A6769-24-D09 [B] Rapid Infiltration Culvert 'Ric' Layout
Attached to the e-mail Minor Change Application OPW25/0042.01 - DA Form 5, Civil Plans - 3 & 7 Serenity Close Noosa Heads.
RL
00
1 4.0
.0
14.
12
RDL01
14.0
12.5% L0 D0
D
1.2 L0 4
13.8
4 1.0
0
1
S
RL
13.60
0
RL
13
Ex
W
W
D0
.24
14
RL
L0 1
13.40
.0
1.2
RL
13
3
.06
13.20
14
RL
.75
14
.0
2.0%
8.6% ALL ROOFWATER TO BE PIPED
D
1in8
Ex
TO RIP'S/RWHT VIA SEALED
RL
S
RL
12
W
D10
WR
14
Ex
1
.78
.7
PIPE SYSTEM TO HYDRAULIC
RL
L1
RL
5
14.40
14.60
14.20
3.7
12
13.80
14.00
12
.83
0
.96
CONSULTANT SPEC.
D ARY
D
OUN
Ex
RL
D0
WW
L01 1
TY B
14.0
12
S
.22
.67
RL
RL
9
PER
1
12
2.0
.0
PRO
Ex
RL
13.5
E
12
E
WW
12.8
.26
2
WW 13.0 13.2
RL RL1 D
12.8
S
FFL12.0
12 2.
Ex
D0
FFL11.15
.35 59
WW L0 1
E
13.0 1.2
BA L13
E 0
SE .0
R
RL
Ex
D0 D0
L0 1 1
E
12
TW
OF
W L0
Ex
W
1.2 1.1
.78
1 6
RL
13
PM
.23
E.1
12
T
.51
E
12.7
4 0 12.5 RWHT
12.9
S
S
S RAINWATER HARVESTING
12.7 TANK 300m3 (MIN)
D
D0
S 12.5 L01 1 CAPACITY TO HYDRAULIC
S
12.7 12.0 .19
CONSULTANTS DETAILS SUMP WITH ACCESS LID OVER
11.95 D0
S
L0 1
S
PROPOSED BIORETENTION BASIN '1'; PROPOSED DRAINAGE NETWORK TO
1.1
7
12.7 REFER WQ01 FOR DETAILS
12.35 12 .5 OUTLET <Q3MONTH FLOWS TO L0
D0
1
RL 11.5 SURFACE OF SWALE.
1.1
8
| | | |
D
|
| | | | | | | || | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Ex
| | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | | |
RL
S
10
S
20
11.
RL
.50
RL
10.
PROPOSED DRAINAGE >3
85
BIO BA 20m2 GEOFABRIC LINED FOREBAY
SIN MONTH ARI FLOWS TO BE
D
|
RL10.45
| |
PIPED DIRECTLY TO RIC
| |
| |
|
S
|
S
|
|
|| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
||
| |
| | |
| | | | |
20
PRO
|
11.
RL
D
PER
85
10.
T
RL
Y BO
WEIR L
S
0 EV
1.2 RL 10.8 EL
S
1
UND
RL 5
0 8.5 8.5
0.7 RL RL
ARY
1
RL RIC1 PROPOSED ROCK GABION Ex Ex
Ex
D
RETAINING WALL. TOP OF
PROPOSED RAPID INFILTRATION CULVERT
WALL RL 11.20. EMERGENCY OVERFLOW VIA CY
14x 1500w x 1200h x 2400 LONG RCBC EN .95
ROCK GABION WEIR
ERG RL10
S
EM IR
S
DE WE
WI OW
m
17 RFL
E
OV
D
PROPERTY BOUNDARY S
S
S S
PRIVATE OPEN SPACE S
S
S
S
CONSERVATION PROTECTION
S
RM
S
WATERWAYS
S S
RM
S
D
S
S S S S RM
S S S S
S S S S S S S S
S S
S
RM
S
RM
NOTE: ALL WORKS TO BE EXISTING CONCRETE FOOTPATH
UNDERTAKEN UNDER STRICT
GUIDEANCE OF ARBORIST
0 2 4 6 8 10
SCALE 1:100 (A1), 1:200 (A3)
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTIONDesign:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 RAPID INFILTRATION CULVERT 'RIC' LAYOUT
APPROVAL Date: AUG 2022 26 Memorial Avenue, Cotton Tree PROPOSED HOTEL
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 3-7 SERENITY CLOSE, NOOSA HEADS DRAWING No:
A6769-24-D09 B 9 of
STEVEN HARRISON
Email: [email protected]
B
A
28/01/2026
27/02/2025
REVISED STORMWATER ALIGNMENT
ISSUE FOR APPROVAL
PBL
PL
SKH
S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CALILE MALOUF INVESTMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6769-24-D09 RIC LAYOUT.dwg - DATE : 28/1/26 - 5:03pm - XREF's: X-BASE; X-SURVEY; X-ARCH 3 ground; X-ARCH 1 basement; X-ARCH 2 lower ground; X-ARCH 4 level01; X-SURVEY retained trees; X-STRUCT; H-Approved-SH; H-Checked-SH Council Ref: