SUPERSEDED Change to an Existing Approval [As Published] · 132005.1067.02

of 15

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                             Officer:          Jack Lewis
                                             Direct Telephone: (07) 5449 5183
                                             Response Address: Locked Bag 72
                                                               Sunshine Coast Mail Centre QLD 4560
                                             Email:            [email protected]
                                             Our Reference:    2005/1067
                                             Your Reference:
16 February 2010

Annette Louise Warner
CARE Annette Louise Warner
PO Box 1234
NOOSA HEADS QLD 4567




Dear Madam

                          Change to an Existing Approval
                                  Integrated Planning Act 1997

I refer to your request to make a change to an existing approval. On 15 February 2010 Council
decided to approve your requested changes.
Details of the decision with the consolidated conditions are as follows:
1        APPLICATION DETAILS

    Application No:              2005/1067
    Street address:              3 Corsair Crescent, Sunrise Beach
    Real property description:   Lot 0, 1 & 2 BUP 4262
    Planning Scheme:             The Noosa Plan

2        DECISION DETAILS

Council on 20 February 2006 decided to issue the following type of approval:-
     Development Aprpoval
In relation to the request to make a change to the existing approval, Council on 15 February 2010
decided to:
A.        Extend the relevant period until 29 November 2013.
B.        Approve to change condition 18.
C.        Issue a Change to an Existing Approval.

3        RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.




                                                                                       Page 1 of 15
Full text of the other 14 pages

Page 2

                                                                                          2005/1067


4     ASSESSMENT MANAGER CONDITIONS
Land Use
1.    Deleted.
2.    The plans submitted for a Development Permit are to include modifications to the proposed
      building design. These changes are to include:-
                                                                                    2
      2.1.   The development shall have a maximum Gross Floor Area of 291.2m .
      2.2.   Deleted.
      2.3.   Deleted.
3.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are numbered DD 1.0b Site Plan, DD
      1.1b Ground Floor Plan, DD1.2b Upper Floor Plan and DD2.1b Elevations 1 dated 19 March
      2006 and plans numbered DD 1.3a Roof Plan, DD2.2a Elevations 2 and DD 3.1a Sections
      dated 26 September 2005, prepared by Emma Stewart and as may be amended by these
      conditions.
4.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
5.    The open space and setback areas are to be landscaped in accordance with Council’s Policy
      on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
      qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
      the premises being occupied and maintained at all times thereafter.
6.    Screening vegetation to reach a height of 4 – 6 metres shall be located along the length of the
      western elevation.
7.    Existing trees on the site and within road reserves are to be retained, except where required to
      be removed due to building operations or the conduct of the approved use. The submitted
      landscape plans shall denote the existing vegetation proposed to be retained. This vegetation
      shall include the pandanus located towards the southern boundary, and all vegetation located
      along the eastern boundary.
8.    All fencing shall be setback at least 1 metre from the front property boundary, with at least half
      of the fencing setback 2 metres. The area of land between the fence and the front property
      boundary shall be densely landscaped to screen any fencing from the street.
9.    Natural and muted colours are to be incorporated on the external walls and are to avoid
      reflective surfaces and colours. In this regard the development shall incorporate external wall
      colours, awning materials and colourbond roofing colours generally in accordance with those
      submitted 6 October 2005.
10.   All fencing shall have a maximum height of 1.8 metres.
11.   The development shall not exceed a height of 2 storeys and 8 metres.
12.   The balustrading of the upper level deck of the eastern unit shall be constructed of transparent
      material to reduce the visual impact of its setback encroachment.
13.   Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
      thus remaining as open structures.




                                                                                        Page 2 of 15

Page 3

                                                                                     2005/1067

14.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
      System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
      Dishwashers and washing machines are excluded from this requirement.
15.   Security in the form of a cash bond or trading bank guarantee to the sum of $10 000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for Operational Works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
16.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
17.   The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for Building Works.
18.   The Development Permit for a material change of use of premises lapses if the use has not
      happened by 29 November 2013 unless an application to extend the currency is approved by
      Council.
Land Development

      Vehicle Access
19.   A vehicular access driveway to serve the development shall be constructed from the Corsair
      Crescent frontage of the site with a maximum width of 4.5m.
20.   The driveway shall be designed and constructed to Council’s design standards and to grades
      that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
      movements along the footpath without any level difference. Should any driveways be
      constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
      the driveway be removed and reconstructed to levels that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
      to have the footpath continue at a constant grade to minimise the potential for pedestrians to
      trip or fall.
21.   All vehicles shall enter and leave the site in a forward direction.
      Carparking
      Off Street
22.   Carparking shall be provided within the site generally as shown on drawing number DD 1.1a
      dated 26/09/05 by Emma Stewart, except as modified herein.
23.   The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
      for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and
      with a minimum head clearance (headroom) at any point of 2.2m.
24.   A 2 metre wide landscaped area shall be maintained between                        the   access
      driveway/manoeuvring area and the front (Corsair Crescent) boundaries.
25.   All carparking shall be kept and maintained in a condition fit for use.




                                                                                   Page 3 of 15

Page 4

                                                                                        2005/1067

      Park Contributions
26.   A Park contribution of $1,529 towards the acquisition of additional parkland or the
      improvement of existing parkland and facilities in the locality shall be paid to the Council prior
      to obtaining a Development Permit for Operational Works in accordance with Council’s
      Planning Scheme Policy PSP24 Park Requirements for Development Applications. This
      amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
      September 2005 until the date of payment.
      Frontage Works
27.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      Corsair Crescent frontage of the site in accordance with Planning Scheme Policy PSP1
      Landscaping Guidelines. Grass shall be couch, free of weeds.
28.   A new 1.2m wide concrete path shall be constructed along the whole of the Corsair Crescent
      frontage of the site. The path shall be constructed in accordance with Council’s design
      standards and to an alignment that protects any significant vegetation or any underground
      services.
29.   All paths shall be designed and constructed to ensure pedestrian safety using non-slip
      materials and to produce an evenly graded surface finish.
30.   All redundant vehicular crossings to the site and redundant stormwater outlet features shall be
      removed and replaced by kerb & channel, footpath paving and landscaping such as trees and
      grasses in accordance with Council’s Standard specifications prior to commencement of the
      use permitted by this permit.
      Pathway Contributions
31.   A pathway contribution of $344 towards external major pathways, in accordance with Planning
      Scheme Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the Council
      prior to obtaining a Development Permit for Operational Works. This amount will be subject to
      variations in the Consumer Price Index, All Groups Brisbane from September 2005 until the
      date of payment.
      Stormwater Drainage
32.   All stormwater drainage shall be collected on site and discharged so there is no net increase
      in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall
      be discharged to Council’s kerb & channel street drainage system in Corsair Crescent. Plans
      of the drainage design shall be prepared by a Registered Professional Civil Engineer and
      submitted to Council prior to obtaining a Development Permit for Operational Works.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
      drainage system at any one location is 25 litres/second.
33.   Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank
      (minimum storage 3000 litres per dwelling unit) that is plumbed to service the toilets in the new
      dwelling and landscaping areas. The design of the rainwater storage system shall be to the
      satisfaction of the Manager Plumbing Services and the location clearly shown on the plans
      submitted for Building Works approval.
34.   All site stormwater drainage shall be by means of a gravity system.
      Sewer Mains
35.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
36.   The existing sewer connection shall be temporarily capped off and reconnected once the new
      duplex is completed. In this regard a permit from Council’s Plumbing Services Section shall be
      obtained prior to any works commencing.
                                                                                      Page 4 of 15

Page 5

                                                                                       2005/1067

      Town Water Supply
37.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
38.   Each water connection to the water reticulation system shall extend to the property boundary
      and be metered. Where multiple units including leased buildings are served by a single
      service, multiple water meters to each individual unit or leased building shall be installed. All
      fees for the supply of water meters shall be paid to the Council.
      Headworks Contributions
39.   Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
      and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
      Contributions respectively and at the rates applicable at the time of payment. An estimate
      only of the contribution rates under the current policies is outlined below. These amounts will
      adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from
      September 2005 until the date of payment.
      Water Supply       $2,058
      Sewerage           $715
      TOTAL              $2773

      All headworks contributions must be paid prior to the issue of a Development Permit for
      Operational Works.

      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
      headworks contributions not be paid at the due time, Council shall call upon the trading bank
      guarantee in full.

      In the event that the Development Permit for Material Change of Use of Premises lapses or is
      cancelled, the contribution or trading bank guarantee will be returned.
      Earthworks
40.   Earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences or structures that border the development site. Fences that are affected shall be
      replaced prior to the issue of the Certificate of Classification. In this regard any fences to be
      replaced shall be clearly shown on the plans submitted for Operational Works approval.
      Erosion and Sediment Control
41.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to
      be submitted to the Council for approval prior to obtaining a Development Permit for
      Operational Works.

      General
42.   Digital detailed design drawings and calculations shall be submitted with any application for a
      Development Permit for Operational Works in respect of roadworks and stormwater drainage
      works. To avoid conflict with underground pipes or services, all existing and proposed
      services required by the development shall be shown on the plans.
43.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
      use of ADAC are available at www.adac.com.au).

                                                                                     Page 5 of 15

Page 6

                                                                                      2005/1067

44.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
45.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site
shall be covered to prevent materials including dust being windblown from the vehicle.

5     REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency       Referral Address

 Concurrence Agency –        Advice              Environmental         GPO Box 2771, Brisbane
 Contaminated Land                               Protection Agency     Qld 4001

A copy of any referral agency conditions is attached.

6     APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.    Plan / Document Name                      Date
 DD 1.0b                           Site Plan                                 19 March 2006
 DD 1.1b                           Group Floor Plan                          19 March 2006
 DD 1.2b                           Upper Floor Plan                          19 March 2006
 DD 2.1b                           Elevations                                19 March 2006
 DD 1.3a                           Roof Plan                                 26 September 2005
 DD 2.2a                           Elevations                                26 September 2005
 DD 3.1a                           Sections                                  26 September 2005

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    The applicant is informed that approval of this development application will trigger an
      Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
      Charges Plan for the estimated amount of $977 and is subject to variations in the Consumer
      Price Index, All Groups Brisbane from September 2005 until the date of payment. An
      Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
      Planning Act 1997.
2.    The applicant is informed that payment via credit card transaction will not be an acceptable
      method of payment for development contributions conditioned in this permit or for
      infrastructure charge notices issued separately.



                                                                                    Page 6 of 15

Page 7

                                                                                          2005/1067

3.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
      cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed
      where it could reasonably be expected to move into a roadside gutter, storm water drain or a
      watercourse. On the spot fines apply for such offences.
4.    The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
      building site in a way that makes or causes audible noise to be made from the building work:-
      4.1.   On a Sunday or public holiday, at any time; or
      4.2.   On a Saturday or a business day, before 7.00am or after 6.30pm.
      A maximum penalty of $1,500 applies to an offence under this legislation.
5.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
      the cost of operational works exceeds $80,000, then a portable long service leave levy is
      required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
      the approved form issued by the Building and Construction Industry (Portable Long Service
      Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
      declaration outlining the cost of the operational works must be submitted to Council with the
      lodgement of any application for operational works over the site.
We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities under
the Disability Discrimination Act (DDA) in regard to the installation of disabled access and the
provision of disabled facilities, and that access to this building and the provision of sanitary facilities
may need to comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the
Building Code of Australia.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8     PROPERTY NOTES

Not applicable.

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable.




                                                                                        Page 7 of 15

Page 8

                                                                                    2005/1067


10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required             Subject of the required Development Permit
 Development        Permit   for   Operational   Landscaping, Car parking, Access, Frontage Works
 Works                                           & Stormwater Drainage

11     SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable.

12     SUBMISSIONS
Not applicable.

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not applicable.
14     RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.

15     OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.


Decision Notice History
20 February 2006                   Original Decision Notice.
25 May 2006                        Negotiated Decision Notice
15 February 2010                   Approved Change with
                                   amendments to Condition
                                   18.
Yours faithfully,




Denis Wallace
Senior Development Planner




                                                                                  Page 8 of 15

Page 9

                                        2005/1067


Referral Agency Conditions
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                      Page 9 of 15

Page 10

   2005/1067




Page 10 of 15


[OCR of page images]
2005/1067

 

Postal address:
Telephone 3224 5644
EPA no:

Application no.:

Property Description

Property Location:

Signed

4a
Mark Paton

Chief Scientific Advisor

Cc

PO Box 2771, BRISBANE QLD 4001

Fax: 32473278 E-mail: [email protected]
AMA 11969

2005/1067

Lot no.: 233 Registered Plan no : RP135363

3 Corsair Crescent, SUNRISE BEACH

A Warmer and K & C Hendrie
C/- Martoo Consulting Pty Ltd

PO Box 1684

NOOSA HEADS QLD 4567

IDAS covering letter (concurrence agency)

Page 2 of 2

Page 10 of 15

Page 11

   2005/1067




Page 11 of 15


[OCR of page images]
2005/1067

 

IDAS C-6

Concurrence agency response
Integrated Planning Act 1997 ss3.3.16 and 3.3 18

Applicant: A Warner and K & C Hendrie
C/- Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567
Application no.: 2005/1067
Date received by EPA: 8 July 2005
Jurisdiction: Envtronmental Protection Act 1994
Role: Concurrence
Description: Material Change of Use
3 Corsair Crescent, SUNRISE BEACH
Lot no.: 233 Registered Plan no.: RP135363
1 Type of development
Ms Material change of use
Oo Reconfiguration of a Lot
where:
o the existing use of the land ts, or if the land is vacant land with no existing use the most

a

2

recent use of the land was, for a notifiable activity under the Environmental Protection Act
1994.

the proposed use of the land is for child care, educational, recreational, residential or
similar purposes and the existing use of the land 1s, or 1f the land 1s vacant land with no
existing use the most recent use of the land was, for an industrial activity

the land 1s on the Environmental Management Register or Contaminated Land Register
under the Environmental Protection Act 1994

the land 1s wholly or partly within an area for which an Area Management Advice for
industrial activity or natural mineralisation has been issued and the proposed use of the
land 1s for child care, educational, recreational, residential or similar purposes.

the land is wholly or partly m an area for which an Area Management Advice for
unexploded ordnance (UXO) has been issued

Response to development application

The Environmental Protection Agency (EPA), acting as a concurrence agency under the Integrated
Planning Act 1997, provides the following response to the application detailed above -

OOoOoO®8g

3

conditions must attach to any approval of the development
any approval must be for part only of the development
any approval must be a prclimunary approval only

there are no concurrence agency requirements

the application must be refused

Reasons for including condition(s) or refusal

The site (the subject lot/s) 1s part of an area of land within which the Department of Defence
(Defence) has assessed a ‘substantial’ nsk of residual UXO contamunation exists.

Defence advises that development or land use rezoning proposals for land within a ‘substantial’ zone
should only proceed following the conduct of UXO investigation and clearance activities. Defence

VER2

Page 11 of 15

Page 12

   2005/1067




Page 12 of 15


[OCR of page images]
2005/1067

 

IDAS C-6

mauntains a list of commercial UXO investigation and remedial search contractors that 1t accredits to
carry out this work.

Defence also recommends that owners or occupiers of potentially affected land and workers and
contractors employed on the land need to be aware of the procedure if a suspect object 1s found.

As the EPA has no record of the site bemg further investigated or remediated, it 1s considered that
there remains a possibility of UXO being found on 1t.

4 Conditions
The following concurrence agericy conditions are to be attached to any approval:

4.1 Prior to the commencement of any development-related excavation, earthworks or soil
disturbance, that part of the site to be so worked 1s to be subjected to investigation and,
where necessary, appropriate remedial action.

4,2 Any person employed to work on any part of the site where Condition 4.1 has not been
satisfied 1s to be forewarned in wniting by the applicant.

This warming is to explain that information available to the EPA indicates a potential for
residual UXO exists on the site and work should proceed with due caution It 1s to state the
procedure to be followed by any person finding an obyect suspected of being explosive
ordnance or component thereof:

Do not disturb the object.

Take action, where appropriate, to prevent it being disturbed by another person.
Note its approximate dimensions and general appearance,

Note the route to its location

Advise the Police as soon as possible.

4.3 Following mvestigation and any remedial action taken to satisfy Condition 4 1 above, the
applicant is to submut a report, prepared in accordance with current guidelines, to the EPA for
assessment The EPA 1s to subsequently advise the Noosa Council and the applicant of its
assessment in regard to Condition 4.1 bemg satisfied

44 No gravel, rock, sand or soil 1s to be removed from the site without written EPA approval
45 The apphcant 1s to advise the owner and any occupier of the site of the above responsibilities.

5 Additional comments or advice

Applicants may contact the EPA’s Contanunated Land Unit on (07) 3224 5644 or visit the Defence
website http //www defence gov aw/uxo for the details of current UXO mvestigation and remedial
search contractors The EPA accepts reports based on investigative and remedial work carried out
by these contractors.

Investigation and remedial action to satisfy Condition 4.1 typically mvolves sampling/search
programs with detection equipment unless the use of such equipment is:
* considered unwarranted by a UXO contractor due to the extent of any prior excavation or
earthworks or, conversely, of any fillmg proposed as part of the development program; or
* prevented or made impracticable by the presence of a structure, stockpile, natural barmer or
metal waste

VER 2

Page 12 of 15

Page 13

   2005/1067




Page 13 of 15


[OCR of page images]
2005/1067

 

IDAS C-6

In the latter case, alternative action may be appropnate to mmmnuse the risk 1n the first instance. For
example, where the risk of exposure to any UXO that may exist 1s reduced by the presence of a
structure or natural barner, issuance of the standard UXO warning (see Condition 4.2) may suffice
while the structure, stockpile or barrier remains in place. Where a structure is to be removed or
reduced as part of the development program, protective precautions, commensurate with any greater
tisk to which workers might then be exposed, may need to be considered. Progressive assessment
will be necessary where such circumstances exist. Unless, at the completion of prelminary works,
there 1s evidence then available to the UXO contractor that any residual risk 1s negligible, the use of
detection equipment will typically be required to confirm the site’s status

Where investrgation, along with any subsequent remedial action and assessment, 1s to be
implemented by stages to satisfy Condition 4.1 and 4 3, a preliminary investigation report should be
submitted by the applicant to the EPA along with a management plan for the proposed work. Staged
investigation/remediation 1s most likely to be applicable where development of smaller, buiit-on lots
(which can present circumstances such as those discussed above) or broadhectare sites 1s proposed. In
such cases, the EPA’s assessment of the report and advice to Council in regard to approval of the
development will be dependent on agreement with the management plan.

Where Condition 4.1 1s to be satisfied by a whole lot or broadhectare development stage being
subjected to investigation and any necessary remedial action, the EPA, based on the subsequent
investigation/remediation report’s findings and recommendation/s, may reassess the lot, or that portion
comprising the development stage, as bemg remeduated or not needing remediation, and advise the
applicant and Council accordingly. Otherwise, any balance of land that has not been further
investigated will retan the risk assessment made by Defence. This is unless evidence obtained from
the investigated part/s can be used to refute Defence’s assessment in regard to all or part of the
balance In the latter case, the EPA may reassess all of the balance or the applicable part/s as beg
unaffected by UXO

6 Additional information

This concurrence response applies only to contaminated land issues and does not remove the need to
obtain any further approval for this development which may be required by this or other legislation,
State and/or Commonwealth. Apphcants are advised to check with all relevant statutory authorities
Applicants should also comply with all relevant legislation

The EPA has not provided a notification to native title parties for this application The State’s
Native Title Work Procedures indicate that the responsibility for assessment of native title issues for
an IDAS application rests with the Assessment Manager. It 1s recommended that the Assessment
Manager determines whether native title notification 1s required for this application

*End of response*
IDAS C-6 CLM

VER2

Page 13 of 15

Page 14

                                                                                                        2005/1067


                                                        Appeal Rights
                                                        INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                         (6) If an application involves assessment against a
Planning Act (Chapter 4).                                           concurrence agency code, appeal rights for submitters
                                                                    for the application are not available against the part of
Division 8 - Appeals to                court   relating   to        the approval that represents the concurrence agency’s
development applications                                            response for the code.
Appeals by applicants                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application               4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following-               jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development           development approval for a development application if-
      application;                                                  (a) the development      application    involves   impact
(b) a matter stated in a development approval, including               assessment; and
      any condition applying to the development, and the            (b) the advice agency told the applicant and the
      identification of a code under section 3.1.6;1                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a                 application as a submission for an appeal.
      development permit was applied for;                              (2) The appeal must be started within 20 business
(d) the length of a relevant period;                                days after the day the decision notice or negotiated
                                                                    decision notice is given to the advice agency as a
(e) a deemed refusal.                                               submitter.
    (2) An appeal under subsection (1)(a) to (d) must be            Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
                                                                    (co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant.                          4.1.30.(1) For a development approval given for a
                                                                    development application, a person to whom any of the
    (3) An appeal under subsection (1)(e) may be started
                                                                    following notices have been given may appeal to the
at any time after the last day a decision on the matter
                                                                    court against the decision in the notice-
should have been made.
                                                                    (a) a notice giving a decision on a request for extension
Appeals by submitters
                                                                       of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
                                                                    (b) a notice giving a decision on a request to make a
appeal to the court about-
                                                                       minor change to an approval.
(a) the giving of a development approval, including any
                                                                        (2) The appeal must be started within 20 business
      conditions (or lack of conditions) or other provisions
                                                                    days after the day the notice of the decision is given to
      of the approval; or
                                                                    the person.
(b) the length of a relevant period for the approval.
                                                                        (3) Subsection (1)(a) does not apply if the approval
    (2) The appeal must be started within 20 business               resulted from a development application (superseded
days (the “submitters appeal period”) after the day the             planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to           application under a superseded planning scheme.
the submitter.
                                                                       (4) Also, a person who has made a request
    (3) If a person withdraws a submission before the               mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the               against a deemed refusal of the request.
decision.
                                                                       (5) An appeal under subsection (4) may be started at
   (4) If an application involves both impact assessment            any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are               should have been made.
available only for the part of the application involving
impact assessment.                                                  Division 9 - Appeals to court about other matters
    (5) If an application is processed under section                Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application         (no co-respondents)
are available only for the aspects of the development that          4.1.31.(1) A person to whom any of the following notices
would have required public notification under the                   have been given may appeal to the court against the
repealed Act.                                                       decision in the notice-
                                                                    (a) a notice giving a decision on a request to change or
                                                                       cancel a condition of a development approval.
1
    Section 3.1.6 (Preliminary approval may override local
    planning instrument)
                                                                                                    Page 14 of 15

Page 15

                                                                                                2005/1067

(b) a notice under section 6.1.442 giving a decision to      (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                  development permit was applied for;
    approval.                                                (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business              relevant period;
       days after the day the notice of the decision is      (e) a deemed refusal.
       given to the person.
                                                                 (2) An appeal under subsection (1)(a) to (d) must be
    (3) Also, a person who has made a request                started within 20 business days (the “applicant’s appeal
       mentioned in subsection (1)(a) may appeal to the      period”) after the day the decision notice or negotiated
       court against a deemed refusal of the request.        decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started at         (3) An appeal under subsection (1)(e) may be started
       any time after the last day the decision on the       at any time after the last day a decision on the matter
       matter should have been made.                         should have been made.
Appeals against decisions to change approval conditions      The Registrar for the Building and Development
under the repealed Act                                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision     http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or        For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court      4.1.36 Appeals about particular infrastructure
against-                                                     charges
(a) the decision; or                                         (1) This section applies to a person who has been
(b) a deemed refusal of the application.                     given, and is dissatisfied with, an infrastructure charges
                                                             notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of      (2) The person may appeal to the court against the
the decision is to be given to the person.                   notice.
    (3) An appeal under subsection (1)(b) may be started     (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter      after-
should have been made.                                       (a) if the notice is given because of a development
Appeals against local laws                                        approval or master plan approval-the day the
                                                                  applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
                                                                  approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the           (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the   (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the
                                                             (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.                              that no reasonable relevant local government, State
    (2) The appeal must be started within 20 business            infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the        have imposed it; or
applicant.
                                                             (b) an error in the calculation of the charge.
For Building Works Only                                      (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the           under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                     used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to                charges schedule or regulated State infrastructure
development applications                                     charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval, including
    any condition applying to the development, and the
    identification of a code under section 3.1.6;3


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
  Section 3.1.6 (Preliminary approval may override local
  planning instrument)
                                                                                             Page 15 of 15

Used in these records

About this file

File size
304 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Change to an Existing Approval [As Published].pdf · 304 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.