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable
10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required           Subject of the required Development Permit
 Development Permit for Building Works         All Building Works

11    SELF ASSESSABLE CODES

The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:

                                                                                      Page 7 of 11

Section 8

                                                                                      2008/299



Advertising Devices Code

12     SUBMISSIONS
There were two (2) properly made submissions about the application. In accordance with Integrated
Planning Act 1997, the name and address of the principal submitter for each properly made
submission is provided and attached.

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable

14     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15     OTHER DETAILS

Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,



Kerri Coyle
COORDINATOR PLANNING APPLICATIONS (NORTH)




                                                                                   Page 8 of 11

Section 9

                                                                   2008/299



                          List of Submitters
                          INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




Michelle Spees
21 Carlton Street
HARBORD NSW 2096

Elizabeth Richards
2/22 Ferguson Street
SUNSHINE BEACH QLD 4567




                                                                Page 9 of 11

Section 10

                                                                                                       2008/299



                                                        Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated
                                                                    (6) If an application involves assessment against a
Planning Act (Chapter 4).                                      concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to                      for the application are not available against the part of
development applications                                       the approval that represents the concurrence agency’s
                                                               response for the code.
Appeals by applicants
                                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following-          4.1.29.(1) An advice agency may, within the limits of
                                                               its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development      development approval for a development application
      application;                                             if-
(b) a matter stated in a development approval,                 (a) the development application involves impact
      including any condition applying to the                      assessment; and
      development, and the identification of a code
      under section 3.1.6;1                                    (b) the advice agency told the applicant and the
                                                                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a             application as a submission for an appeal.
      development permit was applied for;
                                                                  (2) The appeal must be started within 20 business
(d) the length of a relevant period;                           days after the day the decision notice or negotiated
(e) a deemed refusal.                                          decision notice is given to the advice agency as a
    (2) An appeal under subsection (1)(a) to (d) must          submitter.
be started within 20 business days (the “applicant’s           Appeals for matters arising after approval given
appeal period”) after the day the decision notice or           (co-respondents)
negotiated decision notice is given to the applicant.          4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be               development application, a person to whom any of the
started at any time after the last day a decision on the       following notices have been given may appeal to the
matter should have been made.                                  court against the decision in the notice-
Appeals by submitters                                          (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application               extension of the relevant period for an approval;
may appeal to the court about-                                 (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including                minor change to an approval.
      any conditions (or lack of conditions) or other              (2) The appeal must be started within 20 business
      provisions of the approval; or                           days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval.          the person.
    (2) The appeal must be started within 20 business                (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day            approval resulted from a development application
the decision notice or negotiated decision notice is           (superseded planning scheme) that was assessed as
given to the submitter.                                        if it were an application under a superseded planning
                                                               scheme.
    (3) If a person withdraws a submission before the
application is decided, the person may not appeal the             (4) Also, a person who has made a request
decision.                                                      mentioned in subsection (1) may appeal to the court
                                                               against a deemed refusal of the request.
    (4) If an application involves both impact
assessment and code assessment, appeal rights for                 (5) An appeal under subsection (4) may be started
submitters are available only for the part of the              at any time after the last day the decision on the
application involving impact assessment.                       matter should have been made.
    (5) If an application is processed under section           Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the                Appeals for matters arising after approval given
application are available only for the aspects of the          (no co-respondents)
development that would have required public
notification under the repealed Act.                           4.1.31.(1) A person to whom any of the following
                                                               notices have been given may appeal to the court
                                                               against the decision in the notice-
                                                               (a) a notice giving a decision on a request to change
                                                                   or cancel a condition of a development approval.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                  Page 10 of 11

Section 11

                                                                                                    2008/299

(b) a notice under section 6.1.442 giving a decision to     (d) the length of a period mentioned in section 3.5.21
    change or cancel a condition of a development                 relevant period;
    approval.                                               (e) a deemed refusal.
    (2) The appeal must be started within 20                    (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision      be started within 20 business days (the “applicant’s
is given to the person.                                     appeal period”) after the day the decision notice or
   (3) Also, a person who has made a request                negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the                (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request.              started at any time after the last day a decision on the
    (4) An appeal under subsection (3) may be               matter should have been made.
started at any time after the last day the decision on      The Registrar for the Building and Development
the matter should have been made.                           Tribunal may be contacted at the website
Appeals against decisions to change approval                http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
                                                            For Infrastructure Charges Only
decision made on an application to change the               4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under              charges
section 2.19(3)or section 4.4 of the repealed Act may       (1) This section applies to a person who has been
appeal to the court against-                                given, and is dissatisfied with, an infrastructure
(a) the decision; or                                        charges notice or a regulated State infrastructure
(b) a deemed refusal of the application.                    charges notice.
    (2) An appeal under subsection (1)(a) must be           (2) The person may appeal to the court against the
started within 20 business days after the day notice of     notice.
the decision is to be given to the person.                  (3) The appeal must be started within 20 business
    (3) An appeal under subsection (1)(b) may be            days after-
started at any time after the last day a decision on the    (a) if the notice is given because of a development
matter should have been made.                                    approval or master plan approval-the day the
Appeals against local laws                                       applicant is given notice of the decision about the
                                                                 approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions            (b)    otherwise-the day the notice is given to the
applied under a local law about the use of premises or             person.
the erection of a building or other structure permitted     (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court              (a) whether a charge in the notice is so
against the decision or the conditions applied.                  unreasonable that no reasonable relevant local
    (2) The appeal must be started within 20 business            government, State infrastructure provider or
days after the day notice of the decision is given to the        coordinating agency could have imposed it; or
applicant.                                                  (b) an error in the calculation of the charge.
For Building Works Only                                     (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the          appeal under this section can not be about the
Integrated Planning Act 1997 as follows:                    methodology used to establish the charge in the
                                                            relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
                                                            State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval,
    including any condition applying to the
    development, and the identification of a code
    under section 3.1.6;3
(c) the decision to give a preliminary approval when a
    development permit was applied for;


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
   Section 3.1.6 (Preliminary approval may override
  local planning instrument)
                                                                                               Page 11 of 11

Used in these records

About this file

File size
70 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001AB5B5.001.pdf · 70 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.