Council archive · source document
Approved Concept Environment Management Plan OPW11/0116.01
Plans and drawings: the text below has words only, no drawings.
International
Coastal e@co-engineered coastal solutions
_ Management
CONCEPT ENVIRONMENT MANAGEMENT PLAN
REV C
NOOSA RIVER SPIT | |
EROSION PROTECTION WORKS | . |
prepared for
SUNSHINE COAST REGIONAL
COUNCIL
by
INTERNATIONAL
COASTAL MANAGEMENT
International Coast
oerce 50) / G Arm, SY‘
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 13 pages
Page 2
International ae fe Coastal eco-engineered coastal solutions Management Document Control Sheet Prepared by: Andrew Brown Title: Coastal Engineer Company: Intemational Coastal Management Final Review: Bobbie Corbett Title: Senior Coastal Engineer Company: Intemational Coastal Management Approved for release: Bobbie Corbett Title: Senior Coastal Engineer Company: International Coastal Management Version History Version No. Date Changed by Nature of Amendment RevA 6.4.11 Bobbie Corbett Acid sulphate revised. Marine plants revised RevB 16.4.11 Bobbie Corbett Report name and minor working revisions Rev C 1.5.12 Andrew Brown Amendments due to design and methodology changes This document has been produced by International Coastal Management Pty Ltd (ICM) in accordance with the terms and limitations of the brief by SCRC. In preparing this report, ICM has used information provided by the Client and others identified herein. ICM does not and shall not assume any responsibility or liability whatsoever to any third party arising out of any use or reliance by any third party on the content of this document. This document is not to be used without the express approval of SCRC. International Coastal Management iy U0 (ICM) vnee 50 / G Arm, SYC Marina. Main Beach. Qld. 4217. Australia rest PO Box 306. Main Beach U
Page 3
»__ International a Coastal eco-engineered coastal solutions —_ Management TABLE OF CONTENTS 1, SITE LOCATION. 2. INTENT OF CONCEPT CONSTRUCTION MANAGEMENT PLAN............:ssssseccsssseesssssssssessessssnssssnsssseesessssseceessanseereeel, 3; (DESCRIPTION AND PURPOSE OF WORKS cassiesessssisessasscarscabticeccecessestoytcsoasageevasteacner ses anpiaanisansesneanrianetuacatenagin 5.1 Equipment 5.2 Methodology for Dredging / Nourishment 5.3 Methodology for Filling Containers 5.4 Methodology for Constructing Rock Wall papas 6. SUMMARY OF KEY ENVIRONMENTAL ISSUES ..........c.csesssssssesssssesssssessssnscesnessssseessssessnesenviceansesssnvessasunessnresssnrestan 6.1 Water Quality 6.2 Noise 6.3 Flora 6.4 Acid Sulphate 6.5 Cultural Heritage 6.6 | Waste Management 6.7 Air Quality Management 6.8 Social 6.9 Flammable and Combustible Materials 6.10 Greenhouse Gas Emissions CODD HDHHOMNMUYN 7, ENVIRONMENTAL MANAGEMENT MONITORING REQUIREMENTS.......sssssssesssssesssessssessesssessssessnsseesssssensssessssesney 10 8. CONTINGENCY PLANS & EMERGENCY PROCEDURES.......ss:ssssssssssscsseessseessseesssessnsssseeessnsessseesssnsessseeesnsessin 10 International Coastal Management Pry 10 (ICM) rex 50 / G Arm, SYC Marina, Main Beach Qld. 4277,
Page 4
1. SITE LOCATION The site is located within the Noosa River entrance [Figure 1] adjacent to the Noosa River Spit. The works are located outside the Noosa River Fish Habitat Area [Figure 2]. LB Tete tosh gg cs Figure 2: Extent of Works There is a tidal range of approx 2m [QT tide tables]. The site is protected from ocean swell and seas by Noosa Spit and shoals within the entrance. Spring tidal velocities within the southem channel can be up to 1.5m/s, although this may change with channel configuration. The channels and shoal configuration is highly variable.
Page 5
2. INTENT OF CONCEPT CONSTRUCTION MANAGEMENT PLAN This Concept Construction Management Plan is intended to provide an indication of how works may be undertaken by the contractor, likely environmental impacts and intended control measures. The contractor is to prepare a final construction management plan prior to commencing works. The contractor's methodology, plant, equipment, scheduling etc may vary from that indicated here. Any changes to the intended methodology that may increase the impact of the works is not to be implemented without further discussion with DERM. 3. DESCRIPTION AND PURPOSE OF WORKS With the exception of those areas already protected by rock works, Noosa River Spit is currently experiencing erosion along its full length, including the southern end of the Noosa River Spit. While this is reducing amenity along what was once a popular recreational beach, there is also the potential for continued erosion to breach the Noosa River Spit, which could have very serious impacts. A number of options were considered [ICM 2010 report]. The preferred option includes [Figure 3]: e Submerged curved “closure” [sand-filled geotextile mega-containers] designed to create an enclosed, stable beach and lagoon area Dredging for interim navigation and associated foreshore nourishment Training wall [sand-filled geotextile mega-containers] to provide a control point for the southem channel Wall [sand-filled geotextile mega-containers] to prevent erosion along southern end of the Noosa River Spit Two groynes [2.5m3 sand-filled geotextile containers] to stabilize the upstream beach Figure 3: Proposed Strategy
Page 6
A staged approach of construction is being adopted and this construction plan is relevant only for Stage 1 of the works [Figure 4]. Stage 1 includes: Retain existing rock wall [maintain / upgrade as required] Submerged channel closure [partial] Wall at end of Noosa River Spit Groyne / Training Wall Dredging for navigation (location to be determined) Foreshore nourishment Removal of dead trees (marine plants) as required Widening of access track The submerged channel closure and groyne are to be constructed using sand-filled geotextile mega-containers. The wall has been modified from the original design and is to be constructed of a combination of sand-filled geotextile mega- containers and rock. : Proposed Stage 1 Works [preliminary design] 4. RELEVANT APPROVALS The following approvals have been attained: Resource Entitlement ref: 2010/009024 Development Approval ref: OPW11/0116 Prescribed tidal works ref: SPCC01881911 Interfering with Marine Plants:2011DB0083 ERA 16 1(b) ref: SPCE01881811 Registration Certificate ENRE02969911 Clearing (Nature Conservation Act) ref: WICL09310811 oo0ooo0°0
Page 7
5. CONSTRUCTION There are a number of ways in which these works could be achieved and the final methodology is at the discretion of the contractor. 5.1 Equipment Itis anticipated that the works (depending on the methodology) may require the use the following major equipment: 6” or greater cutter suction dredger and pipeline Jet pump (suspended or hopper-fed) Barge Support vessels Excavator Bobcat 5.2 Methodology for Dredging / Nourishment The dredge area is to be located accurately using DGPS or suitable altemative. Dredging is to be undertaken slowly to minimise turbidity. Dredging is to be undertaken in such a way that it does not block navigation once a suitable channel is established. Nourishment is to be achieved generally by relocating the pipeline periodically within the deposition area. Small earthmoving equipment may be used to redistribute material on the visible beach to achieve final nourished profiles. This may be more difficult to achieve given the presence of significant dead tree material on the foreshore. As the slopes are the same as existing, final profiling below low tide will likely be achieved by tidal velocities. 5.3 Methodology for Filling Containers Filling sand-filled geotextile containers can be undertaken in a number of ways. The simplest methodology includes the following 1, Dredge along the structure alignment to achieve the design depth 2. Roll out empty container 3. Secure in location with anchor blocks 4, Fillcontainer using dredge (while excavating for the next container, per step 1) 5. Seal trunks There are a number of potential variations to this generic methodology. These include: Excavation for containers may source nourishment and container fill may be sourced from the dredging of channel. Containers may be filled using a jet-pump suspended from a barge-mounted excavator. Containers may be filled from an onshore stockpile using a hopper-fed jet pump. Material may be double handled in some cases. A frame may be used to secure the container instead of anchor blocks. It is noted that the works will require the use of divers. Works will be tide and weather dependent. 5.4 Methodology for Constructing Rock Wall The general methodology for construction of the rock wall at the end on of the Noosa Spit is as follows: Rock will be delivered to site by body trucks via Hasting Street and access track direct to Dog Beach. Transported by suitable truck along nourished beach to the end of the Noosa River Spit. Rocks will then be placed to achieve approximate profile using tipping barge. The excavator will be used to ensure proper profile and interlocking of armour rock. Note: no need to clear access track for construction; access via backfill along back of structure
Page 8
6. SUMMARY OF KEY ENVIRONMENTAL ISSUES The works are adjacent to (but not within) the Noosa River Fish Habitat Area. The areas to be dredged are not within a Marine Park. The following outlines potential impacts of the works. Works are to be undertaken in such a way that impacts are minimized wherever possible. Monitoring to ensure that any impacts are within acceptable levels is detailed below. 6.1 Water Quality The dredge will operate in such a way to minimise turbidity during dredging operations. To ensure that water quality [pH, DO, Turbidity] remains within acceptable limits, visual monitoring of the plume is to be undertaken as well as any required water quality testing in accordance with ERA requirements. Visual observations for oil, grease, floating scum and litter is to be carried out on a regular basis. | Change to rock will reduce excavation volume and turbidity concerns in this high flow area. 6.2 Noise The works are separated from the businesses and resorts on Hastings St by at least 620m of well-developed vegetation. It is not anticipated that works will cause an issue in this area. The dredging, submerged closure and training wall / groyne, the plant will be over 400m from the residences of Noosa Sound and separated by 60m of well-vegetated area on Noosa River Spit. When undertaking the wall at the end of Noosa River Spit, the works will be within 350m of the residences on Quamby Place (Noosa Sound) and noise could potentially be an issue, particularly outside of normal working hours. The Contractor shall take all reasonable precautions (e.g. the use of mufflers) and undertake works in such a way as to minimize the potential for noise nuisance to residences and businesses and meet the requirements of the ERA conditions. Given the nature of the work and the environment, there will be a need to work in conjunction with the tides and so works may need to be undertaken outside of normal working hours. There is no restriction on working hours provided that the required noise limits are met. An aural inspection is to be undertaken daily and if any issues are identified or complaints are made regarding noise levels, noise monitoring compared to nominated levels is to be undertaken if works are to continue in this area. Change to rock will reduce potential noise impacts due to utilization of smaller plant over a shorter period of time with lower likelihood of operating outside standard working hours. 6.3 Flora Due to the mobility of the channels and shoals and the high erosion rate, the area is characterized by a clean sandy seabed (Figure 5). There are no seagrass beds present within the footprint of the proposed works.
Page 9
Figure 5: Sandy shoal
The only mangroves within proximity of the works are at the south-eastem end of the wall at the end of the Noosa River Spit
(Figure 6). The wall terminates adjacent to the mangroves, but works are to be undertaken in such a way that no mangroves
are to be interfered with as part of the works.
e
, aoe = tia j
ie
of proposed wall
oS om
Figure 6: Mangroves at SE end
Due to the high rate of erosion there are a number of large dead trees along the length of the foreshore (Figure 7). These
are typically well-established trees. The number of trees is unknown, but they cover an area of approximately 7700m2.
These trees are classified as marine plants as they are within the tidal zone. It will be necessary to remove these trees to
allow for construction.
Where excavation is taking place, the full tree should be removed [although this may need to be done progressively during
excavation] to prevent blockages of the dredge pipeline and ensure that organics are not used to fill the container or sharp
sections remain where they could potentially result in damage to the containers. In other areas [i.e. where nourishment is
taking place or within work areas], trees may be trimmed at the required depth [approx 0.3m below surface], sufficient to
allow for access without damage to equipment.
Page 10
Figure 7 Dead trees along the length of the foreshore The amended rock design incorporates a short retum which has been relocated to avoid impact on mangroves which are now close to the works as a result of erosion and to minimise impact on other existing vegetation. The area of impact is approximately 10m? and within this area are grasses and small shrubs (Figure 8). Figure 8 Grass and small shrubs to be cleared at rock return There is a reasonable access path to site from the carpark. Part of the works will include slight widening of this track as required to allow access for construction equipment. Given the low-lying nature of the track, the majority of the trees will be classified as marine plants, however a small number adjacent to the carpark are above HAT and are not marine plants. a] Figure 9:Existing path to site
Page 11
Arborists have advised that the following methodology would be most beneficial and is to be followed as much as practicable: e Removal of branches >6” diameter and placement within Noosa Spit and Noosa Woods (above HAT) as fauna habitat ¢ Heavy trimming of remaining trees, stockpiling and mulching. Mulch to be utilised for rehabilitation along access track and site perimeter. e Removal of remainder of tree litter unsuitable for mulching for disposal at an appropriate location ashore. Removal of trees and mulching to be undertaken by separate, experienced contractors prior to commencement of other works. An offset programme has been developed to compensate for the loss of habitat as a result of the works and this is provided as a separate report. 6.4 Acid Sulphate Sediment testing was undertaken on 4t and 5 January 2011 by Coffey Geotechnics. The sediment is fine-medium grained sand with low (<5%) fines content. While the surface sediments are clean sand suitable for nourishment, acid sulphate soils (both AASS and PASS) were identified within some of the deeper areas. Below is the table from the Coffey Report. The dredging for interim navigation and excavation for the construction of the submerged closure does not disturb acid sulphate soils. Dredging / excavation for the wall and training wall / groyne at the end of Noosa River Spit does disturb some acid sulphates below RL-4.75m AHD for sand-filled geotextile container placement. As such, all material dredged / excavated from below RL-4.5m AHD is to be placed below LAT (i.e. used for filling deeper containers or as backfill adjacent to the toe). | Rock wall construction will not disturb ASS or PASS materials. Component of Works Depth Liming Rates (kg/m*) Above RL -4.75 metres AHD Nil Wall’ Groyne Below RL -4.75 metres AHD 8 (S1-S4) Below RL -5.5 metres AHD 50 around S4 ° Submerged Closure Above RL -6.45 metres AHD Nil (S5-S7) Below RL -6.45 metres AHD 50 Dredging Above RL -3.25 metres AHD Nil (SB - S14) Noite. No disturbance is expected for the Submerged Closure area below RL -6 45 metres AHD or within the Dredging area below RL -3.25 metres AHD
Page 12
6.5 Cultural Heritage The Noosa River Spit was artificially reclaimed in 1978 and there has been significant dredging within the river over recent years. There are no identified areas or items of cultural significance within the proposed area of the works, although a cultural study can be undertaken if required. If any potentially culturally significant items are found, the contractor will cease works immediately and advise the Superintendent. The Superintendent will notify the traditional owners to seek their advice before works in that area can continue. 6.6 Waste Management The sandy material from dredging / excavation will be used for filling containers, backfilling and foreshore nourishment within the vicinity of the works. The sediment type is very consistent across the footprint of the works and is suitable for this purpose. Other wastes (rubbish etc) may be temporarily stored on site if adequately contained. The Contractor is responsible for ensuring that all waste is disposed of at suitable onshore facilities. Every effort is to be made to ensure that litter and other debris does not enter the waters. Any material or objects dropped onto the bed are to be recovered. Visual monitoring is to be undertaken. The seabed is to be checked prior to completion of the works. All waste materials (including anchor blocks and ropes used during construction) are to be removed and not buried or left on the seabed. The contractor is to implement an oil spill management plan. It is not anticipated that any regulated waste will be generated as part of the works. 6.7 Air Quality Management Air emissions from plant and equipment are to be monitored visually to ensure air quality is acceptable throughout the works. Exhaust is to be within the specifications of the equipment and all required maintenance is to be undertaken. 6.8 Social Any complaints are to be investigated and responded to in a prompt manner. The Superintendent is to be notified of any complaints as soon as practicable. A suitable complaint register is to be kept. 6.9 Flammable and Combustible Materials A list of all flammable and combustible materials, chemicals or any other potentially hazardous substances is to be noted on the MSDS register. 6.10 Greenhouse Gas Emissions All machinery is to be regularly maintained and operated in accordance with specifications to minimise possible greenhouse gas emissions.
Page 13
7. ENVIRONMENTAL MANAGEMENT MONITORING REQUIREMENTS Monitoring requirements are to be as below, in addition to any ERA Licence requirements. Issue Monitoring Frequency/Timing Performance Criteria | Responsibility Water Quality Visual Inspection Daily during dredging | No visible turbidity Contractor hours plume from dredging >200m from the dredge site. No visible oil, grease, floating scum or litter Noise Aural inspection of Weekly during Noise levels in Contractor equipment for dredging accordance with excessive noise. equipment specification. Investigation of noise | As required in Complaints responded | Contractor complaints response to any noise | to within 24 hours complaints Air Quality Visual inspection for Daily during dredging | No excess machinery | Contractor excess machinery hours exhaust exhaust emissions Waste Management Visual inspection of Daily during dredging | No uncontained litter | Contractor site for floating debris for barge/dredge hours waste 8. CONTINGENCY PLANS & EMERGENCY PROCEDURES Should any non-confirming results be observed or recorded, works are to suspended immediately and the Superintendent is to be notified. A procedure for non-conformance is prepared for each Project. This procedure incorporates: Work Instructions issued Non Conformance Report Form Reporting Procedure Corrective Action A number of specific detailed contingency plans are to be prepared and include an oil spill management plan and a waste management plan.
Page 14
Used in these records
Approved Concept Environment Management Plan OPW11/0116.01Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.