SUPERSEDED Change to an Existing Approval [As Published] · 132005.1067.02
2005/1067 Page 12 of 15 [OCR of page images] 2005/1067 IDAS C-6 mauntains a list of commercial UXO investigation and remedial search contractors that 1t accredits to carry out this work. Defence also recommends that owners or occupiers of potentially affected land and workers and contractors employed on the land need to be aware of the procedure if a suspect object 1s found. As the EPA has no record of the site bemg further investigated or remediated, it 1s considered that there remains a possibility of UXO being found on 1t. 4 Conditions The following concurrence agericy conditions are to be attached to any approval: 4.1 Prior to the commencement of any development-related excavation, earthworks or soil disturbance, that part of the site to be so worked 1s to be subjected to investigation and, where necessary, appropriate remedial action. 4,2 Any person employed to work on any part of the site where Condition 4.1 has not been satisfied 1s to be forewarned in wniting by the applicant. This warming is to explain that information available to the EPA indicates a potential for residual UXO exists on the site and work should proceed with due caution It 1s to state the procedure to be followed by any person finding an obyect suspected of being explosive ordnance or component thereof: Do not disturb the object. Take action, where appropriate, to prevent it being disturbed by another person. Note its approximate dimensions and general appearance, Note the route to its location Advise the Police as soon as possible. 4.3 Following mvestigation and any remedial action taken to satisfy Condition 4 1 above, the applicant is to submut a report, prepared in accordance with current guidelines, to the EPA for assessment The EPA 1s to subsequently advise the Noosa Council and the applicant of its assessment in regard to Condition 4.1 bemg satisfied 44 No gravel, rock, sand or soil 1s to be removed from the site without written EPA approval 45 The apphcant 1s to advise the owner and any occupier of the site of the above responsibilities. 5 Additional comments or advice Applicants may contact the EPA’s Contanunated Land Unit on (07) 3224 5644 or visit the Defence website http //www defence gov aw/uxo for the details of current UXO mvestigation and remedial search contractors The EPA accepts reports based on investigative and remedial work carried out by these contractors. Investigation and remedial action to satisfy Condition 4.1 typically mvolves sampling/search programs with detection equipment unless the use of such equipment is: * considered unwarranted by a UXO contractor due to the extent of any prior excavation or earthworks or, conversely, of any fillmg proposed as part of the development program; or * prevented or made impracticable by the presence of a structure, stockpile, natural barmer or metal waste VER 2 Page 12 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 304 KB (small file)
- File type
No other editions are linked here.