Council archive · source document
Approved Concept Environment Management Plan OPW11/0116.01
Plans and drawings: the text below has words only, no drawings.
Arborists have advised that the following methodology would be most beneficial and is to be followed as much as practicable: e Removal of branches >6” diameter and placement within Noosa Spit and Noosa Woods (above HAT) as fauna habitat ¢ Heavy trimming of remaining trees, stockpiling and mulching. Mulch to be utilised for rehabilitation along access track and site perimeter. e Removal of remainder of tree litter unsuitable for mulching for disposal at an appropriate location ashore. Removal of trees and mulching to be undertaken by separate, experienced contractors prior to commencement of other works. An offset programme has been developed to compensate for the loss of habitat as a result of the works and this is provided as a separate report. 6.4 Acid Sulphate Sediment testing was undertaken on 4t and 5 January 2011 by Coffey Geotechnics. The sediment is fine-medium grained sand with low (<5%) fines content. While the surface sediments are clean sand suitable for nourishment, acid sulphate soils (both AASS and PASS) were identified within some of the deeper areas. Below is the table from the Coffey Report. The dredging for interim navigation and excavation for the construction of the submerged closure does not disturb acid sulphate soils. Dredging / excavation for the wall and training wall / groyne at the end of Noosa River Spit does disturb some acid sulphates below RL-4.75m AHD for sand-filled geotextile container placement. As such, all material dredged / excavated from below RL-4.5m AHD is to be placed below LAT (i.e. used for filling deeper containers or as backfill adjacent to the toe). | Rock wall construction will not disturb ASS or PASS materials. Component of Works Depth Liming Rates (kg/m*) Above RL -4.75 metres AHD Nil Wall’ Groyne Below RL -4.75 metres AHD 8 (S1-S4) Below RL -5.5 metres AHD 50 around S4 ° Submerged Closure Above RL -6.45 metres AHD Nil (S5-S7) Below RL -6.45 metres AHD 50 Dredging Above RL -3.25 metres AHD Nil (SB - S14) Noite. No disturbance is expected for the Submerged Closure area below RL -6 45 metres AHD or within the Dredging area below RL -3.25 metres AHD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Concept Environment Management Plan OPW11/0116.01Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.