Council archive · source document
Change to existing approval OPW12 0139 01 DACdaDN 1032434 [As Published] · OPW12/0139.01
OPW12/0139.01 2. All vessels berthed at the jetty and/or pontoon must be contained wholly within the lease area. 3. A rigid handrail must be fitted on one side of the walkway. 4. No posts or vertical supports of the proposed jetty are to extend vertically from the structure unless they provide support for handrails, lighting of the walkways or security cameras. 5. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of elevating a vessel above the water without Council approval. 6. The jetty must be constructed in a manner to render the underside area vermin proof. 7. There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the northern boundary of lease P unless all switches and power outlets are positioned above the 1%AEP flood level. 8. Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting. 9. Boat repair activities are not permitted on site. 10. Wastewater and sullage must only be disposed of at approved pumpout facilities. 11. The mooring facility must not be utilised for live-aboard purposes. 12. Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA) 1994 and the Environmental Protection (Water) Policy 2009. 13. Parks or other public land must not be used for delivery or removing construction equipment and materials to / from the construction site in the waterway (other than via a public boat ramp); 14. Certification by a Registered Professional Engineer of Queensland must be submitted to Council at completion of the works and prior to the use of the new pontoons. The certification must state that the pontoons has been constructed in accordance with best practice methods, is in accordance with Coastal Protection and Management Act 1995 and are structurally sound. 15. After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans 16. All necessary State government approvals relating to this development must be obtained prior to any works commencing on the site Page 2 of 5 Document Set ID: 19819105 Version: 1, Version Date: 03/11/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to existing approval OPW12 0139 01 DACdaDN 1032434 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 184 KB (small file)
- File type
No other editions are linked here.