Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 9 June 2009 Council decided to approve the application
in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2008/299
Street address: 14 & 16 Duke Street, Sunshine Beach & 1 & 3 Douglas Street,
Sunshine Beach
Real property description: 5 SP 194338 & Lots 339 - 341 RP 48111
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Development Permit for Material Change of Use - Visitor Accommodation Type 4 - Visitor
Hostel
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are titled and numbered below: -
Plan / Document No. Rev. Plan / Document Name Date
SD.102 P12 Proposed Site Plan – Kidd & Co April 2007
Designers
SD.201a P12 Residence – Ground Level Plan – Kidd April 2007
& Co Designers
Page 1 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 10 sections
Section 2
2008/299
SD.202a P12 Residence – Roof Plan – Kidd & Co April 2007
Designers
SD.501a P12 Residence – Elevations – Kidd & Co April 2007
Designers
SD.502a P12 Residence – Elevations – Kidd & Co April 2007
Designers
SD.201b P12 Backpackers – Ground Level Plan – April 2007
Kidd & Co Designers
SD.202b P12 Backpackers – Upper Level Plan – Kidd April 2007
& Co Designers
SD.202b P12 Backpackers – Roof Plan – Kidd & Co April 2007
Designers
SD.501b P12 Backpackers – Elevations – Kidd & Co April 2007
Designers
SD.502b P12 Backpackers – Elevations – Kidd & Co April 2007
Designers
0293 – T02 Existing Layout Plan – Carpark 10 March 2009
Alterations – Contour Consulting
Engineers
and as may be amended by the conditions herein.
General
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. A sign shall be erected at the entrance to the driveway to Ferguson Street clearly indicating
“Visitor Parking” within the site.
4. With the exception of the manager’s residence, all windows to the northern elevations of the
buildings shall be double glazed.
5. Alcohol shall not be sold on the premises.
6. Amplified music must not be audible at the boundaries of the site between 10pm and 7am.
Landscaping & Vegetation
7. Screening vegetation shall be established between the new bathroom and the northern
boundary of the site.
8. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use. These landscape
plans required to be submitted are to denote areas of existing vegetation or existing trees
proposed or required to be retained.
Energy Efficiency
9. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
Page 2 of 11
Section 3
2008/299
10. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
Security Bond
11. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
12. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
Relevant Period
13. The Development Permit for a material change of use lapses if the use has not happened by 9
June 2013, unless an application to extend the currency is approved by Council.
Lot Amalgamation
14. All separate, adjoining lots that form the southern part of the site (i.e. Lots 339, Lot 340 and
Lot 341 on RP 48111) shall be amalgamated into one undivided allotment in accordance with
Section 3.7.3 of the Integrated Planning Act and the Plan of Survey submitted for registration
at the Land Titles Office. Proof of title being issued for the amalgamated lot shall be submitted
to Council prior to the commencement of the Use.
Vehicle Access
15. A vehicular access driveway to serve the bus loading zone generally as shown on Drawing No
SD.201a Issue P12 dated April 2007 by Kidd & C0 shall be constructed from the Duke Street
frontage of the site with a maximum width of 5.5m. The driveway shall allow for the
manoeuvrings of passengers bus in compliance with AS 2890.2:2002. A Development Permit
for Operational Works shall be required.
16. All driveways shall be in compliance with Council’s design standards and to grades that
prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements
along the footpath without any step or level difference. Should any driveways be constructed
to grades that do not comply with AS/NZS 2890.1-2004 or AS 2890.2:2002 as applicable,
Council will require that the driveway be removed and reconstructed to levels that do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
to have the footpath continue at a constant grade to minimise the potential for pedestrians to
trip or fall.
17. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
the driveway and any associated fencing or vegetation near the driveway shall comply with the
minimum sight line requirements as defined in AS 2890.1:2004, section 3.2.4. The applicant
shall demonstrate compliance by illustrating these sight lines on the plans submitted for both
Operational Works approval and Building Works approval.
18. All vehicles shall enter and leave the site in a forward direction.
19. The vehicle manoeuvring areas shall be contained within the boundaries of the lots.
Car Parking
20. Carparking shall be provided within the site as shown on drawing number 0293-TO1 dated 10
March 2009 by DM Hayes Traffic Engineering Consultant, except as modified herein.
21. A minimum of 5 uncovered carpark spaces and 2 covered carpark spaces shall be provided
on site.
Page 3 of 11
Section 4
2008/299
22. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
for user class 2 with allowance for vehicles to enter and leave the site in a forward gear and
with a minimum head clearance (headroom) at any point of 2.3m.
23. All carparking shall be clearly line-marked in accordance with the approved plans and be kept,
maintained and in a condition fit for use.
24. The “existing carpark and access driveway” shown accessible from Douglas Street in the
southeast corner of the site on some of the submitted plans is NOT an existing site condition
and does not form part of this approval.
Roof Water & Stormwater Drainage
25. Roof runoff from the existing and new buildings on the site shall be directed to a rainwater
storage system or tank that is installed to ensure water from the rainwater storage system or
tank is used for external uses (such as watering gardens, irrigation, ornamental ponds, water
features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use
in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and
installed in accordance with the Queensland Development Code (QDC) current at the time of
building approval, and shall be part of the plumbing application for approval. The location and
capacity of the tanks shall be clearly shown on the plans submitted for Building Works
approval and any overflow shall be directed to Council’s stormwater drainage systems in the
adjoining roads.
26. To ensure that polluted run-off does not enter Council’s stormwater drainage system,
stormwater run-off from the carparking area on Lot 5 SP 194338 shall have the first flush (the
first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap to be
incorporated into the existing drainage collection pit in the carparking area prior to being
permitted to discharge into Council’s drainage system.
A detailed maintenance plan shall be prepared for the grease/oil arrestors/gross pollutant trap.
The maintenance plan shall be incorporated in the developed site management scheme and a
copy of this shall be provided for Council’s records prior to commencement of the approved
Use.
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system, bypassing
the grease/oil arrestor/gross pollutant trap.
27. All site stormwater drainage shall be by means of a gravity system.
Fire Hydrants
28. Fire hydrants are to be provided on the development site in accordance with Council
Engineering Design Standards and in accordance with Queensland Fire Service Standards.
The provision of fire hydrants and any required booster pump shall be in accordance with the
Building Code of Australia, and consultation may also be needed with Queensland Fire
Services to ensure suitable fire fighting infrastructure is provided. To this end any necessary
fire hydrants shall be clearly shown on the plans submitted for Building Works approval and if
a booster pump is deemed necessary, the plans shall indicate where the fire truck is to be
accommodated in order to provide boosting to the water supply.
Erosion and Sediment Control
29. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
Page 4 of 11
Section 5
2008/299
Contributions Towards Council Infrastructure
30. Monetary contributions shall be paid to Sunshine Coast Regional Council towards the cost of
providing and/or upgrading various infrastructure at the rates applicable at the time of
payment. An estimate only of the contribution amounts under the current Council policies and
requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $17,873
PSP16 – Sewerage Headworks Contributions $18,353
PSP17 – Water Supply Headworks Contributions $31,609
PSP20 – Pathway Trunk Network Contributions $5,443
TOTAL Contribution Amount = $73,278
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from March 2009 until the date of payment.
All contributions must be paid prior to Council’s endorsement of the plan of survey.
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, any paid contributions and/or the trading bank guarantee will be returned.
General
31. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
32. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
33. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Refuse
34. Paved waste storage areas shall be provided on site for all wheelie bins.
35. The existing wheelie bin cleaning contract shall be continued, or alternatively, an on-site bin
washing facility connected to the sewer shall be provided.
Health
36. The development shall comply with all the health-related requirements of Local Law No. 22 for
Rental Accommodation.
Noise
37. Noise emission from mechanical equipment shall comply with the following requirements:
37.1 Air-conditioning and Refrigeration
7am to 10pm: Maximum background + 5dB(A)
10pm to 7am: Maximum background + 3dB(A)
37.2 Pumps
7am to 7pm: Maximum background + 5dB(A)
7pm to 10pm: Maximum background + 3dB(A)
Page 5 of 11
Section 6
2008/299
10pm to 7am: No audible noise.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
SD.102 P12 Proposed Site Plan – Kidd & Co April 2007
Designers
SD.201a P12 Residence – Ground Level Plan – Kidd April 2007
& Co Designers
SD.202a P12 Residence – Roof Plan – Kidd & Co April 2007
Designers
SD.501a P12 Residence – Elevations – Kidd & Co April 2007
Designers
SD.502a P12 Residence – Elevations – Kidd & Co April 2007
Designers
SD.201b P12 Backpackers – Ground Level Plan – April 2007
Kidd & Co Designers
SD.202b P12 Backpackers – Upper Level Plan – Kidd April 2007
& Co Designers
SD.202b P12 Backpackers – Roof Plan – Kidd & Co April 2007
Designers
SD.501b P12 Backpackers – Elevations – Kidd & Co April 2007
Designers
SD.502b P12 Backpackers – Elevations – Kidd & Co April 2007
Designers
0293 – T02 Existing Layout Plan – Carpark 10 March 2009
Alterations – Contour Consulting
Engineers
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is advised that development contributions and infrastructure charges applicable
to this development approval have been based on the following Uses Class/ Uses and
applicable quantities:-
Page 6 of 11
Section 7
2008/299
Existing Development Approved Development
Existing Use Class Approved Use Class
Existing Quantity Approved Quantity
/ Use / Use
Semi-Attached 1 detached house Visitor 17 accommodation
Housing on 3 lots Accommodation Type rooms sleeping total
4 - Hostel 60 persons + 1 x 3
Multiple Housing 7 x 2 bedroom units bedroom manager’s
Type 4 on 1 lot. residence
2. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $14,547 and is subject to variations in the
Consumer Price Index, All Groups Brisbane from March 2009 until the date of payment. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
Planning Act 1997.
3. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
4. The applicant is advised that a Compliance Permit for all plumbing and drainage works within
the boundaries of the development site shall be obtained from Council’s Plumbing Services
Section prior to obtaining a Development Permit for Building Works.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Page 7 of 11
Section 8
2008/299
Advertising Devices Code
12 SUBMISSIONS
There were two (2) properly made submissions about the application. In accordance with Integrated
Planning Act 1997, the name and address of the principal submitter for each properly made
submission is provided and attached.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Kerri Coyle
COORDINATOR PLANNING APPLICATIONS (NORTH)
Page 8 of 11
Section 9
2008/299
List of Submitters
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
Michelle Spees
21 Carlton Street
HARBORD NSW 2096
Elizabeth Richards
2/22 Ferguson Street
SUNSHINE BEACH QLD 4567
Page 9 of 11
Section 10
2008/299
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated
(6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to for the application are not available against the part of
development applications the approval that represents the concurrence agency’s
response for the code.
Appeals by applicants
Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following- 4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application
application; if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code
under section 3.1.6;1 (b) the advice agency told the applicant and the
assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
(e) a deemed refusal. decision notice is given to the advice agency as a
(2) An appeal under subsection (1)(a) to (d) must submitter.
be started within 20 business days (the “applicant’s Appeals for matters arising after approval given
appeal period”) after the day the decision notice or (co-respondents)
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
(3) An appeal under subsection (1)(e) may be development application, a person to whom any of the
started at any time after the last day a decision on the following notices have been given may appeal to the
matter should have been made. court against the decision in the notice-
Appeals by submitters (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application extension of the relevant period for an approval;
may appeal to the court about- (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including minor change to an approval.
any conditions (or lack of conditions) or other (2) The appeal must be started within 20 business
provisions of the approval; or days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval. the person.
(2) The appeal must be started within 20 business (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day approval resulted from a development application
the decision notice or negotiated decision notice is (superseded planning scheme) that was assessed as
given to the submitter. if it were an application under a superseded planning
scheme.
(3) If a person withdraws a submission before the
application is decided, the person may not appeal the (4) Also, a person who has made a request
decision. mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.
(4) If an application involves both impact
assessment and code assessment, appeal rights for (5) An appeal under subsection (4) may be started
submitters are available only for the part of the at any time after the last day the decision on the
application involving impact assessment. matter should have been made.
(5) If an application is processed under section Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the Appeals for matters arising after approval given
application are available only for the aspects of the (no co-respondents)
development that would have required public
notification under the repealed Act. 4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 10 of 11
Section 11
2008/299
(b) a notice under section 6.1.442 giving a decision to (d) the length of a period mentioned in section 3.5.21
change or cancel a condition of a development relevant period;
approval. (e) a deemed refusal.
(2) The appeal must be started within 20 (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision be started within 20 business days (the “applicant’s
is given to the person. appeal period”) after the day the decision notice or
(3) Also, a person who has made a request negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request. started at any time after the last day a decision on the
(4) An appeal under subsection (3) may be matter should have been made.
started at any time after the last day the decision on The Registrar for the Building and Development
the matter should have been made. Tribunal may be contacted at the website
Appeals against decisions to change approval http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
For Infrastructure Charges Only
decision made on an application to change the 4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under charges
section 2.19(3)or section 4.4 of the repealed Act may (1) This section applies to a person who has been
appeal to the court against- given, and is dissatisfied with, an infrastructure
(a) the decision; or charges notice or a regulated State infrastructure
(b) a deemed refusal of the application. charges notice.
(2) An appeal under subsection (1)(a) must be (2) The person may appeal to the court against the
started within 20 business days after the day notice of notice.
the decision is to be given to the person. (3) The appeal must be started within 20 business
(3) An appeal under subsection (1)(b) may be days after-
started at any time after the last day a decision on the (a) if the notice is given because of a development
matter should have been made. approval or master plan approval-the day the
Appeals against local laws applicant is given notice of the decision about the
approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions (b) otherwise-the day the notice is given to the
applied under a local law about the use of premises or person.
the erection of a building or other structure permitted (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court (a) whether a charge in the notice is so
against the decision or the conditions applied. unreasonable that no reasonable relevant local
(2) The appeal must be started within 20 business government, State infrastructure provider or
days after the day notice of the decision is given to the coordinating agency could have imposed it; or
applicant. (b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the appeal under this section can not be about the
Integrated Planning Act 1997 as follows: methodology used to establish the charge in the
relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;3
(c) the decision to give a preliminary approval when a
development permit was applied for;
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 11 of 11
Used in these records
001AB5B5.001.pdfRelated documentPublic source context ↗
SUPERSEDED Decision Notice - 010.2008.00000299.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 70 KB (small file)
- File type
No other editions are linked here.