Council archive · source document
Minor Change Existing Approval 132004.240022.2 (As Published)
Officer: Matthew Pinese
Direct Telephone: 07 5329 6245
Our Reference: 132004.240022.2
Your Reference: 24/418
22 July 2025
KL Noosa Properties P/L
C/- Plan A Town Planning Pty Ltd
PO Box 1661
MILTON QLD 4064
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 22 April 2025, requesting a minor change to an existing
development approval. Council decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: 132004.240022.2
Street address: Sofitel Noosa Pacific Resort
14 Hastings Street, Noosa Heads
Real property description: Lot 7 RP 802632
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
In relation to the request to make a minor change to the existing approval, Council on 17 July 2025,
decided to approve the requested changes. The changes are detailed below.
A. Approve The change.
B. Add additional condition 6.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 4
Document Set ID: 23953398
Version: 3, Version Date: 22/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
3. ASSESSMENT MANAGER CONDITIONS
Additional Conditions – 11 November 2016
Approved Plans
4. Development undertaken in accordance with this approval must comply with the approved
plans of development. The approved plans are listed in the following table unless otherwise
amended by these conditions.
Plan No. Rev. Plan/Document Name Date
A.01 1 Site Plan, prepared by Zest Building Design 10/11/16
Studio
A.02 1 Proposed Floor Plan, prepared by Zest 10/11/16
Building Design Studio
A.05 1 Elevations, prepared by Zest Building 10/11/16
Design Studio
A.06 1 Elevations, prepared by Zest Building 10/11/16
Design Studio
A.07 1 Section, prepared by Zest Building Design 10/11/16
Studio
5. The cabana must not be enclosed by permanent fixtures such as shutters, louvres, glass
panelling or the like.
Additional Conditions – 17 July 2025
6. Works approved by change application 132004.240022.2 are to be in accordance with the
following plans.
Plan No. Rev. Plan/Document Name Date
WD.02.15 10 General Arrangement Plan Basement, 20.06.2025
prepared by c e architects
3.02.00.04 MP C Overall Master Plan, prepared Mitchell & 24.06.2025
Eades
- - Indicative Building Material (Western Received
Terrace) 26.06.2025
4. ADVISORY NOTES
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
5. PROPERTY NOTES
Not applicable.
Page 2 of 4
Document Set ID: 23953398
Version: 3, Version Date: 22/07/2025
Page 3
6. VARIATION APPROVAL DETAILS
Not applicable.
7. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject
Development Permit for Building Works All building work
8. SUBMISSIONS
Not applicable.
9. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
10. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Patrick Murphy
Manager, Development Assessment
Development & Regulation
Enc: Appeal Rights
Infrastructure Charge Notice
Approved Plans/Documents
DECISION NOTICE HISTORY
• Original Decision Notice
• Decision Notice - Minor - 23693 DA – 29 April 2004, with an
amendment to condition 9 and additional conditions 1,2 & 3.
• Decision Notice - Minor – 132004.240022.01 (23693 DA) – 11
November 2016, add additional conditions 4 & 5.
• Decision Notice - Minor – 132004.240022.02 (23693 DA) – 17 July
2025, add additional condition 6.
Page 3 of 4
Document Set ID: 23953398
Version: 3, Version Date: 22/07/2025
Page 4
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 4 of 4
Document Set ID: 23953398
Version: 3, Version Date: 22/07/2025
Used in these records
Minor Change Existing Approval 132004.240022.2 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 152 KB (small file)
- File type
No other editions are linked here.