We expect to receive results in the coming week and will forward to Council upon receipt.
With regards to the 1% AEP drainage considerations for both Eumundi Noosa Road and internal site
drainage, these were both addressed in our response to Council’s Information Request dated 6/01/2022 in
our letter 31131(L2) dated 11/02/2022.
Item 10: Stormwater Quality
There are a number of conditions of the higher-order approval which have not been addressed.
Response
The access ramp into the bio-retention basin was shown but the ramp marker was omitted in error. This
has been amended in the attached revised drawings.
There are 2 stormwater drains into the bio-basin. The driveway drain invert is approximately 300mm above
the finished detention basin surface which is proposed to be turf (now noted). This difference in level will
promote flow into the basin and the stone scour protection noted will protect against scour across this area
and into the bi-retention filter area.
The second drainage point into the basin is from the rear of the units along the northern boundary. The pit
levels shown on the submitted OPW plan were incorrect. These have been amended in the attached
revised drawings with the proposed pipe invert and scour protection to match that of the driveway pipe.
Subsoil pipe runs within the bio-retention bed have been shown on the revised attached drawings.
The bio-retention pit details shown on drawing 31131-SW1.2 specifies that only the slotted 100 diameter
pipes are set in the 150 thick drainage layer, not the 225 diameter pipe.
We trust the above information and the attached revised drawings address Council’s request for information and
look forward to Council’s approval.
Please do not hesitate to contact the undersigned should further information of clarification be required.
Yours faithfully
SEAN RICHARDSON – RPEQ 5835
For and on behalf of
SCG CONSULTING ENGINEERS
Enc SCG Drawing Nos.: 31131-OPW-2022.05.17 RFI set
SCG Consulting Engineers Page 3 of 3 SCG Ref: 31131(L3)
[OCR of page images]
We expect to receive results in the coming week and will forward to Council upon receipt.
With regards to the 1% AEP drainage considerations for both Eumundi Noosa Road and internal site
drainage, these were both addressed in our response to Council’s Information Request dated 6/01/2022 in
our letter 31131(L2) dated 11/02/2022.
Item 10: Stormwater Quality
There are a number of conditions of the higher-order approval which have not been addressed.
Response
The access ramp into the bio-retention basin was shown but the ramp marker was omitted in error. This
has been amended in the attached revised drawings.
There are 2 stormwater drains into the bio-basin. The driveway drain invert is approximately 300mm above
the finished detention basin surface which is proposed to be turf (now noted). This difference in level will
promote flow into the basin and the stone scour protection noted will protect against scour across this area
and into the bi-retention filter area.
The second drainage point into the basin is from the rear of the units along the northern boundary. The pit
levels shown on the submitted OPW plan were incorrect. These have been amended in the attached
revised drawings with the proposed pipe invert and scour protection to match that of the driveway pipe.
Subsoil pipe runs within the bio-retention bed have been shown on the revised attached drawings.
The bio-retention pit details shown on drawing 31131-SW1.2 specifies that only the slotted 100 diameter
pipes are set in the 150 thick drainage layer, not the 225 diameter pipe.
We trust the above information and the attached revised drawings address Council’s request for information and
look forward to Council's approval.
Please do not hesitate to contact the undersigned should further information of clarification be required.
Yours faithfully
SEAN RICHARDSON - RPEQ 5835
For and on behalf of
SCG CONSULTING ENGINEERS
Enc SCG Drawing Nos.: 31131-OPW-2022.05.17 RFI set
SCG Consulting Engineers Page 3 of 3 SCG Ref: 31131(L3)
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (SCG 31131(L3).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.