Decision Letter - Change to an Existing Approval - extension to relevant period [As Published] · 132006.271.02
Officer: Denis Wallace
Direct Telephone: (07) 5449 5179
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 2006/271
Your Reference:
7 April 2010
Gregory & Marissa Mann
17 Florence Street
CLAYFIELD QLD 4011
Dear Sir/Madam
Change to an Existing Approval
Integrated Planning Act 1997
I refer to your request to make a change to an existing approval. On 6 April 2010 Council decided
your requested changes.
Details of the decision with the consolidated conditions are as follows:
1 APPLICATION DETAILS
Application No: 2006/271
Street address: 3 Henderson Street, Sunshine Beach
Real property description: Lot 0, 1 & 2 BUP 4358
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
Council on 24 August 2006 decided to issue the following type of approval:-
Development Permit for a Material Change of Use - Duplex Dwelling
In relation to representations, Council on 18 January 2007 decided to:
A. Agree to change Conditions 2, 7, 8 and 50
B. Agree to delete condition 28
C. Issue a Negotiated Decision Notice.
In relation to your request to extend the relevant period for the above development approval, Council
on 6 April 2010 decided to:
A. Extend the relevant period until 24 August 2012
B. Approve to change condition 17
C. Issue a Change to an Existing Approval.
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
Page 1 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 13 pages
Page 2
2006/271
4 ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are titled and numbered Basement Plan
0534.SK01A, Level 1 Plan 0534.SK02A, Level 2 Plan 0534.SK03, Level 3 Plan 0534.SK04,
Elevations 1 0534.SK05A and Elevations 2 0534.SK06A prepared by Kidd + Co and dated
January 2006 and as may be amended by these conditions.
2. Prior to Operational Works approval, amended plans are to be submitted to Council
demonstrating compliance with a minimum building setback of 0.9 metres to both the northern
and southern boundaries of the site, particularly with respect to the basement car park on the
Basement Floor Plan and the terraced areas on Level 1 and swimming pools are to have a
minimum setback to northern and southern boundaries of 1 metre, measured from the outmost
projection of the swimming pool. The setback shall provide for landscaping opportunities
along the side boundaries of the site.
3. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
4. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
the premises being occupied and maintained at all times thereafter. The submitted landscape
plan shall detail the following:-
4.1. the provision of dense screening vegetation along the side (southern and northern)
property boundaries of the site in order to screen the basement walls and raised
terraced areas and provide privacy screening to adjoining properties. Plantings along
these boundaries shall also include:-
4.1.1. the provision of at least 4 x 400 Litre native species to replace the native trees
which are to be removed from the site’s southern side boundary. These shall
nd rd
be sited adjacent to the 2 and 3 level decks at the rear and front of the site
and adjacent to the upper floor windows of the building on the neighbouring
property in order to provide privacy screening to the adjoining property; and
4.1.2. the provision of at least 4 x 200 Litre native species along the site’s northern
nd rd
side boundary, particularly adjacent to the 2 and 3 level decks at the rear
and front of the site in order to provide privacy screening to the adjoining
property.
4.2. the provision of dense screening vegetation along the rear property boundary to screen
swimming pools and associated decks which run parallel with the boundary;
4.3. the provision of 2 x 200 Litre native species to replace the 2 Banksia trees which are
proposed to be removed from the rear of the site. These shall be located along the rear
boundary of the site in the form of 1 per dwelling unit;
4.4. the provision of dense screening vegetation within the front property boundary setback
to screen the basement walls and waste storage areas from view of the street and
driveway; and
4.5. the retention of the Callistemon species located within the road reserve.
5. All fencing shall be setback at least 1 metre from the front property boundary, with at least half
of the fencing setback 2 metres. The area of land between the fence and the front property
boundary shall be densely landscaped to screen any fencing from the street.
Page 2 of 14
Page 3
2006/271
6. All fencing, including the dividing wall/fence between the dwelling units private open space
areas at the rear of the site, shall not exceed a maximum height of 2 metres above natural
ground level.
7. A solid wall or fence, constructed to prevent water entry onto adjoining lots, at least 1.8m high
above finished ground level, is to be erected along the side and rear property boundaries with
the top of the wall or fence being at least 1 metre above the top of the coping of the pool.
8. The walls adjacent to the driveway leading into the basement car park shall have a maximum
height of 200mm above that of natural ground level.
9. The swimming pools and associated decks shall not project greater than 1 metre above
finished ground level.
10. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
thus remaining as open structures.
11. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
12. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
13. The development shall not exceed a maximum height of 3 storeys and 12 metres above
natural and finished ground level.
14. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the maximum
allowable building height as required by either the conditions of approval or the Planning
Scheme.
15. Security in the form of a cash bond or trading bank guarantee to the sum of $30,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
16. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
17. The Development Permit for a material change of use of premises lapses if the use has not
happened by 24 August 2012, unless an application to extend the currency is approved by
Council.
18. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Building Services
19. Fencing to the swimming pool must comply with the Queensland Building Act 1975 Part 3 (as
amended) and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from
the dwelling to the pool enclosure is not permitted.
Page 3 of 14
Page 4
2006/271
Land Development
Vehicle Access
20. A vehicular access driveway to serve site shall be constructed from the Henderson Street
frontage of the site with a maximum width of 3.6m generally in accordance with Drawings No
16076-OW2 dated May 2006 and No 16076-C1 dated July 2006 by SCG Consulting
Engineers and shall maintain a minimum 500mm clearance from the driveway surface to the
top of the sewer main.
21. The driveway shall be designed and constructed with adequate steel reinforcement provided
to protect the sewer pipe and to Council’s design standards and to grades that prevent
vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the
footpath without any level difference. Should any driveways be constructed to grades that do
not comply with AS2890.1-2004, Council will require that the driveway be removed and
reconstructed to levels that do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
to have the footpath continue at a constant grade to minimise the potential for pedestrians to
trip or fall.
22. All vehicles shall enter and leave the site in a forward direction.
Carparking
23. A minimum of four covered carpark spaces shall be provided on site generally in accordance
with Drawing No 0534.SK01A by KIDD & Co except as modified by these conditions.
24. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for
user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with
a minimum head clearance (headroom) at any point of 2.2m.
Park Contributions
25. A Park contribution of $1,582 towards the acquisition of additional parkland or the
improvement of existing parkland and facilities in the locality shall be paid to the Council prior
to obtaining a Development Permit for Operational Works in accordance with Council’s
Planning Scheme Policy PSP24 Park Requirements for Development Applications. This
amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
June 2006 until the date of payment.
Roadworks Contributions (Local Road Network)
26. A roadworks contribution of $953 towards the upgrading of local roads shall be paid to the
Council prior to obtaining a Development Permit for Operational Works. This amount will be
subject to variations in the Consumer Price Index, All Groups Brisbane from June 2006 until
the date of payment.
Frontage Works
27. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Henderson Street frontage of the site in accordance with Planning Scheme Policy PSP3
Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.
28. Deleted.
29. All paths shall be designed and constructed to ensure pedestrian safety using non-slip
materials, to produce an evenly graded surface finish, and to be in accordance with the
Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access &
Mobility.
Page 4 of 14
Page 5
2006/271
30. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
footpath paving and landscaping such as trees and grasses in accordance with Council’s
Standard specifications prior to commencement of the use permitted by this permit.
Pathway Contributions
31. A pathway contribution of $356 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the Council
prior to obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Consumer Price Index, All Groups Brisbane from June 2006 until the date of
payment.
Stormwater Drainage
32. All stormwater drainage shall be collected on site and discharged so there is no net increase
in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall
be discharged to Council’s kerb & channel street drainage system generally in accordance
with Drawings No 16076-OW2 dated May 2006 by SCG Consulting Engineers. Plans of the
drainage design shall be prepared by a Registered Professional Civil Engineer and submitted
to Council prior to obtaining a Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
drainage system at any one location is 25 litres/second.
33. Roof runoff from any new dwelling shall be directed to an individual rainwater storage system
or tank (minimum storage 3000 litres per dwelling/unit) that is installed to ensure water from
the tank can be used for external uses (such as watering gardens, irrigation, ornamental
ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for use in
flushing of toilets internal to the dwelling. All rainwater tanks are to be designed and installed
in accordance with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks,
and shall be part of the plumbing application in conjunction with the building approval. The
location and capacity of the tanks shall be clearly shown on the plans submitted for Building
Works approval and any overflow shall be directed to the road frontage.
34. The development shall not adversely impact on the existing drainage conditions of the
adjoining properties by blocking or diverting the natural overland runoffs. This may require the
design and construction of drainage pipes and/or an overland flow-path within the
development site that caters for stormwater runoff from the adjoining sites for a design storm
with an Average Recurrence Interval of 1 in 100 years. In this regard a Development Permit
for Operational Works shall be obtained.
35. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
36. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
37. In order to achieve adequate cover over the sewer main traversing the proposed driveway, the
sewer main within the site shall be relocated (lowered) generally in accordance with the
submitted Drawing No 16076-C1 dated July 2006 by SCG Consulting Engineers. The
proposed sewer main relocation works shall be at no cost to Council. A Development Permit
for Operational Works shall be required.
38. The existing sewer main that traverses the site and those located in the adjoining properties
and the ‘zone of influence’ (taken as the area within a 45-degree angle measured from the
invert of the sewer main to the finished surface level) shall be accurately located and
determined by a licensed Surveyor and shown on all plans submitted for Operational Works
approval.
Page 5 of 14
Page 6
2006/271
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
In this regard the basement may need to be redesigned. As such the applicant shall amend
Operational Works plans including Building plans to ensure compliance.
39. All Building Applications will need a site plan prepared & certified by a licensed surveyor
clearly illustrating the exact location of all sewer mains within the site or adjacent to the site
and the ‘zone of influence’ of these mains.
Town Water Supply
40. Each dwelling unit shall be connected individually to Council’s existing town water supply and
be constructed in accordance with Council’s standards and requirements at no cost to Council.
41. Each individual water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
42. All water meters must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s Water & Sewerage Capital Works
Manager prior to lodgement and approval of hydraulic drawings.
Service Easements (Sewer)
43. A registered easement shall be created over the zone of influence of all sewers within the
subject site and over those parts of the subject site that are impacted upon by sewers on any
adjoining sites. The easements shall generally be parallel to and centred over the sewer main
and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
within the allotment (measured from the finished surface) and be no less than 3.0m wide
overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
determine the necessary width of the easement, which shall be shown on any plans submitted
for Operational Works / Building Works approval. To this extent the surveyor shall certify that
the sewer and the zone of influence is wholly contained within the easement to be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
44. No building or other structure shall be constructed or encroach over an easement.
45. Any building or structure within proximity of an easement or any other public utility’s
underground must have its foundations designed so that no surcharge loads are imposed
upon such underground infrastructure. Foundations must be taken down a minimum of 1.0m
below a line of influence measured 1.0m in the direction of the foundation from the centreline
of the closest underground service and along the natural angle of repose of the foundation soil
type(s).
Also, foundations for retaining walls and masonry fences across a sewer main shall be
properly designed and constructed, in consultation with Council’s Sewer Section, to minimize
impact on the sewer main and facilitate future maintenance and upgrading works.
Page 6 of 14
Page 7
2006/271
Headworks Contributions
46. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates under the current policies is outlined below. These amounts will
adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from June
2006 until the date of payment.
Water Supply $2,130
Sewerage $1,366
TOTAL $3,496
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the contribution or trading bank guarantee will be returned.
Earthworks and Site Stability
47. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land, and make recommendations on
the type of foundation system(s) best suited for the proposed development and the
appropriate methods (eg sheet piling) of retaining the excavated batters during the
construction stage. The recommendations of this report shall be incorporated into the design
and construction of the proposed development.
48. Earthworks, piling and anchors for piling works carried out on site shall not affect the structural
integrity of any of the existing fences, structures, lands and sewer mains and services that
border the development site. Fences that are affected shall be replaced prior to the Building
Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall
be clearly shown on the plans submitted for Operational Works approval.
At any circumstance where anchors or temporary anchors of piling works encroach into an
adjoining property, the applicant will be responsible to obtain a written permission from the
owners of the property prior to applying for Development Permit for Operational Works.
49. Any excavation, piling and anchoring works undertaken shall be supervised and certified by a
Geotechnical Engineer or similar qualified expert.
50. Prior to the commencement of the operational works on the site, an existing conditions survey
of the existing buildings adjoining the site shall be undertaken by a suitably qualified person.
The survey shall include all buildings that may be affected by the proposed works. A report of
the survey shall be submitted to Council’s Construction Technical Officer 5 days prior to the
start of the works.
Erosion and Sediment Control
51. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Page 7 of 14
Page 8
2006/271
General
52. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure (eg sewer
mains), which shall be submitted in conjunction with an application for a Development Permit
for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed
cadastre layout is to be submitted in conjunction with any application for Operational Works.
53. To facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
use of ADAC are available at www.adac.com.au).
54. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
55. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
56. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
57. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
type of all services and structures. All of which shall be submitted to Council for checking and
for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
Environmental Health
58. A Waste Management Plan (Demolition/Construction) in accordance with Planning Scheme
Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, shall
be submitted for the demolition and construction phases of the development and approved by
Council’s Environmental Health Section prior to the issue of the development permit for
operational works. The Plan shall contain the following information:
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume *specify *specify contractor and
(m³) proposed re- contractor and landfill site
use or on-site recycling outlet
recycling
methods
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Page 8 of 14
Page 9
2006/271
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note: Details of site area to be used for onsite separation, treatment and storage (including
weather protection) shall be provided on the plan drawings accompanying your application.
59. Noise emission from swimming pool and spa equipment (including heating equipment) shall
comply with the following requirements:
59.1. The equipment shall be installed and located in a manner that prevents excessive noise
in accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement
Notices (on-the-spot fines) may apply for offences.
59.2. A person must not use equipment on any day if it makes or causes noise to be made –
59.2.1. From 10pm to 7am: Which is audible outside the most exposed part of an
affected building
59.2.2. From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
59.2.3. From 7pm to 10pm: More than 3 dB(A) above the background noise level.
60. Noise emission from air conditioning equipment shall comply with the following requirements:
60.1. The equipment shall be installed and located in a manner that prevents excessive noise
in accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement
Notices (on-the-spot fines) may apply for offences.
60.2. Submission of written certification from a suitably qualified person confirming that the
noise levels comply when measured at either the residential boundary or outside the
most exposed part of an affected building, whichever is the closest to the equipment.
This is required immediately after installation of the equipment and prior to any
occupation of the building, and in a format approved by Council. This assessment must
take into account noise from any other fixed equipment on the property e.g. swimming
pool pump, heating equipment, that may increase the overall noise level emitted.
60.3. A person must not use equipment on any day if it makes or causes noise to be made –
60.3.1. From 10pm to 7am: More than the lower of either –
40 dB(A)
3 dB(A) above the background noise level
60.3.2. From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
60.3.3. From 7pm to 10pm: More than 3 dB(A) above the background noise level.
Page 9 of 14
Page 10
2006/271
61. Noise from building works associated with residential development shall comply with the
following –
61.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
61.2. All reasonable measures are taken to minimise noise emissions.
61.3. Not permitted on Sunday or public holidays.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
0534.SK01A Basement Plan – prepared by Kidd + January 2006
Co
0534.SK02A Level 1 Plan – prepared by Kidd + Co January 2006
0534.SK03 Level 2 Plan – prepared by Kidd + Co January 2006
0534.SK04 Level 3 Plan – prepared by Kidd + Co January 2006
0534.SK05A Elevations 1 – prepared by Kidd + Co January 2006
0534.SK06A Elevations 2 – prepared by Kidd + Co January 2006
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $1,010 and is subject to variations in the Consumer
Price Index, All Groups Brisbane from June 2006 until the date of payment. An Infrastructure
Charge Notice will be issued in accordance with Chapter 5 of the Integrated Planning Act
1997.
2. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
3. The applicant is advised that a Compliance Permit for all plumbing and drainage works within
the boundaries of the development site shall be obtained from Council’s Plumbing Services
Section prior to obtaining a Development Permit for Building Works.
4. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
4.1. On a Sunday or public holiday, at any time; or
Page 10 of 14
Page 11
2006/271
4.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
5. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.
6. Prior to the commencement of the development, a plumbing assessment must be obtained
from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage
Act 2002 (as applicable).
7. This proposal has not been assessed in relation to the spread of fire between properties /
buildings. It is the building certifiers responsibility to assess the requirements for fire services,
fire separation and appropriate methods of construction as part of the building works approval
process. Referral to the Queensland Fire and Rescue Service (QFRS) may be required as
part of the Building Approval process.
8. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed
where it could reasonably be expected to move into a roadside gutter, storm water drain or a
watercourse. On the spot fines apply for such offences.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable.
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable.
Page 11 of 14
Page 12
2006/271
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All building works
Development Permit for Operational Landscaping, access and/or carparking, site civil
Works works, stormwater drainage, frontage works, sewer
reticulation (including relocation of sewer mains).
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable
12 SUBMISSIONS
One properly made submission was received.
D & A McEvoy, 18 Anthony Street, Hamilton Qld 4007
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable.
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Decision Notice History
24 August 2006 - Original Decision Notice.
18 January 2007- Negotiated Decision Notice with
amendment to Conditions 2, 7, 8 and
50 and deletion of Condition 28.
6 April 2010 - Agree to extend the relevant period
and approve to change Condition 17.
Yours faithfully,
Denis Wallace
Senior Development Planner
Page 12 of 14
Page 13
2006/271
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated (6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
for the application are not available against the part of
Division 8 - Appeals to court relating to the approval that represents the concurrence agency’s
development applications response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following- jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application if-
application; (a) the development application involves impact
(b) a matter stated in a development approval, including assessment; and
any condition applying to the development, and the (b) the advice agency told the applicant and the
identification of a code under section 3.1.6;1 assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must be Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
(co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of the
(3) An appeal under subsection (1)(e) may be started
following notices have been given may appeal to the
at any time after the last day a decision on the matter
court against the decision in the notice-
should have been made.
(a) a notice giving a decision on a request for extension
Appeals by submitters
of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
(b) a notice giving a decision on a request to make a
appeal to the court about-
minor change to an approval.
(a) the giving of a development approval, including any
(2) The appeal must be started within 20 business
conditions (or lack of conditions) or other provisions
days after the day the notice of the decision is given to
of the approval; or
the person.
(b) the length of a relevant period for the approval.
(3) Subsection (1)(a) does not apply if the approval
(2) The appeal must be started within 20 business resulted from a development application (superseded
days (the “submitters appeal period”) after the day the planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to application under a superseded planning scheme.
the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be started at
(4) If an application involves both impact assessment any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are should have been made.
available only for the part of the application involving
impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application (no co-respondents)
are available only for the aspects of the development that 4.1.31.(1) A person to whom any of the following notices
would have required public notification under the have been given may appeal to the court against the
repealed Act. decision in the notice-
(a) a notice giving a decision on a request to change or
cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local
planning instrument)
Page 13 of 14
Page 14
2006/271
(b) a notice under section 6.1.442 giving a decision to (c) the decision to give a preliminary approval when a
change or cancel a condition of a development development permit was applied for;
approval. (d) the length of a period mentioned in section 3.5.21
(2) The appeal must be started within 20 business relevant period;
days after the day the notice of the decision is (e) a deemed refusal.
given to the person.
(2) An appeal under subsection (1)(a) to (d) must be
(3) Also, a person who has made a request started within 20 business days (the “applicant’s appeal
mentioned in subsection (1)(a) may appeal to the period”) after the day the decision notice or negotiated
court against a deemed refusal of the request. decision notice is given to the applicant.
(4) An appeal under subsection (3) may be started at (3) An appeal under subsection (1)(e) may be started
any time after the last day the decision on the at any time after the last day a decision on the matter
matter should have been made. should have been made.
Appeals against decisions to change approval conditions The Registrar for the Building and Development
under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court 4.1.36 Appeals about particular infrastructure
against- charges
(a) the decision; or (1) This section applies to a person who has been
(b) a deemed refusal of the application. given, and is dissatisfied with, an infrastructure charges
notice or a regulated State infrastructure charges notice.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of (2) The person may appeal to the court against the
the decision is to be given to the person. notice.
(3) An appeal under subsection (1)(b) may be started (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter after-
should have been made. (a) if the notice is given because of a development
Appeals against local laws approval or master plan approval-the day the
applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the (b) otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the (4) An appeal under this section may only be about-
planning scheme may appeal to the court against the
(a) whether a charge in the notice is so unreasonable
decision or the conditions applied. that no reasonable relevant local government, State
(2) The appeal must be started within 20 business infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the have imposed it; or
applicant.
(b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the under this section can not be about the methodology
Integrated Planning Act 1997 as follows: used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to charges schedule or regulated State infrastructure
development applications charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval, including
any condition applying to the development, and the
identification of a code under section 3.1.6;3
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override local
planning instrument)
Page 14 of 14
Used in these records
Decision Letter - Change to an Existing Approval - extension to relevant period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 82 KB (small file)
- File type
No other editions are linked here.