Middap Ditchfield Pty Ltd
Cnr Mary & Thomas Streets
NOOSAVILLE QLD 4566
Dear Sir
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 24 February 2009 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2008/2063
Street address: 34 Elanda Street, Sunshine Beach
Real property description: Lot 160 RP 48112
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Development Permit for Material Change of Use - Multiple Housing Type 2 - Duplex
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and may
be amended by these conditions: -
Plan / Rev. Plan / Document Name Date
Document No.
CD 2.01 P4 Basement Floor Plan – Middap 22 January 2009
Ditchfield Pty Ltd
Page 1 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 sections
Section 2
2008/2063
CD 2.02 P4 Ground Floor Plan – Middap Ditchfield 22 January 2009
Pty Ltd
CD 2.03 P4 First Floor Plan – Middap Ditchfield Pty 11 December 2008
Ltd
CD 3.01 P3 North West Elevation – Middap 22 January 2009
Ditchfield Pty Ltd
CD 3.02 P2 South East Elevation – Middap 11 December 2008
Ditchfield Pty Ltd
CD 3.03 P3 North East Elevation – Middap 11 December 2008
Ditchfield Pty Ltd
CD 4.01 P2 Sections AA & BB – Middap Ditchfield 11 December 2008
Pty Ltd
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to
be completed prior to the premises being occupied and maintained at all times thereafter and
shall include:-
3.1 Native screening vegetation a minimum of 500mm in width shall be provided between
buildings as well as along the side and rear boundaries to protect the amenity of
neighbouring residents.
3.2 A minimum of 3 x 45 litre street trees shall be established on the frontage within the
Ferguson Street road reserve.
3.3 A minimum of 2 x 45 litre street trees shall be established on the frontage within the
Elanda Street road reserve and be of the following species:
Acronychia imperforata Fraser Island apple
Alectryon coriaceus Beach birds eye
Acmena hemilampra Broad leafed lilly pilly
Banksia aemula Wallum banksia
Banksia integrifolia
Casuarina glauca Swamp sheaok
Elaeocarpus reticulatus Blue berry ash
Eucalyptus bancrofftii Tumbledown gum
Grevillea banksii Red flowering silky oak
Petalostigma pubescens Quinine berry
Should any of the nominated small trees located under the power lines in the road
reserve becomes unavailable at the time of planting contact Council for a suitable
substitution species.
3.4 The 2 x existing Bloodwoods located along the northern boundary are to be retained.
3.5 The existing mature Bloodwood located along the southeastern boundary (next to 36
Elanda Street) is to be retained.
3.6 The mature Gum Tree located along the northwestern boundary (next to the proposed
driveway) is to be retained.
3.7 The smaller Bloodwood located along the northwestern property and within the open
space areas of Unit 2 is to be retained.
Page 2 of 13
Section 3
2008/2063
3.8 An average of 3m soft landscaping shall be provided along the Elanda and Ferguson
Street frontages.
4. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
4.1 Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
4.2 Disposal for firewood.
4.3 Disposal for landscaping purposes.
4.4 Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
4.5 The disposal method for clearing works is to be submitted in conjunction with an
application for a Development Permit for Operational Work. The Applicant is advised
that other methods may be considered provided full details of the method are
submitted.
4.6 The Applicant is advised that burning off is an unacceptable method of disposal.
5. All fencing shall be setback at least 1 metre from the front property boundary, with at least half
of the fencing setback 2 metres. The area of land between the fence and the front property
boundary shall be densely landscaped to screen any fencing from the street.
6. The development shall not exceed 2 storeys and 8 metres above natural ground level and
finished ground level.
7. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the maximum
allowable building height as required by either the conditions of approval or the Planning
Scheme.
8. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
9. All new kitchen, laundry and bathroom fittings shall comply with the AAA Water Conservation
Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and
Labeling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1), with
toilets to comply with the AAA Water Conservation Rating System. All new tap ware and
shower roses shall not exceed a maximum flow of 9 litres per min. Dishwashers and washing
machines are excluded from this requirement.
10. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
thus remaining as open structures.
11. The gatehouses located along Ferguson Street are not permitted within the setback area and
are to be removed to allow the retention of existing vegetation that will buffer the proposed
building.
12. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for Operational Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
13. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
Page 3 of 13
Section 4
2008/2063
14. The Development Permit for a material change of use of premises lapses if the use has not
happened by 24 February 2013, unless an application to extend the relevant period is
approved by Council.
Land Development
Vehicle Access
15. A vehicular access driveway shall be constructed to the site frontage with a maximum width of
4.5m within the Ferguson Street Road Reserve. The driveway must then increase in width to a
minimum of 5.5m within the property to allow passage of two cars on the driveway.
16. The driveway shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any step or level difference. Should any driveways be
constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
the driveway be removed and reconstructed to levels that do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
to have the footpath continue at a constant grade to minimise the potential for pedestrians to
trip or fall.
17. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
the driveway and any associated fencing or vegetation near the driveway shall comply with the
minimum sight line requirements as defined in AS 2890.1, section 3.2.4. The applicant shall
demonstrate compliance by illustrating these sight lines on the plans submitted for both
Operational Works approval and Building Works approval.
18. All vehicles shall enter and leave the site in a forward direction.
Off Street
19. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
for user class 1A with allowance for vehicles to enter the space in a forward gear, reverse and
leave the site in a forward gear in a total of three movements.
20. The carpark and driveway area must have a minimum head clearance (headroom) of 2.2m at
any point.
21. The applicant must submit a revised carparking plan with the Operational Works application
for access and carparking. The revised carparking plan must illustrate vehicle swept paths for
vehicle access to and from each carpark to demonstrate compliance with the provisions of this
approval.
Vegetation Protection & Preservation
22. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
allow water that falls on this surface to penetrate to the trees root system. The pavement shall
be constructed so as not to damage the tree or their root system and in this regard temporary
fencing shall be provided around the trees during construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of
the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
Operational Works.
23. Where retained tress are located in areas proposed to filled on site (or are located on
neighbouring allotments to the actual site to be filled), there will be a need to prevent fill
material from being placed on the trees root system. To this end the design of the filling works
will need to incorporate terracing around the tree or a similar means of ensuring that the
natural ground level around the trees remains generally the same as existing. These
measures shall clearly be shown on the plans submitted for Operational Works approval and
any drainage required to drain these areas shall also be shown on the plans.
Page 4 of 13
Section 5
2008/2063
Frontage Works
24. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Ferguson Street and Elanda Street frontage of the site in accordance with Planning Scheme
Policy PSP03 Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.
25. Any alteration and damage to the pathway along the Ferguson Street frontage or to the pram
ramp at the Ferguson Street and Elanda Street intersection during the course of construction
shall be repaired by the applicant to Council’s standards and at no cost to Council.
26. All paths, pram ramps, driveways and parking areas shall be designed and constructed to
ensure pedestrian safety using non-slip materials, to produce an evenly graded surface finish,
and to be in accordance with the Disability Discrimination Act 1992 and Australian Standard
1428.1 Design for Access & Mobility.
27. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
footpath paving and landscaping such as trees and grasses in accordance with Council’s
Standard specifications prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
28. Site drainage shall be managed generally in accordance with the indicative stormwater design
detailed on Drawing Number CD 2.01 P4 by Middap Ditchfield Pty Ltd dated October 08
except as modified herein.
A Development Permit for Building Works shall not be granted until a Development Permit for
Operational Works has been issued in regard to the drainage scheme.
29. Roof runoff from any new building shall be directed to a rainwater storage system or tank that
is installed to ensure water from the rainwater storage system or tank is used for external uses
(such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming
pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps
and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the
Queensland Development Code (QDC) current at the time of building approval, and shall be
part of the plumbing application for approval. The location and capacity of the tanks shall be
clearly shown on the plans submitted for Building Works / Operational Works approval and
any overflow shall be directed to the stormwater drainage system located at Elanda Street.
30. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s the
kerb and channel and the existing drainage structures in Elanda Street and Ferguson Street.
Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer
and submitted to Council prior to obtaining a Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s street drainage system
at any one location is 25 litres/second.
31. As the site is proposed to be filled, stormwater drainage pipes and/or an overland flow-path
that caters for drainage from the adjoining sites for a design storm with an Average
Recurrence Interval of 1 in 100 years shall be installed within the site to collect and discharge
stormwater runoff from all adjoining properties to prevent additional ponding/flooding on these
properties.
32. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
33. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
Page 5 of 13
Section 6
2008/2063
Town Water Supply
34. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
35. The development shall be served by individual water meters to each tenement and be capable
of being separately rated.
36. Each individual water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
37. All water meters must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s Water & Sewerage Capital Works
Manager prior to lodgement and approval of hydraulic drawings.
Earthworks
38. Filling works required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
watercourses. Detailed site surveys indicating natural surface levels and contours of the
adjoining properties must be provided with the application for a Development Permit for
Operational Works for Filling and Drainage.
This may require the design and construction of drainage pipes and/or an overland flow-path
within the development site that caters for drainage from the adjoining sites for a design storm
with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of
Water encompassing the drainage pipes or overland flow-path will also be required. In this
regard a Development Permit for Operational Works shall be obtained.
Should evidence be provided to Council indicating that no additional ponding of stormwater
will occur on the adjoining properties the requirement for the drainage pipes, overland flow-
path and easement shall not apply.
39. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
any fences to be replaced shall be clearly shown on the plans submitted for Operational
Works approval.
Site Stability
40. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land, and make recommendations on
the type of foundation system(s) best suited for the proposed development. The
recommendations of this report shall be incorporated into the design and construction of the
proposed development.
Erosion and Sediment Control
41. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Page 6 of 13
Section 7
2008/2063
Contributions Towards Council Infrastructure
42. Monetary contributions shall be paid to Sunshine Coast Regional Council towards the cost of
providing and/or upgrading various infrastructure at the rates applicable at the time of
payment. An estimate only of the contribution amounts under the current Council policies and
requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $ 1,438
PSP16 – Sewerage Headworks Contributions $ 2,023
PSP17 – Water Supply Headworks Contributions $ 2,386
PSP20 – Pathway Trunk Network Contributions $ 323
TOTAL Contribution Amount = $ 6,170
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from December 2008 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
full.
Processing of bonds for security where specific Council approval has been given for the
bonding of contributions will incur an administration fee in accordance with Council’s Land
Development Commercial & Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the paid contributions and/or the trading bank guarantee will be returned.
General
43. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
44. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
45. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Environmental Health
46. Where the development involves the removal, relocation or demolition of a building, a Waste
Management Plan (construction and demolition) shall be submitted prior to demolition,
removal or relocation of any building other than a shed.
Waste Management Plans (construction and demolition) are required to be submitted in
accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
Waste storage areas are to provide for adequate separation of all reusable, recyclable and
waste materials. These shall be located so that they are convenient and safe to use. (Refer to
Noosa Council Waste Management Code)
The Plan shall contain the following information:
Page 7 of 13
Section 8
2008/2063
The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed.
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify contractor
materials volume(m³) *specify proposed *specify contractor and landfill site or
re-use or on-site and recycling outlet other disposal site
recycling methods
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is to
be completed by the demolition contractor.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Additionally Council rewards those who segregate
waste by significantly reducing disposal fees at the landfill some items are free. Higher gate fees
are charged for loads of mixed waste.
47. The developer must provide waste storage and disposal facilities in accordance with Planning
Scheme Policy “Waste Management Multi-Dwellings and Commercial and Industrial
Premises”, including an external imperviously paved area correctly sized for all refuse and
recycling containers and suitably screened from public places and neighbouring properties.
48. Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
pumps etc) shall comply with the following requirements:
48.1 The equipment shall be installed and located in a manner that prevents excessive
noise in accordance with Council’s Local Law No. 12 - Control of Nuisances.
Infringement Notices (on-the-spot fines) may apply for offences.
48.2 A person must not use equipment on any day if it makes or causes noise to be made:
48.2.1 From 10pm to 7am: More than the lower of either –
40 dB(A)
3 dB(A) above the background noise level
48.2.2 From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
48.2.3 From 7pm to 10pm: More than 3 dB(A) above the background noise level.
Page 8 of 13
Section 9
2008/2063
Note: it is recommended that the consultant that will be engaged to certify the noise levels of
mechanical equipment is asked to comment on the position and installation of equipment at
the plan design stage, this way noise problems can be minimised or avoided cost effectively.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
CD 2.01 P4 Concept Design Basement Floor Plan – 22 January 2009
Middap Ditchfield Pty Ltd
CD 2.02 P4 Concept Design Ground Floor Plan – 22 January 2009
Middap Ditchfield Pty Ltd
CD 2.03 P4 Concept Design First Floor Plan – 11 December 2008
Middap Ditchfield Pty Ltd
CD 3.01 P3 Concept Design North West Elevation – 22 January 2009
Middap Ditchfield Pty Ltd
CD 3.02 P2 Concept Design South East Elevation – 11 December 2008
Middap Ditchfield Pty Ltd
CD 3.03 P3 Concept Design North East Elevation – 11 December 2008
Middap Ditchfield Pty Ltd
CD 4.01 P2 Concept Design Sections AA & BB – 11 December 2008
Middap Ditchfield Pty Ltd
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is advised that development contributions and infrastructure charges applicable
to this development approval have been based on the following Uses Class/ Uses and
applicable quantities:-
Existing Development Approved Development
Existing Use Class Approved Use Class
Existing Quantity Approved Quantity
/ Use / Use
Multiple Housing -
Detached House 1 Dwelling 2 x 2 Bedroom Units
Type 2 – Duplex
2. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
Page 9 of 13
Section 10
2008/2063
3. The applicant is advised that a Compliance Permit for all plumbing and drainage works within
the boundaries of the development site shall be obtained from Council’s Plumbing Services
Section prior to obtaining a Development Permit for Building Works.
4. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.
5. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
5.1 On a Sunday or public holiday, at any time; or
5.2 On a Saturday or a business day, before 7.00am or after 6.30pm.
5.3 A maximum penalty of $1,500 applies to an offence under this legislation.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
Development Permit for Operational Landscaping, Access and/or Carparking, Frontage
Works Works, Stormwater Drainage and Erosion and
Sediment Control
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Advertising Devices Code
Page 10 of 13
Section 11
2008/2063
12 SUBMISSIONS
Not applicable
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Tracy Jones
SENIOR PLANNING OFFICER
Page 11 of 13
Section 12
2008/2063
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated
(6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to for the application are not available against the part of
development applications the approval that represents the concurrence agency’s
response for the code.
Appeals by applicants
Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following- 4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application
application; if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code
under section 3.1.6;1 (b) the advice agency told the applicant and the
assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
(e) a deemed refusal. decision notice is given to the advice agency as a
(2) An appeal under subsection (1)(a) to (d) must submitter.
be started within 20 business days (the “applicant’s Appeals for matters arising after approval given
appeal period”) after the day the decision notice or (co-respondents)
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
(3) An appeal under subsection (1)(e) may be development application, a person to whom any of the
started at any time after the last day a decision on the following notices have been given may appeal to the
matter should have been made. court against the decision in the notice-
Appeals by submitters (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application extension of the relevant period for an approval;
may appeal to the court about- (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including minor change to an approval.
any conditions (or lack of conditions) or other (2) The appeal must be started within 20 business
provisions of the approval; or days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval. the person.
(2) The appeal must be started within 20 business (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day approval resulted from a development application
the decision notice or negotiated decision notice is (superseded planning scheme) that was assessed as
given to the submitter. if it were an application under a superseded planning
scheme.
(3) If a person withdraws a submission before the
application is decided, the person may not appeal the (4) Also, a person who has made a request
decision. mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.
(4) If an application involves both impact
assessment and code assessment, appeal rights for (5) An appeal under subsection (4) may be started
submitters are available only for the part of the at any time after the last day the decision on the
application involving impact assessment. matter should have been made.
(5) If an application is processed under section Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the Appeals for matters arising after approval given
application are available only for the aspects of the (no co-respondents)
development that would have required public
notification under the repealed Act. 4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 12 of 13
Section 13
2008/2063
(b) a notice under section 6.1.442 giving a decision to (d) the length of a period mentioned in section 3.5.21
change or cancel a condition of a development relevant period;
approval. (e) a deemed refusal.
(2) The appeal must be started within 20 (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision be started within 20 business days (the “applicant’s
is given to the person. appeal period”) after the day the decision notice or
(3) Also, a person who has made a request negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request. started at any time after the last day a decision on the
(4) An appeal under subsection (3) may be matter should have been made.
started at any time after the last day the decision on The Registrar for the Building and Development
the matter should have been made. Tribunal may be contacted at the website
Appeals against decisions to change approval http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
For Infrastructure Charges Only
decision made on an application to change the 4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under charges
section 2.19(3)or section 4.4 of the repealed Act may (1) This section applies to a person who has been
appeal to the court against- given, and is dissatisfied with, an infrastructure
(a) the decision; or charges notice or a regulated State infrastructure
(b) a deemed refusal of the application. charges notice.
(2) An appeal under subsection (1)(a) must be (2) The person may appeal to the court against the
started within 20 business days after the day notice of notice.
the decision is to be given to the person. (3) The appeal must be started within 20 business
(3) An appeal under subsection (1)(b) may be days after-
started at any time after the last day a decision on the (a) if the notice is given because of a development
matter should have been made. approval or master plan approval-the day the
Appeals against local laws applicant is given notice of the decision about the
approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions (b) otherwise-the day the notice is given to the
applied under a local law about the use of premises or person.
the erection of a building or other structure permitted (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court (a) whether a charge in the notice is so
against the decision or the conditions applied. unreasonable that no reasonable relevant local
(2) The appeal must be started within 20 business government, State infrastructure provider or
days after the day notice of the decision is given to the coordinating agency could have imposed it; or
applicant. (b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the appeal under this section can not be about the
Integrated Planning Act 1997 as follows: methodology used to establish the charge in the
relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;3
(c) the decision to give a preliminary approval when a
development permit was applied for;
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 13 of 13
Used in these records
0019EB06.001.pdfRelated documentPublic source context ↗
SUPERSEDED Decision Notice - 010.2008.00002063.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 80 KB (small file)
- File type
No other editions are linked here.