OPW15/0221 - Decision Notice
Officer: Mark Lewis Direct Telephone: 07 53296290 Our Reference: OPW15/0221 Your Reference: 9 December 2015 FE Harris & CC Harris C/- Pacific BCQ PO Box 1901 NOOSAVILLE BC QLD 4566 Dear Sir/Madam Decision Notice Sustainable Planning Act 2009 I refer to your application and advise that on 9 December 2015, Council decided to approve the application in full subject to conditions. Details of the decision are as follows: 1. APPLICATION DETAILS Application No: OPW15/0221 Street Address: 1 Leeside Pl NOOSAVILLE QLD 4566 Real Property Description: Lot 45 RP 839221 Planning Scheme: The Noosa Plan (16 September 2013) 2. DECISION DETAILS The following type of approval has been issued: Development Permit for Operational Work - Vehicle Crossover 3. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is 2 years starting the day that this development approval takes effect. 4. ASSESSMENT MANAGER CONDITIONS APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date DD.201 C Site Plan prepared by Bark Design Architects as annotated by Council 12 November 2015 SITE SPECIFIC CONDITIONS The access driveway must be located 6 metres from the tangent point in the kerb in Mermaid Quay at the intersection with Leeside Place. The access driveway must be a maximum of 4 metres wide at the kerb. SITE SPECIFIC CONDITIONS Engineering A condition report including photographs of the frontage of the site must be completed and submitted to Council at the prestart meeting. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6244. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: traffic Management during the construction phase. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) provision for safe pedestrian access across the frontage of the site both. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The integrity and condition of any existing public or Council infrastructure and services (above ground and/or underground) must not be adversely affected by the proposed works The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. All works must be constructed and work procedure undertaken in accordance with: the approved plans/documents and conditions detailed in this Decision Notice all relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines the latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Works within Road Reserves No removal of street trees is permitted without Council’s prior written approval. Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Driveways Driveway crossovers must be constructed in accordance with council’s Standard Drawing SEQ R-050. Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossover/driveway: the driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete. the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car Parking for longitudinal and crossfall gradients. the driveway must be constructed so as to not concentrate or direct stormwater runoff onto neighbouring properties have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset, unless a written approval is obtained from Unitywater/Energex/Telstra and submitted to Council. any stormwater kerb outlet in close proximity to the edge of the new driveway must be provided with an approved kerb adaptor any existing kerb sections requiring removal due to the works must be saw-cut and removed to allow for a smooth and neat finish with the new driveway Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer. Stormwater Drainage The constructed driveway must not cause additional ponding on the road formation or the road reserve. Environment (Erosion and Sediment Control) Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. The contractor must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and prior to any predicted rainfall occurring. Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). FOLLOWING CONSTRUCTION A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6244 to arrange for the inspection. 5. REFERRAL AGENCIES Not Applicable. 6. REFERENCED DOCUMENTS Not Applicable. 7. ADVISORY NOTES The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As this driveway is a private structure, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the driveway to ensure that the driveway is constructed in accordance with standard drawing SEQ R-050. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart Inspections Request Contact Council on 5329 6244 to arrange a prestart or an inspection giving a minimum of 5 business days notice of preferred inspection time. It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business days must have passed or the applicant must have provided Council with written confirmation that the applicant has accepted the conditions of Decision Notice and waived their appeal rights. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include: the Sunshine Coast Regional Council Manual for Erosion and Sediment Control V1.2 or other superseding document subsequently adopted by Council; Best Practice Erosion and Sediment Control, International Erosion Control Association (2008) Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. 8. PROPERTY NOTES Not Applicable. 9. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable. 10. FURTHER DEVELOPMENT PERMITS REQUIRED Not Applicable 11. SELF ASSESSABLE CODES Not Applicable. 12. SUBMISSIONS Not Applicable. 13. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable. 14. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. 15. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. Yours faithfully Mark Lewis Coordinator - Engineering Enc: Approved Plans/Documents Appeal Rights cc Unitywater Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. [word/footer1.xml] Page 5 of 9 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 9 [word/header1.xml] OPW15/0221 [Attachment: image4.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW15/0221 - Decision NoticeRelated documentApplication case desk ↗
About this file
- File size
- 103 KB (small file)
- File type
- DOCX
No other editions are linked here.