Council archive · source document
SUPERSEDED Change to an Existing Approval [As Published] · 132005.1067.02
2005/1067
44. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
45. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site
shall be covered to prevent materials including dust being windblown from the vehicle.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Concurrence Agency – Advice Environmental GPO Box 2771, Brisbane
Contaminated Land Protection Agency Qld 4001
A copy of any referral agency conditions is attached.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
DD 1.0b Site Plan 19 March 2006
DD 1.1b Group Floor Plan 19 March 2006
DD 1.2b Upper Floor Plan 19 March 2006
DD 2.1b Elevations 19 March 2006
DD 1.3a Roof Plan 26 September 2005
DD 2.2a Elevations 26 September 2005
DD 3.1a Sections 26 September 2005
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $977 and is subject to variations in the Consumer
Price Index, All Groups Brisbane from September 2005 until the date of payment. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
Planning Act 1997.
2. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
Page 6 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 304 KB (small file)
- File type
No other editions are linked here.