PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 MARCH 2021
Car Parking
12. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
13. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
Stormwater Drainage
14. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
15. Stormwater drainage works and water quality devices and measures must be provided
and maintained generally in accordance with the Stormwater Quality Management
Plan included in the Stormwater Drainage for No 154 Holts Rd Cooroy Report dated
26 September 2014, Ref No: 1432 IWMP.doc, prepared by Callaghan & Toth.
Particular attention must be given to the construction and maintenance regime of the
two proposed Sediment Basins.
Earthworks and Retaining Walls
16. All earthworks and associated batters must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council. All
earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
Erosion and Sediment Control
17. The property owner must ensure non-essential, short or long term, exposure of soil is
prevented by minimising the duration of soil exposure to adverse weather conditions
and effectively turf or stabilise any exposed area without delay and prior to rainfall
occurring.
18. The property owner must ensure sediment does not leave the site or enter onto
adjoining properties or the dam on the site due to surface runoff or on tyres of vehicles
and/or machinery.
19. The property owner must implement appropriate approved erosion and sediment
control measures throughout the life of the development.
Damage to Services and Assets
20. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Waste
21. The developer must provide adequate waste storage and disposal facilities.
22. Refuse bins must not be placed on the existing road formation of Holts Road. A suitably
sized all-weather pad shall be constructed adjacent the driveway entrances to provide
for waste bin collection.
23. Public bins must be provided throughout the site to reduce littering. Bins provided must
be for refuse and recycling and be decanted into the bulk bins by the site operators.
Page 45 of 173
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.