Original source · versioned page text
0093_001
Attached to the e-mail Community Use - Education Type 3 Adult - MCU18/0138.
W_-@ § U3A noosa University of the Third Age Noosa Regional U3A Inc ABN 752 636 117 62 Michael Caniori Development Services Noosa Council PO Box 141 Tewantin Qld 4565 28 August 2018 Dear Michael We hereby submit our Development Application for the material change of use of premises at 64 Poinciana Avenue, Tewantin from Professional Offices to Community Uses — Education Type 3 Adult. Attached are: 1. The DA Form 1 — Development Application Details 2. Proposal to change the material use of 64 Poinciana Avenue, Tewantin. 3. Apendices A-H We look forward to your early consideration and approval in this regard. Kind regards af (a ZF . Liz Gleghorn ED uy ~ President 64 Poinciana Avenue Tewantin QLD 4565 Tel: (07) 5440 5500 Email: [email protected] Website: u3anoosa.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 49 pages
Page 2
Department of Infrastructure, Local Government and Planning
DA Form 1 — Development application details
Approved form (version 1.0 effective 3 July 2017) made under section 282 of the Planning Act 2016.
This form must be used to make a development application involving code assessment or impact assessment,
except when applying for development involving building work.
For a development application involving building work only, use DA Form 2 — Building work details.
For a development application involving building work associated with any other type of assessable development,
use this form (DA Form 1) and parts 4 to 6 of DA Form 2 — Building work details.
Unless stated otherwise, all parts of this form must be completed in full and all required supporting information must
accompany the development application.
One or more additional pages may be attached as a schedule to this development application if there is insufficient space
on the form to include all the necessary information.
This form and any other form relevant to the development application must be used to make a development application
relating to strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994, and airport land
under the Airport Assets (Restructuring and Disposal) Act 2008. For the purpose of assessing a development
application relating to strategic port land and Brisbane core port land, any reference to a planning scheme is taken to
mean a land use plan for the strategic port land, Brisbane port land use plan for Brisbane core port land, or a land use
plan for airport land.
Note: Ail terms used in this form have the meaning given under the Planning Act 2016, the Planning Regulation 2017, or the Development
Assessment Rules (DA Rules).
PART 1 — APPLICANT DETAILS
1) Applicant details
Applicant name(s) (individual or company full name)
Noosa Regional U3A Inc.
Contact name (only applicable for companies) Mike MacDonald
Postal address (P.O. Box or street address) 64 Poinciana Avenue
Suburb Tewantin
State Queensland
Postcode 4565
Country Australia
Contact number 0419 899 290
Email address (non-mandatory)
[email protected]
Mobile number (non-mandatory)
0419899290
Fax number (non-mandatory)
N/A
Applicant's reference number(s) (f applicable)
2) Owner's consent
(J No = proceed to 3)
2.1) Is written consent of the owner required for this development application?
{I Yes — the written consent of the owner(s) is attached to this development application
Queensland
SP Government
Page 3
Department of Infrastructure, Local Government and Planning PART 2 —LOCATION DETAILS [X Street address AND lot on plan (ail lots must be listed), OF C1 Street address AND lot on pian for an adjoining or adjacent property of the premises (appropriate for development in water but adjoining or adjacent to land e.g. jetty, pontoon; all lots must be listed). Unit No. | Street No. | Street Name and Type Suburb 64 Poinciana Avenue Tewantin Postcode | Lot No. Plan Type and Number (e.g. RP, SP) Local Government Area(s) 4565 601 SP 146047 Noosa Unit No. | Street No. | Street Name and Type Suburb a) b) Postcode | Lot No. Plan Type and Number (e.g. RP, SP) Local Government Area(s) CJ Coordinates of premises by longitude and latitude Longitude(s) ew Latitude(s) Datum Local Government Area(s) (if applicable) LC wess4 LC Gpag4 L Other. C1 Coordinates of premises by easting and northing Easting(s) Northing(s) _| Zone Ref. | Datum Local Government Area(s) (if applicable) C54 CJ wese4 (155 L] GDA94 C56 CJ Other: LJ Additional premises are relevant to this development application and their details have been attached in a schedule to this application &] Not required 4) Identify any of the following that apply to the premises and provide any relevant details LJ In or adjacent to a water body or watercourse or in or above an aquifer Name of water body, watercourse or aquifer: | Ld On strategic port land under the Transport Infrastructure Act 1994 Lot on plan description of strategic port land: Name of port authority for the lot: O Ina tidal area Name of local government for the tidal area (i applicable): Name of port authority for tidal area (if applicable): LJ On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 Name of airport: | C1 Listed on the Environmental Management Register (EMR) under the Environmental Protection Act 1994 EMR site identification: | Page 2 DA Form 1 — Development Application details Version 1.0—3 July 2017
Page 4
Department of Infrastructure, Local Government and Planning C Listed on the Contaminated Land Register (CLR) under the Environmental Protection Act 1994 CLR site identification: [ 5) Are there any existing easements over the premises? Note. Easement uses vary throughout Queensiand and are to be identified correctly and accurately. For further information on easements and how they may affect the proposed development. see DA Forms Guide_ XX Yes — All easement locations, types and dimensions are included in plans submitted with this development application (No PART 3 — DEVELOPMENT DETAILS Section 1 — Aspects of development 6.1) Provide details about the first development aspect a) What is the type of development? (tick only one box) Material change of use LJ Reconfiguring a lot LJ Operational work U1 Building work b) What is the approval type? (tick only one box) XJ Development permit CU Preliminary approval UH Preliminary approval that includes a variation approval c) What is the level of assessment? LJ Code assessment XX Impact assessment (requires public notification) d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3 lots): Material change of use from Professional Offices to Community Uses — Education Type 3 Adult e) Relevant plans Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms guide: Relevant plans. XX] Relevant plans of the proposed development are attached to the development application 6.2) Provide details about the second development aspect a) What is the type of development? (tick only one box) L] Material change of use C Reconfiguring a lot L] Operational work O Building work b) What is the approval type? (tick only one box) LJ Development permit CJ Preliminary approval U Preliminary approval that includes a variation approval c) What is the level of assessment? C1 Code assessment LI Impact assessment (requires public notification) d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 fot into 3 lots) e) Relevant plans Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms Guide: Relevant plans. LC Relevant plans of the proposed development are attached to the development application 6.3) Additional aspects of development O Additional aspects of development are relevant to this development application and the details for these aspects that would be required under Part 3 Section 1 of this form have been attached to this development application Not required Page 3 DA Form 1 — Development Application details Version 1.0—3 July 2017
Page 5
Department of infrastructure, Local Government and Planning
Section 2 — Further development details
Material change of use
7) Does the proposed development application involve any of the following?
KX] Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot LJ Yes — complete division 2
Operational work LD Yes — complete division 3
Building work LO Yes — complete DA Form 2— Building work details
Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local
planning instrument.
Provide a general description of the
proposed use
8.1) Describe the proposed material change of use
Provide the planning scheme definition
(include each definition in a new row)
Number of dwelling | Gross floor
units (if applicable) area (m?)
(if applicable)
U3A Noosa is a self-help self-managed,
not-for-profit organisation catering to the
local community who are no longer in
The use of the premises for adult
education or vocational training whether
operated for profit or not.
N/A
full-time work, semi or fully retired.
Members come and learn together, not
for qualifications but for its own reward;
the sheer joy of discovery.
8.2) Does the proposed use involve the use of existing buildings on the premises?
KX] Yes
LI No
Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick al!
LJ Subdivision (complete 10) (CJ Dividing land into parts by agreement (compiete 11))
C1 Boundary realignment (complete 12)) LO Creating or changing an easement giving access to a lot from
a construction road (complete 13))
plicable boxes)
10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of those lots
Intended use of lots created Residential Commercial Industrial Other, please specify:
Number of lots created
10.2) Will the subdivision be staged?
CO Yes — provide additional details below
L No
How many stages will the works include?
What stage(s) will this development application
apply to?
Page 4
DA Form 1 — Development Application details
Version 1.0—3 July 2017
Page 6
Department of Infrastructure, Local Government and Planning
11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the
ecg
Intended use of parts created | Residential Commercial Industrial
Other, please specify:
Number of parts created
12) Boundary realignment
12.1) What are the current and proposed areas for each lot comprising the premises?
Current lot Proposed lot
Lot on plan description Area (m?) Lot on plan description Area (m?)
12.2) What is the reason for the boundary realignment?
13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two ey)
Existing or Width (m) | Length (m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement
Note: This division is only required to be completed if any part of the development application involves operational work.
Division 3 — Operational work
14.1) What is the nature of the operational work?
LD Road work LO Stormwater LJ Water infrastructure
U Drainage work OD Earthworks LO Sewage infrastructure
C Landscaping OJ Signage CJ Clearing vegetation
L Other — please specify:
a e operationa O ecessa OTa ro) k= = (<Fo1 tte] ame) i] Le)
CO Yes — specify number of new lots:
1 No
14.3) What is the monetary value of the proposed operational work? (include GST. materials and labour)
PART 4 —- ASSESSMENT MANAGER DETAILS
15) Identify the assessment manager(s) who will be assessing this development application
16) Has the local government agreed to apply a superseded planning scheme for this development application?
LD Yes — a copy of the decision notice is attached to this development application
LJ Local government is taken to have agreed to the superseded planning scheme request — relevant documents
attached
L1No
PART 5 — REFERRAL DETAILS
17) Do any aspects of the proposed development require referral for any referral requirements?
Page 5
DA Form 1 — Development Application details
Version 1.0—3 July 2017
Page 7
Department of Infrastructure, Local Government and Planning Note. A development application will require referral if prescribed by the Planning Regulation 2017 I No, there are no referral requirements relevant to any development aspects identified in this development application — proceed to Part 6 Matters requiring referral to the chief executive of the Planning Regulation 2017: LO Clearing native vegetation LJ Contaminated land (unexploded ordnance) LJ Environmentally relevant activities (ERA) (only if the ERA have not been devolved to a local government) UO Fisheries — aquaculture L Fisheries — declared fish habitat area U Fisheries — marine plants L Fisheries — waterway barrier works L Hazardous chemical facilities CJ Queensland heritage place (on or near a Queensland heritage place) (1 Infrastructure — designated premises Cd Infrastructure — state transport infrastructure C1 Infrastructure — state transport corridors and future state transport corridors U Infrastructure — state-controlled transport tunnels and future state-controlled transport tunnels U Infrastructure — state-controlled roads O Land within Port of Brisbane's port limits LJ SEQ development area (J SEQ regional landscape and rural production area or SEQ Rural living area — community activity LJ SEQ regional landscape and rural production area or SEQ Rural living area — indoor recreation CL SEQ regional landscape and rural production area or SEQ Rural living area — residential development LJ SEQ regional landscape and rural production area or SEQ Rural living area — urban activity LJ Tidal works or works in a coastal management district LD Urban design C] Water-related development — taking or interfering with water (J Water-related development — removing quarry material (from a watercourse or lake) C1 Water-related development — referable dams CL Water-related development — construction of new levees or modification of existing levees (category 2 or 3 levees only) ( Wetland protection area Matters requiring referral to the local government: LO Airport land UO Environmentally relevant activities (ERA) (only if the ERA have been devolved to local goverment) CL Local heritage places Matters requiring referral to the chief executive of the distribution entity or transmission entity: O Electricity infrastructure Page 6 DA Form 1 — Development Application details Version 1.0—3 July 2017
Page 8
Department of infrastructure, Local Government and Planning
Matters requiring referral to:
e The chief executive of the holder of the licence, if not an individual
e The holder of the licence, if the holder of the licence is an individual
C1 Oil and gas infrastructure
Matters requiring referral to the Brisbane City Council:
LJ Brisbane core port land
Matters requiring referral to the Minister under the Transport Infrastructure Act 1994:
(1 Brisbane core port land
U1 Strategic port land
Matters requiring referral to the relevant port operator:
LO Brisbane core port land (below high-water mark and within port limits)
Matters requiring referral to the chief executive of the relevant port authority:
LJ Land within limits of another port
Matters requiring referral to the Gold Coast Waterways Authority:
UJ Tidal works, or development in a coastal management district in Gold Coast waters
Matters requiring referral to the Queensland Fire and Emergency Service:
LC Tidal works, or development in a coastal management district
18) Has any referral agency provided a referral response for this development application?
C1 Yes — referral response(s) received and listed below are attached to this development application
EX No
Referral requirement Referral agency Date of referral response
Identify and describe any changes made to the proposed development application that was the subject of the referral
response and the development application the subject of this form, or include details in a schedule to this development
application (i applicable).
PART 6 — INFORMATION REQUEST
19) Information request under Part 3 of the DA Rules
{J | agree to receive an information request if determined necessary for this development application
(11 do not agree to accept an information request for this development application
Note: By not agreeing to accept an information request I, the applicant, acknowledge:
that this development application will be assessed and decided based on the information provided when making this development application and
the assessment manager and any referral agencies relevant to the development application are not obligated under the DA Rules to accept any
additional information provided by the applicant for the development application unless agreed to by the relevant parties
« Part 3 of the DA Rules will still apply if the application is an application listed under section 11.3 of the DA Rules.
Further advice about information requests is contained in the DA Forms Guide.
Page 7
DA Form 1 — Development Application details
Version 1,0—3 July 2017
Page 9
Department of Infrastructure, Local Government and Planning
PART 7 — FURTHER DETAILS
20) Are there any associated development applications or current approvals? (e.g. a preliminary approval)
LO Yes — provide details below or include details in a schedule to this development application
KX No
List of approval/development Reference number Date Assessment manager
application references
LC Approval
LJ Development application
LC Approval
LJ Development application
21) Has the portable long service leave levy been paid? (only applicable to development applications involving building work or
operational work)
U1 Yes — the yellow local government/private certifier’s copy of the receipted QLeave form is attached to this
development application
LJ No =I, the applicant will provide evidence that the portable long service leave levy has been paid before the
assessment manager decides the development application. | acknowledge that the assessment manager may give a
development approval only if | provide evidence that the portable long service leave levy has been paid
&] Not applicable
Amount paid Date paid (dd/mm/yy) QLeave levy number (A, B or E)
$
22) Is this development application in response to a show cause notice or required as a result of an enforcement notice?
LO Yes — show cause or enforcement notice is attached
I No
23) Further legislative requirements
Environmentally relevant activities
23.1) Is this development application also taken to be an application for an environmental authority for an
Environmentally Relevant Activity (ERA) under section 115 of the Environmental Protection Act 1994?
CO Yes — the required attachment (form EM941) for an application for an environmental authority accompanies this
development application, and details are provided in the table below
No
Note: Application for an environmental authority can be found by searching “EM941” at www.gid.gov au. An ERA requires an environmental authority
to operate. See www. business. gid gov.au for further information.
Proposed ERA number: Proposed ERA threshold:
Proposed ERA name:
oO Multiple ERAs are applicable to this development application and the details have been attached in a schedule
to this development. application.
Hazardous chemical facilities
23.2) Is this development application for a hazardous chemical facility?
C1 Yes — Form 69: Notification of a facility exceeding 10% of schedule 15 threshold is attached to this development
application
XI No
Note: See www.justice. g/d. gov. au for further information.
Clearing native vegetation
Page 8
DA Form 1 — Development Application details
Version 1.0—3 July 2017
Page 10
Department of Infrastructure, Local Government and Planning
23.3) Does this development application involve clearing native vegetation that requires written confirmation the chief
executive of the Vegetation Management Act 1999 is satisfied the clearing is for a relevant purpose under section 22A
of the Vegetation Management Act 1999?
(1 Yes — this development application is accompanied by written confirmation from the chief executive of the
Vegetation Management Act 1999 (s22A determination)
XX No
Note: See www.qld.gov.au for further information.
Environmental offsets
23.4) ts this development application taken to be a prescribed activity that may have a significant residual impact on a
prescribed environmental matter under the Environmental Offsets Act 2014?
L Yes — | acknowledge that an environmental offset must be provided for any prescribed activity assessed as having a
significant residual impact on a prescribed environmental matter
KX No
Note: The environmental offset section of the Queensland Govemment's website can be accessed at www.qld.gov.au for further information on
environmental offsets.
Koala conservation
23.5) Does this development application involve a material change of use, reconfiguring a lot or operational work within
an assessable development area under Schedule 10, Part 10 of the Planning Regulation 2017?
UO Yes
—J No
Note: See guidance materials at www.ehp.gid.gov.au for further information.
Water resources
23.6) Does this development application involve taking or interfering with artesian or sub artesian water, taking or
interfering with water in a watercourse, lake or spring, taking overland flow water or waterway barrier works?
L Yes — the relevant template is completed and attached to this development application
XI No
Note: DA templates are available from www .dilgp.gid.gov au.
7) Does this application involve taking or interfering with artesian or sub artesian water, taking or interfering
with water in a watercourse, lake or spri or taking overland flow water under the Water Act 2000?
OO Yes — | acknowledge that a relevant water authorisation under the Water Act 2000 may be required prior to
commencing development
J No
Note: Contact the Department of Natural Resources and Mines at www.dnim.gid.gov.au for further information.
Marine acti S
23.8) Does this development application involve aquaculture, works within a declared fish habitat area or removal,
disturbance or destruction of marine plants?
LO Yes — an associated resource allocation authority is attached to this development application, if required under the
Fisheries Act 1994
J No
Note: See guidance materials at www .daf gld.gov.au for further information.
Quarry materials from a watercourse or lake
23.9) Does this development application involve the removal of quarry materials from a watercourse or lake under
the Water Act 2000?
C1 Yes — | acknowledge that a quarry material allocation notice must be obtained prior to commencing development
1] No
Note: Contact the Department of Natural Resources and Mines at www.dnrm.qid, gov. au for further information.
Quarry materials from land under tidal waters
23.10) Does this development application involve the removal of quarry materials from land under tidal water under
the Coastal Protection and Management Act 1995?
UO Yes — | acknowledge that a quarry material allocation notice must be obtained prior to commencing development
Page 9
DA Form 1 — Development Application details
Version 1.0—3 July 2017
Page 11
Department of Infrastructure, Local Government and Planning
Note: Contact the Department of Environment and Heritage Protection at www. ehp.gid.gov.au for further information.
Referable dams
23.11) Does this development application involve a referable dam required to be failure impact assessed under
section 343 of the Water Supply (Safety and Reliability) Act 2008 (the Water Supply Act)?
(1 Yes - the ‘Notice Accepting a Failure Impact Assessment from the chief executive administering the Water Supply
Act is attached to this development application
XX] No
Note: See guidance materials at www.dews.qid.gov.au for further information.
Tidal work or development within a coastal management district
23.12) Does this development application involve tidal work or development in a coastal management district?
CJ Yes — the following is included with this development application:
CO Evidence the proposal meets the code for assessable development that is prescribed tidal work (only required if
application involves prescribed tidal work)
LA certificate of title
XX] No
Note: See guidance materials at www.ehp.qid.gov.au for further information.
Queensland and local heritage places
23.13) Does this development application propose development on or adjoining a place entered in the Queensland
heritage register or on a place entered in a local government's Local Heritage Register?
CO Yes — details of the heritage place are provided in the table below
KI] No
Note: See guidance materials at www.ehp.gid.gov.au for information requirements regarding development of Queensland heritage places.
Name of the heritage place:
Brothels
23.14) Does this development application involve a material change of use for a brothel?
CJ Yes — this development application demonstrates how the proposal meets the code for a development application
for a brothel under Schedule 3 of the Prostitution Regulation 2014
{I No
Decision under section 62 of the Transport Infrastructure Act 1994
23.15) Does this development application involve new or changed access to a state-controlled road?
C1 Yes - this application will be taken to be an application for a decision under section 62 of the Transport
Infrastructure Act 1994 (subject to the conditions in section 75 of the Transport Infrastructure Act 1994 being satisfied)
—] No
PART 8 — CHECKLIST AND APPLICANT DECLARATION
24) Development application checklist
| have identified the assessment manager in question 15 and all relevant referral
requirement(s) in question 17 XX Yes
Note: See the Planning Regulation 2017 for referral requirements
If building work is associated with the proposed development, Parts 4 to 6 of Form 2— 0 Yes
Building work details have been completed and attached to this development application & Not applicable
Supporting information addressing any applicable assessment benchmarks is with
development application
Note: This is a mandatory requirement and includes any relevant templates under question 23, a planning report Yes
and any technical reports required by the relevant categorising instruments (e.g. local government planning
schemes, State Planning Policy, State Development Assessment Provisions). For further information, see DA
Ee ide: Planning Report Te },
Relevant plans of the development are attached to this development application I Yes
Page 10
DA Form 1 - Development Application details
Version 1,0—3 July 2017
Page 12
Department of Infrastructure, Local Government and Planning Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms Guide: Relevant plans. The portable long service leave levy for QLeave has been paid, or will be paid before a OO Yes development pennit is issued (see 21)) XJ Not applicable 25) Applicant declaration J By making this development application, | declare that all information in this development application is true and correct &X] Where an email address is provided in Part 1 of this form, | consent to receive future electronic communications from the assessment manager and any referral agency for the development application where written information is required or permitted pursuant to sections 11 and 12 of the Electronic Transactions Act 2001 Note: ft is unlawful to intentionally provide false or misteading information. Privacy — Personal information collected in this form will be used by the assessment manager and/or chosen assessment manager, any relevant referral agency and/or building certifier (including any professional advisers which may be engaged by those entities) while processing, assessing and deciding the development application. All information relating to this development application may be available for inspection and purchase, and/or published on the assessment manager's and/or referral agency’s website. Personal information will not be disclosed for a purpose unrelated to the Planning Act 2016, Planning Regulation 2017 and the DA Rules except where: e such disclosure is in accordance with the provisions about public access to documents contained in the Planning Act 2016 and the Planning Regulation 2017, and the access rules made under the Planning Act 2016 and Planning Regulation 2017; or e required by other legislation (including the Right to information Act 2009), or e otherwise required by law. This information may be stored in relevant databases. The information collected will be retained as required by the Public Records Act 2002. PART 9 — FOR OFFICE USE ONLY Date received: [ti‘Céz** Reference number(s): [ | Notification of engagement of alternative assessment manager Prescribed assessment manager Name of chosen assessment manager Date chosen assessment manager engaged Contact number of chosen assessment manager Relevant licence number(s) of chosen assessment manager QLeave notification and payment Ie] elem exOutsy 1-18) ment manager if applicable Description of the work QLeave project number Amount paid ($) Date paid Date receipted form sighted by assessment manager Page 11 DA Form 1 — Development Application details Version 1.0—3 July 2017
Page 13
Department of Infrastructure, Local Government and Planning Name of officer who sighted the form The Planning Act 2016, the Planning Regulation 2017 and the DA Rules are administered by the Department of Infrastructure, Local Government and Planning. This form and all other required development application materials should be sent to the assessment manager. Page 12 DA Form 4 — Development Application details Version 1.0—3 July 2017
Page 14
PROPOSAL TO CHANGE THE MATERIAL USE OF 64 POINCIANA AVENUE TEWANTIN Background This report provides support information to the development application for the proposed Material Change of Use of 64 Poinciana Avenue, Tewantin (Michell House) presently leased by the University of the Third Age Noosa Regional U3A Inc (U3A Noosa) from the University of the Sunshine Coast (USC). The change of use proposed is from Professional Offices to Community Uses — Education Type 3 Adult. Noosa U3A has operated since 1991 as a self-help, self-managed, not-for-profit organisation catering to those of the local community who are no longer in full-time work and semi- or fully-retired. Its members come and learn together, not for qualifications, but for its own reward; the sheer joy of discovery. Noosa U3A’s mission is to provide an environment for the exchange of knowledge in a range of academic, cultural, recreational and social activities offering stimulation and development for the wellbeing of our members. Noosa U3A has approximately 800 members. Noosa U3A occupies Michell House that was owned by Alexandra Michell who leased it to Noosa U3A for a peppercorn rent in April 2014. The ownership of Michell House was gifted to USC in June 2014 for GDR purposes. USC subsequently extended the initial lease until 2023 with options to extend the lease for further terms. Unfortunately, the original 2014 lease agreement recorded the use of premises as Educational and Communities activities when the correct definition of the use was, in Council’s opinion, Professional Offices. Neither Ms Michell’s solicitor, nor USC or Noosa U3A were aware of this error until December 2017 when Noosa Council gave notice that the correct definition should be Community Uses - Education Type 3 Adult. 4 Ay Ward Paik : 4 Sido : Ward Park v 5 el : Coles Express = U3A (1) Tewantin th 9 2 Parking Velernary Surgery eee 4 & S : Wool = 9 y i U3A : 3 : > O Poin, : usa, omciana Car Parking 9 — Suggested a Parking areas : for U3A - rediA iW Area (2) é requires a Department of Transport @ 9 and Main Roads permit from U3A It should be noted that only one complaint has been received about the use of Michell House in the last four years. That complaint was from residents of Toolah Street over parking problems allegedly
Page 15
caused by Noosa U3A members. This issue has since been resolved and is evidence that Noosa U3A’s use of Michell House does not cause undue problems in the neighbourhood. PLANNING FOR CHANGE OF USE Discussions have been held with Council staff and Town Planning consultants, Martoo Consulting Pty Ltd and PTT Peco! Traffic and Transport traffic engineers, to understand Council’s needs before submitting a development application. It is not the intention of the U3A Noosa proposal to change the services it provides to its members but to change the syllabus, carparking facilities and use of external accommodation to comply with Council’s planning scheme with special emphasis on car parking. Surveys have been carried out to determine the numbers of members and staff on site at any time, carparking needs and space required to provide the classes required by its members. The surveys for attendances and accommodation used during mid-Semester 1 are attached as Appendix A and a carparking/travel survey as Appendix C. It should be noted that the data for the attendance survey was compiled from class attendances for the week of the 30" of May to the 4" of June 2018 using class levies received. The dataset table shows the maximum number of members on site at any one time during the survey was 109 (1130 to 1200 on Tuesday 1* of May). A further dataset was generated for the month of June 2018 to verify the reduction in use of Michell House after changes were made to offload some classes to external facilities. The dataset and summary are attached at Appendix B which shows the maximum of members on site at any time was reduced from 109 in the May survey to 61 in the June survey. From this information Noosa U3A has been able to analyse and plan changes to the subjects offered, set maximum attendees allowed for each subject, arrange the addition of external classroom facilities and arrange appropriate off-road car parking leases. Those changes will be implemented for Semester 2 starting in late July 2018. PLANNED CHANGES FOR SEMESTER 2 AND FUTURE OPERATIONS. The attendance and accommodation data tabled in Appendices A and B revealed classroom space that was unused as well as class sizes that were over-subscribed. In preparing the syllabus plan for Semester 2, classes requiring floor space such as Yoga, Scottish Country Dancing, Line Dancing and choral rehearsals, have been moved to external facilities such as the Masonic Hall and Catholic Church. All these external facilities are rented and have adequate off-road carparking. The timetable for Semester 2 is attached as Appendix D. In summary, class sizes have been capped, others have been moved off-site and any future classes will be encouraged to use The J complex at Noosa Junction and CQU facilities. Not all these changes have been popular with our student members and tutors, many of whom have a close affinity to Michell House, and have as a result, chosen not to attend classes sited elsewhere. Nevertheless, the changes to the Semester 2 timetable have resulted in a reduction in the maximum number of student and tutor members on site at any time to 47 and 2 volunteer staff; a total of 49. Table 1 shows that Council car parking requirements are a maximum of 55 students on site at any one time. Table 1 COUNCIL CAR PARKING REQUIREMENT Land Use Scale | Rate Requirement Adult Education 2 1 space per employee 2 55 | 1 space per 2.5 students of driving age 22 Total 24
Page 16
Noosa U3A has been advised by Council planning staff that the parking requirements for adult education is 1 space per employee; and 1 space per 10 students of driving age. However, PTT Traffic Consultants have recommended a ratio of 1 car space per staff; 1 space per 2.5 members. This is the ratio used for Semester 2. The PTT Pekol Traffic & Transport report dated 22 August 2018 at Appendix E confirms the parking spaces provided by U3A Noosa meets Council’s planning requirements. Figure 2. SEMESTER 2 PARKING DEMAND AT NOOSA U3A FACILITY MICHELL HOUSE 2 Parking Demand at Rate 1 Space per Staff; 1 Space per 2.5 Students 25 3 £ 20 S £15 fe oO o 10 2 5 0 8:30 9:00 9:30 10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30 Class Start Time ——Max Demand ——=Spaces available SUMMARY It is proposed to change the operation of U3A Noosa at 64 Poinciana Avenue, Tewantin to meet the needs of its members and at the same time conform to Council’s planning scheme. The most important change is to provide an appropriate number of off-street carparking spaces. To achieve this, class maximum sizes have been reduced, others have been cancelled and five have been moved to external rented facilities with off-street parking. The result has been to reduce the range of classes offered to members and lessen the need for street parking in the immediate neighbourhood. This is confirmed in the PTT Pekol Traffic & Transport report. The financial cost of these changes has been considerable. The hire of the Masonic Hall, Catholic Church car park and Church Hall, together with future costs at The J, must be borne from class levies paid by each student. Whilst these levies are modest they comprise 50% of Noosa U3A revenues and will cause levies to be increased in the coming financial year. The more important issue is that Noosa U3A will lose a significant proportion of its members because of these changes and its members, in turn, must find other avenues for their academic, cultural, recreational and social activities in their retirement years. It follows that much of the burden to cater for their wellbeing will pass to Noosa Council. It was noted during Semester 1 that a significant change in the wellbeing of members occurred in Michell House when the prospect of classes being relocated outside Michell House became known. Noosa U3A members enjoy the opportunity to meet and chat with their friends attending other classes in the building which is an important purpose in our mission. With the rumours of planned reductions in class sizes and relocation of classes it was obvious that the opportunity to meet and chat with others would be hugely reduced.
Page 17
To quote one member: ‘I am so grateful for U3A as | look forward to coming every week to attend classes, meet up with my friends to chat and laugh. Otherwise | would feel so lonely and lost; this is like my family.’ In one way this development application is a plea to Noosa Council from U3A members that this convivial atmosphere be restored, and the number of members permitted to use Michell House be increased above the low limit dictated by Council’s planning scheme. it could do so by acknowledging that less than 50% of members attending classes drive to classes and, hence, the parking requirement specified in the Noosa Plan may not be appropriate in Noosa U3A’s case. If this were to be the case, class sizes and variety might be restored to previous levels and the wellbeing of members restored. DETAILS OF THE PROPERTY Address 64 Poinciana Avenue, Tewantin. Real Property Description Lot 601 on SP146047 County of March Parish of Noosa. Title Reference 50389438. + 0 Ms. Cy SRPTHSEZE Site Area Mooring) Street. The site currently comprises one lot being approximately 1,046 m?. There is currently a two-storey building occupying the site with a floor area of 580 m2. The site is bounded to the north by a child care business, to the a east by a commercial building, to the 7m south by Poinciana Avenue and to the Fis octPise4 5 nrse7316 2 15 Zapato anesseae espzrian Mooring! Sreoe west by Moorindil Street. The surrounding area is primarily residential. There is an easement crossing the site to allow passage to the car park at the rear of 66 Poinciana Avenue. NOOSA PLAN 2000 Land Use Classification The land is contained within the zone Attached Housing. Level of Assessment and Type of Application Use of building has triggered a Material Change of Use Development Permit and will be Impact Assessable. Area Classification (ZONE) Attached Housing Application Type Impact Assessable Application (requires Public Notification).
Page 18
Car Parking Car parking is to be provided for 27 off-road reserved car spaces for 2 staff (volunteer members) and a maximum of 55 student members on-site at any one time. The proposed rates comply with Council’s Car Parking Requirements. Attachments APPENDIX A: Attendance survey U3A Noosa Semester 1 February 2018 APPENDIX B: Attendance survey U3A Noosa Semester 1 June 2018 APPENDIX C: Car parking/ travel survey July 2018 APPENDIX D: U3A Noosa Timetable Semester 2 APPENDIX E: PTT PEKOL Traffic & Transport Car Parking Assessment 22 August 2018 APPENDIX F: 64 Poinciana Avenue Building Plan APPENDIX G: Tewantin Parish Carpark Hire Use Agreement APPENDIX H: Sunshine Coast University landlord approval for change of use
Page 19
ATTACHMENTS TO U3A D.A. MATERIAL CHANGE OF USE 64 POINCIANA AVENUE TEWANTIN AUGUST 2018 APPENDIX A: Attendance survey U3A Noosa Semester 1 February 2018 APPENDIX B: Attendance survey U3A Noosa Semester 1 June 2018 APPENDIX C: Car parking/ travel survey July 2018 APPENDIX D: U3A Noosa Timetable Semester 2 APPENDIX E: PTT PEKOL Traffic & Transport Car Parking Assessment 22 August 2018 APPENDIX F: 64 Poinciana Avenue Building Plan APPENDIX G: Tewantin Parish Carpark Hire Use Agreement APPENDIX H: Sunshine Coast University landlord approval for change of use
Page 20
yuany ove 1% A Aktrdonw Seavey . £% ee 4 €% st Sb sb ab ab AL cd Lz be 4 x4 Wz ze a a a 6b 6L 6L 6L 6L z ab 2 Z a eb 2b a ab 2 2b OnTe oO Cy) am [oe vb gs 8s yy ss bb gb ds Zs ds 4s is ve ] bv wh + vb €L eb eb eb se st SZ sz tL be gh ab sh St BL 8L gL sb Sb SL SL eb eb eb eb eb eb ub ub UL bE Mb be [or es gs 8s ce ee ve SY 601 SL GL SZ Le 6L ] ab ab 8b WZ Le be be 12 be tL a bb HL bb Lb Sz sz sz wy vy vy oy a a Zt eb ab ze 6L 6b 6L 6 6 6b [zz 2% £% be Le te Le S ge ee bE 6E ee 0c ] vb vl yh vt tL vb vb ab Zt ab 4b 9 9 €b eb el eb lt 02 oz oz 0% oz oz saunjos] Aepus qnywuuiny a1qqge19S youe4 Zz saAloy | soytioy eBo, EuIEH a6pug “Jaqu| Jayndwog Aepuy ssanuquog ysiueds lensiA olpny Buimeiq ysiueds BS1D18X BUSD DISNW IEDISSEI ueWed suasp) Jajndwog. BUN saytloy ueWEg Aepsunus youa4 INO|OD JBIEAA SION *® SSIAC Buor yew ysiueds soyioy aleadsayeyus 0g B\SeUED Aepsaupoy, eIAOg eBo, BuyeH AN|OD JS}EA\ spiea NoysIH youal4 uonyepaiddy yy AydesBojoug Buor yey Aepsany asoulud SHEID HINW. SJSNUNUOD UBIEY yousd UOIBIIEY PHOM Jayndwop eiadQ Buor yew Aepuow O09L-OES1 DES1-00S1 OOSL-OEFl DEHL-OOF! OOF1-DEEL O€EL-OOEL ODEL-OEZL OEZL-00Z! 00ZL-OEL 1 DEL L-OOL} OOL L-OE01 OE01-0001 00D1-0€60 DEGO-0D60 G060-0E80 ‘S|EAIS}U! ssejo AUNOH JIEH
Page 21
aiqepiene sasedGemee = pueLag Xe ——
Sul} ULI sseD
oe &
“yugwauinbas Bupped siqy
oz UM aouepsoo—e Ul S} UOISIAOJd Bulsed seo Buysixe ay] :uoisnjouod
Q LZ aiqeyieae saoeds
se zz 12101.
a a Lt sjuapnjs ¢°z Jad aoeds } Sy
a S aafojdua Jad aoeds 1 ¢ sonpz ynpy
oo Sz juewasinbey ayey a1e9g asf) puey
_ Juawainbay Bue sed jlounog
a syuapnys OE
Gz Jad aoeds T ‘yye1s sad aoeds T ajey ye puewag Bupjiedg
Le Le Le Le Lz Le Le Le Lt Lt L@ Le Le Le Le ene saoeds
4 TT vt vT vT €T €T oT L LT LT LT LT LT oT & ewag xe
‘S O€:ST 00:ST O€:bT 00:7T O€:ET 00:€T O€:7T 00:2T O€:TT 00:TT O€:0T 00:0T O€:6 00:6 O€:3 Wels ssejD
0 0 0 0 v v er eT vE 92 92 9% 92 v2 0 Aepil4
Le Of O€ 0€ ct S 6 LT TE TE TE 6c 67 oT 0 Aepsany.
Le ce cE ce ce ce v oT €v €v £v €v ev 0z 0 sepsaupaM
€@ vE vE ve €% €¢ vT vT vt vE vE ve ve 9¢ € Aepsanl
ve Gc Sc SZ St SZ Gz 9 9 8T 8T 8T 8T S 0 Aepuoy|
sjeAsa}UlL
OOST O€sT OOST O€vT OOrT O€ET OOET O€2T 00zT OETT OOTT O€OT OooT O&60 0060 sse[o
-OEST -OOST -OEVT -O0rT -OEET -OOET “OEZT -002T -OETT -OOTT -O€OT -000T -0£60 -0060 -O€80 Ajanoy
HEH
8TOZ OZAINF- 9T Ajnr Aanuns Supjied
Apondix @
Attendaru Sumy
Page 22
Tur os
Aypendiy, @.
Athen demce Lovey
{se se aA oe 9 3 bb bb GL 6b 6h 6L aouepusny XeW
bb bE bE uolstaey youel
€ € € € gnoluuuny
le be be Le sone Aepuis
9 9 9 9 ajqqeos
bb a bb bE bb bE eBbpug
8 8 g g ajyeIpawaju] Jayndwo5,
Aepu
6Z 6% 6z (44 2 v Le ge ge zy he ] SoUepUs}HY XW
Z Z Z dnolg jensia oipny
€b eb €b €b £b Buimesg oyu) 395
6 6 6 6 6 SISNIA| [BOISSE|D
S S S ayelpauayy] UEWaS)
v v v v v y dnolg suas¢ Jajndwog
4b db 4b Lb SIM UMO INO UI
zz zz ZL zz za zz oipnyg uado ayuoy
6 6 6 Sunyeuajun ayosjnaq
Aepsuny
[@s zs es zs te 6& 9 oe 9s 9g 9s 9s 9s LL ] SoUBpUsHY Xe
8 8 8 8 ayelpausayy] youel4
LL bb bb Vb sisuulbag JnojoqayeAA,
6 6 6 6 6 6
ve ve ve ve A ve
9 9
SL SL St gL SL Sb solAloy
SL gb SL SL SL SL areadsayeys
SL SL SI SL SL 9190S
HL bb bb bb bb bb BYSEUED JOO, @ PUBL
Aepseupamy,
{se sé se se dz Zz g g St AL db Ay db db |] souepusHy Xe
8 8 8 8 BIAIOg
ab 2b dv 2b ZL db BJe|PSUUe}U] NOjONaye NA
OL OL OL OL OL OL 00g ewes pled
8 8 8 siouulbeg youl
Zt Zt db Zt ab db Buolyew
Aepsany
[zz cz 2 vL 3 vl vl lL ee zs i) i) zs db SoUepUspY Xe
€ £ € asaulud
s s s
vb PL vb vl vl vb vb vl SYRIONINW
6 6 aiseg Bundwos
- 6b 6L 6L 6L Ai0}s!IH
OL 91 OL OL OL eiado
ab 4b db ab 2b 2b Buofyew
009L-0€S1 O£S1-00S1 OOSL-OEPL OLPL-OOFL OOFL-OFEL OEEL-OOEL OOEL-OFTZL OEZL-O0ZL OOZL-OELL OSL L-OOLL OOLL-O€0L OFOL-0001 000L-0E60 O€60-0060 0060-0E80 Aepuow
8402 eunr
seouepuepy pue sezig ssejp wnuixeyy
Page 23
Appx C., aLqepene SadedS awl) WEIS sseiD PUEWIEG XE) —— oT ‘yuawauinbas Bupyed siy) YIM BoUeps0998 U! S| UOISIAOJd Bupyed Jeo Buysixe oy, :ucIsnjoU0D Zz 8 12 aiqeyieae saoeds st zz 12} S LT sjuapnis g'z Jad soeds | Ey oz 8 $ aafo|dwia Jad aceds | ¢ ‘onpz unpy Sz juswsuinbey ayey gjeog asf puey quaweunbay Buned Je9 jlounog syuspnys OE GZ Jad aseds T ‘eis sad aseds T ajey ye puewag BSulnjsed LZ Le Lt Le L@ Le Le L@ Le £2 Lt Le Le Lt Le ene seeds TT vT vT vT €T eT oT Z LT LT LT Lt LT oT € ewaq xe O€:ST 00:ST O€-bT 00:7T O€-ET 00:€T OE:ZT 00:2T OTT 00:TT O€:0T 00:0T O€:6 00:6 0E:8 Hels sse[> 0 0 0 0 v v cr er vE 92 9¢ 97 92 ve 0 Aepiss L@ 0€ 0€ OE ce S 6 LT TE TE TE 6c 6c OT 0 Aepsiny,. Le ze ce ce ze ze v 9T ev ev €v ev ev 0z 0 sepsoupoM &t vE vE ve &% &% vT vT vT vE ve vE ve 9% € Aepsan ve S@ St SZ Sz SZ Gz 9 9 8T 8T 8T 8T S 0 Aepuol SJeAsO}UL OO9T O€sT OOsT OfvT OOvT OEET OOET O€ZT oozT O€TT OOTT O€0T OO00T O€60 0060 sse|> -O€ST -00ST ~OEVT -00vT “O€ET -OOET -OE2T -002T -OETT -OOTT -O€0T -O00T -0€60 -0060 -0€80 Ajanoy eH 8T0Z OZAINI- OT Ajnf AaAans Buljseg
Page 24
\ nonn Ca oye Je}0098/E91g EM z Ixeysng wl L 9}8 Jajooos/ayig HEM Ixeysng Wi t~ ON O fF oy Je}O0NS/aNIg HEM ixeysng ull wer OOrTN JejOoL BUBIDUIOg [puLooY) yd weo younyo een slejoL Jayjo juouls JB}OOL BUBIOUIOd [IPULOOW yd seo younyo een SIEIOL 4aujo luoulg JejooL BUBIOUIOg [[PuLLooWy yd veo younu een awed pieog + g ~ A10}8}H, Z OL esedo S 91 Buolyew wdog'e-06°6 Of Lb-0E'6 00°Z4-00°6 Aepuow Aepuow op Aepuow gjaaes, noA pip Moy ‘BUIALP 30U 4] aandvd geen 07 3A0U0
Page 25
rn“ ooaoosnd nor Oo ~ - OOO oO 278 sa}0008/a%1g HEM wxeysng wil r OND TDAO DG 0 I 9}8 J9}0008/ey1g 0 IEMA z ixeysng 0 L 949 19]000S/a41g AEM eysng Ht nooooco S]E}OL Jayjo juoulg de|OOL, BUeIOUIOd lIpuLooyy, yd ueo younuy een SIEIOL Jayjo JUOUIS Jej00], eueloUlod [Ipuooyy yd seo younyo een S|E}OL Jaujo luouls Je}OOL BUeIOUIOg [IpULOOW) yd seo younyg een s]e}OL Jayjo juoulg gL uuepuew werent uidy-0¢°7 wdy-0¢'% we Aepuoj) SIOALIP XEYy siaajun|oA, divs wudy-00°6 Aepuow Aepuoyy Aepuow
Page 26
\Ab oil ooo:9o hore seou[___] oy seJOONS/eyIg EM wxeysng Ul ooo0o00nd0 948 Je}o0os/ayig HEM ixeysng tr ON eK OH a} JejO0Ns/OyIg WEM ixeysng ull ROrvr er ee S|e]OL Jayjo Je}OoL BUPIOUIOd IIPULLOOW yd seo younyg een S}E}OL Jaujo juouls: JeJOOL BUBIOUIOd HPULoOYy yd seo younyg een S|2}0L Jayjo juoulg JejOOL BUBIOUIOg [IPULOOYy yd seo yonu een £% + £ davLS ludp-weg Aepseny syeuabeyweld ce Au0}S!H og" L-0e'6 Lb AWGSANL 6I Wd Aepuoy sueaup xe) <1 YeINHINA, uidp-o¢'Z Aepuow,
Page 27
any
o» or Oo
seou[___
dye 18}000S/Ex1g
MEM t
xeysng
wil z
seou{ i]
248 Ja}00NS/Eyx1g
HEM
ixeysng
yl
r OO MOO
a
0
b
L
9}8 Jajo09s/ax1g lL
EM z
ixeysng z
HI \
een
s|ejoL
Jayjo
\uoulg
Je|OoL
BUBIDUIOg
[IPULCoyy
yd se youny
een
s|e}0),
Jayjo
luouls
JBjOOL
BURIDUIOd
WPULooyy
yd seo younug
een
S|e}O1.
Jaujo
tuouls
Je}ooL
BURIDUIOg
PULCOYy
yd ueo younud
een
bb
ge
vl
vl
00s spueg wdyp-} Aepsan,
BIAIIOG wde-L Wd AVaSanL
we sony SIAUIP XeYy
suauulbeq
youes4 wid}-0¢' LL Aepsen,
\peoueape
Buofyew = we0¢'1 1-086 Aepsan
Page 28
L EM L peeysng L wi o}e Ja}000S/Ex1g z HEM ixeysng L wl o}9 J8}009S/E%1g L HEM b Ixeysng v wil o}8 Je}O0NS/Ex1g +EM ixeysng v Hl € z S seo[ 1] “ z oor er er IIpULCOW yd seo younyo een s|2}0. Jaujo juoulg JejOO | BUBIOUIOd [PULOOW yd seo younyo egn S|E}OL JayO juouls dejo} BURIOUIOg [PULCOW, yd seo younug egn s|ejOL Jayjo juouls JB,OOL BURIDUIOg [IPuLcoyy yd seo younya, ab bb tb St ce vl Zb soyfoy Oe Zb-08'6 AVGSANGSM wd Aepsan| siaAup XeY sajejeBo, udoe’¢ -z Aepsean ANO[ODISJSAA, wudp-1, Aepsan
Page 29
[4 seo L z d}e Ja}009S/ay1q b HEM ixeysng y Ul Co seou[____] 2}8 se}ooos/eylg L IEMA ixeysng € Ww r [Lj seul] nN oye sa}O00S/Ex1g ‘ b eM 8 é ixeysng z ul \ Lj seei|___zi] d}9 Ja}O0NS/ey1g s|e]OL Jayjo luoulg JejooL, BUBIOUIOg ULLOOW yd seo younyg een |e} Jaujo Juouls, JejOoL BUBIOUIOd [pULooW, yd geo younug een S|P}OL. JEu}O juoulg 3B}00). Od Ipuuooyy yd seo younyo een SleqOL Jaujo uoulg Je|OOL eueloulog WL €b OL eyseuea o10s aieadsayeys uo0uz}-6 uoouzL-6 Oe bb-0€'6 Aepseupann Aepsaupan, Aepsaupann
Page 30
ON
o}8 Ja}0008/E91g
z
HEM lL
ixeysng lL
ull :
sel si]
z
aye J8}0008/ax!g €
HEM z
ixeysng z
ut! 9
OJ sa}O0NS/ey1g
4M €
peysng L
ull ¢
dye 19}0008/2¥1g 1
weEM
xeysng l
ull p
BUBIOUIOd
IIpuLcow
yd seo younyo
een
sjejoL
Joyo
\uOUIg
Je|OOL.
BURIDUIOg
[IpuLoow]
yd yea yonyg
een
SIE}OL
JEayjo
luouls,
JejOoL
BUBIOUIOd
{PULOOW
yd seo younyg
een
S|BIOL
Jaujo
Juouls
JBIOO]
BUeIDUIOd
!
yd wea younyo,
OOW
een
SL
cz
eb
Ze
youal4 wdog’e-} PEM
2J0W
pue selAoW wdy-}
ssueuulbeq
Buolyen wdy-| Pan
WWE P2/A SISALIP XE
yes wdp-weg Aepsoupany,
Page 31
or re - rq b d]e eJ000S/E41g YEN 9 ixeysng wl 7 seoif a] O}e Je}000S/ex1g eM wxeysng ull z 24e Ja}O0NS/ay1g lL 4eEM L wxeysng ull z Jaujo juouls, Je]OOL BUBIDUIOg Wl yd 420 younyo ULOOW een s|e}OL Jeyyo juoulg JE|OOL BURIDUIOg I yd seo younyo ULJOOI een S|P}OL Jaujo 1uoUuls JBjOOL BURIOUIOdg [PuLooV] yd eo younyug een S|e}OL Jayjo juouls JEIOOL eb 61 BunUM Az) - 0€6 Aepsiny v ,olpnys uedo z uv aie u 0e'6 Aepsinu LZ ueway G\- by 6L AVGSYNHL gz ud pang SIOAUP XeYy
Page 32
938 19]0008/941g EM ixeysng z wl z = 978 1a}000S/ex1g l 4eEM ixeysng ull l 919 J9]}0008/E41g HIEAA L ixeysng fi sel es] een s]e}Oy Jayjo 1uoUuls JejOoL BUBIOUIOg [PpuLooyy yd seo younyo egn SIEIOL Jeujo luouls Je}00] BUBIOUIOd I[PuLOOW yd seo younyo een s]e}0] Jayjo juouls Je|OO] BUBIDUIOg [Ipuooyy yd seo younyg een S|e}OL Z le Bun y9eLo1d wdL-os" bb wwe Aepsiny] SI@AIp XBW Hes 00°F-00°6 BeIpauvayu ueullad weg} }-0e'0l idnosB siesp) suayndwiog 00°Z1-08'6 AepsinyL Aepsuny Aepiuny Aepsunyy
Page 33
9}9 19}0008/841g HEM ¢ wxeysng wil L aye Jejooos/ey1g l EM i ixeysng ull l sieoi| a b o}9 J9}009S/Ey1g HEM xeysng Hl nn ONAN dye JajOoNs/ay1g IEMA L ixeysng b Jayjo \uoUIS Jej00] BUBIOUIOg [puLooWy yd seo younyg een S|P}OL Jayjo juouls JejooL BUBIOUIOdg [puLCoW yd seo younyo, een S}e}O Jayjo juouls Je}OOL BUBIOUIOg IIPULOOW yd seo yonuo een Se}OL Jaujo juouls JEJOOL BuBIOUlod lIpuooyy yd seo younyo db 6 be oISnW [esIssejD suouuibeaq SIENSIA OIpnYy Bumesq uv widp- wdz wdo¢'e-z wdp-0¢"L Aepsuny Aepsiny Aepsiny
Page 34
Ly L ul S o]8 Jajooos/ayxig HIE T eysng ull L 0} 19}0008/Ex1g EM iIxeysng ul mn dA oye Je}000S/Ex1g HEM 1 ixeysng wi z een sje}0L Jaujo \uoUuls Je}OOL BURIOUIOdg [PULooW, yd seo younyD een SIE}OL Jayjo Juouls Je]OOL BUEIOUIOd IIpuooy, yd seo youny9 een SIEIOL s9yjo JUOUlS JB]00) BURIOUIOdg HpULOOY| yd seo younug een sjeqoL vt a3plig = 00°ZT -00°6 Aepis4 ,olpnys uado € uy =: O0'ZT-0E'6 Aepi4 cr youaig = WT-O€ TT Aepud 9 HeIS wudz-weg Woz AVGIYS ce ud Aepsuny] SJOAUP Xe
Page 35
br 948 JaJO00S/ay1g 4M wxeysng ull € seoi[_ | T O}9 1a}009S/E%1g T EM. v ixeysng ull Z € ay 19}0008/Ey1g EM € ixeysng T S|PIOL Jeujo 1uouls JBjOOL BURIDUIOd lIpuLoow yd seo younug een SIeIOL, Jayjo Juouls, tejooL BURIOUIOd IIpuLooW yd seo younua een syejoL Jeyjo juoUIs 4ej00, BUBIDUIOg lIpuooyy yd seo younyo, v ayqqess = Wy -0€'T Wd Aepu4 ve we Aepud SJaALIP XEW ,21e1pawJa}u] 8 Bunndwo> 00'TT-00'6 Aepu4
Page 36
x B
‘
.
Aen a
AS a ee |
adenguey oT ot OT ot youal{
wnuvoupny oT OT 9T oT OT BJO 7 SOIAOW)
Jayndwo> ¢ g S suor yew
azen3ueq ysiueds
olpnis TT TT TT TT TT soyAsoy
wnuoypny aseadsayxeys
uy sewed ojos
Wy Seued eyseue)
Kepsaupem,
ze] de] e]_ ee] sie |
Jayndwo5 9 9 9 9 10g
olpnys eT eT eT €T €L ANOJOD JBIEM
wy sawed 8 8 8 8 8 sple>
winuoypny sa1ejeso,
asensueq youai4
olpnis, A104SIH
wy sawes suor ye
Kepson
ve eet
Jayndwoz € € €
wnoypny a a eT a 7 cL SYeIIINA
agen3zue] 6 6 6 ssanuljuod ueley|
olpnis se cE SE SUO!dIay POM
dajndwo> S S S Jayndwuop
winwoypny OT oT OT erado
wy sawed 9ST 91 oT Buor ye
uoes0]]e QO9T O€ST OOST O€hT OOVT OEET OOET OFZT OOZT OETT OOTT O€0T O00T O0€60 0060 sjeasaqul
wooy -OEST -OOST -O€VT -OOPT -OEET -OOET -OEZT -OOZT -OETT -OOTT -O€OT -OOOT -O€60 -0060 -O€80 ssejo Ajnoy yeH
SIOZ IsN3ny - ajqeyauly saysauag esoou yen
Page 37
*8ZIS Ul PS9INPss BWIOS PUC SBNUDA J3Y{O O} PAAOW UIa|q BABY Sasse[d BWOS
umoys azeds ay} u! saapuaye Jo saquunu pue sasse[a Mau Joy saUlIa aiqeyieAy (Zz) :38
azenguey
winwoypny
3 uedawy/uiye7
saunyoa] Aepi4
Jayndwo5 € & € € qny}uuny
ly sewed 6 6 6 aqqesos
agenguey] youai4
olpnys soyjAsoy
Wy sewey aspiuig
Jayndwo> *Jaquy 4ajndwo>
Repu
or] ze] ze| ce] on]
Jayndwo9 LZ Z Z ZL Z jensin
winioypny 8 asiojaxa ajjuay
oipnis 9T oT oT oT suymelg
wnuoupny 6 6 6 6 6 dIsnW) sse|D
wuinvoypny PSO, JIEYULY
asen3uey SulwuM paloJd
wy sawes uewda5
sayndwo> suas Jaindwo>
wnuoypny SUunUM
oipnis olpnys uado
wy saweg uewsay
(oy) Kepsinui
0091 OEST OOST OPT OOPE O€€T OEE O€ZT OOZT OETT OOTT O€0T O00T 0€60 0060 SeAIojUI
“OES -OOST -O€PT -OOPT -OEET -OOET -OEZE -OOZT -DETT -OOTT -O€0T -000T -0€60 -0060 -0€80 ssejo Aunoy s1eH
Page 38
Apmodix &.
———
PEKOL TRAFFIC & TRANSPORT
ABN 96 067 593 962
P 07 3839 6771
PEKOL TRAFFIC & TRANSPORT Level G 67 St Pauls Tce
\IsO 9001
CERTIFIED
Quatiry
MANAGEMENT
Spring Hill Q@ 4000,
WWW.PTT.COM.AU
22 August 2018
U3A Noosa
64 Poinciana Avenue
Tewantin Qld 4565
Attention: Mike MacDonald
Dear Mike
RE: 64 POINCIANA AVENUE, TEWANTIN
CAR PARKING ASSESSMENT
INTRODUCTION
This report has been prepared by Pekol Traffic and Transport {PTT), as requested by University for the
Third Age (U3A) Noosa, to update our initial car parking assessment of the U3A educational facility at
64 Poinciana Avenue, Tewantin. Additional student class and mode share information has been provided
from which this revised assessment is based.
SITE CHARACTERISTICS
The subject site is described as Lot 601 on $P146047 and is located within the jurisdiction of Noosa Shire
Council. There is currently an office building occupying the subject site which contains the U3A
educational facility. The site is bounded to the north by a child care, to the east by a commercial building,
to the south by Poinciana Avenue and to the west by Moorindil Street. The surrounding uses are primarily
residential.
The development currently has 12 on-site car parking spaces and has an agreement to use 15 car parking
spaces at the nearby church to the south of the development, as shown in Figure 1. This equates to a total
provision of 27 car parking spaces. There are 47 marked car parking spaces on-street in the adjacent
area, as follows: :
P:\2018-19\79-040 64 POINCIANA AVENUE, TEWANTIN UPDATED \OUTPUTS\ 19-040 LETTER REPORT - V2 WITH PARKING DEMAND.DOCX 1
Page 39
PEKOL TRAFFIC A TRANSPORT thirteen 2 hour car parks on Moorindil Street adjacent to the child care five 15 minute (unlimited between 9:30-14:30) car parks on Moorindil Street adjacent to the child care eight 2 hour car parks on Poinciana Avenue adjacent to the development sixteen no limit car parks on Poinciana Avenue five no limit car parks on Moorindil Street opposite the church Additionally, within 200m walking distance, there are approximately 60 unmarked on-street car parking spaces. This is a total of 146 car parking spaces within 200m walking distance of the subject site. A desktop assessment of aerial images of this area during weekdays indicates that less than 50% of this capacity is utilised. Figure 1: SITE LOCATION P:\2018-19\19-040 64 POINCIANA AVENUE, TEWANTIN UPDATED\OUTPUTS\19-040 LETTER REPORT - V2 WITH PARKING DEMAND.DOCX 2
Page 40
PEKOL THAFFIC & TKANSFUPT CAR PARKING REQUIREMENT The parking requirement for the proposed development based on Council's Planning Scheme is shown in Table 1. It is understood that only 55 students are on-site at any one time and two staff. Classes are taught by students of the U3A and therefore have not been included in the number of staff. Table 1: PLANNING SCHEME CAR PARKING REQUIREMENT 2 staff 1 space per employee Adult Education a ; 55 students 1 space per 10 students of driving age Total 7% 8 Therefore, the existing development requires a parking provision of 7 car parks. The site has 12 on-site car parks and an agreement to use an additional 15. This is consistent with the parking requirements of Council’s Planning Scheme. Itis understood that Council has previously adopted a different car parking rates for similar developments. Table 2 shows the parking requirement under these rates. This parking rate is not outlined in the Planning Scheme. Table 2: COUNCIL CAR PARKING REQUIREMENT 2 staff 1 space per employee 2 Adult Education 55 students 1 space per 2.5 students of driving age 22 Total 24 The existing car parking provision is in accordance with this parking requirement. PARKING DEMAND Additional information for the Semester 2 timetable, student and staff attendance and mode share between 16 July 2018 and 20 July 2018 has been analysed to determine the parking demand on-site and in the surrounding streets. The data provided indicates that on average 65% of students and staff drive. Figure 2 shows the number of parked vehicles associated with the U3A facility throughout the day. This analysis assumes that the parks available to U3A are limited to the 12 on-site and the 15 at the church. This analysis shows that there is a peak parking demand of 39 vehicles occurs between 9.30-11:30am on a Wednesday, as indicated in Figure 2. This is 144% of the total parking capacity. However, the average peak parking demand over the week is equal to 27 vehicles or 100% of the capacity, as shown in Figure 3. Therefore, the average parking demand is consistent with the parking available to the U3A. SSS _____ P:\2018-19\19-040 64 POINCIANA AVENUE, TEWANTIN UPDATED\OUTPUTS\ 19-040 LETTER REPORT - V2 WITH PARKING DEMAND. DOCK 3
Page 41
PEKOL IWATIIC & IRANSPORI The additional peak parking demand overflow could be accommodated within the existing on-street parking provision. Figure 2: PARKING DEMAND OF U3A FACILITY 4S ———=Monday ===Tuesday —-—=Wednesday Thursday === Friday === Available Parks 40 Peak Parking 35 Demand 30 25 20 15 Number of Vehicles Parked 10 5) 0 2 S S wS) FF FF SL SF SS AW ar Ne te OST OAS ov TF KF SF SF SF SF PPT PK TK KY Figure 3: AVERAGE PARKING DEMAND OF U3A FACILITY 30 ON oom Average —— Available Parks 25 20 Peak Parking 45 Demand 10 Number of Vehicles Parked P:\2018-19\19-040 64 POINCIANA AVENUE, TEWANTIN UPDATED\OUTPUTS\ 19-040 LETTER REPORT - V2 WITH PARKING DEMAND.DOCX 4
Page 42
PEKOL IRAFFIC & TRANSPORT CONCLUSIONS AND RECOMMENDATIONS The U3A educational facility has been evaluated in terms of parking demand. The main points to note are: = the facility has 12 on-site car parking spaces and an agreement to use 15 of the church’s car parking spaces (ie a total provision of 27 spaces) == there are 47 marked on-street car parking spaces in the surrounding area == within 200m walking distance there are approximately 60 unmarked on-street car parking spaces of which less than 50% are utilised == a fotal of 55 students and two staff members are on-site at any one time = aparking provision of 7 spaces is required on-site as per the Council Planning Scheme consistent with the parking available to U3A = the parking rate recently adopted by Council for similar developments requires 24 car parking spaces however this parking rate is not outlined in the Planning Scheme = the U3A facility has a total parking provision in line with the Planning Scheme requirement and the alternative requirement = a mode share survey was conducted between 16 July 2018 and 20 July 2018 == the results of the survey show that on average 65% of students and staff drive to the site == the peak parking demand of 39 vehicles or 144% of the capacity occurs on a Thursday morning WH- == the average peak parking demand over the week is 27 vehicles or 100% of the capacity «= the overflow from the peak parking demand can be accommodated by the existing on-street car parking If you have any questions regarding the issues discussed above, please do not hesitate to contact us. Yours sincerely, Adam Director (RPEQ 5286) — ££ — P:\2018-19\19-040 64 POINCIANA AVENUE, TEWANTIN UPDATED\QUTPUTS\ 19-040 LETTER REPORT - V2 WITH PARKING DEMAND. DOCK Sy
Page 43
YP pIOg arg
HLYON BOO1s dl) Sud
. mance ‘sor = mee
Cnn sees . ioetore ne
a -' em aM 5 an ay
, a on peer i - aan SSS : = LL oy = Zoe Care & IZ ¢ TER, >
% = = a OF R q
Se i, | —— SBLNOVA. 4 e A = ae “yy
4 7A4aas00 ANY WAL. i‘. a
yh 7 y 4 a
ze U \ |
times a q — .
ann 2 ~ Td MER gB4
gy V8aaoa 1. £
~-3 2 | | X. . ff Z is \ -
‘YA: ’ ' TE - = | 4 tle
eS is - | vs iL 7
woou | HAE, / ec | WOOYaxOLS E
3OVOONVI. 4 gi 4h fan
. i ii { M4 i | } 1 |
— | |
dq ‘ He - 4
Cb ‘ sO
o1anis
—-
; a | y
[ “re Y %
: Y
it a ew
£
\ y
aed
me
Lane
oi
+ om °
“swe
a
Ss
Bye
x, |
SSeS &
= wy ma
J
g
ee
4 - : -
Ga
“Pot eur - ‘ Linaxeo vrai Vs
Bs AS a Wye +S
z : 7 Ser Zi
fi ___ __— .—_ thie Se era. Lickin cae eomae
Br om on &
Sears prem stepinnveen Sie N — Ne
Ariane BA ABN
TAN KU
Page 44
8 He a: Supoie _ ns SS 28401 . — - aii Maddy Fos 5 HLAOS WOOT v : . s $ MOO waddAvS DUC 2: Gi = aw oN oy aM > Az LZ azine ir Ff Gi LC ¥ Tia 2 al SH aa op FBS p “tA = . / De _. , ON wean } 0) saints 44 q H\ —_ “ OT Bada vO Le ONY wan 3 \ ar Len ae fd - RES NN c\ vit . , . - ly ayre . 4 Kd ; eS . / . aDVNONY4 iY WAKO .™ , : A 8 Ue ; . A y ae Ay k i} & 5 1) , “4 * ts am a - | 4 Lom 'f ar BY WOOU FALLIWNOD ©. " ¥ . tL Ae 4 5 kh iy LE DDE a eM
Page 45
Re meen ee 1A OS 9j)9PS
ome Se . “ALYON BOOT GNACUD Ye HUG
uber
ory Mm om
z So ZZZZ - Yi ZZ—2Z1 oe Z2ZAI z ZZIZLL LIL LL PL
SEIS aes, a I YZ Zz ah x, Z : Li2L LL LLL J
s fits vy xX 7]
\ WY Ss
s 4) '
“S| 4 ASLNVd Si
if ; :
baa JG
. ©
MaVddVoO
tS YilA
, “NO1Ld39au
\
BHSTNONLUG
\ la
OB FOV OL
fomus Lsvid WM Os l
ee
§
i
j
NOWOLigay ~ O Ap " aa
/
/ 321430 | }
ie
“4 , Ae Wood»
—_ ~% Wing |, :
=m a Be YWALNAAMWOD ‘ VO
‘on oO geet Ay
soa A 4. -1lo1 Le
1 od
“AS A
7
J
mw
a
<<
=
\ I
h
;
i
t
1
KONA
m 7 :
= L meses S277 Z. PLZZ TIT
z 2 7772 a ZZLL 2202-22 222 Z
om
Tena
nw
Page 46
Fenny SSN LL] ‘ Sy ~~ ~ 3 WAIYOLIANY , 4 5 fh A D\asao SST Sa SS Ss ee | | | ryt ny | | 144 J 2 | We - a 1 | | 4 i | | | | | 17] bj od wl XS = s_ iM WO)Ld4a03ay “SJ. Se Saal oe SVS SST SS 3 Y a | } \ Sasol NOOUBNOIS __ ZL ZZ ZZ, = S z CLE T —— LE WLLL LL LL om! a eM dol LY INBA ANANY PES ALNIBOW BSS390¥ UGd NSISIO 8b} SY cea GL CANOD O4 TOL DALINYA a En Oak BA OL SMOONIM MSN “rode |-0g AG WLIOS WOOTA ANNOYS “PY Daa
Page 47
10. 11. 12 13. Kygud TEWANTIN PARISH CARPARK HIRE USE AGREEMENT Nee: SL LSTITEL SMPIOME parish This Agreement is made between the Noosa District Catholic Parish (‘Parish’) and U3A Noosa Regional Inc (‘Hirer’) The Parish agrees to allow the Hirer use of the Tewantin Parish Car Park as set out in item D of Schedule 1 for the periods set out in item A of Schedule 1. The Hirer agrees to pay the Parish the sum specified in item B of Schedule 1 for use of the Parish Carpark The Hirer agrees to effect the insurance set out in item C of Schedule 1 and to provide a Certificate of Currency to the Parish prior to the hire period. The Hirer acknowledges that the Parish is not liable to the Hirer for any loss suffered by the Hirer arising out of the Hirer’s use of the Parish Carpark. The Hirer releases the Parish from any claim made against the Parish arising out of, in connection with or caused by the Hirer's use of the Parish Carpark. The Hirer indemnifies the Parish from and against all loss, including legal expenses, connected with or arising from any claims, demands or prosecutions made by any third party arising out of, in connection with or caused by the Hirer's use of the Parish Carpark. However, the extent of the Indemnity provided by the Hirer shall be reduced proportionately to the extent that any act or omission of the Parish contributed to the loss. The Hirer agrees to notify the Parish of all injuries or damage arising out of the Hirer’s use of the Parish Carpark within 24 hours of the Hirer becoming aware of the injury or damage and to complete and incident report on such injury or damage and provide same to the Parish within 48 hours of such incident. The Hirer agrees to reimburse the Parish for the full cost of repairing any damage caused to the Parish Carpark or facitities by the Hirer during the hire period (Fair wear and tear excepted). The Hirer acknowledges receipt of the Additional Conditions of Use of Parish Carpark set out in Schedule 2 and agrees to abide by those conditions and to ensure that all users of the Parish Carpark by their members under this agreement are aware of and agree to abide by these conditions of use. The hirer wil! be responsible for any accident, loss, damage or injury suffered by any person it allows to use the carpark during the hiring period and any loss, damage or injury suffered by any such person on the hired premises and its surrounds. Either party to this agreement may terminate this agreement with 2 weeks written notice to the other party. This agreement, and the rights conferred under the agreement, are not transferable to other parties. The hire is a non-exclusive hire of the area and the Parish cannot guarantee that car parking will be available on all of the days covered by this agreement. Execution of Agreement Signed for the Hirer: Signed for the Parish: “= ZA fuse L\ fs L woke Annie Lowe - President Name: Fred de Waard — Parish Manager Phone: 0419814622 Phone: 0429897903 Date: ‘44 02 -A201f pate [9/a[o v
Page 48
SCHEDULE 1 HIRE TERMS A. HIRE PERIOD: The hire period shall be for the period commencing 5" of February 2018 until 9"" December 2018 inclusive, excluding the period 2 July 2018 to 15 July 2018 a total of 40 weeks of hire. B. HIRE FEES: The hire fee shall be $20.00 per week (GST Not Applicable”) payable to the Parish Office on the following dates: 5" February 2018 to 15th April 2018-10 weeks- $200.00 by 26/02/2018 16 April 2018 to 1 July 2018 — 11 weeks - $220.00 by 30/04/2018 16th July 2018 to 23 September 2018-8 Weeks $160.00 by 23/07/2018 24" Sept. 2018 to 9"" December 2018 — 11 weeks $220.00 by 1/10/2018 *1— No GST is applied to the hire fee as the hire rate is a non-commercial rate of hire and the payment is made via a donation towards the Parish towards maintenance of the facility. C. INSURANCE TO BE HELD AND MAINTAINED The insurance to be effected by the Hirer is public liability insurance indemnifying the Hirer for claims for personal injury and property damage for a sum of not less than $5 million for claims arising out of any one occurrence. The insurance is to be written on an occurrence basis and maintained for the entire period specified in item A of this Schedule. D. USE ALLOWED a) The maximum number of vehicles that may be parked in the Parish Carpark at any one time is 15 vehicles. b) The vehicles must be being used by people engaged in activities of the Hirer’s organization at the time the vehicles are parked in the Parish Carpark. c) The use under this agreement applies to Mondays and Fridays excluding public holidays. d) The vehicles are to be parked in the area indicated in yellow on the site map below: on e) The Parish may give the Hirer notice up to 3 days in advance that the Parish Carpark is not available on a particular day due to a wedding, funeral or other parish function being held which requires full use of the carpark on that day for Parish purposes. No adjustment to hire charges will apply on such days. f) Overnight parking is strictly prohibited.
Page 49
SCHEDULE 2 ADDITIONAL CONDITIONS OF USE OF PARISH CARPARK The Parish makes no warranty or representation to the hirer about the condition of the carpark or its suitability for the hirer's purpose. Further, the hirer acknowledges that they have inspected the facilities and warrants that the facilities are suitable for the hirer's purpose Noise (music etc) must be contained within the requirements of the regulations administered by the Noosa Council. Additionally, music must cease at 11pm on Fridays and Saturdays, 10.00pm on Sundays, and 9.00pm on all other days. No Commercial activities are to be conducted on the Carpark area. The Parish accepts no responsibility for private property left or stored in or on vehicles parked in the carpark Cars are to be parked in a reasonable manner to ensure maximum parking use of the area by other vehicles. Car are not to be parked within 1 metre of the St Vincent de Paul collection bins and are not to be parked in front of the bins. Users of the carpark park with vehicles parked on the site do so at their own risk. The Parish accepts no responsibility for any damage to persons or property arising from falling tree limbs or branches or droppings of any kind from flora or fauna whilst the persons are on the property or their vehicles parked on the property.
Page 50
Appimdie H Fi USC AUSTRALIA 2 July 2018 Elizabeth Gleghorn President University of the Third Age Noosa Regional U3A Incorporated 64 Poinciana Avenue TEWANTIN QLD 4565 Dear Elizabeth, RE: MATERIAL CHANGE OF USE APPLICATION FOR PREMISES AT 64 POINCIANA AVE, TEWANTIN The University (Lessor) would like to formally inform the University of the Third Age Noosa Regional U3A Incorporated (Lessee) of its decision to consent to the Lessee’s Material Change of Use application to Noosa Shire Council. The Lessor consents to the proposed change of use from ‘Professional Offices’ to ‘Community Use—Type 3 Adult’, which is defined within The Noosa Plan as: “The use of premises for adult education or vocational training whether operated for profit or not. The use includes a TAFE, university, language school, hospitality training.” | wish you all the best with your application submission. Yours sincerely, c la Prof. Greg Hill Vice-Chancellor & President University of the Sunshine Coast 7+6175459 4448 © +61. 754565057 E [email protected] Locked Bag 4, Maroochydore DC Qld 4558 Australia 90 Sippy Downs Drive, Sippy Downs Qld 4556 Australia usc.edu.au University ofthe Sunsiine Coast | cRicos PROviota HUMBER 015550