                                                                                                                                                                                                                                SURVEY                                                                                                                                                                                                                                              ACCORDANCE WITH CURRENT CONSTRUCTION SAFETY ACT AND WORKPLACE HEALTH AND SAFETY LEGISLATION.
                                                                                                                                                                                                                                1.    THIS DESIGN IS BASED ON SURVEY PROVIDED BY MAX WATTERSON & ASSOCIATES.                                                 EROSION & SEDIMENT CONTROL                                                                                       8.    THE CONTRACTOR IS TO TAKE ALL POSSIBLE MEASURES TO ENSURE PROPER COMPACTION TO BACKFILLING OF
                                                                                                                                                                                                                                2.    ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (AHD).                                                                       OBJECTIVES:                                                                                                            TRENCHES AND STRUCTURES.

                                                                                                                                                                                                                                3.    THE CONTRACTOR SHALL CONFIRM EXISTING LEVELS, FEATURES AND UTILITIES PRIOR TO CONSTRUCTION.                            1.     THESE DRAWINGS ARE PROVIDED FOR GUIDANCE ONLY. THE CONTRACTOR SHALL ASSESS WHAT MEASURES ARE              9.    THE CONTRACTOR IS TO PROVIDE A CCTV SURVEY OF ALL NEWLY CONSTRUCTED STORMWATER DRAINAGE ASSETS
                                                                                                                                                                                                                                                                                                                                                                    REQUIRED TO SUIT THE PROPOSED CONSTRUCTION METHODOLOGY AND STAGING.                                             FOR APPROVAL BY THE ENGINEER AND / OR LOCAL AUTHORITY.
                                                                                                                                                                                                                                4.    ALL ELEMENTS OF PROPOSED WORK TO BE SETOUT AND CHECKED BY THE CONTRACTOR'S LICENSED SURVEYOR
                                                                                                                                                                                                                                      AND ANY DISCREPANCIES ARE TO BE REPORTED TO THE SUPERINTENDENT.                                                        2.     THE CONTRACTOR SHALL COMPLY WITH ALL STATUTORY REGULATIONS DURING THE CONSTRUCTION PHASE AND              10.   IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DEMONSTRATE HE HAS CAUSED NO DAMAGE TO EXISTING
                                                                                                                                                                                                                                                                                                                                                                    MAINTENANCE PERIOD.                                                                                             STORMWATER INFRASTRUCTURE DURING THE CONSTRUCTION OF THESE WORKS.

                                                                                                                                                                                                                                                                                                                                                             3.     EROSION AND SEDIMENTATION CONTROL MAY BE AIDED BY MINIMISING THE AREA OF DISTURBANCE.                     11.   ALL DEFECTS IDENTIFIED BY THE CCTV SURVEY WILL BE REPAIRED TO A SATISFACTORY STANDARD BY THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    CONTRACTOR. PAYMENT FOR THESE REPAIRS WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR, UNLESS IT
                                                                                                                                                                                                                                EXISTING SERVICES                                                                                                                                                                                                                                   CAN BE DEMONSTRATED THAT THE IDENTIFIED DAMAGE WAS PRE-EXISTING AND THE RESPONSIBILITY OF OTHER
                                                                                                                                                                                                                                                                                                                                                             MANAGEMENT PRINCIPLES:
                                                                                                                                                                                                                                1.    THE LOCATION OF ALL IN-GROUND AND OVERHEAD SERVICES HAS BEEN DETERMINED FROM FIELD SURVEY, DIAL                                                                                                                                               PARTIES.
                                                                                                                                                                                                                                      BEFORE YOU DIG ENQUIRIES AND INFORMATION PROVIDED BY THE SERVICE PROVIDERS / AUTHORITIES.                              4.     THE MANAGEMENT PRINCIPLES EMPLOYED IN THESE DRAWINGS ARE IN ACCORDANCE WITH THE 'BEST PRACTICE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              12.   UPON COMPLETION ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND OTHER
                                                                                                                                                                                                                                                                                                                                                                    EROSION AND SEDIMENT CONTROL' MANUAL, PUBLISHED BY THE INTERNATIONAL EROSION CONTROL ASSOCIATION
                                                                                                                                                                                                                                2.    THE SERVICES ARE SHOWN ON THESE DRAWINGS FOR INFORMATION ONLY AND NO RESPONSIBILITY IS TAKEN FOR                                                                                                                                              BLOCKAGES.
                                                                                                                                                                                                                                                                                                                                                                    (IECA). THE BASIC PRINCIPLES ARE TO:
                                                                                                                                                                                                                                      THE ACCURACY OR COMPLETENESS OF THE INFORMATION SUPPLIED.
                                                                                                                                                                                                                                                                                                                                                                        ● MINIMISE THE AREA OF DISTURBANCE;
                                                                                                                                                                                                                                3.    NOT ALL EXISTING SERVICES HAVE NECESSARILY BEEN IDENTIFIED AND SHOWN ON THE DRAWINGS.                                             ● CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;                                   SUBSOIL DRAINAGE
                                                                                                                                                                                                                                4.    THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING SERVICES ON THE SITE PRIOR TO COMMENCING                                 ● MINIMISE EROSION;
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              13.   SUBSOIL DRAINS SHALL BE SUPPLIED AND CONSTRUCTED IN ACCORDANCE WITH MRTS03.
                                                                                                                                                                                                                                      WORKS.                                                                                                                            ● MINIMISE SEDIMENTATION;
                                                                                                                                                                                                                                                                                                                                                                        ● PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE.                                                 14.   SUBSOIL DRAINS ARE TO BE GRADED AT 1% MINIMUM (DESIRABLE) AND 0.5% (MINIMUM).
                                                                                                                                                                                                                                5.    NO WORK IS TO BE UNDERTAKEN OVER OR WITHIN 3m OF EXISTING SERVICES PRIOR TO NOTIFICATION TO THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              15.   SUBSOIL FLUSHING POINTS ARE TO BE PLACED AT A MAXIMUM DISTANCE OF 50m.
                                                                                                                                                                                                                                      APPROPRIATE AUTHORITIES.
                                                                                                                                                                                                                                                                                                                                                             CONSTRUCTION PRE-START MEETING:                                                                                  16.   THE MAXIMUM LENGTH OF ANY SUBSOIL DRAINAGE LINE SHALL BE 100m.
                                                                                                                                                                                                                                6.    EXISTING VALVES, HYDRANTS, PITS, ACCESS CHAMBERS AND OTHER UTILITIES SHALL BE MODIFIED WHERE
                                                                                                                                                                                                                                      NECESSARY TO SUIT FINAL FINISHED SURFACE LEVELS.                                                                       5.     THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL PARTIES TO DISCUSS CRITICAL ISSUES, SUCH     17.   THE CONTRACTOR SHALL ENSURE THAT ANY EXISTING SUBSOIL DRAINS HAVE AN APPROPRIATE OUTLET.
                                                                                                                                                                                                                                                                                                                                                                    AS:

                                                                                                                  SITE                                                                                                                                                                                                                                                  ● KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL PLAN;
                                                                                                                                                                                                                                                                                                                                                                        ● REQUIRED WATER QUALITY OBJECTIVES;
                                                                                                                                                                                                                                CLEARING, GRUBBING AND DISPOSAL                                                                                                         ● PERFORMANCE MONITORING AND INSPECTION PROCEDURES;                                                   CONCRETE
                                                                                                                                                                                                                                1.    CLEARING SHOULD NOT OCCUR UNLESS PRECEDED BY THE INSTALLATION OF ALL NECESSARY EROSION AND                                        ● IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS;                                                    1.    CONCRETE WORKS SHALL BE IN ACCORDANCE WITH AS3600 CONCRETE STRUCTURES.
                                                                                                                                                                                                                                      SEDIMENT CONTROL MEASURES. THE EXCEPTION WOULD BE ANY CLEARING NECESSARY TO ALLOW INSTALLATION                                    ● IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS;
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              2.    CONCRETE SHALL BE BATCHED USING BLENDED CEMENT: 25% FLYASH & 75% PORTLAND CEMENT. ANY ALTERNATIVE
                                                                                                                                                                                                                                      OF THESE CONTROL MEASURES.                                                                                                        ● REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES AND EVENTS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    PROPORTIONS SHALL BE SUBMITTED FOR APPROVAL.
                                                                                                                                                                                                                                2.    CLEARING SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.                                                                                                                                                         3.    CONCRETE TEMPERATURE AT PLACEMENT;

                                                                                                               135 LAKE WEYBA DRIVE,                                                                                            3.
                                                                                                                                                                                                                                4.
                                                                                                                                                                                                                                      ESTABLISH ANY NON-DISTURBANCE OR EXCLUSION AREAS IDENTIFIED.
                                                                                                                                                                                                                                      WHERE APPROPRIATE, IDENTIFY, ISOLATE AND/OR PROTECT RETAINED VEGETATION.
                                                                                                                                                                                                                                                                                                                                                             SITE INSPECTION AND MONITORING:
                                                                                                                                                                                                                                                                                                                                                             6.     CONTRACTOR SHALL NOMINATE A PERSON RESPONSIBLE FOR INSTALLATION, MONITORING AND MAINTENANCE OF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ● NO CONCRETE SHALL BE PLACED IF THE TEMP OF THE CONCRETE IS LESS THAN 10°C OR EXCEEDS 35°C.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ● CONCRETE SHALL BE PLACED AND COMPACTED WITHIN 1 HOUR OF CHARGING THE MIXER FOR CONCRETE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         TEMPERATURES UP TO 32°C & WITHIN 45 MINUTES OF CHARGING THE MIXER FOR CONCRETE TEMPERATURES
                                                                                                                                                                                                                                                                                                                                                                    CONTROL MEASURES (E.G. SITE FOREMAN).

                                                                                                                     NOOSAVILLE                                                                                                 5.
                                                                                                                                                                                                                                6.
                                                                                                                                                                                                                                7.
                                                                                                                                                                                                                                      CLEARING SHALL BE MINIMISED TO ONLY THE TREES AND VEGETATION NECESSARY TO UNDERTAKE THESE WORKS.
                                                                                                                                                                                                                                      A SPOTTER-CATCHER SHOULD BE PRESENT DURING ALL CLEARING OPERATIONS.
                                                                                                                                                                                                                                      CLEARING AND GRUBBING INCLUDES REMOVAL OF THE MAIN TREE ROOTS TO A MINIMUM DEPTH OF 1.0m AND THE
                                                                                                                                                                                                                                                                                                                                                             7.     ALL EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE INSPECTED:
                                                                                                                                                                                                                                                                                                                                                                       ● AT LEAST DAILY WHEN RAIN IS OCCURRING;                                                               4.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         UP TO 35°C.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ALL CONCRETE SHALL BE VIBRATED UNO.
                                                                                                                                                                                                                                                                                                                                                                       ● AT LEAST WEEKLY (EVEN IF WORK IS NOT OCCURRING ON-SITE);                                             5.    PROVIDE 20mm FILLETS OR CHAMFERS FOR EXPOSED CONCRETE EDGES HAVING CONTAINED ANGLE OF LESS THAN

                                                                                                                 4 LOT SUBDIVISION                                                                                              8.
                                                                                                                                                                                                                                      REMOVAL OF SURFACE ROOTS AND VEGETABLE MATTER FROM THE TOP 0.3m BELOW THE NATURAL SURFACE LEVEL.
                                                                                                                                                                                                                                      DISPOSAL OF ALL CLEARED VEGETATION AND RUBBISH SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE
                                                                                                                                                                                                                                                                                                                                                                       ● WITHIN 24 HOURS PRIOR TO EXPECTED RAINFALL;
                                                                                                                                                                                                                                                                                                                                                                       ● WITHIN 18 HOURS OF A RAINFALL EVENT.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              6.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    120° UNO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    SUPPORT REINFORCEMENT ON PLASTIC CHAIRS AND SPACERS TO GIVE CORRECT CONCRETE COVER.
                                                                                                                                                                                                                                      LOCAL AUTHORITY.                                                                                                       8.     CONTRACTOR TO CHECK AFTER RAINFALL FOR PERFORMANCE INDICATORS SUCH AS EVIDENCE OF EXCESSIVE FLOW                WHERE PLASTIC CHAIRS ARE TO BE TEMPORARILY SUPPORTED BY SOIL:
                                                                                                                                                                                                                                9.    CLEARED VEGETATION CAN BE PROCESSED THROUGH WOOD CHIPPING AND THE MULCH PRODUCED PLACED IN                                    CONCENTRATIONS, EROSION PATHS DEVELOPING, SILT AND SEDIMENT ACCUMULATION.                                         ● FOR MESH REINFORCEMENT, PROVIDE 'PIE PLATE' SUPPORT UNDER EACH CHAIR OR POUR 50mm MINIMUM
                                                                                                                    CIVIL ENGINEERING DRAWINGS                                                                                        INTERIM STOCKPILES FOR LATER USE IN EROSION AND SEDIMENT CONTROL OR LANDSCAPING PURPOSES.                              9.     CONTRACTOR TO CHECK DURING RAIN THAT FLOWS ARE NOT BYPASSING CONTROL MEASURES.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                              7.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         BLINDING CONCRETE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    POUR JOINTS
                                                                                                                                                                                                                                                                                                                                                             10.    WHEN A SITE INSPECTION DETECTS A NOTABLE FAILURE IN THE ADOPTED MEASURES, THE SOURCE OF THIS FAILURE
                                                                                                                   for WA GABARRIN & TO GABARRIN                                                                                                                                                                                                                    MUST BE INVESTIGATED AND THE APPROPRIATE AMENDMENTS MADE TO THE SITE CONTROLS.                                    ● SCABBLE THE FACE OF POUR JOINTS AND CLEAN OFF DUST AND CONTAMINANTS BEFORE NEW POUR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      ● COAT FACE WITH BONDING AGENT
                                                                                                                                                                                                                                EARTHWORKS / EXCAVATION                                                                                                      11.    THE CONTRACTOR SHALL MAINTAIN A WRITTEN RECORD OF DATES OF ALL INSPECTIONS INCLUDING ANY
                                                                                                                                                                                                                                                                                                                                                                    CORRECTIVE ACTIONS TAKEN.                                                                                 8.    CONCRETE SHALL BE CURED IN ACCORDANCE WITH THE FOLLOWING REQUIREMENTS AND WITH AS3600 CONCRETE
                                                                                                                                                                                                                                GENERAL:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    STRUCTURES;
                                                                                                                                                                                                                                1.    ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED PRIOR TO COMMENCEMENT OF EXCAVATION.                                                                                                                                               PERFORMANCE CRITERIA:
                                                                                                    DRAWING INDEX                                                                                                               2.    ALL EARTHWORKS ACTIVITIES INCLUDING STRIPPING, EXCAVATION, FILLING, COMPACTION AND TESTING, IS TO BE                                                                                                                                             ● CRACKS IN CONCRETE (90 DAYS AFTER PLACEMENT) SHOULD NOT EXCEED 0.3mm AT THE SURFACE.
                                                                                                                                                                                                                                      UNDERTAKEN IN ACCORDANCE WITH MRTS04, THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT AUSTRALIAN                        ROAD PAVEMENT                                                                                                                 CONCRETE WITH CRACKS EXCEEDING LIMIT SHALL BE REPAIRED.
                                                                                                                                                                                                                                      STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE                         GENERAL:                                                                                                                      OBTAIN SUPERINTENDENT APPROVAL FOR REPAIR METHODS PREFERRED CURING METHOD.
                                                                                                          DRAWING NO                REVISION                                   DRAWING TITLE                                          ENGINEER.                                                                                                                                                                                                                                        ● WHILST PLACING, SPRAY CONCRETE WITH ALIPHATIC ALCOHOL AFTER FIRST SCREED & AGAIN DURING
                                                                                                                                                                                                                                                                                                                                                             1.     ASPHALT PAVEMENTS SHALL BE SUPPLIED AND PLACED IN ACCORDANCE WITH MRTS30.                                       FINISHING WORKS:
                                                                                                                                                                                                                                3.    ALL EARTHWORK FILLING SHALL BE CARRIED OUT IN ACCORDANCE WITH LEVEL 1 AS3798 COMPACTION STANDARD.
                                                                                                          17623-C000                     L            LOCALITY PLAN, DRAWING INDEX AND NOTES                                                                                                                                                                 2.     WHERE APPLICABLE, THE ASPHALT OVERLAY IS TO BE TIED-IN NEATLY TO THE KERB AND CHANNEL FOLLOWING EDGE               ● COMMENCE CURING TOP SURFACE OF SLABS ONCE FINISHING OPERATIONS COMPLETE.
                                                                                                                                                                                                                                4.    STOCKPILES SHALL BE COVERED WITH TARPS.                                                                                       PLANING.                                                                                                               COMMENCE CURING ALL OTHER SURFACES WITHIN 1 HR OF STRIPPING FORMWORK.
                                                                                                          17623-C001                     H            PLAN OF DEVELOPMENT                                                       5.    EARTHWORKS SHOULD AVOID THE EROSION OR SILTATION OF ADJOINING LANDS, STREAMS OR WATERCOURSES.                                                                                                                                                    ● CURE FOR 7 DAYS MINIMUM.
                                                                                                                                                                                                                                                                                                                                                             3.     UNBOUND PAVEMENTS SHALL BE SUPPLIED AND PLACED IN ACCORDANCE WITH MRTS05.
                                                                                                          17623-C100                     H            EARTHWORKS, EROSION AND SEDIMENT CONTROL PLAN                             6.    ALL EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND FULLY OPERATIONAL PRIOR TO COMMENCEMENT OF                       4.     BASE COURSE AND SUB BASE TO BE STEPPED, AT JOINT BETWEEN EXISTING AND PROPOSED PAVEMENT, IN
                                                                                                                                                                                                                                      EARTHWORKS.                                                                                                                   ACCORDANCE WITH STANDARD DRAWING IPWEAQ RS-170.
                                                                                                          17623-C200                     J            ROADWORKS & DRAINAGE PLAN
                                                                                                                                                                                                                                7.    EARTHWORKS SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.                                      5.     ALL PAVING OPERATIONS INCLUDING MATERIAL SUPPLY, CONSTRUCTION PROCEDURES AND TESTING                      REINFORCEMENT
                                                                                                          17623-C201                     G            ROADWORKS DETAILS                                                                                                                                                                                             REQUIREMENTS SHALL BE IN ACCORDANCE WITH TMR STANDARDS AND SPECIFICATIONS.                                1.    REINFORCEMENT SHALL CONFORM WITH TMR MRTS71 'REINFORCEMENT STEEL' .
                                                                                                                                                                                                                                TOPSOIL:                                                                                                                                                                                                                                      2.    ALL REINFORCEMENT SHALL BE ACRS (AUSTRALIAN CERTIFICATION AUTHORITY FOR REINFORCING STEEL) CERTIFIED.
                                                                                                          17623-C400                     J            SEWERAGE AND WATER SUPPLY PLAN
                                                                                                                                                                                                                                8.    PRIOR TO ANY EARTHWORKS ACTIVITIES, TREE STUMPS, BUILDING DEBRIS, ORGANIC RICH TOPSOIL AND SEVERELY                    EXISTING PAVEMENT:                                                                                               3.    REINFORCEMENT SHALL BE 'N' GRADE D500N HOT ROLLED HIGH YIELD BARS TO AS 4671. U.N.O.
                                                                                                                                                                                                                                      ROOT AFFECTED AREAS MUST BE REMOVED.                                                                                                                                                                                                          WHERE 'R' BARS ARE SPECIFIED, THESE SHALL BE ROUND BARS GRADE R250N.
                                                                                                                                                                                                                                                                                                                                                             6.     WHERE PAVEMENT WIDENING IS PROPOSED, THE EXISTING PAVEMENT IS TO BE SAW CUT TO FORM THE JOINT, AS
                                                                                                                                                                                                                                9.    ORGANIC RICH TOPSOIL MUST NOT BE USED IN FILL. IT SHALL BE STOCKPILED FOR RE-USE IN LANDSCAPING OR                            PER STANDARD DRAWING IPWEAQ RS-170. THE DEPTH OF THE EXISTING PAVEMENT IS TO BE CONFIRMED AS PART OF      4.    BAR SHAPES SHALL BE PER TMR STANDARD DRAWING 1043, U.N.O. HOOKS AND COGS SHALL BE DETAILED PER TMR
                                                                                                                                                                                                                                      DISPOSED OF. TOPSOIL STOCKPILES SHALL NOT EXCEED 2m IN HEIGHT.                                                                THIS PROCEDURE.                                                                                                 STANDARD DRAWING 1044.
                                                                                                                                                                                                                                                                                                                                                             7.     ALL EXISTING PAVEMENT SURFACES ARE TO BE SWEPT CLEAN OF ALL LOOSE DEBRIS/FOREIGN MATTER PRIOR TO          5.    DO NOT CUT REINFORCEMENT TO CLEAR PENETRATIONS, SLEEVES OR H.D BOLTS. DISPLACE REINFORCEMENT
                                                                                                                                                                                                                                SUBSOILS:                                                                                                                           APPLICATION OF SEAL.                                                                                            SLIGHTLY AS NECESSARY AND PROVIDE CORRECT COVER TO THE PENETRATIONS, SLEEVES OR H.D BOLTS.
                                                                                                    GENERAL NOTES
                                                                                                    1. DO NOT SCALE DRAWINGS.                                                                                                   10.   ENSURE SUITABLE GROUND COVER IS PROVIDED TO ALL EXPOSED SUBSOILS AS SOON AS PRACTICAL, TO MINIMISE                     8.     AREAS OF EXISTING PAVEMENT CONTAINING POTHOLES, TO BE SAW CUT AND REPLACED WITH DEEP LIFT ASPHALT         6.    REINFORCEMENT LAP SPLICE LENGTHS (mm) UNO ON DRAWINGS.
                                                                                                                                                                                                                                      THE RISK OF SOIL EROSION, ESPECIALLY IF THE SOILS ARE DISPERSIVE.                                                             WITH A MINIMUM THICKNESS OF 100mm.
                                                                                                    2.    ALL DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT FOR CLARIFICATION BEFORE PROCEEDING.
                                                                                                                                                                                                                                                                                                                                                             9.     IF UNDERLYING GRAVEL IS EXPOSED DURING MILLING OPERATIONS A PRIMER SEAL SHALL BE PLACED OVER THE                                                                             D500N BAR DIAMETER (mm)
                                                                                                    3.    THE CONTRACTOR SHALL NOTIFY THE SUPERINTENDENT IN WRITING OF ALL VARIATIONS ARISING FROM THE
                                                                                                                                                                                                                                SUBGRADES:                                                                                                                          AFFECTED AREA.
                                                                                                          CLARIFICATION OF THE DISCREPANCY.                                                                                                                                                                                                                                                                                                                                            BAR LOCATION                   12              16                20          24         28           32
                                                                                                                                                                                                                                11.   SUBGRADES IN PAVEMENT AREAS SHALL BE PROOF ROLLED USING A MINIMUM 10T FLAT DRUM ROLLER AND ANY                                                                                                                                                                                                                   LAP LENGTH (mm)
                                                                                                    4.    THE CONTRACTOR SHALL SUBMIT DETAILS OF ANY ADDITIONAL COST ARISING FROM A VARIATION TO THE
                                                                                                                                                                                                                                      SOFT SPOTS OR UNSUITABLE MATERIALS SHALL BE EXCAVATED AND REPLACED WITH SELECT FILL.                                                                                                                                                             ALL OTHER BARS                 450             600              850        1200        1400        1750
                                                                                                          SUPERINTENDENT FOR APPROVAL, BEFORE PROCEEDING WITH THE WORKS.
                                                                                                                                                                                                                                12.   SUBGRADE TESTS SHALL BE UNDERTAKEN AND RESULTS SUPPLIED TO THE ENGINEER, TO DETERMINE THE                              TRAFFIC MANAGEMENT                                                                                                        WELDED MESH                                                        225mm LAP
                                                                                                    5.    ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT
                                                                                                                                                                                                                                      ADEQUACY OF THE PAVEMENT DEPTH DETAILED ON THE DRAWINGS.
                                                                                                          AUSTRALIAN STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY                                                                                                                                                  1.     NO WORK IS TO BE UNDERTAKEN UNDER OR ADJACENT TO LIVE TRAFFIC WITHOUT A PRE-APPROVED TRAFFIC
                                                                                                          AND THE SUPERINTENDENT.                                                                                               13.   THE SUBGRADE IS TO BE INSPECTED BY THE SUPERINTENDENT BY MEANS OF A PROOF ROLL, BY A LOADED WATER                             CONTROL PLAN.
                                                                                                                                                                                                                                      CART, PRIOR TO PLACEMENT OF ANY PAVEMENT LAYERS. THE SUBGRADE SHALL EXHIBIT NO VISIBLE SIGNS OF
                                                                                                    6.    NO WORK IS TO COMMENCE ON SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN WRITING AND AN                                                                                                                                               2.     THE CONTRACTOR IS TO ENSURE THAT ALL NECESSARY PERMITS ARE GRANTED AND MEASURES ARE ONLY IN PLACE
                                                                                                                                                                                                                                      DEFORMATION UNDER PROOF-ROLLING.
                                                                                                          OFFICIAL PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL AND THE ENGINEER HAVE BEEN HELD. THE                                                                                                                                                          WITHIN THE APPROVED HOURS STIPULATED.
                                                                                                          CONTRACTOR IS TO OBTAIN A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH THE                      14.   THE SUPERINTENDENT MAY REQUEST ADDITIONAL SUBGRADE TESTING OR SUBGRADE REPLACEMENT FOLLOWING
                                                                                                                                                                                                                                                                                                                                                             3.     THE CONTRACTOR SHALL ENSURE THAT ALL MEASURES ARE INSTALLED IN ACCORDANCE WITH THIS APPROVED
                                                                                                          REQUIREMENTS THEREOF.                                                                                                       THIS INSPECTION.
                                                                                                                                                                                                                                                                                                                                                                    TRAFFIC CONTROL PLAN INCLUDING TEMPORARY SIGNS, BARRIERS, LIGHTS ETC.
                                                                                                    7.    ALL CONSTRUCTION SHALL COMPLY WITH THE RELEVANT WORK PLACE HEALTH AND SAFETY LEGISLATION.                                                                                                                                                          4.     THE CONTRACTOR SHALL NOMINATE A REPRESENTATIVE TO IMPLEMENT, MONITOR AND ADDRESS ALL TRAFFIC
                                                                                                    8.    A MINIMUM OF 24 HOURS NOTICE IS REQUIRED FOR ALL ENGINEERING INSPECTIONS.                                             STOCKPILE MANAGEMENT:                                                                                                               MANAGEMENT ISSUES.
                                                                                                    9.    THE WORK AREA WILL BE MINIMISED TO FACILITATE CONSTRUCTION WHILST ENABLING CONTINUAL OPERATIONS OF                    15.   CONTRACTOR TO ENSURE STOCKPILES ARE NOT LOCATED IN A POSITION WHERE THEY COULD BE WASHED INTO A                        5.     ALL TRAFFIC CONTROL MEASURES SHOULD CAUSE THE MINIMUM DISRUPTION POSSIBLE TO ALL OTHER USERS,
                                                                                                          THE NEIGHBOURING AREA, TO THE SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.                                             GUTTER, DRAIN OR WATER BODY, SUCH AS:                                                                                         INCLUDING MOTORISTS AND PEDESTRIANS.
                                                                                                                                                                                                                                        ● ON A ROAD PAVEMENT;
                                                                                                    10.   WORKING HOURS, COMMUNICATIONS PROTOCOLS, SITE ACCESS, AREA FOR CONTRACTORS FACILITIES/STORAGE
                                                                                                                                                                                                                                        ● WITHIN AN OVERLAND FLOW PATH;
                                                                                                          AND SITE SECURITY TO BE AGREED WITH THE PRINCIPAL AND SUPERINTENDENT.
                                                                                                                                                                                                                                        ● ADJACENT TO STREAM BANKS.
                                                                                                    11.   THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED;                                                                                                                                                                                             STORMWATER DRAINAGE
                                                                                                                                                                                                                                16.   CONTRACTOR TO ENSURE STOCKPILES ARE COVERED WITH A TARP OR OTHER IMPERVIOUS COVER. LONG TERM
                                                                                                            ● CONSTRUCTION PRE-START MEETING
                                                                                                                                                                                                                                      STOCKPILES CAN BE COVERED WITH MULCH OR TEMPORARY VEGETATION (GRASS).                                                  1.     EXCAVATION, BEDDING AND BACKFILLING OF STORMWATER DRAINAGE PIPES TO BE IN ACCORDANCE WITH
                                                                                                            ● SET OUT
                                                                                                                                                                                                                                                                                                                                                                    STANDARD DRAWING IPWEAQ DS-0030 (TYPE 2).
J:\2017\17623SD2_4_Lot_Subdivision_at_135_Lake_Weyba_Drive\4.CADD\#ACAD\17623_CIVIL_OPW.dwg




                                                                                                            ● DEMOLITION                                                                                                        17.   ENSURE APPROPRIATE DUST CONTROL MEASURES EXIST FOR ALL STOCKPILES. ENSURE AN APPROPRIATE SEDIMENT
                                                                                                            ● SUBGRADE PROOF-ROLLS                                                                                                    CONTROL SYSTEM IS LOCATED DOWN-SLOPE OF ALL STOCKPILES.                                                                2.     ALL MANHOLES TO BE 1050mm DIAMETER IN ACCORDANCE WITH STANDARD DRAWING IPWEAQ DS-010.                     STANDARD DRAWINGS
                                                                                                            ● PRE-SEAL PROOF-ROLLS                                                                                                                                                                                                                           3.     ALL MANHOLE COVERS LOCATED WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS D IN ACCORDANCE WITH
                                                                                                            ● CONCRETE PRE-POURS                                                                                                SITE REHABILITATION:                                                                                                                STANDARD DRAWING IPWEAQ DS-019.                                                                           NOOSA SHIRE COUNCIL / INSTITUTE OF PUBLIC WORKS ENGINEERING AUSTRALIA, QLD (IPWEAQ)
                                                                                                            ● FINAL INSPECTION
                                                                                                                                                                                                                                18.   ENSURE THE SOIL SURFACE IS SCARIFIED PRIOR TO THE PLACEMENT OF TOPSOIL TO BREAK UP ANY EXCESSIVE                       4.     ALL MANHOLE COVERS LOCATED NOT WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS B IN ACCORDANCE
                                                                                                    12.   THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN,                                       COMPACTION, AND ENABLE THE APPROPRIATE KEYING OF THE SOIL LAYERS.                                                             WITH STANDARD DRAWING IPWEAQ DS-020.
                                                                                                          ENVIRONMENTAL MANAGEMENT PLAN AND WORK PLACE HEALTH AND SAFETY PLAN FOR REVIEW AND APPROVAL OF                                                                                                                                                                                                                                                                      RS-056.1          DRIVEWAYS, RURAL DRIVEWAY
                                                                                                                                                                                                                                19.   SCARIFY LIGHTLY COMPACTED SOILS TO A MINIMUM DEPTH OF 100mm AND HEAVILY COMPACTED SUBSOILS TO A                        5.     THE CONTRACTOR IS TO CONSIDER CONSTRUCTION LOADING ON EXISTING AND NEW STORMWATER PIPES AND
                                                                                                          PRINCIPAL AND SUPERINTENDENT, PRIOR TO CONSTRUCTION.
                                                                                                                                                                                                                                      MINIMUM DEPTH OF 300mm.                                                                                                       STRUCTURES.
                                                                                                    13.   FOLLOWING COMPLETION OF THE WORKS THE CONTRACTOR SHALL CLEAN UP THE SITE AND DEMOBILISE TO THE
                                                                                                                                                                                                                                20.   TURF MUST NOT BE PLACED ON EXCESSIVELY COMPACTED SOILS.                                                                6.     ALL PIPE PENETRATIONS WILL BE NEATLY MORTARED ON THE INSIDE FACE OF MANHOLES AND / OR PITS.
                                                                                                          SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.
                                                                                                                                                                                                                                21.   ALL SITE REHABILITATION MEASURES SHOULD BE MONITORED, PARTICULARLY AFTER RAINFALL.                                     7.     THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL TRENCH EXCAVATION AND CONSTRUCTION IS IN



                                                                                              COPYRIGHT ©                           L    23.05.23   DRAWING INDEX REVS UPDATED                  DR     Associated Consultants            Client                                                                                                            Drawn                    Verified                 Project                                                           Drawing Title                                                                               Scale                 Sheet Size
                                                                                                                                    K    16.05.23   DRAWING INDEX REVS UPDATED                  DR                                                                                                                                                         AR                       DR
                                                                                              This drawing is subject to
                                                                                              copyright in accordance with          J    06.03.23   DRAWING INDEX REVS UPDATED (C000 : C400)    DR
                                                                                                                                                                                                                                         WA GABARRIN & TO                                                                                                                                                    135 LAKE WEYBA DRIVE                                              LOCALITY PLAN,                                                                                       NTS            A1
                                                                                              the agreement between TOD                                                                                                                                                                                                                                    Designed                 Verified
                                                                                              Consulting Pty Ltd (tc) and tc's      H    23.05.22   DRAWING INDEX : C400 REVISION               DR                                       GABARRIN                                                                                                          DR                       DR                       4 LOT SUBDIVISION                                                 DRAWING INDEX AND NOTES                                                                     Drawing Number
                                                                                              client. This drawing shall only      G     10.05.22   DRAWING INDEX REVISIONS UPDATED             DR
                                                                                              be used for this specific project.
                                                                                                                                    F    17.03.22   DRAWING INDEX REVISIONS UPDATED             DR
                                                                                                                                                                                                                                                                                                                                                           Approved                 RPEQ No                  RP DESCRIPTION       LOT1 RP36729                                                                                                                                     17623-C000
                                                                                              This drawing shall not be used                                                                                                                                                                      Noosa: 07 5449 9600       Sunshine Coast: 07 5329 3190   D. REYNOLDS              9072                     LOCAL AUTHORITY      NOOSA SHIRE COUNCIL
                                                                                                                                    E    22.02.22   MINOR CHANGE APPLICATION 2.0                DR                                                                                                                                                                                                           MCU APPROVAL         -               HORIZ DATUM MGA94 Z56                            0      10     20         30   40         50    60                       Sheet                  Revision
                                                                                              for construction until marked as                                                                                                                                                                               PO Box 61, Noosaville, QLD 4566               Signed
                                                                                                                                    D    28.01.21   MINOR CHANGE APPLICATION                    DR                                                                                                [email protected]     www.todconsulting.com                                                      ROL APPROVAL         RAL17/0504      VERT DATUM AHD
                                                                                              'Issued For Construction' in the
                                                                                              revision description.                Rev    Date      Revision Description                       Drawn                                                                                                              ABN 39 128 805 336                                                              23.05.23   OPW APPROVAL                         RL DATUM    (PSM 52593) 0.988                         MEASUREMENT BAR - INCREMENTS IN mm                                         1 of 6           L
Log in to download the original file

17623-C000_[L].pdf · 516 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.