NOOSA Checklist - Applications Involving Land
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
SLICATION-FOR
1.1. Form 1 PartA
1.1.1 Ensure that the form is fully completed.
4.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 if there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2 Form1 Part B-O Supporting Information
; 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. LT]
1.1.2.1. Ensure that each of Forms 8-O which are attached are fully completed. |
34 Ensure that Part Git is is completed if ‘EPA, referral is is required,
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
M@eAeRORM:2 REQUESIRIO:CHANGE- APPROVAL TAC 5.
4.1 Ensure that items 1-28 have been checked and/or completed eluding information renaring
applicant details and owners consent. 4
NSS 2 OE Sas Re
"Ensure that at least 6 sets of the Plan of Development (5 for Reconfi iguration and Operationat £
Works) accompanies the application. In addition ensure that each set is complete.
§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is Y
unbound.
Ensure that at least 6 copies 5 of any report accompanies the application (5 for Reconfiguration |
and Operational Works). {f the application is accompanied by a covering letter, ensure that it is
capable of reproduction FA
6.2 In the case of f reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
71 "Ensure ‘that the pyaar fee, as determined from the Council’ s adopted scale of fees,
accompanies the application or has been paid.
v
7.2: Ensure that the fee which has been paid is recorded on the application form. . /
Receiving Officer _Sairta.He sesvecsssseseeseseeseeee pate .... AZ. 2S. COT ccc
| Having completed this form and accepted the application, please deliver both to the following {DAS Application Receiving
- trays:-
e — Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
* Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.
¢ If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
e —Inail other circumstances — AOP1’s desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 22 pages
Page 2
oe so% o’ Our Reference: 00787 L04 HB Our Project Planner. Hannah Blue mM a rtoo consulting m pty Itd town planners + urban designers 16 May 2007 abn | 86 120 928 707 Chief Executive Officer Noosa Shire Council PO Box 141 TEWANTIN Q 4565 Attention: Land Use Section Dear Sir/Madam RE: Development Application for Request to Change an Existing Approval (Dwelling House in a Sand Dune Problem Area) situated at 56 Seaview Terrace, Sunshine Beach: Suzie Phillips ' Martoo Consulting has been engaged as town planning consultants for the above proposal. A development application for the above proposal has been prepared in accordance with the /ntegrated Planning Act 1997 and is enclosed for Council’s assessment as the Assessment Manager of this application. The following documents are enclosed to comprise this development application: * — four (4) copies of the Proposal Report; * acompleted IDAS application Form 2; and *® a cheque for $815.00 which is understood to be Council's application fee as the Assessment Manager. Please contact our Sunshine Coast office if you require any further information and/or clarification in relation to this development application. ‘ Yours sincerely Hannah Blue Senior Planner Martoo Consulting Pty. Ltd. 3 4 * SUNSHINE COAST OFFICE GYMPIE OFFICE 1/199 GYMPIE TERRACE, NOOSAVILLE | POBOX 1684 NOOSA HEADS Q 4567 1/28 REEF STREET GYMPIE | PO BOX 391 GYMPIE Q 4570 TELEPHONE | 0754555425 FACSIMILE | 07 54555725 TELEPHONE | 0754827440 FACSIMILE | 07 5482 4952 [email protected] [email protected]
Page 3
a INTEGRATED PLANNING ACT 1997 Form 2, Version 3.3, 29 May 2006 eee Re Boron ce Request to change an existing approval 56 Seaview Terrace +
Page 4
INTEGRATED PLANNING ACT 1997 Form 2, Version 3.3, 29 May 2006 ca C/ Martoo Consulting PO Box 1684 Noosa Heads Q 4567 -lan Own. Aqnatug C/ Nadine Gorton 5455 5425 5455 5725 [email protected] Name in Full Date ) See Ghove iil) til W) ‘al-Wave required Refer attached letter Concurrence
Page 5
é Plan / Drawing / Report Number “| refer attached letter Form 2, Version 3.3, 29 ae, RENG: EY
Page 6
martoo Our Reference: 00787 L03 HB consulting m Council’s Reference: 2005/0901 pty Itd town planners + urban designers abn | 86 120 928 707 16 May 2007 Chief Executive Officer Noosa Shire Council P.O. Box 141 TEWANTIN Q 4565 Attention: Land Use Section Dear Sir/Madam RE: Application for Request to Change an Existing Approval (Dwelling House in a Sand Dune Problem Area) situated at 56 Seaview Terrace, Sunshine Beach described as Lot $5 on RP 81810, Parish of Weyba: Suzie Phillips Martoo Consulting Pty Ltd has been engaged by Suzie Phillips, as applicant for the above proposal to submit a development application to Noosa Shire Council under the integrated Planning Act 1997. This application requests a change to an existing approval (2005/0901) for a Detached House located at 56 Seaview Terrace, Sunshine Beach. This letter details the proposal and provides an assessment of the relevant code provision contained within the Detached House Code. 1. THE SUBJECT SITE The subject site comprises an existing lot which is described as Lot 65 on RP 81810, Parish of Weyba, County of March. The subject site has an area of 546m? and is afforded access directly from Seaview Terrace. A location map is included as Attachment 1. The subject site is included in the Detached House Zone under The Noosa Plan, and the Natural Resources Overlay (Coastal Protection Precinct) is applicable and retevant to the site. An approved two storey dwelling is located on the site. Plans detailing the existing dwelling can be provided if required. 2. SURROUNDING PREMISES The subject site is surrounded by a detached houses. These houses are a mixture of recently constructed large dwellings, and older style holiday houses. SUNSHINE COAST OFFICE GYMPIE OFFICE 1/199 GYMPIE TERRACE, NOOSAVILLE | PO BOX 1684 NOOSA HEADS Q 4567 1/28 REEF STREET GYMPIE | PO BOX 391 GYMPIE Q 4570 TELEPHONE | 0754555425 FACSIMILE ! 07 54555725 TELEPHONE | 0754827440 FACSIMILE | 07 5482 4952 [email protected] . . [email protected]
Page 7
® Page 2
3. SITE HISTORY
The site has recently been subject of a Development Application for Material! Change of Use of
Premises for Dwelling House in Sand Dune Problem Area. This application was lodged and assessed
under the now superseded Planning Scheme. This application sought approval for the removal of the
existing house, and the construction of a larger scale ‘Bark Design’ dwelling house. A Development
Permit (2005/0901) was issued 29 November 2005 which contained 38 conditions. A copy of this
permit, and the approved plans are included as Attachment 2.
4. THE DEVELOPMENT APPLICATION
This application seeks to undertake a change to the existing approval (2005/0901). Rather than
construct a new dwelling, the applicant now seeks to retain the existing dwelling, and undertake minor
renovations to improve its internal functionality and external visual appearance. A copy of the proposal
plans are included as Attachment 3.
The following significant changes from the original approval are proposed:
¢ Retain the existing structure;
Increase the front boundary setback of the garage from 2.6 metres to 3.4 metres;
Increase the rear boundary (beach front) setback of the upper and lower level decks;
Reduce the average height of the development;
Incorporate additional design features (ie. pitched roofing and overhangs) desirable for
a beach front locality; and
+ — Significantly reduce the amount of excavation and earthworks required.
The following modifications are proposed to the existing dwelling:
+ Extension of the dwelling towards the road front boundary;
+ Construction of a garage, master bedroom, entryway, office, media room and gym
within the western portion of the site;
+ Re-configuration the Living Room, Dining Room and Kitchen (however it is noted the
existing eastern building line is retained);
* Minor extension of the existing deck; and
+ Re-configuration of the lower level (however it is noted that the existing eastern building
line is retained).
5. ASSESSMENT — COASTAL PROTECTION OVERLAY
The Noosa Pian includes the site in the Coastal Protection Overlay. The assessment table for this overlay
indicates that when carrying out building work not associated with a material change of use within a Coastal
Protection Precinct, a code assessable development application is required. An assessment against the
relevant provisions are provided below.
Coastal Protection Precinct
Column Column 2 oo Trans)
Specific Outcomes Probable Solutions Compliance
Coastal Protection Precinct and
Erosion Prone Areas-Eastem $17.1 Buildings and other structures including | The proposal seeks to reduce the
Beaches Locality swimming pools, retaining walls and eastem boundary setback of the
O6 The siting and design of landscaped terraces, but excluding approved dwelling.
development and materials used within cantilevered decks that are uncovered and
the Coastal Protection Precinct, as unenclosed— in this regard, the approved dwelling
identified on the Natural Resources a) do not extend seaward of the coastal provides a minimum setback of 4.5
Page 8
@ Page3 Overlay Maps, do not cause any significant adverse impacts on the coastal resources of the location nor interrupt the natural cycles of erosion and accretion of foreshore areas and beaches. AND O7 Buildings, structures and works within the Coastal Protection Precinct that are visible from the beach— a) are designed to protect the character of the beachfront when viewed from the water and integrate with the surrounding natural landscape and skyline vegetation (see Error! Reference source not found.); and b) are finished predominately in colours and hues of the surrounding natural landscape; AND O08 Rear fences adjacent to the beachfront within the Coastal Protection Precinct are designed and sited to be sympathetic with the visual amenity of the beachfront and do not degrade the natural beachfront character. building line; or b) where a coastal building line does not exist on properties fronting the beachfront or a reserve adjoining the beachfront— are setback a minimum of 6m from the seaward boundary of the site; AND $17.2 Cantilevered decks that are uncovered and unenclosed located seaward of the coastal building line— a) do not extend seaward of the average of the outermost seaward projection of buildings on directly adjoining properties; and b) are a maximum depth of 3m; c) are setback a minimum of 6m from the seaward boundary of the site; AND $17.3 Where a coastal building line does not exist on properties fronting the beachfront or a reserve adjoining the beachfront— cantilevered decks are setback a minimum of 6m from the seaward boundary of the site; AND $17.4 Dense landscaping, comprising a mix of native coastal species of ground cover, scrubs and trees, is provided for a width of 5m from the seaward or rear boundary of the site to provide adequate landscape buffering to protect the coastal dune system. $18.1 No solution provided 1 $19.1 Rear fences adjacent to the beachfront within the Coastal Protection Precinct (as shown on Overlay Map OM4.5) incorporate the following— a) no more than 1.2m in height; and b) open construction (ie at least 50% transparent); c) lightweight materials (ie timber); and d) dark colours to blend with the natural landscape. AND $19.2 Gates are not installed in fences to gain direct access to the beachfront. metres to the cantilevered deck. The proposed modifications seek to increase this setback to 7 metres. As previously detailed, the proposal seeks to retain the existing structure and undertake minor upgrades to intemal functionality and extemal! visual appearance of the dwelling. The eastern facade of the existing structure is located forward of the 15 metre coastal building line as detailed on the proposal plans included as Attachment 3. It is considered that discretion is warranted in this case as the following is noted: . the proposal does not seek to extend further into the coastal buikding line; . the existing dwelling is setback further than that of the adjoining southern dwelling; . the existing dwelling does not. adversely impact the coastal resource or natural cycles of erosion; . the proposed renovations will improve the visual appearance of the dwelling when viewed from the beach frontage. As the proposal does not seek to undertake any works forward of the existing dwelling, all existing vegetation within this area is able to be retained. 6. CONCLUSION This application can be supported on a number of grounds. These grounds include: * The proposed changes significantly reduce the scale and bulk of the approved dwelling; * The proposed changes increase both the street front and beach front setbacks of the approved dwelling; * The proposed changes utilise the existing dwelling, thereby significantly reducing the amount of earthworks required within the sensitive easter portions of the site; * The proposed changes improve the dwelling's visual contribution to the surrounding area; as it teduce the box-like profile of the approved structure, and incorporates overhangs, pitching and extemal cladding;
Page 9
@ Page4 | * The proposed changes will positively impact upon the coastal resources of the location, as the development impacts less upon the natural cycles of erosion and accretion of the beach front. The Assessment Manager's favourable consideration of the above development application is therefore recommended. Please contact our office if you require any further information and/or clarification with respect to the above application. Yours sincerely SMA Hannah Blue Senior Planner Martoo Consulting Pty. Ltd. Cc. Suzie Phillips Kidd + Co
Page 10
TOWN PLANNERS DEVELOPMENT CONSULTANTS = 8 Request to Change an Existing Approval (Dwelling House in a Sand Dune Problem Area) situated at 56 Seaview Terrace, Sunshine Beach * LOCATION MAP PLANNING ASSESSMENT REPORT May 2007 DATE> FILE NAME> LOCATION MAP AMENDED> N/A 00787 JOB NO> VERSION> 1.0 “see above” SCALE> Figure [J NOOSA SHIRE COUNCIL SOURCE >
Page 11
! —— $ mwas
Sep
oS a, aw!
8 | Tee
ni 1~ Roof Overneng .
wy .
a — Reef Overhang Bl} —-.
|
I
cord Proposed ;
Garage *
garage.
E isting House, . Existing Houise .
* Existing House
.Lot6t on jo. 7 Lot 62'6n* “Lot 66'on_
RP 81810... . RP 81810: *
~ RP.81810 *
—-
aH Use figured dimensions in Sessa ss - - -
Rev. Date Description preference to scale, All BERS Z 8 8 Project Drawing Title a Project No.
1 49.05.05 Issued For DA dimensions to be verified RESSeT Powell House Setback Precedents P.62
and checked on site. 3 eee Ss N .
These designs, drawings, Soscoiet for Alan and Marion Powell 5 Drawing No.
specifications and the = g }
copyright thereof are the = RAIA Member &* i oo. . DA.O2
property of Bark Design 28469 2 s 3 ' i
Ply Lid and must not be egte 7 z ad ( —“T Revision
eer. Tatair ani, 2@2 BG. ' . \ :
used, retained oF copied eet as Scale $:280 at AS Date May 200% North “__* [
SRRSEC se | :
CESEE OE ij
FLARE aS ak
Page 12
REAL PROPERTY DESCRIPTION
Site Area §70.25 m?
\ \ Maximum Allowed Site Cover(50%) -—-«- 285.13 m?
| . \ \ \ Proposed Site Cover (49.25%) 280.88 m?
: ; '
| 3 \ | |
. ! 4)
! j
| 3 \ \ \ '
ae
Be Outline of Adjacent Building \ \ ‘
gl *
a8 LL — —== \ ¢
‘\ a
‘ ¢
N \ \ .
\ OU? {8 28,0 6 210 ‘
ok 7 Po
\ 1500mm Setback !
\ —_ eiback j
, ! "3
. ‘ f i :
\ ! ay
oO O 1 ? aa a
oO \ fo
\
3 /
i
oO ! t
> | 1
oO 1 |
® !
“” boy ‘
r 1
rf t
roy i
' 1
oe! o
QW | NS
\ ' .
1
\ ‘ ° \ \
\
\ ' 1
: \
. petra q
1 1
| ' ' é
! 44, y
\
| V
. ' i
|
'
. I f
!
| \ : ,
1 :
: \ '
t
|
. \
| 1 | vw
. " Use figured dimensions in SSSESa Bb -
Rev. Date Description preference to scale. All 23 ee E 5 8 Project Drawing Title Project No.
7 12.04.05 Firstlssue dimensions to be verted egshes Powell House Site Plan P.02
and c! . ela ¢g A .
A 2804.05 Poot and Deck Moved These designs, drawings, SS8S825 for Alan and Marion Powell Brawing No
8 19.05.05 Issued For DA specifications and the 3 3 . .
copyright thereof are the RAIA Member ®
property of Bark Design 28409 2 2B. DA.03
y Bsgrrg —
ood tained or nied Architects s2e2 52 Revision
" Toei, Registration No, £ & = § : ie
witheut the written authority Seer te “en a g z A = 3 Scale 7:200 at A3 Date May 2005 B
of Bark Design Pty Ltd, 3668 (SG) eC&sgsagad
Page 13
m1
Line of Roof
Overhang
Line of Building Over
=—A-
: Bedroom 2
= * RL 22.50
- , ;
’ ’ :
Ling of Deck Over
—_—
—_
o
®
o
~
—_—
— —
Asa
4
ys!
LL
s
09
! \ Stair | |
1 i RL 22.50 ;
Wil
1
‘ /
Siting of Existing House | ‘
re
|
|.
I
t
L
Bedroom 3
RL 22.50
|
|
Lo
l
|
I
|
L
be
—_
I
I
\ | ‘Pool Pump
1
1
1
‘Enclosure
‘& Store Room!
2,050
Outline of Adjacent Building
v
i
7 fons in onre seh - - - i -
Rev. Date Description hr liciderhelaainagh 3 2 BS € 8 8 Project Drawing Title i Project No.
. + ve eo = i, 5 y
} 42.04.05 First Issue dimensions to be verified ggBS g 3 Powell House Ground Floor Plan P.02
and checked on site. How tts a : : .
A___ 28.04.05 Pool and Deck Moved These designs, drawings, 558s 3 28 for Alan and Marion Powell ti Drawing No.
B 19.06.05 Issued For DA specifications and the 5 2
copyright thereof are the = RAIA Member & < f , DB A. 4
property of Bark Design —- 28409 ¢ $8, : 4 / '
Pty Ltd and must not be Architects 2 yet” . 5 ign 4 ( } Revision
used, retained or copied = RovcrationNe. EES=<_ S 2 ® Scale 4:400 at AS Dste ft. Ve North a
without the written authority Sena LA) ° Ba S2t © g Al re h itects 12100 at A3 se May 2005 — B
of Bark Design Piy Lid. 3686 (SS) F&sZSaes ~ “ ?
Page 14
184°20'4'
Line of Roof
Overhang
“Ling of Garage Over
‘
‘
RL 26.70
Poo!
Gate
Cellar
RL 25,20
Outline of Adjacent Building
Pool Cabana
RL 26.70
Scullery
Kitchen
RL 25.50
RL 25.50
Ses sz
Rev. Date Description
i 12.04.05 First Issue
A 28.04.05 Paol and Deck Moved
B 19.05.05 Issued For DA
Use figured dimensions in
preference to scale. All
dimensions to be verified
and checked on site.
These designs, drawings,
specifications and the
copyright thereof are the
property of Bark Design
Pty Ltd and must not be
used, retained or copied
without the written authority
of Sark Design Pty Ltd.
Slot
H 3,000
, Glass
RAIA Member
28409
Architects
3668 (SG)
Une of Floor Over
Study
| “\ Dressing
“, iRoom
}
RL 25.50
Line clesstna House
07 5471 0340
07 5471 0343
Telephone
Facsimile
0418 876 394
0442 127 904
[email protected]
Steve Guthrie
Lindy Atkin
Email
Noosa Heads
FO Box 1355
Queensland
4567
Australia
F=Elue Design
Architects
~Outline of Adjacent Building
ii
Project
Powell House
for Alan and Marion Powell
Scale 4:100 at A3
Drawing Titte ‘i
First Floor Plan
a
|
\
Date May 2005
Project No.
P.02
Drawing No.
DA.05
Revision
B
Page 15
perro
Outline of Adjacent Building ——\
Line of Roof
Overhang
|
|
|
|
|
|
I
|
|
|
Roof Below
;
ween t 2
SS eC Sat: c= art
: 3 Studio
eS = j : RL 28,20
Balustrade
~, with Timber
Shutters Over.
seca FEIT
K | cancend po
We CT Seer eee]
Up
—_
Store Lift,
Ma
3 als
% | | Glazed Roof : B OS ols
ran [Awning Below ‘ \ : 3 ; l ae
: ‘ a
TTT ing nes : Une ot eng House : zag
st =) |b | I \
8 T [qr -wpRL 26.70 Kt Lldup --4
s $f | .
3
-
Lib ee
—_
ELLLLLLIY
94°20'40". ;
37.761 M =
Outline of Adjacent Building
Rev, Date Description Use figured di
ensions in enor. Bb -
t6 scale, All 38 3 8 5 5 3 Project Drawing Title Project No.
1 12.04.05 First issue s to be verified Eepes :
Ee oak Nows sea eeked-on att, Sieos a. Powell House Second/Floor Plan P.02
~ These designs, drawings, SSS88 3% for Alan and Marion Powell \
5B 19.05.05 tssued For DA specifications and the z 3 " well | Drawing No.
copyright thereof are the RAIA Member 8 < i BD A 06
_- property of Bark Design 28409 » $8 4 . cy .
Pty Ltd and must not be : eo fst ez « —
used, retained or copied he ca No BEOE_ 8 3 . \ Revision
without the written authority ea 0. BG eeg OB Scale 4:106 at A3 Date May 2008 North “_- B
oe of Bark Design Ply Lid. gage (SG) Eessagea |
Page 16
Lower Floor Level
RL 22.50
igh
2
sg
fz
a
oO
a
2
E
Rev. Date Description
i 12.04.05 First Issue
A 28.04.05 Pool and Deck Moved
B 19.05.05 Issued For DA
Pekan ERT
Use figured dimensions in
preference to scale. All
dimensions to be verified
and checked on site.
These designs, drawings,
specifications and the
copyright thereof are the
property of Bark Design
Pty Ltd and must not be
used, retained or capied
i the written authority
Bark Gesion Piy Ltd.
onorvyrs
3288 8
Soon 8k
rrchage
BRaene
Bale
o
55588
=
a
RAIA Member 8
28409 o 8
Architects, 2 = ~
Ragistration No. Be
Ps 5 35
3664 (LA) eee
3658 (SG} Osu
Noosa Heads
Australia
PO Box 1355
Queensland
4567
Project .
Powell Hous
for Alan and Marion Powell
Scale 1:160 at 43
e
PR
Adjacent Garage
yo.
eee
Site Bounda
Drawing Title 4 Project No.
North Elevation . ~ P.02
Drawing No.
| ~ DA.08
) (©) Reai7-—————
Date May 2005
I
North “s__- / 8
Page 17
aq
Upper Level
RL 28.
Lower!
RL 22.50
. '
| i
2 e i
2 3
lz E|
3 3 '
. o co:
2 2|
E n
: : ,
’ i
‘
,
Use figured dimensions in Selssz eh = ——— -
Rev. Date Description preference to scale. All 8 3 Bo Z 8 bss Project Drawing Title | . Project No.
1 12,04.05 First Issue dimensions to be verified gRBEES Powell House East Elevation P.02
and checked on site, woes Bb
A 28.04.05 Pool and Deck Moved These designs, drawings, b538 3 3 & for Alan and Marion Powell Drawing No.
B 19.05.05 issued For DA specifications and the = 8
copyright thereof are the = RAIA Member @ o < ‘ - DA.OS9
property of Bark Design 28408 2 £8 . ( _
Pty Ltd and must not be Architects eyes =e B : Design \ J Revision
used, retained or copies = Renistrationne. EGE _ FE Ar c hit . , Scala 4:100 at A3 Date May 2008 North “_” B
without the written authority 3664 (LA) SRe3a & ra cts
of Bark Design Pty Lid. 3668 (SG) £¢ é Su 2 G te
t
Page 18
@ Page7 Attachments Attachment 3 — Proposed Renovations
Page 19
te an a . LAND USE SECTION FEES som MMO : RECEIPT TYPE SALE OF DOCUMENTS . Superseded Planning Scheme‘Documentation §20 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 411 APPLICATION FEES: oO Material Change of Use - Code/Impact / Consistent 521 Inconsistent 521 - Assessment under Superseded Planning Scheme _ 521 Modification to a Development Permit . ‘ B/S. ba. §21 .- Extension of a Currency Period ‘ 521 Operational Works - Landscaping ot §21 ’ Bldg Work assessable against the Planning Scheme §21 PRE LODGEMENT REVIEW Half Hour * §22 . One Hour, ‘ $22 ADVERTISING : ‘ Purchase Advertised Applications ~ §23 JETTIES © . : Jetty Application Fee . §24 Jetty Bond ‘ _ $4 . (Category 4) BONDS : Performance Bond . . . 51 . (Category 9) SIGNS . a no Registration Fee Se, : co . 222 SEARCH FEE . : Search of Land Use Section file 112 Liquor Licensing Request . “113 totaL. $ J/f.00 NAME: Marto lorvulina pty. Ltd appress: YD fox /b8ft 7 7 _ Moora Heady &W 4567 a FILENO: __.zg04/4ol DATE: /7-S: 07 \ ‘RECEIPT NO: 2 eq Lao _. Signature of TP Officer: u. W\ AUTHORITY NO: 14/2005 [401] 2
Page 20
CALCULATION OF FEES
APPLICATION —
FEE
TOTAL
FEES
MCU - CODE ASSESSMENT
Details of Development
Consistent 1.0
Inconsistent 3.0
FEE CALCULATION «|
MCU - IMPACT ASSESSMENT
Details of Development
Consistent 1.0
‘{Inconsistent 3.0
FEE CALCULATION
OPERATIONAL WORKS
Details of Development
FEE CALCULATION
4
TOTAL FEES
Page 21
() toas
“ON onset “ON Buyneig
+£90 6
NOT Aqumesg
20, AVA UMOYs SE
ag a)
NV1d YOO13 YSMOT
OL Bupreng
sdiitd
yen)
yoeag eulysung
891 MAIABAS 9G
voy
uojeAouay pasodaig
pobeig
929 5/61 erg Gog
PRSPURE'9 99005 YG
BVVS Rerepa Fe ge
Apuco 9 uogngsUD}
‘wodey
1p stuprg eweutu
{pA uogounfuce ig peas
qaqhmep ay
Ne"UX0O' COP AMMA,
Ne" Woo' Coppa
CESS Lees 20 ‘equysce
CEOS Lees 20 euoydeqe),
L9S¢ CD SpeaH ES0ON
702 X98 Od
296 C7 Wpeeg sunysuns
Wang 9g OZ
siouBisap
NV1d YOO 1d YAMOT\_Z_/
©
zv@oort awos /10'aS\
OOL
S865
ANGE
le le
Ore
40 038
~ ——— = —_ =
a es
eww
eee ee eee we ew eM ew ew we ew =
1
poysyoursg oq & Guysxg [[ ~~]
owen hacen won 7777
demon [___]
seen Gunso
‘i AOL
"92 Joo, Agua
2v@ 0011 aos / \o'as\
YOOTS AMINA | /
Peysjouleg
9qq Buys [~~~ |]
SIEM Auosen MON 7/7/74
srem“en [___]
sem Suns
quudjoos
2wg6'6ez —- Guiping
ZUNE LLG early ays
LE LL AOL
%02'92 00,4 Aqua
%8S'LE 100}, Jaddy,
%66'E| 00[ JAMO]
SUORE|NI[ED JOAOD SYS
OST
Hor
wz8
OL
at)
i 7
Dead dae per
i se ‘
Ze PS i
i
' i
+
wees
006'20 Tu
40.038
v
006°22 1
7
Page 22
‘oNeney ON Buea
Lego 96
“ON GOr iqueg
20, AVN UMOYS Sse
aed og
NOILLOSS 8 NYTd
aL, Buyweng,
sduiilid
pak
yoeag eurysung
82) MBIABSS 9G
00]
uogeaouay pesodolg
wefoug
S085 Zr¥S 20 omunse 4
CEOS Lers 20 suoydoqer
FERS LHS 20 suoUdoyaL
295% TWO Spee} escon
292 "8 Od
29% G70 yeeg eursung
voags 94g 02
souBisap
Sys»
KIEL
QS SY,
Y
ISI, :
~~" Jugpunog ays © —
SRIEIUES
VOR AIA
xXS WS SKE ASTS KS
SSK TSS
KoO® SLEYIL ILS
ZS
aaa
KY Z ZS
ox
S
LS
KYLE
ENN LEY S
i
Oo
O
O
Ong
£ Weird ‘AOL
zv@on1 aos /zxas\
NV1d YOOTd daddn\ | /
SIENA Kobosey mon ZZ
seem MeN [~)
sip Gugsnc |
02'S sooty Aqua
1986 ZE J00.4 addn,
1%66'E | JOO} JAMO}
{|
Page 23
i e designers 20 Duke Street Sunshine Beach QLD 4567 ? PO Box 262 . Noosa Heads QLD 4567 N a7 g Twephone OT SUT S58 Facsimile 07 5447 5833 [email protected] ware. kiddoo.com.au (—1.SOUTH ELEVATION : a = SCALE1:100 @ A2 (3. \WEST ELEVATION (2 EAST ELEVATION S05 sone or SCALE1:100 @A2 = i, turbo vent i 5 aN ig metal roof sheeting a new sheeting to roof ? Saye ? — Proposed Renovation 7 ’ Location =. x [le GE 56 Seaview Tce 2 seu v7 ; : - E —— Sunshine Beach =) Ca Ghent Oo” E Philips ‘Drawing Tle ELEVATIONS Scale Date as shown MAY ‘07 Drawn By Job No: gb 0631 bpsue No, SD.03 (F) 4 \NORTH ELEVATION $D.03 / SCALE1:100 @A2 ;
Used in these records
05/0901 - Change to a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.